L-10-050, RTL A9.621B, 1/2-ODC-1.01, Revision 8, ODCM: Index, Matrix and History of ODCM Changes.

From kanterella
Jump to navigation Jump to search
RTL #A9.621B, 1/2-ODC-1.01, Revision 8, ODCM: Index, Matrix and History of ODCM Changes.
ML101310417
Person / Time
Site:
Issue date: 04/30/2009
From:
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
L-10-050 RTL #A9.621B
Download: ML101310417 (396)


Text

{{#Wiki_filter:(Page 1 of 84) RTL #A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-1.01 ODCM: Index, Matrix and History of ODCM Changes Document Owner Manager, Chemistry Revision Number 8 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 05/30/09

(Page 2 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 2 of 84 TABLE OF CONTENTS 1.0 PUR PO S E .................................................................................................................................... 4 2 .0 SC O PE ......................................................................................................... ................................ 4

3.0 REFERENCES

AND COMM ITMENTS ................................................................................. 4 3.1 R eferences Used in This Procedure ............................................................................... 4 3.2 Summary of References Used Throughout Other Procedures of the ODCM ........................ 5 3 .3 C o m m itmen ts ................................................................................................................... 13 4.0 RE C O RD S A ND FORM S .......................................................................................................... 13 4 .1 R e c o rd s ............................................................................................................................ 13 4 .2 F o rm s ............................................................................................................................... 13 5.0 PRECAUTION S AND LIMITATION S ................................................................................. 14 6.0 ACC EP T A N C E C RITE R IA ....................................................................................................... 14 7 .0 P RERE Q U IS IT ES ..................................................................................................................... 15 8 .0 PRO C EDUR E ............................................................................................................................ 15 8.1 D escription of O D CM Structure ................................................................................. 15 8.1.1 1/2-ODC-1.01, ODCM: Index, Matrix and History of ODCM changes ...... 15 8.1.2 1/2-ODC-2.01, ODCM: Liquid Effluents .................................................... 16 8.1.3 1/2-ODC-2.02, ODCM: Gaseous Effluents .................................................. 17 8.1.4 1/2-ODC-2.03, ODCM: Radiological Environmental Monitoring Program ....... 17 8.1.5 1/2-ODC-2.04, ODCM: Information Related to 40 CFR 190 ...................... 17 8.1.6 1/2-ODC-3.01, ODCM: Dispersion Calculational Procedure and Source Term Inp u ts ............................................................................................................... 18 8.1.7 1/2-ODC-3.02, ODCM: Bases for ODCM Controls ......................................... 18 8.1.8 1/2-ODC-3.03, ODCM: Controls for RETS and REMP Programs ............... 19 8.2 History O f O D CM C hanges 2....................... 20 8.2.1 Change (1) of BV-1 ODCM (Issue 1), Effective January, 1984 .................... 20 8.2.2 Change (2) of BV-I ODCM (Issue 1, Rev 1), Effective October, 1984 ...... 20 8.2.3 Change (3) of BV-I ODCM (Issue 1, Rev 2), Effective July, 1986 ................. 20 8.2.4 Change (4) of BV-1 ODCM (Issue 2), and BV-2 ODCM (Issue 1, Rev 1), E ffectiv e Ju ly, 19 8 7 .......................................................................................... 21 8.2.5 Change (5) of BV-I ODCM (Issue 2, Rev 1), and BV-2 ODCM (Issue 1, Revision 2), Effective December, 1987 ........................................................ 22 8.2.6 Change (6) of BV-1 ODCM (Issue 2, Rev 2), and BV-2 ODCM (Issue 1, Rev 3), E ffective June, 1989 ............................................................................... 22 8.2.7 Change (7) of BV-1 and 2 ODCM (Issue 3), Effective August, 1995 ........ 24 8.2.8 Change (8) of BV-1 and 2 ODCM (Issue 3, Rev 1), Effective October, 1995 .... 29 8.2.9 Change (9) of BV-1 and 2 ODCM (Issue 3, Rev 2), Effective May 1997 .......... 32 8.2.10 Change (10) of BV-1 and 2 ODCM (Issue 3, Rev 3), Effective June 1997 ........ 33 8.2.11 Change (11) of BV-I and 2 ODCM (Issue 3, Rev 4), Effective March 1998 ..... 33 8.2.12 Change (12) of BV-1 and 2 ODCM (Issue 3, Rev 5), Effective November 199835 8.2.13 Change (13) of BV-1 and 2 ODCM (Issue 3, Rev 6), Effective May 1999 ........ 36 8.2.14 Change (14) of BV-1 and 2 ODCM (Rev 14), Effective March 2000 ........ 37 8.2.15 Change (15) of BV-1 and 2 ODCM (Rev 15), Effective August 2000 ........... 38 8.2.16 Change (16) of BV-1 and 2 ODCM (Effective April 2002) .......................... 39

-(Page 3 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes ORevision: 8 Page Nmber: 3 of 84 TABLE OF CONTENTS 8.2.17 Change (17) of BV-I and 2 OCDM (Effective August 2002) ........................ 42 8.2.18 Change (18) of the BV-I and 2 ODCM (Effective October 2002) ................ 43 8.2.19 Change (19) of BY-1 and 2 ODCM (Effective November 2002) .................. 44 8.2'.20 Change (20) of BV-I and 2 ODCM (Effective October 2003) ....................... 44 8.2.21 Change (21) of BV-I and 2 ODCM (Effective November 2004) .................. 47 8.2.22 Change (22) of BV-I and 2 ODCM (Effective August 2006) ........................ 50 8.2.23 Change (23) of BV-I and 2 ODCM (Effective December 2006) .................... 51 8.2.24 Change (24) of BV-I and 2 ODCM (Effective May 2007) ................................ 53 ATTACHM ENT A .............................................................................. LIST OF ODCM TABLES 7 ATTACHM ENT B ............................................................................. LIST OF OD CM FIGURES 3 ATTACHMENT C ................................................ ODCM CONTROLS PROCEDURE MATRIX 4

(Page 4 of 84) Beaver Valley Power Station Procedure Num66 OD.- 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 1DC Page Number: 4 of 84 1.0 PURPOSE 1.1 This procedure provides an index for the entire Offsite Dose Calculation Manual (ODCM). 1.2 This procedure also provides an historical description of all changes to the ODCM. 1.3 This procedure also contains a matrix of plant procedure references for Radiological Effluent Technical Specifications (RETS), Radiological Environmental Monitoring Program (REMP) surveillances that were transferred from the Technical Specification Procedure Matrix to the ODCM via Change (8) and Change (16). 1.3.1 Prior to issuance of this procedure, these items were located in the Index and Appendix F of the old ODCM. 1.3.2 The numbering of each specific ODCM Controls, ODCM Surveillance Requirements and ODCM Controls Tables contained in this procedure does not appear to be sequential. This is intentional, as all ODCM Controls, ODCM Surveillance Requirements and ODCM Controls Tables numbers remained the same when they were transferred from the Technical Specifications Procedure Matrix. This was done in an effort to minimize the amount of plant procedure changes and to eliminate any confusion associated with numbering changes. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References Used in This Procedure 3.1.1 NUREG-0472, Draft 7 for Rev. 3, Standard Radiological Effluent Technical Specifications For PWRs September, 1982. 3.1.2 NUREG-0133, Preparation Of Radiological Effluent Technical Specifications For Nuclear Power Plants, October, 1978. 3.1.3 Generic Letter 89-01, Implementation Of Programmatic Controls For Radiological Effluent Technical Specifications In The Administrative Controls Section Of The Technical Specifications And The Relocation Of Procedural Details Of RETS To The ODCM Or To The PCP, January 31, 1989. 3.1.4 NUREG-1301, Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls For Pressurized Water Reactors, Generic Letter 89-0 1, Supplement No. 1, April, 1991. 3.1.5 1/2-ODC-3.03, ODCM: Controls for RETS and REMP Programs

-(Page 5 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 5 of 84 3.1.6 1/2-ADM-1640, Control of the Offsite Dose Calculation Manual 3.1.7 1/2-ADM-0100, Procedure Writer's Guide 3.1.8 NOP-SS-3001, Procedure Review and Approval 3.1.9 CR04-09895, Missed ODCM Channel Functional Test (Gas Effluent Sampler Flowrate). CA-04, Revise ODCM procedure 1/2-ODC-1.01, Attachment C, Table F:3a to show that the Channel Functional Test requirements for the Unit 1 Sampler Flowrate Measuring Devices delineated in ODCM procedure 1/2-ODC-3.03, Attachment F, Table 4.3-13 are being met by Form 1/2-ENV-01.04.F01 instead of 1MSP-43.71-I 3.1.10 CR05-01169 Chemistry Action Plan For Transition of RETS, REMP and ODCM, CA- 14 thru CA-2 1, Revise ODCM procedures to change document owner from "Manager, Radiation Protection" to Manager Nuclear Environmental & Chemistry". 3.1.11 CR06-04908, Radiation Monitor Alarm Setpoint Discrepancies. CA-03; revise ODCM procedure 1/2-ODC-2.01 to update the alarm setpoints of [RM-1RM-100] and [RM-lDA-100] for incorporation of the Extended Power Uprate per Unit 1 TS Amendment No. 275. Also, CA-04; revised ODCM procedure 1/2-ODC-2.02 to add a"<" designation to all alarm setpoints for Unit 1 and Unit 2 low range noble gas effluent monitors. 3.1.12 CR06-6476, Procedure 1/2-ODC-2.01 Needs Revised for Plant Uprate. CA-01; revise ODCM procedure 1/2-ODC-2.01 to update the alarm setpoints of [2SWS-RQ1O1] for incorporation of the Extended Power Uprate per Unit 2 TS Amendment No. 156. 3.2 Summary of References Used Throughout Other Procedures of the ODCM 3.2.1 BVPS-I and 2 UFSAR: 3.2.1.1 BVPS-1 UFSAR Section 11.2.3; Gaseous Waste Disposal System 3.2.1.2 BVPS-1 UFSAR Section 11.2.4; Liquid Waste Disposal System 3.2.1.3 BVPS-2 UFSAR Section 11.2; Liquid Waste Management Systems 3.2.1.4 BVPS-2 UFSAR Section 11.3; Gaseous Waste Management Systems 3.2.2 Condition Reports and SAP Orders: 3.2.2.1 CR 971578, MEMBERS OF THE PUBLIC Discrepancies. CA-01, Revise Section 4 of the ODCM to clarify how doses due to effluents for members of the public (conducting activities inside the site boundary) are derived and reported. 3.2.2.2 CR 980129, ODCM Procedure Matrix Discrepancies. CA-01, Revise Appendix F of the ODCM to correct discrepancies with 1/2-OM L5 Surveillance Logs.

(Page 6 of 84) Beaver Valley yPower P wrSainPoeueubr Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Sn8 Page Number: 6 of 84 3.2.2.3 CR 980353, EPMP 2.01 Discrepancies for Environmental Sampling Locations. CA-01, Revise Section 3 of the ODCM to correct REMP sample site distances and sectors. 3.2.2.4 CR 981488, Chemistry Related ODCM Procedures and ODCM Appendix F References. CA-01, Revise ODCM Appendix F to add Chemistry procedure references. 3.2.2.5 CR 981489, ODCM Table 4.11-2 Row A (Waste Gas Storage Tank Discharge Tritium). CA-01, Revise Appendix C of the ODCM (Table 4.11-2) to add clarification as to where and when tritium samples are to be obtained for GWST discharges. 3.2.2.6 CR 981490, ODCM Table 4.11-2 Note e, and Related Chemistry Department Procedures. CA-01, Revise Appendix C of the ODCM (Table 4.11-2, Note e) to specify the proper tritium sample point. 3.2.2.7 CR 982097, Liquid Discharge Post Release Review Methodology. CA-01, Revise Section 1 of the ODCM to add clarification for calculation of radionuclide concentration when the Post Dose Correction Factor is >1. 3.2.2.8 CR 990025, Unnecessary Radiation Monitor Setpoint Change After Waste Discharges. No ODCM changes are required forthis CR. 3.2.2.9 CR 992652, Discrepancies Concerning ODCM Surveillances of Unit 1 Gaseous Effluent Instrumentation. CA-02, Revise Appendix F of the ODCM to make proper reference to the HP Shift logs.. 3.2.2.10 CR 993021, Apparent Failure to Test RM-DA-100 Trip Function as Required by ODCM. No ODCM changes are required for this CR. 3.2.2.11 CR 001682, ODCM Action 28 Guidance. CA-02, Revise Appendix C of the ODCM (Table 3.3-13, Action 28) to differentiate actions associated with Inoperable Process Flow Rate Monitors vs. Sample Flow Rate Monitors. 3.2.2.12 CR02-05533, Procedure 1/2-ODC-3.03, ATTACHMENT E Missing Information. CA-01, Revise ODCM procedure 1/2-ODC-3.03 (Table 3.3-12) to include minimum channels operable and associated actions when Flow Rate Measurement Device [FR-i LW- 103] is inoperable. 3.2.2.13 CR02-05711, TS and ODCM changes not reflected in 1OM-54.3.L5 Surveillance Log. CA-01, Revise 1/2-ODC-3.03 to add a requirement for applicable station groups notification of pending ODCM changes.

(Page 7 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01 Titleit:t vel OfU se: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 7 of 84 3.2.2.14 CR02-06174, Tracking of Activities for Unit I RCS Zinc Addition Implementation. CA-13, Revise ODCM procedure 1/2-ODC-1.01 to include a discussion as to why Zn-65 is being added to the ODCM. CA-14, Revise ODCM procedure 1/2-ODC-2.01 (Tables 1.1-la and lb) to include the addition of Zn-65 to ODCM liquid source term. 3.2.2.15 CR 03-02466, RFA-Radiation Protection Effluent Control Provide Recommendation on Processing when Performing Weekly Sample of [1LW-TK-7A/7B]. CA-02, Revise ODCM Procedure 1/2-ODC-2.01, (Attachment D) to show the liquid waste flow path cross-connect between Unit 1 and Unit 2. 3.2.2.16 CR03-04830, Containment Vacuum Pump Replacement Increases ODCM Source Term. CA-03, Revise Unit 1 Containment Vacuum Pump Source-Term in ODCM procedure 1/2-ODC-2.02, Attachment A, Table 2.1-la. 3.2.2.17 CR03-06123, Enhance Table 3.3-6 of 1/2-ODC-3.03 to Add More Preplanned Method of Monitoring. CA-01, Revise Table 3.3-6 and Table 4.3-3 to allow use of Eberline SPING Channel 5 as an additional 2 nd PMM when the Unit 1 Mid or High Range Noble Gas Effluent Monitors are Inoperable. 3.2.2.18 CR03-06281, Gaseous Tritium Sampling Required by ODCM (1/2-ODC-3.03) Unclear for Chemistry. CA-01, Revise procedure Attachment K Table 4.11-2 for RP & Chemistry sampling of Gaseous Effluent Pathways to show which effluent pathways need sampled for compliance to ODCM Control 3.11.2.1 requirements. 3.2.2.19 CR03-07487, Results of NQA Assessment of the Radiological Effluents Program. CA-01, Revise Calculation Package No. ERS-ATL-95-007 to clarify the term "Surface Water Supply" per guidance presented in NIJREG-0800 SRP 15.7.3. CA-05, Revise 1/2-ODC3.03 Control 3.11.1.4 to update the activity limits for the outside storage tanks. 3.2.2.20 CR03-07668, Benchmark Effluent & Environmental Programs VS Papers Presented at 1 3 th REMP/RETS Workshop. CA-01, Evaluate procedure Attachment K Table 4.11-2 to reduce the amount of Effluent Samples obtained during a power transient. 3.2.2.21 CR03-09288, LAR 1A-321 & 2A-193, Increased Flexibility in Mode Restraints. CA-19, Review LAR IA-321/2A-193 to identify the affected Rad Effluent procedures, programs, manuals, and applicable plant modification documents that will need to be revised to support implementing the LAR. 3.2.2.22 CR03-09959, RFA-Rad Protection Provide Clarification to ODCM 1/Day Air Tritium Sample. CA-01, Revise ODCM procedure 1/2-ODC-3.03 Attachment K (Table 4.11-2 note c & note e) to allow sampling of the appropriate building atmosphere.

(Page 8 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1 8 8 of 84 3.2.2.23 CR03--11726, Typographical Error Found in ODCM 3.11.2.5. CA-01, Revise ODCM procedure 1/2-ODC-3.03, Attachment 0, Control 3.11.2.5 to correct a typographical error. Specifically, the final word in Action (a) needs changed from "nad" to "and". 3.2.2.24 CR04-00149, Radiation Protection Performance Review Committee Action Items. CA-12. Incorporate the Global Positioning System [GPS] in the Radiological Environmental Monitoring Program. 3.2.2.25 CR04-01643, Procedure Correction - Typographical Error in the ODCM. CA-01, Revise ODCM procedure 1/2-ODC-3.03, Attachment F, (Table 3.3-13 and 4.3-13) to correct a typographical error. Specifically, the Asset Number for the Vacuum Gauge used for measurement of sample flow (from the Alternate Sampling Device) needs changed from [PI-IGW-13] to [PI-1GW-135]. 3.2.2.26 CR04-02275, Discrepancies in Table 3.3-13 of the ODCM. CA-01, Revise ODCM procedure 1/2-ODC-3.03, Attachment F, (Table 3.3-13 and 4.3-13) to add clarification that the "Sampler Flow Rate Monitors are the devices used for "Particulate and Iodine Sampling". 3.2.2.27 CR05-01169, Chemistry Action Plan For Transition of RETS, REMP and ODCM, CA-14 thru CA-21, Revise ODCM procedures to change document owner from "Manager, Radiation Protection" to Manager Nuclear Environmental & Chemistry". 3.2.2.28 CR05-01390; Include GPS data in 2004 REMP Report and related 1/2-ODC and 1/2-ENV procedures. CA-02, revise ODCM procedure 1/2-ODC-2.03 to include an update of REMP sample locations (using the GPS Satellite data). 3.2.2.29 CR05-03306, Incorporated Improved Technical Specifications (ITS). This includes transfer of programmatic controls for BV-2 Noble Gas Effluent Steam Monitors [2MSS-RQ101A], [2MSS-RQ10iB] and [2MSS-RQ101C] from the Technical Specifications to ODCM procedure 1/2-ODC-3.03 (Attachment D Tables 3.3-6 and 4.3-3). This was permitted via Unit 1/2 Technical Specification Amendments No. 278/161. 3.2.2.30 CR05-03854, ODCM Figure for Liquid Effluent Release Points Needs Updated. CA-01, revise ODCM procedure 1/2-ODC-2.01 (ODCM: Liquid Effluents) Attachment D, Figure 1.4-3 to incorporate a modified version of Plant Drawing No. 8700-RM-27F.

