L-12-023, Annual Notification of Nuclear Property Insurance Coverage
| ML12089A376 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Davis Besse, Perry, Crane |
| Issue date: | 03/29/2012 |
| From: | Sena P FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-12-023, TMI-12-005 | |
| Download: ML12089A376 (3) | |
Text
FENOC FirstEnergy Nuclear Operating Company 76 South Main Street Akron, Ohio 44308 Petet P. Sqa lll President and Chief Operating Officer March 29,2012 L-12-023 TMI-12-005 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440. License No. NPF-58 Three Mile lsland Power Station, Unit No. 2 Docket No. 50-320, License No. DPR-73 Annual Notification of Nuclear Propertv Insurance Coverage 10 cFR 50.5a(wX3) ln accordance with 10 CFR 50.54(wX3),
the FirstEnergy Nuclear Operating Company hereby submits the 2012 Annuat Notification of Nuclear Property lnsurance Coverage for FirstEnergy Corp. nuclear units to the Nuclear Regulatory Commission.
The attachment lists the insurers, policy numbers and coverage limits for the Beaver Valley Power
- Station, Unit Nos. 1 and 2; the Davis-Besse Nuclear Power Station, Unit No. 1; the Perry Nuclear Power Plant, Unit No. 1; and the Three Mile lsland Power Station, Unit No. 2.
Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 Three Mile lsland Power Station.
Unit No. 2 L-12-023 TMt-12-005 Page 2 There are no regulatory commitments contained in this letter. lf there are any questions, or if additional information is required, please contact Mr. Phil H. Lashley, Supervisor
- Fleet Licensing, at (330) 315-6808.
L d w t Peter P. Sena. lll
Attachment:
2012 Annual Notification of Nuclear Property Insurance Coverage cc: NRC Region lAdministrator NRC Region lll Administrator NRC Resident Inspector
- Beaver Valley Power Station, Unit Nos. 1 and 2 NRC Resident Inspector
- Davis Besse Nuclear Power Station, Unit No. 1 NRC Resident Inspector
- Perry Nuclear Power Plant, Unit No. 1 NRC Resident Inspector
- Three Mile lsland, Unit No. 2 NRR Project Manager - Beaver Valley Power Station, Unit Nos. 1 and 2 NRR Project Manager - Davis-Besse Nuclear Power Station, Unit No. 1 NRR Project Manager' Perry Nuclear Power Plant, Unit No. 1 NRR Project Manager
- Three Mile lsland, Unit No. 2 Director BRP/DEP Site BRP/DEP Representative Utility Radiological Safety Board Sincerely,
Attachment L-12-023 TMI-12-005 2012 Annual Notification of Nuclear Property Insurance Coverage Page 1 of 1 Beaver Vallev Power Station. Unit Nos. 1 and 2 lnsurer Nuclear Electric Insurance Limited (NErL)
Nuclear Electric Insurance Limited (NEtL) lnsurer Nuclear Electric Insurance Limited (NEtL)
Nuclear Electric lnsurance Limited (NEtL)
Insurer Nuclear Electric Insurance Limited (NErL)
Nuclear Electric lnsurance Limited (NEIL) lnsurer Nuclear Electric Insurance Limited (NErL)
Policv No.
P12-071 x12-014 Davis-Besse Nuclear Power Station. Unit No. 1 Policv No.
P12-059 x12-035 Perrv Nuclear Power Plant. Unit No. 1 Policv No.
P12-067 x12-065 Three Mile lsland. Unit No.2*
Pollcv No.
P12-041 Amount of Insurance
$500,000,000
$2,250,000,000
$2,750,000,000 Amount of Insurance
$500,000,000
$2,000,000,000
$2,500,000,000 Amount of Insurance
$500,000,000
$2,250,000.000
$2,750,000,000 Amount of lnsurance
$150,000,000
$150,000,000
- By letter dated July 21, 1999, the Nuclear Regulatory Commission approved an exemption from the amount of insurance coverage stated in 10 CFR 50.5a(w).