L-12-255, Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
| ML12200A036 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/02/2012 |
| From: | Kaminskas V FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-12-255, RIS-12-007 | |
| Download: ML12200A036 (3) | |
Text
.,1FENOC Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 Vito A. Kaminskas 440-280-5382 Vice President Fax: 440-280-8029 July 02, 2012 L-12-255 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Requlatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations This letter provides the Perry Nuclear Power Plant (PNPP) response to NRC Regulatory Issue Summary (RIS) 2012-707,.Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to-provide information for scheduling and preparation of operator licensing examinations.
The proposed Operator Licensing Examination Data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2014 through 2017.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Anthony E. Mueller Jr.,
Manager, Perry Training Section at (440) 280-5535.
Sincerely, Vito A. Ka inskas
Enclosure:
OPERATORLICENSING EXAMINATION DATA, NRC Form 536 cc:.Regional Administrator, NRC Region Ill NRC Resident Inspector NRC Project Manager Tamara Bloomer, Acting Chief, Operations Branch, NRC Region III
,4,03
Enclosure L-12-255 NRC Form 536 Page 1 of 2
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-6 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. or by Internet-EXAMINATION DATA mail to lacndt.Rcnrc.gov, an to the [esk Office,, Office 01 Information an Regulatory Affairs, NE08-10202, (3150-0131), Office of Management and Budget, Washington.
DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not requied to respond to, the information colletion.
FACILITY NRC REGION Perry Nuclear Power Plant Region I11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 0
5 0
4 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
7 0
8 NUMBER OF SENIOR REACTOR 0
4 0
4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE N/A 02/09/2015 N/A 02/13/2017 ALTERNATE DATE N/A 02/16/2015 N/A 02/20/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 120 0
0 12 0
CANDIDATES NRC FORM 536 (9-2011)