-(Page 9 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 9 of 84 3.2.2.31 CR06-04908, Radiation Monitor Alarm Setpoint Discrepancies. CA-03; revise ODCM procedure 1/2-ODC-2.01 to update the alarm setpoints of [RM-1RM-100] and [RM-1DA-100] for incorporation of the Extended Power Uprate per Unit 1 TS Amendment No. 275. Also, CA-04; revised ODCM procedure 1/2-ODC-2.02 to add a"<" designation to all. alarm setpoints for Unit 1 and Unit 2 low range noble gas effluent monitors. 3.2.2.32 CR06-6476, Procedure 1/2-ODC-2.01 Needs Revised for Plant Uprate. CA-01; revise ODCM procedure 1/2-ODC-2.01 to update the alarm setpoints of [2SWS-RQ101] for incorporation of the Extended Power Uprate per Unit 2 TS Amendment No. 156. 3.2.2.33 SAP Order 200197646-0110: Revise ODCM procedure 1/2ODC-3.03, 1/2-HPP-3.06.001, 1/2-ENV-05-01, Form 1/2-HPP-3.06.001.F05 and Form 1/2-ENV-05. 1.F05 to incorporate revised outside liquid storage tank activity limits via Calculation Package No. ERS-ATL-95-007, R2. 3.2.2.34 SAP Order 200240681: Revise ODCM procedure 1/2-ODC-3.03 (Attachment E Table 3.3-12) to add an alternate Action when the primary Flow Rate Measurement Device [FT-1CW-101-1] is not OPERABLE. The alternate Action (25A) uses local measurements (as described in 1MSP-31.06-I) to determine a total dilution flow rate during liquid effluent releases. 3.2.2.3 5 CR06-04944: ODCM 3.03 Attachment E conflict between Applicability and Action Statement. CA-01; revise ODCM procedure 1/2-ODC-3.03, Attachment E to clarify Applicability for tank level indicating devices is during addition to the tank. 3.2.2.36 CR07-12924 and SAP Order 200247228-04 10: Revise ODCM procedure 1/2-ODC-3.03 (Attachment F Tables 3.3-13 and 4.3-13) to clarify the Functional Location of the Sampler Flow Rate Monitors for the BV-2 gaseous effluent release pathways. Specifically, the procedure was changed to refer to Functional Location [2HVS-FIT 101-I] instead of [2HVS-FIT 101], [2RMQ-FIT301-1] instead of [2RMQ-FIT301], [2HVL-FIT 112-1 ] instead of [2HVL-FIT 112], and [2RMQ-FIT303-1] instead of [2RMQ-FIT303]. 3.2.3 Calculation Packages: 3.2.3.1 ERS-ATL-83-027; Liquid Waste Dose Factor Calculation for HPM-RP 6.5, Issue 3 and Later 3.2.3.2 ERS-SFL-85-03 1; Gaseous Effluent Monitor Efficiency Data 3.2.3.3 ERS-ATL-86-008; ODCM Alarm Setpoint Revisions for Gaseous Monitors 3.2.3.4 ERS-HHM-87-014; Unit 1/2 ODCM Gaseous Effluent Monitor Alarm Setpoint Determinations

(Page 10 of 84) Beaver Valley Power Station ProcedureNumbODC

Title:

Unit Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 10 of 84 3.2.3.5 ERS-ATL-87-026; BVPS-1 and BVPS-2 ODCM T Factor Justification 3.2.3,6 ERS-ATL-89-014; Verification/Validation of ODCM R Values 3.2.3.7 ERS-ATL-90-021; Justification for Removal of Technical Specification Process Flowrate Measurement Requirements for 2RMQ-RQ301, 2RMQ-RQ303 and 2HVL-RQ 112 3.2.3. 8 ERS-ATL-95-006; Re-evaluation of TS/ODCM SR's 4.11.1.1.3, 4.11.1.1.4 and Notes e and g of TS/ODCM Table 4.11-1 3.2.3.9 ERS-ATL-95-007; Verification of Outside Storage Tank Activity Limit of TS 3).11.1.4 3.2.3.10 Stone and Webster UR(B)-160; BVPS Liquid Radwaste Releases and Concentrations - Expected and Design Cases (Per Unit and Site) 3.2.3.11 Vendor Calculation Package No. 8700-UJR(B)-223, Impact of Atmospheric Containment Conversion, Power Uprate, and Alternate Source Terms on the Alarm Setpoints for the Radiation Monitors at Unit 1 3.2.3.12 Engineering Change Package No. ECP-04-0440, Extended Power Uprate (Unit 1) 3.2.3.13 Vendor Calculation Package No. 8700-UR(B)-508, Impact of Atmospheric Containment Conversion, Power Uprate, and Alternate Source Terms on the Alarm Setpoints for the Radiation Monitors at Unit 2 3.2.3.14 Engineering Change Package No. ECP-04-0440, Extended Power Uprate (Unit 2) 3.2.3.15 ERS-MPD-93-007, BVPS-1 Gaseous Radioactivity Monitor Emergency Action Levels 3.2.4 Internal Letters: 3.2.4.1 DLC Response to NRC Unresolved Item 50-334/83-30-05, Radiation Monitor Study- Particle Distribution Evaluation, November 26, 1986. 3.2.4.2 ND1SHP-776, BVPS-1 ODCM Table 2.2-2, Appendix B, February 12, 1988 3.2.4.3 ND3NSM:3431; Technical Specification Verification Effort, August 11, 1988 3.2.4.4 NDLNSM:3522; Technical Specification Verification Effort Checklist, September 14, 1988 3.2.4.5 ND1NSM:3652; Technical Specification Verification Effort, November 21, 1988 3.2.4.6 NPD3SHP:2466; Self Assessment of the Liquid and Gaseous Effluent Processes at BVPS - Final Report, July 16, 1997

(Page 11 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC- 1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 11 of 84 3.2.4.7 NPD3S-SHP:2257; ODCM Liquid Waste Recirculation Rates, February 11, 1998 3.2.4.8 NPD3SHP:2643; Action 28 of ODCM Appendix C Table 3.3-13, January 14, 1999 3.2.4.9 ND3MNO:4309; Response to Request for Technical Specification Interpretation, April 20, 1999. 3.2.5 Contractor Technical Evaluation Reports: 3.2.5.1 EGG-PHY-8194; Technical Evaluation Report for the Evaluation of ODCM Updated through Issue 2, Revision 1, Beaver Valley Power Station, Unit 1, September 1988 3.2.5.2 EGG-PHY-8217; Technical Evaluation Report for the Evaluation of ODCM updated through Issue 1, Revision 2, Beaver Valley Power Station, Unit 2, September 1988 3.2.5.3 NUS-2173; Development of Terrain Adjustment Factors For Use at the Beaver Valley Power Station for the Straight-Line Atmospheric Dispersion Model, June 1978 3.2.5.4 UCRL-50564; Concentration Factors of Chemical Elements in Edible Aquatic Organisms, Revision 1, 1972 3.2.6 NRC Letters: 3.2.6.1 Unit 1 Technical Specification Amendment 66, March 28, 1983 3.2.6.2 Beaver Valley Unit 2 - Offsite Dose Calculation Manual, ODCM (TAC 63996), July 14, 1987 3.2.6.3 Beaver Valley Units 1 and 2 - Acceptance of the Offsite Dose Calculation Manuals (TAC 93996 and 67421), March 2, 1989 3.2.6.4 Unit 1/2 Technical Specification 6.8.6, including Amendments 1A-188/2A-70 (LAR 1A-175/2A-37), Implemented August 7, 1995 3.2.6.5 Unit 1/2 Technical Specification 6.8.6, including Amendments 1A-194/2A-77 (LAR's 1A-231/2A-101), Implemented December 1, 1995 3.2.6.6 Unit 1/2 Technical Specification Figure 5.1-2, including Amendments 1A-202/2A-83 (LAR 1A-234/2A-107, Implemented June 9, 1997 3.2.6.7 Unit 1/2 Technical Specifications 6.9.1.10 and 6.9.2, including Amendments 1A-220/2A-97 (LAR 1A-246/2A- 116), Implemented May 20, 1999 3.2.6.8 Unit 1/2 Technical Specification 3.3.3.1, including Amendments IA-246/2A-124 (LAR IA-287/2A-159), Implemented April 11, 2002

(Page 12 of 84) Procediifr- Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 12 of 84 C 8 3.2.6.9 Unit 1/2 Technical Specifications 3.11.1.4, 3.11.2.5, 6.8.6, and 6.9.2 including Amendments 1A-250/2A- 130 (LAR 1A-291/2A- 163), Implemented August 7, 2002

3.2.7 NUREG's

3.2.7.1 NUREG-0017, Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents from Pressurized Water Reactors, (PWR- Gale Code), Revision 1, April 1985 3.2.7.2 NUREG 0133; Preparation of Radiological Effluent Technical Specification for Nuclear Power Plants, October 1978 3.2.7.3 NUREG-0172; Age-Specific Radiation Dose Commitment Factors for a One-Year Chronic Intake, November 1977 3.2.7.4 NUREG-0324, XOQDOQ, Program for the Meteorological Evaluation of Routine Releases at Nuclear Power Stations, September 1977 3.2.7.5 NUREG-0472; Radiological Effluent Technical Specifications for PWR's. 3.2.7.6 NUIREG-0800, Standard Review Plan, Postulated Radioactive Releases Due to Liquid-Containing Tank Failures, July 1981 3.2.7.7 NUREG-1301; Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1), April 1991 3.2.7.8 NUREG-143 1; Standard Technical Specification - Westinghouse Plants Specifications 3.2.7.9 NUREG/CR-2919; Meteorological Evaluation of Routine Effluent Releases At Nuclear Power Stations, September 1982 3.2.8 Regulatory Guides: 3.2.8.1 RG-1.23; Meteorological Measurement Program For Nuclear Power Plants 3.2.8.2 RG-1.109; Calculation of Annual Doses to Man From Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I, April 1977 3.2.8.3 RG-1.111; Methods For Estimating Atmospheric Transport And Dispersion of Gaseous Effluents In Routine Releases From Light-Water-Cooled Reactors, Revision 1, July 1977

(Page 13 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: PageNumber: 1 1 3 of 84 3.2.8.4 RG-1. 113; Estimating Aquatic Dispersion.of Effluents From Accidental and Routine Reactor Releases For The Purpose of Implementing Appendix I, April 1977 3.3 Commitments 3.3.1 10 CFR Part 20, Standards for Protection Against Radiation 3.3.2 10CFR20.1302, Compliance with Dose Limits for Individual Members of the Public. 3.3.3 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities 3.3.4 10CFR50.36a, Technical Specifications on Effluents from Nuclear Power Reactors 3.3.5. Appendix I to 10 CFR Part 50, Numerical Guides For Design Objectives and Limiting Conditions For Operation to Meet The Criterion "As Low As Reasonably Achievable" For Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents. 3.3.6 40 CFR Part 141 3.3.7 40 CFR Part 190, Environmental Radiation Protection Standards For Nuclear Power Operations 3.3.8 Licensee Response to NRC Unresolved Item 50-334/83-30-05. The Radiation Monitor* Particle Distribution Evaluation showed that the Licensee must continue to use correction factors to determine particulate activity in samples obtained from the effluent release pathways. 3.3.9 CR 05-03854, ODCM Figure for Liquid Effluent Release Points Need Updated. CA-01, revise ODCM procedure 1/2-ODC-2.01 (ODCM: Liquid Effluents) Attachment D, Figure 1.4-3 to incorporate a modified version of Plant Drawing No. 8700-RM-27F. 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (e.g.; letter or calculation package) with an appropriate RTL number. 4.1.2 Changes to the ODCM shall be documented and records of reviews shall be retained in accordance with the applicable record retention provisions of the quality assurance program description included in the Updated Final Safety Analysis Report. 4.2 Forms 4.2.1 None

(Page 14 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix OC Ine,8 and History of ODCM Changes Revision: '14 of 84 Page Number: 5.0 PRECAUTIONS AND LIMITATIONS 5.1 This OFFSITE DOSE CALCULATION MANUAL (ODCM) provides the information and methodologies to be used by Beaver Valley Power Station Unit 1 and Unit 2 (BV-1) and (BV-2) to assure compliance with the Administrative Controls Section of the operating Technical Specifications. They are intended to show compliance with 10 CFR 20.1302, (3.21) 10 CFR 50.36a,(3-2) Appendix I of 10 CFR Part 50,(3.2-3) and 40 CFR Part 190.(3.2.4) i 5.2 This ODCM is based on the NUREG's and Generic Letter documents from the United States Nuclear Regulatory Commission. (31.1, 3.1.2, 3.1.3, 3.1.4) Specific plant procedures for implementation of the ODCM are included in various site procedures and documents, and are utilized by the operating staff to assure compliance with Technical Specifications and the CONTROLS Procedure of the ODCM:( 3 '5) 5.3 The ODCM has been prepared as generically as possible in order to minimize the need for future versions. However, some changes to the ODCM may be necessary in the future. Any such changes will be properly prepared, reviewed, and approved as indicated in the Administrative Control Section of the Technical Specifications. Additionally, changes to the ODCM require review and acceptance by the PORC. 5.3.1 An implementation procedure for control of the ODCMis included in 1/2-ADM-1640 (3.1.6) 5.4 This procedure also contains information that was previously contained in Appendix F of the previous BV- I and 2 Offsite Dose Calculation Manual. 5.4.1 In regards to this, the Tables that were transferred from Appendix F to the appropriate ATTACHMENTS of this procedure will still contain a prefix denoting an "F". 5.5 This procedure includes Improved Technical Specifications ([ITS]) information that is NOT applicable to current Technical Specifications ([CTS]) information that is NOT applicable in [ITS]. The [CTS] information shall be used prior to the [ITS] effective date. The [ITS] information shall be used on or after the [ITS] effective date. 6.0 ACCEPTANCE CRITERIA 6.1 All changes to this procedure shall contain sufficient justification that the change will maintain the level of radioactive Effluent Control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50, and not adversely impact the accuracy or reliability of effluent dose or alarm :setpoint calculation.(317) 7 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-010013"1' ) and 1/2-ADM-1640. (3.1.6) 6.1.2 All changes to this procedure shall be reviewed and approved in accordance with NOP-SS-3001 (3.1.8) and 1/2-ADM-1640. (3.1.6)

-(Page 15 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1 8 15 of 84 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and content. 8.0 PROCEDURE 8.1 Description of ODCM Structure 8.1.1 1/2-ODC-1.01, ODCM: Index, Matrix and History of ODCM changes (formerly: ODCM Index and Appendix F) 8.1.1.1 History of ODCM Changes 8.1.1.2 Summary of ODCM References 8.1.1.3 List of Tables (ATTACHMENT A) 8.1.1.4 List of Figures (ATTACHMENT B) 8.1.1.5 Matrix of Procedures Used to Meet ODCM Controls (ATTACHMENT C) 8.1.1.5.1 BV-1 Radiation Monitor Surveillances 8.1.1.5.2 BV- 1 Liquid Effluent Monitor Surveillances 8.1.1.5.3 BV-2 Liquid Effluent Monitor Surveillances 8.1.1.5.4 BV-1 Gaseous Effluent Monitor Surveillances 8.1.1.5.5 BV-2 Gaseous Effluent Monitor Surveillances 8.1.1.5.6 BV-1 and 2 Liquid Effluent Concentration Surveillances 8.1.1.5.7 BV-1 and 2 Liquid Effluent Dose Surveillances 8.1.1.5.8 BV-1 and 2 Liquid Effluent Treatment Surveillances 8.1.1.5.9 BV-1 and 2 Gaseous Effluent Air Dose Surveillances 8.1.1.5.10 BV-I and 2 Gaseous Effluent Particulate and Iodine Surveillances 8.1.1.5.11 BV-I and 2 Gaseous Effluent Treatment Surveillances 8.1.1.5.12 BV-1 and 2 Gaseous Effluent Total Dose Surveillances 8.1.1.5.13 BV-I and 2 Gaseous Effluent REMP Surveillances

(Page 16 of 84) Procedure Number: Beaver Valley Power Station __________________________________________1/2-ODC-1.01 1/ooODo-1.01

Title:

Unit Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 16-of 84 8.1.1.5.14 BV-1 and 2 Gaseous Effluent Land Use Census Surveillances 8.1.1.5.15 BV- I and 2 Gaseous Effluent Interlaboratory Comparison Program Surveillances 8.1.2 1/2-ODC-2.01, ODCM: Liquid Effluents (formerly; ODCM Sections 1 and 5) 8.1.2.1 Alarm Setpoints 8.1.2.1.1 BV- 1 Setpoint Determination Based On A Conservative Mix 8.1.2.1.2 BV- 1 Setpoint Determination Based On Analysis Prior To Release 8.1.2.1.3 BV-2 Setpoint Determination Based On A Conservative Mix 8.1.2.1.4 BV-2 Setpoint Determination Based On Analysis Prior To Release 8.1.2.2 Compliance With 10 CFR 20 EC Limits 8.1.2.2.1 Batch Releases 8.1.2.2.2 Continuous Releases 8.1.2.3 Compliance With 10 CFR 50 Dose Limits 8.1.2.3.1 Cumulation Of Doses 8.1.2.3.2 Projection Of Doses 8.1.2.4 Liquid Radwaste Treatment System 8.1.2.4.1 BV-1 Liquid Radwaste Treatment System Components 8.1.2.4.2 BV-1 Laundry and Contaminated Shower Drain System Components 8.1.2.4.3 BV-2 Liquid Radwaste Treatment System Components 8.1..2.5 Site Boundary for Liquid Effluents 8.1.2.5.1 Liquid Effluent Site Boundary

"(Page 17 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number. 8 17 of 84 8.1.3 1/2-ODC-2.02, ODCM: Gaseous Effluents (formerly; ODCM Sections 2 and 5) 8.1.3.1 Alarm Setpoints 8.1.3.1.1 BV-1 Setpoint Determination Based On A Calculated Mix 8.1.3.1.2 BV-1 Setpoint Determination Based On Analysis Prior To Release 8.1.3.1.3 BV-2 Setpoint Determination Based On A Calculated Mix 8.1.3.1.4 BV-2 Setpoint Determination Based On Analysis Prior To Release 8.1.3.1.5 BV-1/2 Setpoint Determination Based On A Calculated Mix 8.1.3.1.6. BV-1/2 Setpoint Determination Based On Analysis Prior To Release 8.1.3.2 Compliance With 10 CFR20 Dose Rate Limits 8.1.3.2.1 Dose Rate Due To Noble Gases 8.1.3.2.2 Dose Rate Due To Radioiodines And Particulates 8.1.3.3 Compliance With 10 CFR 50 Dose Limits 8.1.3.3.1 Doses Due To Noble Gases 8.1..3.3.2 Doses Due To Radioiodines And Particulates 8.1.3.4 Gaseous Radwaste Treatment System 8.1.3.4.1 BV-1 Gaseous Radwaste Treatment System Components 8.1.3.4.2 - BV-2 Gaseous Radwaste Treatment System Components 8.1.3.5 Site Boundary for Gaseous Effluents 8.1.4. 1/2-ODC-2.03, ODCM: Radiological Environmental Monitoring Program (formerly; ODCM Section 3) 8.1.4.1 Program Requirements 8.1.5 1/2-ODC-2.04, ODCM: Information Related to 40 CFR 190 (formerly; ODCM Section 4) 8.1.5.1 Compliance with 40 CFR 190 Dose Limits 8.1.5.2 Report Requirements

