L-10-140, Service List Revision Update

From kanterella
Jump to navigation Jump to search
Service List Revision Update
ML101590708
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 06/02/2010
From: Halnon G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-10-140
Download: ML101590708 (5)


Text

FENOC 0"

76 South Main Street FirstEnergy Nuclear Operating Company Akron, Ohio 44308 June 2, 2010 L-10-140 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Davis-Besse Independent Spent Fuel Storage Installation Docket No. 72-14, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Service List Revision for the FirstEnergy Nuclear Operating Company Please update the Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation and the NRC Regions [ and III Service Lists for the FirstEnergy Nuclear Operating Company (FENOC) generating facilities. A revision to the Service List is required to reflect recent changes to the organization. Attachments 1, 2, and 3 provide the requested FENOC distribution for the NRC Service List for the Beaver Valley Power Station, the Davis-Besse Nuclear Power Station, and the Perry Nuclear Power Plant, espectively.

Additionally, p5lease use the following as the primary recipients of NRC correspondence associated with FENOC and its facilities. The addresses of the individuals are contained within the attachments.

FENOC correspondence:

James H. Lash President and Chief Nuclear Officer Beaver Valley correspondence:

Paul A. Harden Site Vice President 1~ODoQ

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-10-140 Page 2 of 2 Davis-Besse correspondence:

Barry S. Allen Site Vice President Perry correspondence:

Mark B. Bezilla Site Vice President There are no changes requested for non-FirstEnergy personnel or organizations.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is requested, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 761-6071.

Director, Fleet Regulatory Affairs Attachments:

1. Requested FENOC Distribution for the NRC Service List for Beaver Valley Power Station, Unit Nos. 1 and 2
2.

Requested FENOC Distribution for the NRC Service List for Davis-Besse Nuclear Power Station and Davis-Besse Independent Spent Fuel Storage Installation

3.

Requested FENOC Distribution for the NRC Service List for Perry Nuclear Power Plant cc: NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector (Beaver Valley)

NRC Resident Inspector (Davis-Besse)

NRC Resident Inspector (Perry)

NRC Project Manager (Beaver Valley)

NRC Project Manager (Davis-Besse)

NRC Project Manager (Perry)

Director BRP/DEP Site BRP/DEP Representative Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

Utility Radiological Safety Board

a L-10-140 Requested FENOC Distribution for the NRC Service List for Beaver Valley Power Station, Unit Nos. 1 and 2 Pagelofl James H. Lash President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Peter P. Sena, III Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Main Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Karen Fili Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Donald A. Moul Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Paul A. Harden Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 L-10-140 Requested FENOC Distribution for the NRC Service List for Davis-Besse Nuclear Power Station and Davis-Besse Independent Spent Fuel Storage Installation Page 1 of 1 James H. Lash President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-1 9 76 South Main Street Akron, OH 44308 Peter P. Sena, III Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Main Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Karen Fili Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Donald A. Moul Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308

V L-10-140 Requested FENOC Distribution for the NRC Service List for Perry Nuclear Power Plant Page 1 of 1 James H. Lash President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Peter P. Sena, III Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Main Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Karen Fili Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Donald A. Moul Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308