(Page 18 of 84) V y B r SProcedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 I Page Number: 18 of 84 8.1.5.3 Inside the Site Boundary Radiation Doses 8.1.5.3.1 Gaseous Effluent Site Boundary 8.1.6 1/2-ODC-3.01, ODCM: Dispersion Calculational Procedure and Source Term Inputs (formerly; ODCM Appendix A & B) 8.1.6.1 Dispersion and Deposition Parameters 8.1.6.2 BV-1 and 2 Release Conditions 8.1.6.3 BV-1 Liquid Source Term Inputs 8.1.6.4 BV-2 Liquid Source Term Inputs 8.1.6.5 BV-I Gaseous Source Term Inputs 8.1.6.6 BV-2 Gaseous Source Term Inputs 8.1.7 1/2-ODC-3.02, ODCM: Bases for ODCM Controls (formerly; ODCM Appendix D) 8.1.7.1 Bases 3.3.3.1: Radiation Monitoring Instrumentation 8.1.7.2 Bases 3.3.3.9: Radioactive Liquid Effluent Monitoring Instrumentation 8.1.7.3 Bases 3.3.3.10: Radioactive Gaseous Monitoring Instrumentation 8.1.7.4 Bases 3.11.1.1: Liquid Effluent Concentration 8.1.7.5 Bases 3.11.1.2: Liquid Effluent Dose 8.1.7.6 Bases 3.11.1.3: Liquid Radwaste Treatment System 8.1.7.7 Bases 3.11.1.4: Liquid Holdup Tanks 8.1.7.8 Bases 3.11.2.1: Gaseous Effluent Dose Rate 8.1.7.9 Bases 3.11.2.2: Dose- Noble Gases 8.1.7.10 Bases 3.11.2.3: Dose - Radioiodines, Radioactive Material in Particulate Form, and Radionuclides Other Than Noble Gases 8.1.7.11 Bases 3.11.2.4: Gaseous Radwaste Treatment System

                     .8.1.7.12      Bases 3.11.2.5: Gas Storage Tanks 8.1.7.13      Bases 3.11.4.1: Total Dose

.(Page 19 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 19 of 84 8.1.7.14 Bases 3.12.1: REMP Program Requirements 8.1.7.15 Bases 3.12.2: REMP - Land Use Census 8.1.7.16 Bases 3.12.3: REMP - Interlaboratory Comparison Program 8.1.8 1/2-ODC-3.03, ODCM: Controls for RETS and REMP Programs (formerly; ODCM Appendix C) 8.1.8.1 Controls 3.0.1 thru 3.0.4: Applicability 8.1.8.2 Controls 4.0.1 thru 4.0.4: Surveillance Requirements 8.1.8.3 Control 3.3.3.1: Radiation Monitoring Instrumentation 8.1.8.4 Control 3.3.3.9: Radioactive Liquid Effluent Monitoring Instrumentation 8.1:8.5 Control 3.3.3.10: Radioactive Gaseous Monitoring Instrumentation 8.1.8.6 Control 3.11.1.1: Liquid Effluent Concentration 8.1.8.7 Control 3.11.1.2: Liquid Effluent Dose 8.1.8.8 Control 3.11.1.3: Liquid Radwaste Treatment System 8.1.8.9 Control 3.11.1.4: Liquid Holdup Tanks 8.1.8.10 Control 3.11.2.1: Gaseous Effluent DoseRate 8.1.8.11 Control 3.11.2.2: Dose-Noble Gases 8.1.8.12 Control 3.11.2.3: Dose - Radioiodines, Radioactive Material in Particulate Form, and Radionuclides Other Than Noble Gases 8.1.8. 13 Control 3.11.2.4: Gaseous Radwaste Treatment System 8.1.8.14 Control 3.11.2.5: Gas Storage Tanks 8.1.8.15 Control 3.11.4.1: Total Dose 8.1.8.16 Control 3.12. 1: REMP Program Requirements 8.1.8.17 Control 3.12.2: REMP - Land Use Census 8.1.8.18 Control 3.12.3 REMP - Interlaboratory Comparison Program 8.1.8.19 Control 6.9.2: Annual REMP Report 8.1.8.20 Control 6.9.3: Annual RETS Report

(Page 20 of 84) Beaver Valley Power Station ProceCure Nub: I/2-ODC-I.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 20 of 84 8.2 History Of ODCM Changes 8.2.1 Change (1) of BV-1 ODCM (Issue 1), Effective January, 1984 8.2.1.1 This is the initial issue of the BV-I ODCM, as-prepared for implementation of the Radiological Effluent Technical Specifications (RETS). Implementation of this manual was commensurate with Amendment No. 66 to the Unit 1 Technical Specifications as approved by the NRC on March28, 1983. 8.2.2 Change (2) of BV-1 ODCM (Issue 1, Rev 1), Effective October. 1984 8.2.2.1 A description of the changes implemented with this revision are as follows: 8.2.2.1.1 Section 1.0: Table 1.3-1 was revised to include liquid dose factors for nuclides presently identified at BVPS and not included in the original table. 8.2.2.1.2 Section 2.0: Equations 2.1-19 and 2.1-22 were revised as approved at RSC Meeting No. BVPS-RSC-1-84 on January 31, 1984. The equations were revised to clarify flow rate terminology. 8.2.2.1.3 Section 2.0: Section 2.2.2 was revised to delete the food and ground pathways for gaseous dose rate calculations of 1-131, tritium, and radionuclides in particulate form with half lives greater than 8 days. 8.2.2.1.4 Section 2.0: Table 2.2-13 was revised to include 7 organs rather than only the maximum organ. Also, the receptor was changed from infant to child, and addition/deletion of nuclides to be consistent with the Technical Specifications and nuclides identified at BV-1. 8.2.3 Change (3) of BV-1 ODCM (Issue 1, Rev 2), Effective July, 1986 8.2.3.1 A description of the changes that were implemented with this revision are as follows: 8.2.3.1.1 Section 1.0: Provide a flow based monitor setpoint adjustment factor in Section 1.1.2. This change makes Section 1.1.2 consistent with Section 1. 1.1 and current procedures. 8.2.3.1.2 Section 1.0 and 2.0: Revise the 31-day dose projection limits and methodology in Sections 1.3.2, 2.3.1.2, and 2.3.2.2. This change corrected the 31-day dose projection limits and changed the dose projection methodology to be consistent with proposed software.

-(Page 21 of 84) Procedure Number: Beaver Valley Power Station 1/2-o DCm.0l

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes MRevision: 8 Page Number: 21 of 84 8.2.3.1.3 Section 2.0: Revise the Gaseous Effluent Monitor Setpoints in Sections 2.1.1 and 2.1.2. They were revised due to pressure corrections determined for the detectors, changes in isotopic literature, and the addition of SPING Channel 5 alternate monitor data. The calculations supporting this item are contained in Calculation Packages ERS-SFL-85-031 and ERS-ATL-86-008. 8.2.4 Change (4) of BV-1 ODCM (Issue 2), and BV-2 ODCM (Issue 1, Rev 1), Effective July, 1987 8.2.4.1 With the start-up of BV-2 in the second half of 1987, the BV-I ODCM required revision and the BV-2 ODCM required initial implementation. A description of the changes are as follows: 8.2.4.1.1 Produce functionally compatible BV-1 and BV-2 ODCMs which address site dose rate limits and meet regulatory requirements. Note that due to the scope of the revisions to the Unit 1 ODCM, it was re-issued as Issue 2. Also, for clarity, the draft BV-2 ODCM previously submitted to the NRC was regarded as Issue 1 (historical) and operation of BV-2 began with Issue 1, Revision I of the BV-2 ODCM. 8.2.4.1.2 Section 1.0: A shared liquid radwaste system, permitting mixing of waste for processing, the sharing of dilution water, and the apportionment of dose according to NUREG-0 133 was incorporated into both ODCMs. 8.2.4.1.3 Section 2.0: A shared elevated gaseous radwaste system, permitting the mixing of gaseous radwaste and the apportionment of dose, according to NUREG-0133 was incorporated into both ODCMs. 8.2.4.1.4 Section 2.0: Separate ground level gaseous releases were maintained. The BV-1 ODCM was updated to incorporate the BV-2 five year meteorology base. Gaseous source terms were revised to that calculated for BV-I in the BV-2 FSAR, and terms were added for calculation of a turbine building release. 8.2.4.1.5 Section 2.0: The gaseous effluent monitor alarm setpoints of both ODCMs were revised as required by revisions to meteorology, source terms, monitor efficiencies, and revised percentages of site dose rate limits. 8.2.4.1.6 Section 2.0: Formal justification was provided for use of the "T" factor as described in the Containment Purge Dose Rate calculations. Whereas, the dose rate for a Containment Purge may be averaged over a time period not to exceed 960 minutes. Since the Containment air volume change time period is 60 minutes, then the maximum value for "T" is 16 (i.e., 960 minutes/60 minutes = 16).

(Page 22 of 84) e avBe r

                              ......           al aley     Po wer Sta tio n                       oc    ureNumber:    ....

1/2-ODC-1.0.1

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 22 of 84 8.2.5 Change (5) of BV- I0DCM (Issue 2, Rev 1), and BV-2 ODCM (Issue 1, Revision 2), Effective December, 1987 8.2.5.1 Section 2.0: Sections 2.1.3 and 2.1.4 of both ODCMs were changed to delete a note concerning noble gas nuclides as requested by a NRC letter dated July 14, 1987 titled Beaver Valley Unit 2 - Offsite Dose Calculation Manual, ODCM (TAC 63996). 8.2.6 Change (6) of BV- I0DCM (Issue 2, Rev 2), and BV-2 ODCM (Issue 1, Rev 3), Effective June, 1989 8.2.6.1 A description of the changes implemented with this revision are as follows: 8.2.6.1.1 Section 1.0 and 2..0: Both ODCMs were revised for addition of Sections 1.4 and 2.4. This addition gives a description of and includes flow diagrams of the Liquid Radwaste System and the Gaseous Radwaste System. (See justification 1) 8.2.6.1.2 Section 1.0: Corrected typos to BV- 1ODCM Equation 1.1-8 to show differentiation between the two fs, and add the division sign. (See Justification 1) 8.2.6.1.3 Section 1.0: Re-define Fk in equation 1.3-1 of both ODCMs, as allowed by the NRC. (See Justification 1) 8.2.6.1.4 Section 1.0 and 2.0: Typos were corrected to the following: (1) BV-1 ODCM equation 1.3-7; add a division sign between the brackets. (2) BV-I ODCM equation 1.3-8; add a division sign between the brackets. (3) Equation 2.1-20 of both ODCMs; change the HIHSP to HSP multiplier from 0.70 to 0.33. (4) Equation 2.1-24 of both ODCMs, change the HHSP to HSP multiplier from 0.70 to 0.33. (See Justification 1) 8.2.6.1.5 Section 1.0 and 2.0: Typos were also corrected as follows: (1) Add the words "from each reactor unit" to five places (Sections 1.3.1, 1.3.2, 2.3.1.1, 2.3.1.2, and 2.3.2.2) of both ODCMs. This ensures compliance with the current requirements of the Technical Specifications. (2) Correct punctuation in Section 2.3.2. 1 of the BV-I ODCM. (3) Correct typos in Table 3.0-1 of both ODCMs. (4) Correct typos in Figure 3.0-3 of both ODCMs. 8.2.6.1.6 Section 2.0: Add a Reference to Section 2 of the BV-i ODCM. (See Justification 3) 8.2.6.1.7 Section 2.0: Add the words "from the site" to Section 2.2.2 of both ODCMs. This ensures compliance with the current requirements of the Technical Specifications. (See Justification 2)

-(Page 23 of 84) Beaver Valley Power Station Procecdure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1_8 23 of 84 8.2.6.1.8 Section 2.0: Revise BV-I ODCM Table 2.2-2 to change the particulate and iodine radionuclide mix for the Unit 1 Ventilation Vent and to correct a typo for Xe-135m in the Containment Vacuum Pumps. (See Justification 3) 8.2.6.1.9 Section 2.0: Provide re-verified Pi, values for the Beaver Valley site in Table 2.2-13 of both ODCMs. (See Justification 1) 8.2.6.1.10 Section 2.0: Correct.the definition for the tf value in the cow-meat pathway in Section 2.3.2.1 of both ODCMs. (See Justification 1) 8.2.6. l 11 Section 2.0: Provide re-verified R values for the Beaver Valley site in Tables 2.3-2 through 2.3-20 of both ODCMs. (See Justification 1) 8.2.6.1.12 Appendix B: Change the particulate and iodine release fractions in Appendix B of the BV-1 ODCM. (See Justification 3) 8.2.6,2 The justification used for Change (6) to the ODCMs are as follows: 8.2.6.2.1 A letter dated March 2, 1989 (from the NRC) was received by Duquesne Light regarding acceptance of the Offsite Dose Calculation Manuals. The NRC acceptance of the BV-1 and BV-2 ODCMs was based on Technical Evaluation Reports (TER No. EGG-PHY-8194 and EGG-PHY-8217) provided by the Idaho National Engineering Laboratory. As stated in the letter, minor concerns are delineated in Section 4 of the TER. In general, these concerns are considered typos or additions and in one way impact any of the calculations currently being performed for dose contributions. However, one of these concerns is regarding the inability to reproduce the ODCM R values for the cow-meat, cow-milk and goat-milk pathways when using the ODCMINUREG-0133 methodology. These R values (along with all other ODCM R values) were re-validated VIA Calculation Package No. ERS-ATL-89-014. The results of this package showed that the R values for the three aforementioned pathways were in error. SINCE the R values in error do not involve the controlling receptor for gaseous release (i.e.; the controlling receptor is VIA the Inhalation, Ground, and Vegetation pathways, not the pathways subject to error), THEN the changes will not adversely impact the accuracy or reliability of effluent dose calculations. 8.2.6.2.2 As requested by DLC letters ND3NSM:343 1, ND1NSM:3522, and NDINSM:3652, Technical Specifications were required to be verified in all plant implementing procedures. As part of this effort, wording errors/typos were identified in various sections of the ODCM. This revision corrects the anomalies identified during the verification effort.

(Page 24 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes MRevision: 8 Page Number: 24 of 84 8.2.6.2.3 As delineated in letter NDI SHP:776, dated February 12, 1988 (BVPS-1 ODCM Table 2.2-2, Appendix B) a series of apparent discrepancies were identified between ODCM Table 2.2-2 and similar tables of the BVPS-2 FSAR. Evaluation showed that apparent credit was given for continuous filtration of SLCRS releases which is invalid at Unit 1. However, the calculation package on which the BVPS-2 FSAR expected release tables are based, is correct (i.e.; no credit was taken for routine filtration for Unit 1 releases). Except for revising the ODCM, no further corrective action is necessary because the particulates and iodines in the ODCM were not used for gaseous effluent alarm setpoint. Therefore, this change does not adversely impact the accuracy or reliability of setpoint calculations. 8.2.7 Change (7) of BV-1 and 2 ODCM (Issue 3), Effective August, 1995 8.2.7.1 The combined ODCM contains the following changes: 8.2.7.1.1 Prior to ISSUE 3, BV- I and BV-2 had individual ODCMs that were generically equal. In an effort to simplify the implementing documents, the ODCMs have been combined. This merger of the individual ODCMs will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR Part

50. Also, this merger will not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations.

8.2.7.1.2 Section 1.0: Revised Section 1.0 (Liquid Effluents) to show compliance with 10 CFR 20 Appendix B (20.1001 - 20.2401), Table 2, Col. 2 EC's. This includes the following: (1) Revising the alarm setpoints for monitors [RM-1LW-104, RM-1LW-1 16, and 2SGC-RQ100]. (2) Updating the BV-1 monitor detection efficiencies. (3) Updating discharge rate and dilution rate parameters for BV-I and BV-2. (4) Adding the alarm setpoints for monitors [RM-1RW-100, RM-1DA-100, 2SWS-RQ101, and 2SWS-RQ102].

(Page 25 of 84) Procedure Number: Beaver Valley Power Station 1/2eODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 25 of 84 8.2.7.1.3 Section 1.0: Revised Section 1.0 (Liquid Effluents) and Section 2.0 (Gaseous Effluents) to merge the BV- 1 alarm setpoint calculations with the BV-2 alarm setpoint calculations. For all practical purposes, when Tables, Figures, and Equations were transferred to the combined ODCM, the numbering was kept generically equal. The two exceptions to this are as follows: (1) If a table was contained in both ODCMs, but each had data specific to BV-i or BV-2, then an a or b was added to the table. For example, Table 1.1-1 was previously included in the BV-I ODCM and the BV-2 ODCM. These tables are now numbered 1.1-1a and 1.1-1b denoting BV-I and BV-2 respectively. A cross reference for ODCM tables is provided in the Table Of Contents. (2) If an equation was contained in both ODCMs, but each had data specific to BV-I or BV-2, then a (1) or (2) was added to the equation. For example, Equation 1.1-1 was previously included in the BV-I ODCM and the BV-2 ODCM. These equations are now numbered 1.1(1)-1 and 1.1(2)-1, denoting BV-I and BV-2 respectively. A cross reference for ODCM equations is provided in the Table Of Contents. 8.2.7.1.4 Section 3.0: Revised Section 3.0 (Radiological Environmental Monitoring Program) to list the program requirements from the Radiological Assessment Branch Technical Position (Revision 1, 1979). 8.2.7.1.5 Section 4.0: Revised Section 4.0 (Information Related To 40 CFR 190) to provide clarified reporting requirements for the Special Report. The clarifications were taken from Generic Letter 89-01, Supplement No. 1 (NUREG- 1301). 8.2.7.1.6 Appendix A: Revised Appendix A to transfer the Batch Release dispersion parameters from Appendix A (Tables A-2 through A-5) to Section 2.3 (Tables 2.3-35 through 2.3-38). This revision was done for clarification. For example, all dispersion parameters are now included in one area of the ODCM. 8.2.7.1.7 Appendix C: This is a new Appendix to the ODCM. Procedural details for the Radiological Effluent Technical Specifications (RETS) were transferred from the Technical Specifications to Appendix C of the ODCM per Generic Letter 89-01 and Generic Letter 89-01, Supplement No. 1 (NUJREG 1301). This Appendix also includes selected Definitions and Tables as delineated in the Technical Specifications (Section 1) and selected Applicability and Surveillance Requirement statements as delineated in the Technical Specifications (Section 3/4). These were added to Appendix C for reference purposes, even though they are currently described in the Technical Specification. 8.2.7.1.8 Appendix D: This is a new Appendix to the ODCM. The bases for ODCM Controls were transferred from the Bases Section of the Technical Specifications to Appendix D of the ODCM per Generic Letter 89-01.

(Page 26 of 84) Beaver Valley Power Station I1/2-ODC-1.01 Procedure Number: 12OC10

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 26 of 84 8 8.2.7.1.9 Appendix E: This is a new Appendix to the ODCM. The Annual Radioactive Effluent Release Report and the Annual Radiological Environmental Report reporting requirements are listed in this appendix to the ODCM. 8.2.7.1.10 There are three differences (i.e., non-editorial changes) in this ODCM revision when compared to the previous BV-1 and BV-2 Technical Specifications. These are the only changes that are identified by revision bars. These differences are as follows: 8.2.7.1.10.1 First Difference - LLD Definition Clarification is described as follows: (1) There was a sentence removed in the LLD Standard Deviation Definitions delineated in Appendix C Tables 4.11-1 and 4.11-2. This sentence stated: "In calculating the LLD for a radionuclide determined by gamma ray spectrometry, the background shall include the typical contributions of other radionuclides normally present in the samples (e.g., potassium in milk samples)." (2) This sentence was removed by justification of NUREG-0472, Rev. 2 (i.e., this revision to the NUREG removed the sentence from Tables 4.11-1 and 4.11-2). At BV- I and 2, there are no other radionuclides normally present in effluent samples. However, there is applicability to environmental LLD calculations due to the existence of other radionuclides in environmental samples. This sentence, therefore, will not be removed from Appendix C, Table 4.12-

1. (3) Removal of the sentence from Appendix C, Tables 4.11-1 and 4.11-2 does not adversely impact the accuracy or reliability of current or past effluent LLD calculations. This change maintains the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR Part 50, and does not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations. (4) This change brings ODCM Appendix C, Tables 4.11-I and 4.11-2 in generic agreement with NRC guidance (i.e., NUREG-0472) and industry standard.

.(Page 27 of 84) Beaver Valley Power Station PcedureNu ODr 101

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM- Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 27 of 84 8.2.7.1.10.2 Second Difference - Change From Semi-Annual Report To Annual Report as follows: (1) The frequency of the Radioactive Effluent Release Report was changed from Semi-Annual to Annual. This change is justified by Federal Register, Rules And Regulations (Vol. 57, No. 169, Monday, August 31, 1992), where as; 10 CFR Part 50.36a(a)(2) states, in part. "Each licensee shall submit a report to the Commission annually that specifies the quantity of each of the principal radionuclides released to unrestricted areas in liquid and in gaseous effluents during the previous 12 months of operation.. the time between submission of the reports must be no longer than 12 months..." (2) This change maintains the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR Part 50, and does not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations. 8.2.7.1.10.3 Third Difference - Implementation Of New 10 CFR 20 is described as follows: (1) The definition for MEMBER(S) OF THE PUBLIC was revised to agree with the definition in 10 CFR 20.1003. (2) The definition for UNRESTRICTED AREA was modified from the definition that was in the Technical Specifications prior to transferring to the ODCM. This modification was necessary to ensure that the ODCM dose model for gaseous releases is not affected. The modification involved adding the following sentence: "For gaseous release dose calculations, the UNRESTRICTED AREA should exclude any public road, railway, or waterway adjacent to or crossing the site that is not occupied continuously by MEMBER(S) OF THE PUBLIC". (3) The limits for liquid effluent concentration were changed from 1 times 10 CFR 20 Appendix B (20.1 - 20.601), Table II, Col. 2 MPC's to 10 times 10 CFR 20 Appendix B (20.1001 - 20.2401), Table 2, Col. 2 EC's. This limit will now be referred to as the ODCM Effluent Concentration Limit (OEC). (4) For gaseous effluents, no changes were made to implement the New 10 CFR 20. As justification, when the utility adopted the RETS (1/1/84), compliance to 10 CFR 20 shifted from the MPC concept to the Unrestricted Area Dose Rate concept. The Dose Rate concept is the preferred method of controlling gaseous effluent release rate, and will continue to be used in-lieu of the MPC or EC concept. (5) Changing to the OEC limit for liquid effluents accommodates needed operational flexibility to facilitate implementation of the New 10 CFR 20 requirements. (6) For information, the general intent of the New Part 20 is that radiation doses to members of the public not exceed 100 mrems per year, which is more restrictive than the 500 mrems per year limit in the Old Part 20, and that fuel cycle licensees also comply with 40 CFR 190. The New Part 20 does not include a requirement on limiting radioactivity concentrations in effluents, which is less restrictive than the Old Part

(Page 28 of 84) Beaver BValcy a l rV PProcedure Power Station. Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 28 of 84

20. (7) The basic requirements for RETS (i.e.; ODCM Appendix C Controls) are stated in 10 CFR 50.36a. These requirements indicate that compliance with the RETS will keep average annual releases of radioactive material in effluents to small percentages of the limits specified in the 10 CFR 20.106 (10 CFR 20.1302). These requirements also indicate that operational flexibility is allowed (with considerations for public health and safety) which may temporarily result in releases higher than such small percentages, but still within the MPC limits specified in the 10 CFR 20.106. The MPC's relate to an annual dose of 500 mrem. Also, 10 CFR 50.36a indicates that when using operational flexibility, best efforts shall be exerted to keep levels of radioactive materials in effluents to ALARA as set forth in 10 CFR 50 Appendix I.

(8) As stated in the Introduction to Appendix B of the New 10 CFR 20, the liquid EC's are based on an annual dose of 50 mrem. Since a release concentration corresponding to a limiting dose rate of 500 mrem/year has been acceptable as a RETS limit for liquid effluents, it should not be necessary to reduce this limit by a factor often. (9) BV-1 and BV-2, has demonstrated that the use of the MPC's associated with the 10 CFR 20.106 has resulted in calculated maximum individual doses to a member of the public that are small percentages of the limits of 10 CFR 50 Appendix I. Therefore, the use of the OEC's, which correspond to an annual dose of 500 mrem (i.e.; 10 times the 10 CFR 20 EC's) should not have a negative impact on the ability to continue to operate within the limits of 10 CFR 50 Appendix I, and 40 CFR 190. (10) Operational flexibility is also necessary in establishing a basis for effluent monitor setpoint calculations. As previously discussed, the EC's stated in 10 CFR 20 relate to a dose of 50 mrem in a year. This is too restrictive to base effluent monitor setpoint calculations. For many liquid effluent release situations, the monitor background is high, which could result in a monitor setpoint that is approximately equal to the monitor background. (11) In summary, to accommodate operational flexibility needed for effluent releases, the limits associated with the liquid release concentration (i.e.; the OEC) are based on 10 times the EC's stated in the 10 CFR 20. The multiplier of 10 is used because the annual dose of 500 mrem (10 CFR 20 MPC bases) is a factor of 10 higher than the annual dose of 50 mrem (10 CFR 20 EC bases). Compliance with the 100 mrem dose limit of the 10 CFR 20.1302 will be demonstrated by operating within the dose limits of 10 CFR 50 Appendix I, and 40 CFR 190 (which are also ODCM Controls for liquid and gaseous effluents). Implementation of the 10 CFR 20 for liquid effluents maintains the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR Part 50, and does not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations.

-(Page 29 of 84) Beaver Valley PProcedure Power Station Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 29 of 84 8.2.7.2 In summary, Per Generic Letter 89-01, the transfer of RETS procedural details fulfills the goal of the USNRC Policy Statement for Technical Specification improvements. It is not the USNRC's (or DLC's) intent to reduce the level of radioactive effluent control. Rather, the intent is to provide programmatic controls for RETS (as delineated in Technical Specification 6.8.6) and allow for relocation of the procedural details of the RETS to the ODCM. 8.2.8 Change (8) of BV-1 and 2 ODCM (Issue 3, Rev 1), Effective October, 1995 8.2.8.1 A description of the changes implemented with this revision are as follows: 8.2.8.1.1 Index: Editorial changes were made for clarity. (See justification 1) 8.2.8.1.2 Section 1.0: Revised Nb-95 and Nb-97 dose factors in Table 1.3-1 due to changing the niobium bioaccumulation factor. (see justification 2) 8.2.8.1.3 Appendix A: A change was made to Table 1.1 so that the letter A would proceed the table number. (See justification 1) 8.2.8.1.4 Appendix B: A descriptive paragraph was added at the front of this Appendix. Also, changes were made to the tables so that the letter B would proceed the table numbers. (See justification 1) 8.2.8.1.5 Appendix C: Descriptive paragraphs were added at the front of the Appendix (See justification 1). Removed the process flow rate operability and surveillance requirements for gaseous effluent radiation monitors [2RMQ-RQ301, 2RMQ-RQ303 and 2HVL-RQ 112] from Tables 3.3-13 and 4.3-13 (See justification 3). Added alternate system effluent flow rate measuring devices for the three gaseous effluent pathways to Tables 3.3-13 and 4.3-13 (See justification 4). Revised Surveillance Requirements 4.11.1.1.3 and 4.11.1.1.4 and notes e and g of Table 4.11-1 to clarify Turbine Building sump sampling requirements (See justification 5). 8.2.8.1.6 Appendix D: Descriptive paragraphs were added at the front of the Appendix. (See justification 1) 8.2.8.1.7 Appendix E: Descriptive paragraphs were added at the front of the Appendix. (See justification 1) 8.2.8.1.8 Appendix F: This is a new Appendix to the ODCM. It contains plant procedure references for Radiological Effluent Technical Specification (RETS) that were transferred from the Technical Specification Procedure Matrix. (See justification 1) 8.2.8.2 The justification used for change (8) to the ODCM are as follows:

(Page 30 of 84) Procedure N~ihfber:. BeaverValley Power Station ____________________________________________1/2-ODC-1.01 1/ooODC-1.0

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes DRevision: 8 Page Number: 30 of 84 8.2.8.2.1 These changes are considered editorial in nature. Therefore, these editorial changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also the editorial changes will not adversely impact the accuracy or reliability of effluent dose or setpoint calculation.

8.2.8.2.2 This change resulted from revising the bioaccumulation factor (BF) for niobium from the value posted in Table A-I of Regulatory Guide 1.109, Revision 1, 1977 (30,000 pCi/kg per pCi/1). Since this change in niobium BF (as documented and justified in Appendix A to Calculation Package No. ERS-ATL-83-027) merely removes the conservatism associated with organism uptake, then the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, removing the conservatism will not adversely impact the accuracy or reliability of effluent dose or setpoint calculation. 8.2.8.2.3 This change removes the process flow rate operability and surveillance requirements for BV-2 Gaseous Effluent Radiation Monitors [2RMQ-RQ301, 2RMQ-RQ303 and 2HVL-RQ 112] from Appendix C Tables 3.3-13 and 4.3-13. These items were removed from the ODCM by justification provided in Calculation Package No. ERS-ATL-90-02 1. A safety analysis and a no significant hazards evaluation were prepared and approved prior to submitted it to the NRC via TSCR No. 2A-61 in 1992. However, it was withdrawn in 1993 in an effort to alleviate any further delays associated with approval of TSCR No. 1A-175/2A-37 (Generic Letter 89-01 implementation). Removal of these requirements from the ODCM will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50. Also removal of these items will not adversely impact the accuracy or reliability of effluent dose or setpoint calculation. The following is a summary of the justification. (1) BVPS-1 and BVPS-2 is currently using, and will continue to use design (maximum) system flow rates in ODCM Dose

                                 & Dose Rate Calculations, rather than those flow rates observed during normal plant operation. (2) BVPS-2 UFSAR Section 11.3.3 indicates that the source term for these three pathways are not significant. These pathways are not included in UFSAR Tables 11.3-1 through 11.3-4 that list the expected and design releases for each potentially radioactive pathway. (3)

The DLC commitment to Regulatory Guide 1.97, Rev. 2 (Section 1.8-1 of the BVPS-2 UFSAR) is not affected. This RG applies to instrumentation used during and after postulated accident conditions. These three process flow rate instruments were not used in any accident analysis, nor are they used to assess plant conditions during and following an accident. (4) The DLC commitment to Regulatory Guide 1.21, Rev. I (Section 1.8-1 of the BVPS-2 UFSAR) is not affected. RG 1.21, Section C.2 (Location of Monitoring) states in part: "All major and potentially significant paths for

(Page 31 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Index, Matrix and History of ODCM Changes Revision: 8 31 of 84 release of radioactive material during normal reactor operation, including anticipated operational occurrences, should be monitored. Measurements of effluent volume, rates of release, and specific radionuclides should be made insofar as practical . . " As previously stated, the three process flow rate instruments are located on effluent pathways that do not have a significant source term. (5) BVPS-2 UJFSAR Sections 9.4.13 and 9.4.16 indicate that the building ventilation system for these three pathways are non-safety related and are not required to perform any safety-related function. (6) There is no effect to the Noble Gas Monitors located on these three pathways. The Noble Gas Monitors are still capable of performing their intended functions as described in BVPS-2 UFSAR Section 11.5.2.4. 8.2.8.2.4 This change adds alternate system effluent flowrate measuring devices for the three BV-I gaseous effluent pathways to Appendix C Tables 3.3-13 and 4.3-

13. A 10 CFR 50.59 safety evaluation has concluded that no unreviewed safety question is involved by adding the alternate measuring devices to Appendix C Tables 3.3-13 and 4.3-13. This conclusion is based on the following: (1) There is no increase in the probability or consequences of accidents or malfunctions of equipment important to safety. (2) There is no creation of a possibility for an accident or malfunction of a different type than any evaluated previously. (3) There is no reduction in the margin of safety.

(4) Also, since this change merely adds alternate measuring devices that meet the same surveillance requirements of the primary channel, then the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, addition of the alternate flow rate measuring devices will not adversely impact the accuracy or reliability of effluent dose or setpoint calculations. 8.2.8.2.5 This change to the ODCM clarifies Turbine Building sump sampling requirements and clarifies effluent related actions associated with detection of radioactivity in the secondary system. These clarifications are documented and justified in Calculation Package No. ERS-ATL-95-006. Also, since these clarifications were shown to meet the intent ofNUREG- 1301 (superseding NUREG-0472) and the BVPS-1 and 2 UFSAR's, then the clarification will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50. Also, the clarifications will not adversely impact the accuracy or reliability of effluent dose or setpoint calculation. Also, a 10 CFR 50.59 safety evaluation has concluded that no unreviewed safety question is involved by clarifying these actions. This conclusion is based on the following: (1) There is no increase in the probability or consequences of accidents or malfunctions of equipment important to safety. (2) There is no creation of a possibility for an accident or malfunction of a different type than any evaluated previously. (3) There is no reduction in the margin of safety.

(Page 32 of 84) Procedure Number: Bcavcr Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: P Number:3ge 8 32 of 84

                   .8.2.9     Change (9) of BV-1 and 2 ODCM (Issue 3, Rev 2), Effective May 1997 8.2.9.1       A description of the changes implemented with this revision are as follows:

8.2.9.1.1 Index: Editorial changes were made for clarity. (See Justification 1) 8.2.9.1.2 Section 1.0: Clarifying statements were added to Tables 1.2-la and 1.2-lb to show that the recirculation times listed are based on historical recirculation rates. Figure 1.4-3 was added to show BV-I and 2 liquid Effluent Release Points. (See Justification 1) 8.2.9.1.3 Section 3.0: Removed the option to perform broad leaf vegetation sampling at the site boundary in a sector with the highest D/Q. (See Justification 2) 8.2.9.1.4 Appendix C: Added plant specific Mark Numbers to Tables 3.3-12, 4.3-12, 3.3-13 and 4.3-13 (See Justification 1). Corrected typographical errors on Surveillance Requirement 4.11.4.1.1 (See Justification 1). Added clarifying statements from NUREG-1301 and the Radiological Assessment Branch Technical Position to Tables 3.12-2 and 4.12-1 (See Justification 1). Removed the option to perform broad leaf vegetation sampling at the site boundary in a sector with the highest D/Q (See Justification 2). 8.2.9.1.5 _Appendix E: Corrected typographical error on Table 6.9-1. (See Justification 1) 8.2.9.1.6 Appendix F: Added procedure details to Tables 11, 12 and 13. (See Justification 1) 8.2.9.2 The justification used for Change (9) to the ODCM are as follows: 8.2.9.2.1 These changes are considered editorial in nature. The changes either correct typographical errors or add editorial details from previously approved station documents. Therefore, these changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50. Also, the editorial changes will not adversely impact the accuracy or reliability of effluent dose or setpoint calculations.

-(Page 33 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 33 of 84 8.2.9.2.2 This change removes the option to perform broad leaf vegetation sampling at the site boundary (in a sector with the highest D/Q) in lieu of the garden census. Per NUREG-1301 and the Radiological Branch Technical Position, this option does not apply to plants with elevated releases. Since BV-I and 2 have elevated releases, the option should not be exercised. A review of past garden census showed that the option was never exercised at BV-I and 2. Since this change removes an option that should not be exercised, then the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR

50. Also, removal of the option will not adversely impact the accuracy or reliability of effluent dose or setpoint calculations.

8.2.10 Change (10) of BV-1 and 2 0DCM (Issue 3, Rev 3), Effective June 1997 8.2.10.1 A description of the changes implemented with this revision are as follows: 8.2.10.1.1 Section 2.0: A release point for the BV-2 Turbine Building Vent was added (for editorial purposes) to Figure 2.4-2. 8.2.10.2 The justification used for Change (10)to the ODCM is as follows: 8.2.10.2.1 This change is considered editorial in nature. The change adds an equivalent item that was previously located on BV-2 Technical Specification Figure 5.1-

2. Since BV-2 Technical Specification Amendment 83 removed this figure, then the gaseous release point for the BV-2 Turbine Building Vent needed transferred to the ODCM. Therefore, since this change is considered editorial, the change will maintain the level of radioactive effluent control required by 10'CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50. Also, the editorial change will not adversely impact the accuracy or reliability of effluent dose or setpoint calculations.

8.2.11 Change (11) of BV-1 and 2 ODCM (Issue 3, Rev 4), Effective March 1998 8.2.11.1 A description of the changes implemented with this revision are as follows: 8.2.11.1.1 Index: Editorial changes were made for clarity. 8.2.11.1.2 Section 3.0: The distances for the environmental monitoring sample points were revised to show a more accurate measurement from the center of the Unit 1 Containment Building. The actual sample locations and descriptions remain unchanged. Also, the 4 individual quadrant maps showing TLD locations were consolidated into 1 map. This is a Corrective Action to Condition Report CR 980353.

(Page 34 of 84)

                                                            ......                        Procedure Number:

Beaver Valley Power Station P 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Index, Matrix and History of ODCM Changes Revision: 8 34 of 84 8.2.11.1.3 Section 4.0: Added clarifying statements as to how doses due to radioactive effluents for MEMBERS OF THE PUBLIC conducting activities inside the site boundary are derived and reported. This is a Corrective Action to Condition Report CR 971578. 8.2.11.1.4 Appendix C: Added statements to Action 23 of Table 3.3-12 to clarify that batch liquid releases may also be initiated with the same Action needed for resuming the release. This is a recommendation from the 1997 RETS Self-Assessment. A note was also added to this table.to clarify that independent signatures on the discharge permit satisfy the-requirement for "two technically qualified members of the Facility Staff independently verify the release rate calculation..." Added Action 29 to RM-1GW-108B on Table 3.3-13. This addition ensures consistency with the other.7 continuous gaseous effluent pathway Actions for Noble Gas Monitor inoperability. Added plant specific Mark Numbers for primary and alternate instrumentation to Tables 3.3-13 and 4.3-13 as follows: (1) For Noble Gas Activity Monitors', [RM-lVS-109 Channel 5] was added as an alternate to [RM-1VS-101B] and [RM-1VIS-110 Channel 5] was added as an alternate to [RM-1VS-107B]. [RM-1GW-109 Channel 5] was not added as an alternate to [RM-1GW-108B] at this time, because it does not perform on auto-isolation of gaseous waste decay tank release upon upper activity alarm. (2) For Particulate Activity Monitors, [RM- 1VS- 109 Channel 1] was added as an alternate to [RM-lVS-l10A], [RM-lVS-1 110 Channel 1] was added as an alternate to [RM-VS-1 107A], and [RM-1GW-109 Channel 1] was added as an alternate to RM-1GW-108A. 8.2.11.1.5 Appendix E: Corrected typographical errors on Table E:6.9-1 8.2.11.1.6 Appendix F: Updated the procedure details for primary and alternate instrumentation included in Appendix C Tables 3.3-13 and 4.3-13. Reduced the amount of detail contained in reference to the Operating Manual L-5 logs so that the position of the surveillance on the logs can be changed without having a need to change the Tables in this Appendix. This is a Corrective Action to Condition Report CR 980129. 8.2.11.2 The justification used for Change (11) to the ODCM is as follows: 8.2.11.2.1 These changes are considered editorial in nature. The changes either correct typographical errors or add editorial details from previously approved station documents. Therefore, these changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50. Also, the editorial changes will not adversely impact the accuracy or reliability of effluent dose or alarm setpoint calculations.

(Page 35 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 35 of 84 8.2.12 Change (12) of BV-1 and 2 ODCM (Issue 3, Rev 5), Effective November 1998 8.2.12.1 A description of the changes implemented with this revision are as follows. 8.2.12.1.1 Index: Editorial changes were made for clarity. (See Justification 1.) 8.2.12.1.2 Section 1.0: Added clarification for calculation of radionuclide concentration when the Post Dose Correction Factor is >1. (See Justification 1). 8.2.12.1.3 Section 3.0: Added an additional site location for the upstream environmental surface water sample. Added additional method after collecting and compositing this sample. (See Justification 2.) 8.2.12.1.4 Appendix C: Revised the definitions for MEMBER(S) OF THE PUBLIC and UNRESTRICTED AREA to ensure compliance with 10 CFR 20.1003. (See Justification 1.) Added a definition for MEMBER(S) OF THE PUBLIC to ensure compliance with 40 CFR 190.02(k). (See Justification 1.) Added plant specific Mark Numbers for primary and alternate instrumentation to Table 3.3-13 that were inadvertently omitted from change (11) to the ODCM. (See Justification 1.) Added clarification to Table 4.11-2 as to where and when H-3 samples of Waste Gas Storage Tanks are to be obtained. This is a Corrective Action to Condition Report CR 981489. (See Justification 1.) Added clarification to note "e" of Table 4.11-2 as to the appropriate ventilation release path. This is a Corrective Action to CR 981490. (See Justification 1.). Corrected an obvious omission on Table 3.12-1 to ensure that 2 TLD's are used for determination of Direct Radiation. (See Justification 1.) Incorporated the appropriate changes to Table 3.12-1 that are described above for Section 3.0. (See Justification 2.) 8.2.12.1.5 Appendix F: Added procedure details from the Chemistry Manual to Table 6. This is a Corrective Action to Condition Report CR 981488. (See Justification 1.) 8.2.12.2 The justifications used for Change (12) to the ODCM are as follows: 8.2.12.2.1 These changes are considered editorial in nature. The changes either correct typographical errors or add editorial details from previously approved station documents. Therefore, these changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the editorial changes will not adversely impact the accuracy or reliability of effluent dose or alarm setpoint calculations.

(Page 36 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC- 1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1 8 36 of 84 8.2.12.2.2 These changes involve the upstream environmental surface water sample method and sample site. Since these changes were shown to meet the intent of NUREG-1301, and BVPS-1 and 2 UFSAR's, then the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50. Also, the change will not adversely impact the accuracy or reliability of effluent dose or alarm setpoint calculations. Also, a 10 CFR 10.50 safety evaluation has concluded that no unreviewed safety question is involved by adding an additional sample site and sample method. This evaluation is based on the following: (1) There is no increase in the probability or consequences ,of accidents or malfunctions of equipment important to safety. (2) There is no creation of a possibility for an accident or malfunction of a different type than any evaluated previously. (3) There is no reduction in the margin of safety. 8.2.13 Change (13) of BV-1 and 2 ODCM (Issue 3, Rev 6), Effective May 1999 8.2.13.1 A description of the changes implemented with this revision are as follows: 8.2.13.1.1 Index: Editorial changes were made for clarity. 8.2.13.1.2 Section 3.0: Updated figure number and table reference. Removed a redundant upstream environmental surface water sampling location. 8.2.13.1.3 Appendix C: Made editorial changes for clarity. Added definitions for SHUTDOWN and STARTUP. Changed definition for ODCM to ensure agreement with definition provided in Unit 1/2 Technical Specification Amendments 220/97. Changed designations for primary and alternate instruments on Tables 3.3-12, 4.3-12, 3.3-13 and 4.3-13 from "P" and "A" to "Pri" and "Alt". ýClarified use of the Flow Rate Measurement Devices for the Cooling Tower Blowdown Line on Tables 3.3-12 and 4.3-12 to show that the Unit 1/2 combined instrument [FT-1CW-101-1] is the primary and both of the individual Unit 1 and Unit 2 instruments [FT-1CW-101] and [2CWS-FT101] are the alternates. Updated Actions 24, 25 and 26 of Table 3.3-12 to describe use of comparable alternate monitoring channels when the primary channels are INOPERABLE. Clarified Table 3.3-13 Action 28 applicability for Unit 2 gaseous effluent monitors. Clarified Table 3.3-13 Action 30 to show that applicability is for batch purges of the reactor containments. Changed reference of Special Report compliance requirement from Technical Specification 6.9.2f to 10 CFR 20.2203 and 10 CFR 50.4 as permitted by Unit 1/2 Technical Specification Amendments 220/97. Clarified note b of Table 4.11-2 regarding sampling and surveillances frequencies. Clarified Controls3.12.1 and 3.12.2 to ensure compliance with NUREG- 1301.

'(Page 37 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 37 of 84 8.2.13.1.4 Appendix E: Made editorial changes for clarity. Changed reference of Special Report compliance requirement from Technical Specification 6.9.2f to 10 CFR 20.2203 and 10 CFR 50.4 as permitted by Unit 1/2 Technical Specification Amendments 220/97. Changed submittal date of annual REMP report from May 1 to May 15 as permitted by Unit 1/2 Technical Specification Amendments 220/97. Changed column heading in Table E: 6.9-1 to ensure consistency with NUREG-1301. 8.2.13.2 The justification used for change (13) to the ODCM is as follows: 8.2.13:2.1 All changes are considered editorial in nature. The changes either clarify the intent of the original specification or add equivalent items form the standard guidance document (NUREG-1301) or recent Technical Specification Amendments. Therefore, since these changes are considered editorial, the changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR

50. Also, the editorial changes will not adversely impact the accuracy or reliability ofeffluent dose or setpoint calculations.

8.2.14 Change (14) of BV-1 and 2 ODCM (Rev 14), Effective March 2000 8.2.14.1 Prior to this ODCM change, the change numbers did not match the Issue and Revision numbers. For example, the last implemented ODCM change was (13), but carried an Issue 3, Revision 6 designation. Therefore, as of this ODCM change (14), consecutive Revision numbers will begin with Revision 14. 8.2.14.2 A description of the changes implemented with this revision are as follows: 8.2.14.2.1 Index: Editorial changes were made for clarity. References to condition reports CR 982097, CR 992652 and CR 993021 were added. 8.2.14.2.2 Appendix C: Editorial changes were made for clarity. Corrected a typographical error on Table 3.3-12 in regards to FT-CW-101-1. Changed the grab sampling requirement from 8 hours to 12 hours for Table 3.3-12 Action 24 (NUREG-1301, Table 3.3-12, Action 36 and 37 allow this change). Enhanced the Channel Functional Test requirements on Table 4.3-12 from Q(6) to Q(1) for RM-1DA-100 (Corrective Action to Condition Report CR 993021). Add clarification to Table 3.3-13 and 4.3-13 to show the plant specific Mark Numbers for the primary and alternate BV- 1 Sample Flow Rate Measuring Devices. Corrected a typographical error on Table 3.3-13 Action 27. Separated Action 28 of Table 3.3-13 into individual Action 28 requirements for System Effluent Flow Rate Measuring Devices/Process Flowrate Monitors and. individual Action 28 requirements for Sample Flow Rate Measuring Devices/Sample Flowrate Monitors. Added clarification to Table 3.3-13 to show that Action 29 and Action 32 are applicable for continuous releases. Added an alternate method in lieu of grab

(Page 38 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 38 of 84 sample collection (ie., local monitor readings can be obtained when communication is lost to the Control Room) to show compliance to Table 3.3-13 Action 29.: Changed the grab sampling requirement from 8 hours to 12 hours for Table 3.3-13 Action 29 and Action 32 (NUREG-1301, Table 3.3-013, Action 47 allows this change). Corrected typographical errors on Table 4.11-1 in regards to liquid composite analysis frequency and table notation. 8.2.14.2.3 Appendix F: Made editorial changes for clarity. Updated the procedure details for primary and alternate instrumentation included in Appendix C Tables 3.3-13 and 4.3-13. Added appropriate references to the HP Shift Logs (ie., HPM Appendix 1) when these logs are used satisfy ODCM Appendix C Surveillances and Actions (Corrective Action to Condition Report CR 992652). 8.2.14.3 The justification used for change (14) to the ODCM is as follows: 8.2.14.3.1 Most of these changes are considered editorial in nature. All changes were screened for 10CFR50.59 applicability. In summary, the BVPS-1 and 2 UFSAR's are not impacted, because the changes either clarify the intent of the original specification, add plant specific Mark Numbers, or add equivalent items from the standard guidance document (NUREG-1301). Therefore, these changes willmaintain the level of radioactive effluent control required by 10CFR20.1302, 40CFR Part 190, 10 CFR50.36a, and Appendix I to 10CFR50. Also, these changes will not adversely impact the accuracy or reliability of effluent dose or alarm setpoint calculations. 8.2.15 Change (15) of BV-1 and 2 ODCM (Rev 15), Effective August 2000 8.2.15.1 A description of the changes implemented with this revision are as follows: 8.2.15.1.1 Index: Editorial changes were made for clarity. Reference to Condition Report CR 001682 was added. Reference to NRC unresolved Item 83-30-05 was added. 8.2.15.1.2 Appendix C: Editorial changes were made for clarity. Annotated Actions 28 of Table 3.3-13 into Action 28A and 28B to show differentiation between Action 28A requirements for system/process flow rate measurement and Action 28B requirements for sampler flow rate measurement. Added an alternate method in lieu of 4 hour flow rate estimations (ie; assume ODCM design values for system/process flow rate) to show compliance with Table 3.3-13 Action 28A, when the system/process flow rate monitor is inoperable. Annotated Actions 30 of Table 3.3-13 into Action 30A and 30B to show differentiation between Action 3 OA requirements for BV-I reactor containment purges and Action 30B requirements for BV-2 reactor containment purges.

(Page 39 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 39 of 84 8.2.15.2 The justification used for change (15) to the ODCM is as follows: 8.2.15.2.1 Some of these changes are considered editorial in nature. These changes were screened for 10CFR50.59 applicability and determined not to impact the BVPS-1 and 2 UFSAR's. Since the editorial changes clarify the intent of the original specification, then these changes will maintain the level of radioactive effluent control required by 10CFR20.1302, 40CFR Part 190, 10CFR50.36a, and Appendix I to 10CFR50. Also, these changes will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. 8.2.15.2.2 The change to allow use of design (maximum) system flow rates in lieu of 4 hour flow rate estimations (for five of the eight gaseous effluent release pathways) was screened for 10CFR50.59 applicability and determined not to impact the BVPS-1 and 2 UFSAR's. The 4 hour flow rate estimations for these effluent release pathways have never been used in ODCM Dose and Dose Rate Calculations. The method for use of process flow rates in ODCM Dose and Dose Rate Calculations remains unchanged. For example, BVPS-1 and BVPS-2 is currently using, and will continue to use design (maximum) system flow rates in ODCM Dose and Dose Rate Calculations for all eight gaseous effluent release pathways. This is necessary to ensure that DLC response to NRC Unresolved Item 50-334/83-30-05 is not compromised. Also this change is considered similar and within the justification provided for ODCM change (8) that removed all of the process flow rate operability and surveillance requirements for the other three gaseous effluent release pathways. Based on the above, these changes will maintain the level of radioactive effluent control required by I0CFR20. 1302, 40CFR Part 190, 10CFR50.36a, and Appendix I to 10CFR50. Also, these changes will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. 8.2.16 Change (16) of BV-I and 2 ODCM (Effective April 2002) 8.2.16.1 A description of the changes implemented with this revision are as follows: 8.2.16.1.1 The entire BV-1 and 2 ODCM was converted to the ODC format as delineated in 1/2-ADM-0100. As part of this process, the ODCM was separated into eight procedures as follows: 8.2.16.1.1.1 1/2-ODC-1.01, Rev 0; ODCM: Index, Matrix and History of ODCM Changes (formerly; ODCM Index and Appendix F) 8.2.16.1.1.2 1/2-ODC-2.01, Rev 0; ODCM: Liquid Effluents (formerly; ODCM Section 1 and 5) 8.2.16.1.1.3 1/2-ODC-2.02, Rev 0; ODCM: Gaseous Effluents (formerly; ODCM Section 2 and 5)

(Page 40 of 84) Beaver VValley Beaver leProcedure Power Station Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: n8 40 of 84 8.2.16.1.1.4 1/2-ODC-2.03, Rev 0; ODCM: Radiological Environmental Monitoring Program (formerly; ODCM Section 3) 8.2.16.1.1.5 1/2-ODC-2.04, Rev 0; ODCM: Information Related to 40CFR190 (formerly; ODCM Section 4) 8.2.16.1.1.6 1/2-ODC-3.01, Rev 0; ODCM: Dispersion Calculational Procedure and Source Term Inputs (formerly; ODCM Appendix A & B) 8.2.16.1.1.7 1/2-ODC-3.02. Rev 0; ODCM: Bases for ODCM Controls (formerly; ODCM Appendix D) 8.2.16.1.1.8 1/2-ODC-3.03, Rev 0; ODCM: Controls for RETS and REMP Programs (formerly; ODCM Appendix C and E) 8.2.16.1.2 Procedure 1/2-ODC-3.02, Rev 0: Technical Specification Bases 3/4.3.3.1 was duplicated in the Bases for ODCM Controls as permitted by Unit 1/2 Technical Specification Amendments 1A-246/2A-124. (3-2.6-8 8.2.16.1.3 Procedure 1/2-ODC-3.03, Rev 0: Portions of Technical Specification LCO 3.3.3.1 (including portions of Tables 3.3-6 and 4.3-3) were transferred to the ODCM Controls as permitted by Unit 1/2 Technical Specification Amendments 1A-246/2A-124.(3 2 6 8) Specifically, this includes the Mid and High Range Channels of Noble Gas Effluent Monitors [RM- 1VS- 109 (7 and 9), RM-IVS-110 (7 and 9), RM-1GW-109 (7 and 9), and 2HVS-RQ109C and 109D], the Atmospheric Steam Dump Valve/Code Safety Relief Valve Discharge Monitors [RM-1MS-100A, B and C] and Auxiliary Feedwater Pump Turbine Exhaust Monitor [RM-1MS-101]. The Preplanned Method of Monitoring (PMM) was also added for clarification of necessary actions when the primary instrument is inoperable. Addition of the PMM's are considered an editorial change because it merely specifies the asset number (or appropriate form number), which were included as PMM's in previously approved station documents. 8.2.16.1.4 Procedure 1/2-ODC-3.03, Rev 0: Added clarifications to ODCM Control 3.3.3.9 Table 3.3-13 to show that Action 30A and Action 3B are applicable to the initial batch purge of the reactor containment atmosphere. All other releases of reactor containment atmosphere (i.e.; after the initial batch purge) are considered continuous releases.

.(Page 41 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 41 'of 84 8.2.16.1.5 Procedure 1/2-ODC-3.03, Rev 0: Added specific plant asset numbers to ODCM Control 3.3.3.10 Table 3.3-13 and Table 4.3-13 to show that Sample Flow Rate Monitor flow transmitters [2HVS-FIT 101-1, 2RMQ-FIT301 - 1, 2HVL-FIT 112-1 and 2RMQFIT303-1] may be used as comparable alternates when the primary instruments [RM- 1I Monitor Item 28 for 2HVS-RQ 101, 2RMQ-RQ301, 2HVL-RQ 112 and 2RMQ-RQ303], respectively, are INOPERABLE. This is considered an editorial change because the primary monitoring channel (i.e.; RM-1 1 Monitor Item 28) display already receives its input from these same flow transmitters. 8.2.16.1.6 Procedure 1/2-ODC-3.03, Rev 0: Added notation to ODCM Control 3.3.3.10 Table 3.3-13 and Table 4.3-13 to show that [RM-1GW-109 Channel 5] may be used as a comparable alternate to [RM-1GW-108B] for continuous releases. However, since [RM-1GW-109 Channel 5] cannot perform an automatic isolation of gaseous waste decay or storage tank releases, then notation was also added to prevent using this monitor as a comparable alternate for batch releases. This is considered an editorial change because it merely specifies the asset number of a redundant alternate monitoring channel that was included in previously approved station documents. 8.2.16.1.7 Procedure 1/2-ODC-3.03, Rev 0: Replaced the requirements for "Particulate Activity Monitors" in ODCM Control 3.3.3.10 Tables 3.3-13 and Table 4.3-13 with requirements for "Particulate and Iodine Samplers". This is considered an editorial change because the NRC guidance document used for preparation of ODCM Controls (NUREG- 1301) contains the clarification that the requirements listed in these Tables are for the "Particulate and Iodine Samplers", and not for the "Particulate Activity Monitors". 8.2.16.2 The justification used for change (16) to the ODCM is as follows: 8.2.16.2.1 The specific radiation monitoring channels transferred to the ODCM provide alarms and indications to alert plant personnel of high radiation conditions and to assist in evaluating and trending plant effluents. The Actions applicable if the monitors are inoperable require only that area surveys be performed on a daily basis, or that explanations of inoperability be provided in an annual effluent report. The Actions do not impact or reference the operability of other systems nor do the Actions require that plant operation be terminated at any time. 8.2.16.2.2 Some of the radiation monitoring effluent monitors transferred to the ODCM provide indications used to assess selected plant parameters following an accident consistent with the recommendations of NUREG-0737. However, the monitors do not provide indication for post accident variables that have been identified as Regulatory Guide 1.97 Type A or Category I.

(Page 42 of 84)

                                                 --1Procedure                                                 Number:

Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number 8 42 of 84 8.2.16.2.3 The Safety Analysis performed for the License Amendments conclude that the radiating monitoring channels transferred to the ODCM do not reduce the effectiveness of the requirements being relocated. Rather, the transferred results in a change in the regulatory control required for future changes made to the requirements. The requirements will continue to be implemented by the appropriate plant procedures in the same manner as before. However, future changes to the transferred requirements will be controlled in accordance with 10 CFR 50.59 instead of requiring a license amendment per 10 CFR 50.90. 8.2.16.2.4 Based on the above, these changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.3 6a, and Appendix I to 10 CFR 50. Also, these changes will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. 8.2.17 Change (17) ofBV-1 and 2 OCDM (Effective August 2002) 8.2.17.1 A description of the changes implemented with this revision are as follows: 8.2.17.1.1 Procedure 1/2-ODC-3.03. Rev 1: Technical Specification LCO 3.11.1.4 for Liquid Storage Tank Activity Limits, and LCO 3.11.2.5, for Gas Storage Tank Activity Limits were transferred to ODCM Controls 3.11.1.4 and 3.11.2.5 respectively as permitted by Unit 1/2 Technical Specification Amendments I A- 250/2A-130.(3.2.6.91 8.2.17.1.1.1 As part of the preparation work for transfer of the Liquid Storage Tank Activity Limits to the ODCM, the 10 Curie Limit for these tanks was re-verified and documented in Calculation Package ERS-ATL 007.(3.2.3.9) The results of this calculation provide tank specific activity limits to ensure that the 10CFR20 Appendix B Table 2, Col. 2 EC Limits will be maintained should an accidental release of the tank(s) contents occur. Previously, LCO 3.11.1.4 used a generic limit of 10 Curies for each of the four tanks listed. However, formal documentation for derivation of the 10 Curie value could not be located in the records storage system. 8.2. 17. 1.1.2 In addition, individual tank Activity limits were developed for the Unit I and 2 Refueling Water Storage Tanks (RWST's), which were also added to this ODCM Control. The Surveillance Requirements for determination of RWST Activity will not be performed once per 7 days like the other Liquid Storage Tanks, because radioactive material is not added to the RWST's on a weekly basis. Therefore, the surveillance for determination of (RWST's) Activity will be performed within 7 days of returning reactor cavity water (radioactive material) back to the RWST (i.e.; during a refueling outage).

-(Page 43 of 84) Beaver Valley Power Power St1/2-ODC-1.01 Station Procedure Number: Title Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes ORevision: 8 Page Number: 43 of 84 8.2.17.1.2 Procedure 1/2-ODC-3.03, Rev 1: Changed the due date of the Annual Radioactive Effluent Release Report from April 1 to May 1 as permitted 69 by Unit 1/2 Technical Specification Amendments 1A-250/2A-130.(3. ) 8.2.17.1.3 Procedure 1/2-ODC-3.03. Rev 1: Changed Table 3.3-12 of Control 3.3.3.9 to correct an obvious omission of Channel Operability and Action Statement Requirements for Flow Rate Measurement Device [FR- 1LW-103] on the Liquid Waste Containment Drain Line. This obvious omission is detailed in CR 02-05533.(322"12) 8.2.17.1.4 Procedure 1/2-ODC-3.03, Rev 1: Made editorial changes to correct the primary asset numbers of the BVPS-2 Sample Flowrate Monitors as shown on Tables 3.3-13 and 4.3-13 of Control 3.3.3.10. These changes clarify that the primary Sampler Flowrate Monitor is the device that is used for monitoring sample flowrate through the Particulate and Iodine Sampler Flowpath, not the Particulate and Iodine Monitoring Flowpath. 8.2.17.2 The justification used for change (17) of the ODCM is as follows: 8.2.17.2.1 These changes merely transfers existing storage tank activity limits from the Technical Specification to the ODCM and changes the due date for the Annual Radioactive Effluent Release Report as permitted by Unit 1/2 Technical Specification Amendments 1A-250/2A-130. As part of this change, the ODCM Control for Liquid Storage Tank Activity Limits was enhanced to add ODCM Controls and Surveillance Requirements for the Unit 1 and Unit 2 RWST's. Therefore, these changes (as delineated in the Technical Specification Amendments) will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, these changes will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. 8.2.18 Change (18) of the BV-1 and 2 ODCM (Effective October 2002) 8.2.18.1 A description of the changes implemented with this revision are as follows: 8.2.18.1.1 Procedure 1/2-ODC-3.03, Rev 2: Added requirement for applicable station groups notification of pending ODCM changes as described in CR 09-0571 0.(3.2.2.13) 8.2.18.2 The justification used for change (18) of the ODCM is as follows: 8.2.18.2.1 This change is considered editorial in nature, which exempts the change from Regulatory Applicability Determination. Therefore, this change will not impact the level of radioactive effluent control required by 10CFR20.1302, 40CFR Part 190, 10CFR50.36a, and Appendix I to 10CFR50. Also this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation.

(Page 44 of 84) P- Procedure Number: Beaver Valley Power tation 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: Index, Matrix and History of ODCM Changes 1 8 44 of 84 8.2.19 Change (19) of BV-l and 2 ODCM (Effective November 2002) 8.2.19.1 A description of the changes implemented with this revision are as follows: 8.2.19.1.1 Procedure 1/2-ODC-2.01, Rev 1: Changed Table 1.1-la and 1.1-1b to add Zn-65 to the respective BV-I and 2 Liquid Source Term as described in CR 02-06174 (CA-01, CA-13 and CA-14). For information, zinc may be added to the reactor coolant system in an effort to reduce general corrosion of primary system materials and mitigation of stress corrosion cracking. Added benefits to zinc addition involve preferential release of nickel and cobalt which, in-turn, reduces plant dose rates. Development of the specific Zn-65 Annual Release Activity is delineated in Calculation Package No. ERS-ATL-83-027.(3.23.l) Addition of Zn-65 to the source terms also caused changes in the Liquid Effluent Monitor Alarm Setpoints, and appropriate monitor conversion factors. 8.2.19.1.2 Procedure 1/2-ODC-2.01, Rev 1: Table 1.1-la was changed to update the remainder of the source term with annual release values derived in Stone and Webster Calculation Package No. UR(B)- 160.(32 3 0 ) 8.2.19.1.3 Procedure 1/2-ODC-2.01, Rev 1: Editorial changes were made to this procedure for update of ODCM references and to add discussion of why Liquid Waste Evaporators are no longer used at BV-I and 2 to process liquid waste. 8.2.19.2 The justification used for change (19) of the ODCM is as follows: 8.2.19.2.1 Addition of Zn-65 to the BV-I and 2 Liquid Source Terms, along with update of the BV-1 and 2 Liquid Source Term is considered a procedure correction, and is enveloped by the Regulatory Applicability Determination performed for BV-1 ECP-02-0410. Based on the above, these changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, these changes will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. 8.2.20 Change (20) of BV-1 and 2 ODCM (Effective October 2003) 8.2.20.1 A description of the changes implemented with this revision are as follows: 8.2.20.1.1 Procedure 1/2-ODC-2.01, Rev 2: Changed LW System diagrams (Attachment D) to indicate the flow path for cross connect of LW between Unit I and Unit 2. 8.2.20.1.2 Procedure 1/2-ODC-2.02, Rev 1: Changed Table 2.1-1 to revise the source term for the Unit 1 Containment Vacuum Pumps as described in CR03-04830 (CA-03).

"(Page 45 of 84) BlrProcedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes. Revision: 8 Page Number: 45 of 84 8.2.20.1.3 Procedure 1/2-ODC-3.03. Rev 3: Changed the Preplanned Method of Monitoring (PMM) in Attachment D Table 3.3-6 and Table 4.3-3. Specifically, the 2nd PMM for the Reactor Building/SLCRS Mid & High Range Noble Gas Monitors (RM-1 VS- 110 Ch 7 & Ch 9) was changed FROM "(RM-1VS-107B)" TO "(RM-IVS-107B, or RM-1VS-I10 Ch 5)". Also, the 2nd PMM for the Auxiliary Building Ventilation System Mid & High Range Noble Gas Monitors (RM- 1VS- 109 Ch 7 & Ch 9) was changed FROM "(RM-IVS-1O1B)" TO "(RM-1VS-1O1B, or RM-1VS-109 Ch 5)". Similarly, the 2nd PMMvI for the Gaseous Waste/ Process Vent System Mid & High Range Noble Gas Monitors (RM- 1GW-i109 Ch 7 & Ch 9) was changed FROM "(RM-1GW-108B)" TO "(RM-1GW-108B, or RM-1GW-109 Ch 5)". 8.2.20.1.4 Procedure 1/2-ODC-3.03, Rev 3: Changed Attachment J Control 3.11.1.4 to update the activity limits for the liquid storage tanks to the values specified in Calculation Package No. ERS-ATL-95-007. 8.2.20.1.5 Procedure 1/2-ODC-3.03, Rev 3: Changed Attachment K Table 4.11-2 to add more specific guidance for sampling of Gaseous Effluent Pathways. Specifically, this table is generic for Unit 1 & Unit 2 Gaseous Effluent Pathways, but sampling may only need required at some of the Gaseous Effluent Pathways rather than all of the Gaseous Effluent Pathways (as could be inferred from the wording in the Table Notation). Therefore to prevent unnecessary sampling, applicability statements were added to this table to delineate which ventilation systems are affected by the note(s). Also, note (f) includes a clarification of how compliance to this requirement is achieved per response to NRC Unresolved Item 50-334/83-30-05. 8.2.20.2 The justifications used for change (20) of the ODCM are as follows: 8.2.20.2.1 Procedure 1/2-ODC-2.01, Rev 2: Changing the diagram to show the LW cross connect between Unit 1 and Unit 2 is not a change to plant configuration, and is considered a procedure correction. Specifically, this procedure of the ODCM already describes the shared radwaste treatments system. Also, the UFSAR's describe the cross connect. Based on the above, this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation.

(Page 46 of 84) Beavcr Valley P..Procedure yPower Station Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: I 8 46 of 84 8.2.20.2.2 Procedure 1/2-ODC-2.02, Rev 1: The original source-term calculation for the GW System was based on an operating flow rate of 5 scfm for the Unit 1 containment vacuum pumps. The flow rate for the new pumps is 70 scfm. Consequently, the source-term was revised per Calculation Package ERS-HHM-87-014 and then transcribed to this procedure. Although the new pumps represent a factor of 15 increase in flow rate, the gaseous effluent monitor alarm setpoints are unchanged. Specifically, the previous setpoints were based on a percentage of Offsite Dose Rate Limits, and those values were actually above the range of the instruments, so an on-scale value was substituted. This is also true for the re-calculated setpoints, so the same on-scale values are used. In summary, changing the source term is considered a procedure correction, and is enveloped by the Regulatory Applicability Determination performed for BV-I ECP-02-0079. Based on the above, this change will maintain the level of radioactive effluent control required by 10

                                  .CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR
50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. . This procedure change implements a Corrective Action*per CR03-04830-03.

8.2.20.2.3 Procedure 1/2-ODC-3.03. Rev 3: Changing the Preplanned Method of Monitoring (PMM) will prevent unnecessary grab sampling (ie; the 3rd PMIVI) when the primary channel for the Mid or High Range Noble Gas Monitor is inoperable. Specifically, IF other Noble Gas Monitoring channels are available on that effluent pathway, THEN monitoring should be assumed with those channels as the 2nd PMM. In summary, the 3rd PMM (ie; obtaining grab gas samples every 12 hours) should only be performed as a last resort to a complete lack of continuous noble gas monitoring channels being available on that effluent pathway. Based on the above, this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. . This procedure change implements a Corrective Action per CR03 -06123-01. 8.2,20.2.4 Procedure 1/2-ODC-3.03, Rev 3: Changing the activity limits for liquid storage tanks does not affect original plant accident analyses. Specifically, the original analyses were performed in accordance with NUREG-0800 SRP 15.7.3 using the best available data at that time. The updated analyses were also performed in accordance the same NUREG, but current (more accurate) data was used to determine allowable activity content in each tank. Based on the above, this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. This procedure change implements a Corrective Action per CR03-07487-05.

(Page 47 of 84) Beaver Valley Power Station Procedureur:

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 47 of 84 8.2.20.2.5 Procedure 1/2-ODC-3.03, Rev 3: Changing Attachment K Table 4.11-2 to add more specific guidance for sampling of Gaseous Effluent Pathways is considered a simple change. Specifically, this change merely prevents unnecessary sampling of unaffected ventilation pathways. Based on the above, this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. This procedure change implements a Corrective Action per CR03-06281-01. 8.2.21 Change (21) of BV-1 and 2 ODCM (Effective November 2004) 8.2.21.1 A description of the changes implemented with this revision are as follows: 8.2.21.1.1 Procedure 1/2-ODC-1.01, Rev 4, Procedure 1/2-ODC-2.01, Rev 3 and Procedure 1/2-ODC-3.03. Rev 4: Changed ownership of procedures from the Radiation Protection Section to the Nuclear Environmental & Chemistry Section per CR05-01169-14, CR05-01169-15 and CR05-01169-21. 8.2.21.1.2 Procedure 1/2-ODC-2.01, Rev 3: Changed Attachment D to correct the volume of Liquid Waste Drain Tanks (2LWS-TK21A/21B) from 7,500 gal/tank to 10,000 gal/tank. 8.2.21.1.3 Procedure 1/2-ODC-3.03, Rev 4: Changed Attachment C to implement the increased flexibility in Mode restraints that is described in LAR 1A-321/2A-193 and CR03-09288-19. 8.2.21.1.4 Procedure 1/2-ODC-3.03, Rev 4: Corrected a typographical error in Attachment 0, Control 3.11.2.5 per CR03-11726-01. Specifically, the final word in Action (a) was changed from "nad" to "and". 8.2.21.1.5 Procedure 1/2-ODC-3.03, Rev 4: Revised Attachment F, (Table 3.3-13 and 4.3-13) to correct a typographical error per CR04-01643-01. Specifically, the Asset Number for the Vacuum Gauge used for measurement of sample flow (from the Alternate Sampling Device) was changed from [PI- 1GW- 13] to [PI-1GW-135]. 8.2.21.1.6 Procedure 1/2-ODC-3.03, Rev 4: Revised Attachment F, (Table 3.3-13 and 4.3-13) per CR04-02275-01. Specifically, clarification was provided to indicate that the "Sampler Flow Rate Monitors are the devices used for "Particulate and Iodine Sampling". 8.2.21.1.7 Procedure 1/2-ODC-3.03, Rev 4: Revised Attachment J, Control 3.11.1.4, ACTION a, to add clarification that requires specific calculation of 10 CFR Part 20 EC's when the individual tank limits are exceeded.

(Page 48 of 84) Procedure Numbter: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: vel Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes 01 Revision: 8 Page Number: 48 of 84 8.2.21.2 The justifications used for change (21) of the ODCM are as follows: 8.2.21.2.1 Procedure 1/2-ODC-1.01, Rev 4, Procedure 1/2-ODC-2.01, Rev 3 and Procedure 1/2-ODC-3.03, Rev 4: Changing ownership of these procedures from Radiation Protection to Nuclear Environmental & Chemistry is considered a procedure correction. SINCE the changes merely transfers RETS, REMP and ODCM responsibilities to a different manager, THEN the changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, the changes will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. The procedure changes implement Corrective Actions per CR05-01169-14, CR05-01169-15, and CR05-01169-21.

8.2.21.2.2 Procedure 1/2-ODC-2.01, Rev 3: Changing the volume of the Unit 2 Liquid Waste Tank is considered a procedure correction. SINCE this was a typographical error on the Attachment, THEN it does not impact the actual tank volume that is used in effluent release calculations and offsite dose determinations. Therefore, this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. 8.2.21.2.3 Procedure 1/2-ODC-3.03. Rev 4: Changing Attachment C to implement the increased flexibility in Mode restraints (described in LAR IA-321/2A-193) is considered a simple change. SINCE the change implements guidance provided in the Technical Specifications, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. This procedure change implements a Corrective Action per CR03-09288-19. 8.2.21.2.4 Procedure 1/2-ODC-3.03, Rev 4: The typographical error in Attachment 0, Control 3.11.2.5 is considered a procedure correction. Therefore, this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. This procedure change implements a Corrective Action per CR03-11726-01.

- (Page 49 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Lvel 0 Use: 1/2 General Skill Reference Page Number: ODCM: Index, Matrix and History of ODCM Changes Revision: 8 49 of 84 8.2.21.2.5 Procedure 1/2-ODC-3.03, Rev 4: Correcting the typographical error in Attachment F, (Table 3.3-13 and 4.3-13) is considered a procedure correction. SINCE thischange merely corrects an obvious error, THEN this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. This procedure change implements a Corrective Action per CR04-01643-01.

8.2.21.2.6 Procedure 1/2-ODC-3.03, Rev 4: Providing clarification for the Sampler Flow Rate Monitors is considered a simple change, because it was possible to misinterpret which filter paper sampler (e.g.; moving filter or fixed filter) the specification was referring to. SINCE no changes were made to actual samplers used for effluent release calculations or offsite dose determinations, THEN this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. This procedure change implements a Corrective Action per CR04-02275-01. 8.2.21.2.7 Procedure 1/2-ODC-3.03, Rev 4: Providing clarification that requires calculation of 10 CFR Part 20 EC's (when the individual tank limits are exceeded) is considered a simple change. Specifically, the individual tank limits were derived from an assumed source-term and may not be representative of the actual source term at time of sample. This clarification also ensures that a "Special Report" is submitted only when the 10 CFR Part 20 EC limits are actually exceeded (i.e.; when calculated using actual sample analysis) at the nearest surface water supply and the nearest potable water supply in the unrestricted area. Per Calculation Package No. ERS-ATL 007 (3.2.3.9), the nearest surface water supply and the nearest potable water supply are considered to be the entrance to the Midland Water Treatment Facility. SINCE no changes were made to the bases for the tank activity limits, THEN this change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, this change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation.

(Page 50 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-I.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference ODCM: Index" Matrix and History of ODCM Changes Page Number: oevision: 1 8 50 of 84 8.2.22 Change (22) of BV-1 and 2 ODCM (Effective August 2006) 8.2.22.1 A description of the changes implemented with this revision are as follows: 8.2.22.1.1 Procedure 1/2-ODC-2.01, Rev 4: Incorporated Improved Technical Specification Reference changes from T.S. 6.8.6 to T.S. 5.5.2, per CR05-03306. Revised the alarm setpoints of [RM-1RM-100] and [RM-1DA-100] via vendor calculation Package No. 8700-UR(B)-223. These changes reflect the Extended Power Uprate (EPU) at Unit 1 per ECP-04-0440, Unit 1 TS Amendment No. 275 and CR06-04908-03. Updated the figure of Liquid Effluent Release Points (Attachment D, Figure 1.4-3) to incorporate a modified version of Plant Drawing No. 8700-RM-27F per CR05-03854-01. 8.2.22.1.2 Procedure 1/2-ODC-2.02, Rev 2: Changed ownership of procedure from the Radiation Protection Section to the Nuclear Environmental & Chemistry Section per CR05-01169-16. Incorporated a "<" designation for all low range noble gas effluent monitor alarm setpoints to meet the provisions of vendor calculation Package No. 8700-UR(B)-223. These changes reflect the Extended Power Uprate (EPU) at Unit 1 per ECP-04-0440, Unit 1 TS Amendment No. 275 and CR06-04908-04. 8.2.22.1.3 Procedure 1/2-ODC-3.03, Rev 5: Revised the alarm setpoints of the mid range and high range noble gas effluent monitors via vendor calculation Package No. 8700-UR(B)-223. These changes reflect the Extended Power Uprate (EPU) at Unit 1 per ECP-04-0440, Unit 1 TS Amendment No. 275 and CR06-04908-03. 8.2.22.2 The justifications used for change (22) of the ODCM are as follows: 8.2.22.2.1 Procedure 1/2-ODC-2.01, Rev 4: Updating the alarm setpoints and the figure of liquid effluent release points are considered procedure corrections, because they merely update the ODCM to agree with previously approved documents that were implemented with TS Amendments. SINCE the change merely updates the ODCM, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. SINCE PORC review & acceptance is required per TS 6.14 and 1/2-ADM-1640, THEN the review is considered complete per Regulatory Applicability Determination RAD-06-03831, RAD-06-01658 and RAD-06-05070. As previously noted, these procedure changes implement Corrective Actions per CR06-04908-03, and CR05-03854-01.

'(Page 51 of 84) Procedure Number: Beaver Valley Powcr Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 51 of 84 8.2.22.2.2 Procedure 1/2-ODC-2.02, Rev 2: Changing the ownership of the procedure and updating the alarm setpoints with a "<"designation are considered procedure corrections, becausethey merely update the ODCM to agree with previously approved documents that were implemented with TS Amendments. SINCE the change merely updates the ODCM, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. SINCE PORC review & acceptance is required per TS 6.14 & 1/2-ADM-1640, THEN the review is considered complete per Regulatory Applicability Determination RAD-06-03831 and RAD-06-01658. As previously noted, these procedure changes implement Corrective Actions per CR05-01169-16 and CR06-04908-04.

8.2.22.2.3 Procedure 1/2-ODC-3.03, Rev 5: Updating the alarm setpoints is considered a procedure correction, because this merely updates the ODCM to agree with previously approved documents that were implemented with TS Amendments. SINCE the change merely updates the ODCM, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. SINCE PORC review & acceptance is required per TS 6.14 & 1/2-ADM-1640, THEN the review is considered complete per Regulatory Applicability Determination RAD-06-03831 and RAD-06-01658. As previously noted, these procedure changes implement Corrective Actions per CR06-04908-03.

8.2.23 Change (23) of BV-1 and 2 ODCM (Effective December 2006) 8.2.23.1 A description of the changes implemented with this revision are as follows: 8.2.23.1.1 Procedure 1/2-ODC-1.01, Rev 5: Changed Attachment C, Table F: 3a of the procedure matrix to add Form 1/2-ENV-01.04.FOI as documentation for performing a Channel Functional Test of the Unit I Primary and Alternate Gaseous Effluent Sampler Flowrate Measuring Devices per CR04-09895. Attachment C Tables were also changed to denote transition of ODCM Channel Checks from Operations (L5 Logs) to Nuclear Environmental & Chemistry (Form 1/2-ADM-0606.FO1 & F02) per CR05-01422. Also, per Improved Technical Specifications (ITS), changed Attachment C Tables to reflect change in term from CHANNEL FUNCTIONAL TEST to CHANNEL OPERATIONAL TEST (COT), and added step 4.1.2 to identify requirements for ODCM changes record review and retention requirements. Revised step 5.3 to require ODCM changes be reviewed and accepted by PORC per CR05-03306.

(Page 52 of 84) Beaver Valley Power Station Procedure Number: 1/2-0DC-1.01

Title:

.... Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 52 of 84 8.2.23.1.2 Procedure 1/2-ODC-2.01, Rev 5: Revised the alarm setpoints of [2SWS-RQ 101] via vendor calculation Package No. 10080-UR(B)-508. These changes reflect the Extended Power Uprate (EPU) at Unit 2 per ECP 0441, Unit 2 TS Amendment No. 156 and CR06-6476-01. 8.2.23.1.3 Procedure 1/2-ODC-2.03, Rev 1: Updated the existing REMP sampling locations with the most recent survey results that were performed using a Global Positioning System per CR05-01390-02. 8.2.23.1.4 Procedure 1/2-ODC-3.02, Rev 2: Changed ownership of procedure from the Radiation Protection Section to the Nuclear Environmental & Chemistry Section per CR05.-01169-20. 8.2.23.1.5 Procedure 1/2-ODC-2.03, Rev 1, Procedure 1/2-ODC-2.04, Rev 1 and Procedure 1/2-ODC-3.01, Rev 1: Changed ownership of procedures from the Radiation Protection Section to the Nuclear Environmental & Chemistry Section per CR05-0 1169-17, CR05-01169-18 and CR06-01169-19. 8.2.23.2 The justifications used for change (23) of the ODCM are as follows: 8.2.23.2.1 Procedure 1/2-ODC-1.01, Rev 5: Changing Attachment C, Table F: 3a of the procedure matrix to add Form 1/2-ENV-01.04.F01 as documentation for performing the Channel Functional Test of the Unit 1 Primary and Alternate Gaseous Effluent Sampler Flowrate Measuring Devices is considered a procedure correction, because no Acceptance Criteria was altered. Transition of ODCM Channel Checks from Operations (L5 Logs) to Nuclear Environmental & Chemistry (Form 1/2-ADM-0606.FO1 & F02) isalso considered a procedure correction, because the no Acceptance Criteria was altered. SINCE these changes merely correct the procedure matrix, THEN the changes will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. As previously noted, these procedure changes implement Corrective Actions per CR04-09895, CR05-01422 and CR05-03306.

(Page 53 of 84) Beaver Valley Power Station ProcedureNumber: 1/2-ODC-1.01

Title:

Unit Level OfUse: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 53 of 84 8.2.23.2.2 Procedure 1/2-ODC-2.01, Rev 5: Updating the alarm setpoints is considered a procedure correction, because this merely updates the ODCM to agree with previously approved documents that were implemented with TS Amendments. SINCE the change merely updates the ODCM, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. SINCE PORC review & acceptance is required per TS 6.14 & 1/2-ADM-1640, THEN the review is considered complete per Regulatory Applicability Determination RAD-06-04585. As previously noted, these procedure changes implement Corrective Actions per CR06-6476-01.

8.2.23.2.3 Procedure 1/2-ODC-2.03. Rev 1: Updating the existing REMP sampling locations with the most recent survey results that were performed using a Global Positioning System is considered a procedure correction. SINCE the change provides more accurate distances to existing REMP sampling locations, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. The procedure change implements Corrective Actions per CR04-00149-12 and CR05-01390-02. 8.2.23.2.4 Procedure 1/2-ODC-2.03, Rev 1, Procedure 1/2-ODC-2.04, Rev 1 and Procedure 1/2-ODC-3.01, Rev 1: Changing ownership of these procedures from Radiation Protection to Nuclear Environmental & Chemistry is considered a procedure correction. SINCE the changes merely transfers RETS, REMP and ODCM responsibilities to a different manager, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR

50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. These procedure changes implement Corrective Actions per CR05-01169-17, CR05-01169-18 and CR06-01169-19.

8.2.24 Change (24) of BV-1 and 2 ODCM (Effective May 2007) 8.2.24.1 A description of the changes implemented with this revision are as follows: 8.2.24.1.1 Procedure 1/2-ODC-3.03, Rev 6: Incorporated Improved Technical 0 Specifications (ITS). This includes transfer of programmatic controls for BV-2 Noble Gas Effluent Steam Monitors [2MSS-RQ101A], [2MSS-RQ101B] and [2MSS-RQ101 C] from the Technical Specifications to ODCM procedure 1/2-ODC-3.03 (Attachment D Tables 3.3-6 and 4.3-3). Reference CR05-03306.

(Page 54 of 84) Procedure Number: Beave'r Vallcy Power Station 1/2-ODC-1.01

Title:

.. Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1 8 54 of 84 8.2.24.1.2 Procedure 1/2-ODC-3.03, Rev 6: Revised Attachment J to update the outside liquid storage tank activity limits via Calculation Package No. ERS-ATL 007, R2. Reference SAP Order 200197646-0110. 8.2.24.1.3 Procedure 1/2-ODC-3.03, Rev 6: Revised Attachment E to clarify that the Applicability for tank level indicating devices is during additions to the tank. Reference CR06-04944. 8.2.24.1.4 Procedure 1/2-ODC-3.03, Rev 6: Revised Attachment E Table 3.3-12 to add an alternate Action when the primary Flow Rate Measurement Device [FT-1CW-101-1] is not OPERABLE. The alternate Action (25) uses local measurements (as described in 1MSP-3 1.06-I) to determine a total dilution flow rate during liquid effluent releases. Reference SAP Order 200240681. 8.2.24.1.5 Procedure 1/2-ODC-3.03, Rev 6: Revised Attachment F Tables 3.3-13 and 4.3-13 to clarify the Functional Location of the Sampler Flow Rate Monitors for the BV-2 gaseous effluent release pathways. Specifically, the procedure was changed to refer to Functional Location [2HVS-FIT 101-1 ] instead of [2HVS-FIT101], [2RMQ-FIT301-1] instead of [2RMQ-FIT301], [2HVL-FIT 112-1] instead of [2HVL-FIT112], and [2RMQ-FIT303-1] instead of [2RMQ-FIT303,]. Reference CR07-12924 and SAP Order 200247228-0410. 8.2.24.2 *Thejustifications used for change (24) of the ODCM are as follows: 8.2.24.2.1 Procedure 1/2-ODC-3.03, Rev 6: Incorporating the Improved Technical Specifications (ITS) is considered a simple change, because this was performed in accordance with the guidance provided in Unit 1/2 Technical Specification Amendments No. 278/16 1. The ITS upgrade includes transfer of programmatic controls for BV-2 Noble Gas Effluent Steam Monitors [2MSS-RQ1OIA], [2MSS-RQIO1B] and [2MSS-RQ101C] from the Technical Specifications to ODCM procedure 1/2-ODC-3.03 (Attachment D Tables 3.3-6 and 4.3-3. SINCE the change was performed in accordance with the TS Amendments, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.3 6a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. PORC review and acceptance of this change was completed in May 2007. The procedure change implements Corrective Actions per CR05-03306.

-(Page 55 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit Level OfUse: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 1 8 - Page Number: 55 of 84 8.2.24.2.2 Procedure 1/2-ODC-3.03. Rev 6: Revising Attachment J to update the outside liquid storage tank activity limits via Calculation Package No. ERS-ATL-95-007, R2 is considered a simple change, because this change merely implements updated release volumes and source-terms from other station documents. SINCE the change was performed in accordance with the guidance provided in Standard Review Plan 15.7.3 of NUREG-0800, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. PORC review and acceptance of this change was completed in May 2007. The procedure change implements Corrective Actions per SAP Order 200197646-0110. 8.2.24.2.3 Procedure 1/2-ODC-3.03, Rev 6: Revising Attachment E to indicate that the Applicability for tank level indicating devices is during additions to the tank is considered a simple change, because this merely clarifies the existing Applicability of the instrument. SINCE this change merely provides clarification of existing Applicability, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. PORC review and acceptance of this change was completed in May 2007. The procedure change implements Corrective Actions per CR06-04944-01. 8.2.24.2.4 Procedure 1/2-ODC-3.03, Rev 6: Revising Attachment E Table 3.3-12 to add an alternate Action when the primary Flow Rate Measurement Device [FT-1CW-101-1] is not OPERABLE is considered a simple change, because use of an alternate Action does not modify the intent of estimating flow rate when the primary and alternate flow rate instruments are not OPERABLE. SINCE this change merely provides an alternate means of estimating dilution flow rate during liquid releases, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. PORC review and acceptance of this change was completed in May 2007. The procedure change implements Corrective Actions per SAP Order 200240681.

(Page 56 of 84) Pr6*e-dure Number: Beaver Valley Power Station 1/2-oDC-1.01

Title:

Unit: vel Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 56 of 84 8.2.24.2.5 Procedure 1/2-ODC-3.03, Rev 6: Revising Attachment F Tables 3.3-13 and 4.3-13 to clarify the Functional Location of the Sampler Flow Rate Monitors for the BV-2 gaseous effluent release pathways is considered a simple change, because this merely clarifies the actual Functional Location in use. SINCE this change merely updates a location title, THEN the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50. Also, the change will not impact the accuracy or reliability of effluent dose or alarm setpoint calculation. PORC review and acceptance of this change was completed in May 2007. The procedure change implements Corrective Actions per CR07-12924 and SAP Order 200247228-0410.

                                                           - END -

(Page 57 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 57 of 84 ATTACHMENT A Page 1 of 6 LIST OF ODCM TABLES LIQUID EFFLUENTS Included in Procedure 1/2-ODC-2.01 1.1-1a BV-1 Liquid Source Term 1.1-lb BV-2 Liquid Source Term 1.2-1a BV-l Recirculation Times Required Before Sampling Of Liquid Discharge Tanks 1.2-1b BV-2 Recirculation Times Required Before Sampling Of Liquid Discharge Tanks 1.3-1 A,, Values For An Adult For The Beaver Valley Site GASEOUS EFFLUENTS Included in Procedure 1/2-ODC-2.02 2.1-1a BV-1 Radionuclide Mix For Gaseous Effluents 2.1-1b BV-2 Radionuclide Mix For Gaseous Effluents 2.1-2a BV- 1 Monitor Detector Efficiencies 2.1-2b BV-2 Monitor Detector Efficiencies 2.2-1 Modes Of Gaseous Release From Beaver Valley Site Vents For Implementation Of 10 CFR 20 And 10 CFR 50 2.2-2a BV-1 Radionuclide Mix For Gaseous Effluents 2.2-2b BV-2 Radionuclide Mix For Gaseous Effluents 2.2-3 Distances Of Limiting Maximum Individual Receptors To Release Points For Annual x/Q Values ANNUAL AVERAGE x/0 Included in Procedure 1/2-ODC-2.02 2.2-4 BV-1 And 2 Containment Vents (Ground Release) 2.2-5 BV-1 And 2 Ventilation Vents (Ground Release) 2.2-6 BV-1 And 2 Process Vent (Elevated Release) 2.2-7 BV-1 And 2 Turbine Building Vents (GroundRelease) 2.2-8 BV-2 Decontamination Building Vent (Ground Release)

(Page 58 of 84) Procedure Number: . Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 58 of 84 ATTACHMENT A Page 2 of 6 LIST OF ODCM TABLES 2.2-9 BV-2 Waste Gas Storage Vault Vent (Ground Release) 2.2-10 BV-2 Condensate Polishing Building (Ground Release) NOBLE GAS DOSE FACTORS AND DOSE PARAMETERS Included in 1/2-ODC-2.02 2.2-11 Dose Factors For Noble Gases And Daughters 2.2-12 Dose Parameters For Finite Elevated Plumes, Beaver Valley Site P&I DOSE PARAMETERS Included in 1/2-ODC-2.02 2.2-13 Pit Values For A Child For The Beaver Valley Site MODES OF GASEOUS RELEASES Included in Procedure 1/2-ODC-2.02 2.3-1 Modes Of Gaseous Release From The Beaver Valley Site Vents For Implementation Of 10 CFR 20 And 10 CFR 50 P&I ORGAN DOSE FACTORS Included in 1/2-ODC-2.02 2.3-2 R Values for Inhalation - Adult 2.3-3 R Values for Inhalation - Teen 2.3-4 R Values for Inhalation - Child, 2.3-5 R Values for Inhalation - Infant 2.3-6 R Values for Ground 2.3-7 R Values for Vegetation - Adult 2.3-8 R Values for Vegetation - Teen 2.3-9 R Values for Vegetation - Child 2.3-10 R Values for Meat - Adult 2.3-11 R Values for Meat - Teen 2.3-12 R Values for Meat - Child 2.3-13 R Values for Cow Milk - Adult 2.3-14 R Values for Cow Milk - Teen

-(Page 59 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 59 of 84 ATTACHMENT A Page 3 of 6 LIST OF ODCM TABLES 2.3-15 R Values for Cow Milk - Child 2.3-16 R Values for Cow Milk - Infant 2.3-17 R Values for Goat Milk - Adult 2.3-18 R Values for Goat Milk - Teen 2.3-19 R Values for Goat Milk - Child 2.3-20 R Values for Goat Milk - Infant CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 Miles) Included inPnxedure 1/2-ODC-2.02 2.3-21 BV-1 And 2 Process Vent (Elevated Release) 2.3-22 BV-1 And 2 Containment Vents (Ground Release) 2.3-23 BV- 1 And 2 Ventilation Vents (Ground Release) 2.3-24 BV-1 And 2 Turbine Building Vents (Ground Release) 2.3-25 BV-2 Condensate Polishing Building (Ground Release) 2.3-26 BV-2 Decontamination Building Vent (Ground Release) 2.3-27 BV-2 Waste Gas Storage Vault Vent (Ground Release) CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) Included in Procedure 1/2-ODC-2.02 2.3-28 BV-1 And 2 Process Vent (Elevated Release) 2.3-29 BV-1 And 2 Containment Vents (Ground Release) 2.3-30 BV-1 And 2 Ventilation Vents (Ground Release) 2.3-31 BV- 1 And 2 Turbine Building Vents (Ground Release) 2.3-32 BV-2 Condensate Polishing Building (Ground Release) 2.3-33 BV-2 Decontamination Building Vent (Ground Release) 2.3-34 BV-2 Waste Gas Storage Vault Vent (Ground Release)

(Page 60 of 84) Procedure Number: _ Beaver Valey Power Station ___ _ __ _ _ _ __ _ _ _ _ __ _ _ _ _ _1__ _ _ /2-ODC-1.01 1/ooODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM:. Index, Matrix and History of ODCM Changes Revision: Page Number: 8 60 of 84 ATTACHMENT A Page 4 of 6 LIST OF ODCM TABLES BATCH RELEASE DISPERSION PARAMETERS (Special Distances) Included in Procedure 1/2-ODC-2.02 2.3-35 BV-I And 2 Containment Vents (Ground Release) 2.3-36 BV-1 And 2 Ventilation Vents (Ground Release) 2.3-37 BV-1 And 2 Process Vent (Elevated Release) BATCH RELEASE DISPERSION PARAMETERS (0-5 Miles) Included in Procedure 1/2-ODC-2.02 2.3-38 BV-1 And 2 Process Vent (Elevated Release) ENVIRONMENTAL MONITORING Included in Procedure 1/2-ODC-2.03 3.0-1 Radiological Environmental Monitoring Program DISPERSION CALCULATION Included in Procedure 1/2-ODC-3.01 A: 1 BV-1 And 2 Release Conditions INPUTS TO COMPUTER CODES Included in Procedure 1/2-ODC-3.01 B: la Inputs To GALE Code For Generation Of BV-1 Liquid Source Term Mixes B: lb Inputs To SWEC LIQ1BB Code For Generation Of BV-2 Liquid Source Term Mixes B:2a Inputs To SWEC GAS1BB Code For Generation Of BV-1 Gaseous Source Term Mixes B:2b Inputs To SWEC GAS 1BB Code For Generation of BV-2 Gaseous Source Term Mixes ODCM CONTROLS Included in Procedure l/2-ODC-3.03 C: 1.1 Operational Modes C: 1.2 Frequency Notation C:3.3-6 Radiation Monitoring Instrumentation C:4.3-3 Radiation Monitoring Instrumentation Surveillance Requirements C:3.3-12 Radioactive Liquid Effluent Monitoring Instrumentation C:4.3-12 Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements C:3.3-13 Radioactive Gaseous Effluent Monitoring Instrumentation

-(Page 61 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 61 of 84 ATTACHMENT A Page 5 of 6 LIST OF ODCM TABLES C:4.3-13 Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements C:4. 11-1 Radioactive Liquid Waste Sampling And Analysis Program C:4.11-2 Radioactive Gaseous Waste Sampling And Analysis Program C:3. 12-1 Radiological Environmental Monitoring Program C:3.12-2 Reporting Levels For Radioactivity Concentrations In Environmental Samples C:4.12-1 Maximum Values For The' Lower Limits Of Detection (LLD) FORMAT FOR ANNUAL REPORT Included in Procedure 1/2-ODC-3.03 E:6.9-1 Environmental Radiological Monitoring Program Summary ODCM CONTROLS PROCEDURE MATRIX Included in Procedure 1/2-ODC-1.01 F: 1a BV- I Radiation Monitoring Instrumentation Surveillance F: lb BV-2 Radiation Monitoring Instrumentation Surveillance F:2a BV- I Liquid Effluent Monitor Surveillances F:2b BV-2 Liquid Effluent Monitor Surveillances F:3a BV-1 Gaseous Effluent Monitor Surveillances F:3b BV-2 Gaseous Effluent Monitor Surveillances FA4 BV-I and 2 Liquid Effluent Concentration Surveillances F:5 BV-I and 2 Liquid Effluent Dose Surveillances F:6 BV-1 and 2 Liquid Effluent Treatment Surveillances F: 7 BV-I and 2 Liquid Storage Tank Activity Limit Surveillances F: 8 BV-1 and 2 Gaseous Effluent Dose Surveillances F:9 BV-I and 2 Gaseous Effluent Air Dose Surveillances F: 10 BV- 1 and 2 Gaseous Effluent Particulate and Iodine Dose Surveillances F: 11 BV-I and 2 Gaseous Effluent Treatment Surveillances

(Page 62 of 84) Bt- Procedure Number: Bcavcr Valley Power SLatlon 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 62 of 84 ATTACHMENT A Page 6 of 6 LIST OF ODCM TABLES F: 12a BV-I Gaseous Storage Tank Activity Limit Surveillances F: 12a BV-2 Gaseous Storage Tank Activity Limit Surveillances F: 13 BV-1 and 2 Total Dose Surveillances F: 14 BV-I and 2 REMP Surveillances F: 15 BV-1 and 2 Land Use Census Surveillances F: 16 BV-1 and 2 Interlaboratory Comparison Program

"(Page 63 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 63 of 84 ATTACHMENT B Page I of I LIST OF ODCM FIGURES LIQUID EFFLUENTS Included in Procedure 1/2-ODC-2.01 1.4-1 BV-1 Liquid Radwaste System 1.4-2 BV-2 Liquid Radwaste System 1.4-3 BV-I and 2 Liquid Effluent Release Points 5-1 Site Boundary For Liquid Effluents GASEOUS EFFLUENTS Included in Procedure l/2-ODC-2.02 2.4-1 BV-I and 2 Gaseous Radwaste System 2.4-2 BV-1 and 2 Gaseous Effluent Release Points 5-1 Site Boundary For Gaseous Effluents RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM Included in Procedure 1/2-ODC-2.03 3.0-1 Air Sampling Locations 3.0-2 TLD Locations 3.0-3 Shoreline Sediment, Surface Water, And Drinking Water Sampling Locations 3.0-4 Milk Sampling Locations 3.0-5 Foodcrop Sampling Locations 3.0-6 Fish Sampling Locations

(Page 64 of 84) Beaver Valley Power Station

                                                                                          .      .Proedure Nubeo".

1/2-ODC-1 . .01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Index, Matrix and History of ODCM Changes Revision: 8 64 of 84 ATTACHMENT C Page ] of2l ODCM CONTROLS PROCEDURE MATRIX BV-1 RADIATION MONITORING INSTRUMENTION SURVEILLANCES TABLE F: la 1/2-ODC-3.03, Attachment D Control 3.3.3.1: Maintain Radiation Monitoring Channels in Table 3.3-6 OPERABLE APPLICABILITY: MODES 1 thru 4 ODCM SR DESCRIPTION PROCEDURE 4.3.3.1 Test Monitors at Table 4.3-3 Frequency 4.3.3.1.1 Noble Gas Effluent Monitors - NOTE: Actions for INOPERABLE Monitors are SPINGS documented in the Operations & Rad Effluent Shift Logs. 4.3.3.1.1.a Supplementary Leak Collection and 1MSP-43.59-1: Channel Calibration Release System Form 1/2-ADM-1611i.F03: Channel Check or (RM-1VS-110 CH7 & CH9) Form 1/2-ADM-0606.FO1: Channel Check 1OST-43.07: Channel Operational Test 4.3.3.1.1. b Auxiliary Building Ventilation System 1MSP-43.60-1: Channel Calibration (RM-1VS-109 CH7 & CH9) Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check IOST-43.07: Channel Operational Test 4.3.3.1.1.c Process Vent System (RM-1GW-109 1MSP-43.58-1: Channel Calibration CH7 & 9) Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check 1OST-43.07: Channel Operational Test 4.3.3.1.2 Noble Gas Steam Effluent NOTE: Actions for INOPERABLE Monitors are Monitors documented in the Operations & Rad Effluent Shift Logs. 4.3.3.1.2.ci Atmospheric Steam Dump Valve and 1MSP-43.62-1: RM-1 MS-1 00A Channel Calibration v.1.2a Code Safety Valve Discharge 1MSP-43.63-1: RM-1MS-1OOB Channel Calibration (RM-1MS-100A, B, C) IMSP-43.64-1: RM-1MS-100C Channel Calibration Form 1/2-ADM-1611i.F03: Channel Check or Form 1/2-ADM-0606.F01: Channel Check 1OST-43.05: Channel Oerational Test 4.3.3.1.2. b Auxiliary Feedwater Pump Turbine 1MSP-43.65-1: Channel Calibration Exhaust (RM-iMS-101) Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check 1OST-43.05: Channel Operational Test

-(Page 65 of 84) Beaver Valley Power Station Procedure Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 65 of 84 ATTACHMENT C Page 2 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-2 RADIATION MONITORING INSTRUMENTION SURVEILLANCES TABLE F: lb 1/2-ODC-3.03, Attachment D Control 3.3.3.1: Maintain Radiation Monitoring Channels in Table 3.3-6 OPERABLE APPLICABILITY: MODES 1 thru 4 ODCM SR DESCRIPTION PROCEDURE 4.3.3.1 Test Monitors at Table 4.3-3 Frequency 4.3.3.1.1 Noble Gas Effluent Monitors NOTE: Actions for INOPERABLE Monitors are documented in the Operations & Rad Effluent Shift Logs. 4.3.3.1.2. Supplementary Leak Collection and 2MSP-43.33-1: Channel Calibration c.i.1.1.a Release System (2HVS-RQ109C & D) Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 2OST-43-08: Channel Operational Test

(Page 66 of 84) Procedure Number" Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Page Number: ORevision: 8 66 of 84 ATTACHMENT C Page 3 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 LIQUID EFFLUENT MONITOR SURVEILLANCES TABLE F: 2a 1/2-ODC-3.03. Attachment E Control 3.3.3.9: Maintain Liquid Effluent Monitors in Table 3.3-12 OPERABLE APPLICABILITY: During Releases Through The Flow Path ODCM SR DESCRIPTION PROCEDURE 4.3.3.9 Test Monitors at Table 4.3-12 Frequency 4.3.3.9.1 Monitors Providing Alarm and NOTE: Actions for INOPERABLE monitors are documented in the Automatic Termination Operations & Rad Effluent Shift Logs. 4.3.3.9.1 .a Liquid Radwaste Effluent Line 1MSP-43.18-1: Channel Calibration (RM-1 LW-1 04) Form 1/2-ENV-05.04.F01: Source Check I/20M-17.4A.D: Source Check 1OST-43.09: Channel Operational Test Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.F01: Channel Check 4.3.3.9.1.b Liquid Waste Contaminated Drain Line 1MSP-43.23-l: Channel Calibration (RM-1 LW-1 16) Form 1/2-ENV-05.04.F01: Source Check 1/20M-17.4A.D: Source Check IOST-43.09: Channel Operational Test Form 1/2-ADM-1611..F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check 4.3.3.9.1 .c Auxiliary Feed Pump Bay Drain Monitor I MSP-43.70-1: Channel Calibration (RM-1 DA-1 00) 1OM-54.3 L5 Log: Source Check 1OST-43.09: Channel Operational Test Form I/2-ADM-1611i.F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check 4.3.3.9.2 Monitors Providing Alarm, but Not NOTE: Actions for INOPERABLE monitors are documented in the Prividing Auto Termination Operations & Rad Effluent Shift Logs. 4.3.3.9.2.a Component Cooling - Recirculation Spray 1MSP-43.10-1: Channel Calibration Hx River Water Monitor 1OST-43.09: Channel Operational Test (RM-1 RW-1 00) 1OST-43.09A: Source Check Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.F01: Channel Check 4.3.3.9.3 Flow Rate Measurement Devices NOTE: Actions for INOPERABLE monitors are documented in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.04 4.3.3.9.3a,b Liquid Radwaste Effluent Lines 1MSP-1 7.05-1: Channel Calibration (3b) 3a: (FR-i LW-1 04 for RM-1 LW-1 04) 1MSP-1 7.06-1: F-LW-i 04-1 Channel Calibration (3a) 3b: (FR-1 LW-103 for RM-1LW-1 16) 1MSP-17.07-1: F-LW-104-2 Channel Calibration (3a) 1MSP-1 7.08-1: F-LW-i 04-1 Channel Operational Test (3a) 1MSP-i 7.09-1: F-LW-i 04-2 Channel Operational Test (3a) 1MSP-17.10-1: F-LW-103 Channel Operational Test (3b) Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check 4.3.3.9.3.c Cooling Tower Blowdown Line 1MSP-31.04-1: F-CW-1 01 Channel Calibration (FT-1CW-101) I MSP-31.05-1: F-CW-101 Channel Operational Test (FT-1CW-101-I) IMSP-31.06-1: F-CW-101-1 Channel Calibration 1MSP-31.07-1: F-CW-1 01-1 Channel Operational Test IOM-54.3 L5 Log: FT-CW-101 Channel Check 1OM-54.3 L5 Log: FT-CW- 01-1 Channel Check 4.3.3.9.4 Tank Level Indicating Devices NOTE: Actions for INOPERABLE monitors are documented in the Operations Shift Logs 4.3.3.9.4.a Primary Water Storage Tank 1MSP-8.01-1: L-PG1 15A Channel Operational Test (LI-1 PG-1i15A for 1BR-TK-6A) 1MSP-8.03-1: L-PG1 15A Channel Calibration 1OM-54.3 L5 Log: Channel Check (When Adding to Tank) 4.3.3.9.4.b Primary Water Storage Tank 1MSP-8.02-1: L-PG-1 15B Channel Operational Test (LI-1 PG-i 15B for I BR-TK-6B) 1MSP-8.04-1: L-PG-1 15B Channel Calibration 1OM-54.3 L5 Log: Channel Check (When Adding to Tank) 4.3.3.9.4.c Steam Generator Drain Tank IMSP-17.01-1: L-LW110 Channel Operational Test (LI-1LW-1 10 for 1LW-TK-7A) 1MSP-1 7.03-1: L-LW1 10 Channel Calibration S1OM-54.3 L5 Log: Channel Check (When Adding to Tank)

-(Page 67 of 84) Beaver Valley Power Station Procedure Number: B 1/2-ODC-1.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference Revision: Page Number: ODCM: Index, Matrix and History of ODCM Changes 8 67 of 84 ATTACHMENT C Page 4 of 21 ODCM CONTROLS PROCEDURE MATRIX 4.3.3.9.4.d Steam Generator Drain Tank lMSP-17.02-1: L-LW111 Channel Operational Test (LI-1 LW-111 for 1LW-TK-7B) 1MSP-17.04-1: L-LW1 11 Channel Calibration IOM-54.3 L5 Log: Channel Check (When Adding to Tank)

(Page 68 of 84) Beaver Valley Power Station ValleyPowerStation_1/2-ODC-1.01 Procedure Number:

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 68 of 84 ATTACHMENT C Page 5 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-2 LIQUID EFFLUENT MONITOR SURVEILLANCES TABLE F: 2b 1/2-ODC-3.03, Attachment E Control 3.3.3.9: Maintain Liquid Effluent Monitors in Table 3.3-12 OPERABLE APPLICABILITY: During Releases Through The Flow Paths ODCM SR DESCRIPTION PROCEDURE 4.3.3.9 Test Monitors at Table 4.3-12 Frequency 4.3.3.9.1 Monitors Providing Alarm and NOTE: Actions for INOPERABLE monitors are Automatic Termination documented in the Operations & Rad Effluent Shift Logs. 4.3.3.9.1.a Liquid Waste Process Effluent Form 1/2-ADM-1611.F04: Channel Check or Monitor Form 1/2-ADM-0606.F02: Channel Check (2SGC-RQ100) Form 1/2-ENV-05.04.F01: Source Check 2MSP-43.39-1: Channel Calibration 1/20M-17.4A.C: Source Check 20M-25.4.L: Source Check 2OM-25.4.N: Source Check 2OST-43.03: Channel Operational Test 4.3.3.9.2 Flow Rate Measurement Devices NOTE: Actions for INOPERABLE monitors are documented in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.04 4.3.3.9.2.a Liquid Radwaste Effluent 2MSP-25.01-1: 2SGC-P26A,B Channel Calibration (2SGC-FIS100) 2MSP-25.01-1: 2SGC-P26A,B Channel Operational Test 2MSP-43.39-1: Channel Calibration Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 4.3.3.9.2.b Cooling Tower Blowdown Line 2MSP-31.04-1: Channel Calibration (2CWS-FT101) 2MSP-31.05-1: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check

(Page 69 of 84) Beaver Valley Power Station Procedureubr

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 69 of 84 ATTACHMENT C Page 6 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 GASEOUS EFFLUENT MONITOR SURVEILLANCES TABLE F: 3a 1/2-ODC-3.03, Attachment F Control 3.3.3.10: Maintain Gaseous Effluent Monitors in Table 3.3-13 OPERABLE APPLICABILITY: During Releases Through The Flow Paths ODCM SR DESCRIPTION PROCEDURE 4.3.3.10 Test Monitors at Table 4.3-13 Frequency 4.3.3.10.1 Gaseous Waste I Process Vent NOTE: Actions for INOPERABLE monitors are System documented in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.1.a Noble Gas Activity Monitor 1MSP-43.22-1: Channel Calibration Pri: (RM-1GW-108B) 1OM-19.4.E, H: Channel Check (Batch Release) Alt: (RM-IGW-109 Ch 5): for 1OM-19.4.E, H: Source Check continuous releases only, not 1/2-OM-19.4A.D: Source Check an alternate for batch releases 1/2-OM-19.4A.D: Channel Check (Batch Release) 1OST-43.09: Channel Operational Test Form 1/2-ADM-161I.F03: Channel Check or Form 1/2-ADM-0606.FO1: Channel Check 4.3.3.10.1.b Particulate & Iodine Sampler Form 1/2-ADM-1611.F03: Channel Check or Pri: Filter Paper and Charcoal Form 1/2-ADM-0606.FO1: Channel Check Cartridge for (RM-1GW-1 09) Alt: Filter Paper and Charcoal Cartridge for (RM-1GW-110) 4.3.3.10.1.c System Effluent Flow Rate 1MSP-19.05-1: Channel Operational Test Measuring Device 1MSP-19.06-1: Channel Calibration Pri: (FR-iGW-108) Form 1/2-ADM-1 611. F03: Channel Check or Alt: (RM-1GW-109 Ch 10) Form i/2-ADM-0606.FO1: Channel Check 4.3.3.10.1.d Sampler Flow Rate Measuring 1MSP-43.21-1: Channel Calibration Device Form 1/2-ENV-01.04.FOI: Channel Operational Test Pri: (RM-1GW-109 Ch 15) Form 1/2-ADM-1611.F03: Channel Check or Alt: (Rotometer: FM-1GW-101 Form 1/2-ADM-0606.F0I: Channel Check and Vacuum Gauge: PI-1GW-135 for RM-1GW-110)

             -4.3.3.10.2      Auxiliary Building Ventilation            NOTE: Actions for INOPERABLE monitors are System (Ventilation Vent)                documented in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.2.a  Noble Gas Activity Monitor                1MSP-43.13-1: Channel Calibration Pri: (RM-1VS-101B)                        1OST-43.07A: RM-1VS-109 Channel Operational Test Alt: (RM-1VS-109 Ch 5)                    IOST-43.09: Channel Operational Test 1OST-43.09A: Source Check Form 1/2-ADM-1611.F03: Channel Check or Form 112-ADM-0606.F01: Channel Check 4.3.3.10.2.b  Particulate & Iodine Sampler             Form 1/2-ADM-1611.F03: Channel Check or Pri: Filter Paper and Charcoal           Form 1/2-ADM-0606.FO1: Channel Check Cartridge for (RM-1VS-109)

Alt: Filter Paper and Charcoal Cartridge for (RM-1VS-111) 4.3.3.10.2.c System Effluent Flow Rate iMSP-44.07-1: Channel Operational Test Measuring Device 1MSP-44.08-1: Channel Calibration Pri: (FR-iVS-101) Form 1/2-ADM-1611.F03: Channel Check or Alt: (RM-1VS-109 Ch 10) Form 1/2-ADM-0606.F01: Channel Check

(Page 70 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 70 of 84 ATTACHMENT C Page 7 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 GASEOUS EFFLUENT MONITOR SURVEILLANCES Continued TABLE F: 3a 1/2-ODC-3.03, Attachment F Control 3.3.3.10: Maintain Gaseous Effluent Monitors in Table 3.3-13 OPERABLE APPLICABILITY: During Releases Through The Flow Paths ODCM SR DESCRIPTION PROCEDURE 4.3.3.10.2.d Sampler Flow Rate Measuring 1MSP-44.07-1: Channel Functional Test Device 1MSP-44.08-1: Channel Calibration Pri: (RM-1VS-109 Ch 15) Form 1/2-ENV-01.04.FO1 Channel Operational Test Alt: (Rotometer: FM-1VS-102 and Form 1/2-ADM-1611.F03: Channel Check or Vacuum Gauge: PI-1VS-659 Form 1/2-ADM-0606.FO1: Channel Check for RM-1VS-111) 4.3.3.10.3 Rx Containment / SLCRS NOTE: Actions for INOPERABLE monitors are (Elevated Release) documented in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.3.a Noble Gas Activity Monitor 1MSP-43.20-1: Channel Calibration Pri: (RM-lVS-107B) 1OM-54.3 L5 Log: RM-1VS-107B Channel Check Alt: (RM-1VS-110 Ch 5) 1OST-43.07A: RM-1VS-110 Channel Operational Test 1OST-43.09: Channel Operational Test 1OST-43.09A: Source Check Form 1/2-ADM-1611.F03: Channel Check or Form 1/2-ADM-0606.F01: Channel Check 4.3.3.10.3.b Particulate & Iodine Sampler Form 1/2-ADM-0606.FO1: Channel Check Pri: Filter Paper and Charcoal Cartridge for (RM-1VS-110) Alt: Filter Paper and Charcoal Cartridge for (RM-1VS-112) 4.3.3.10.3.c System Effluent Flow Rate 1MSP-44.09-1: Channel Calibration Measuring Device iMSP-44.10-1: Channel Operational Test Pri: (FR-i VS-112) Form 1/2-ADM-1611.F03: Channel Check or Alt: (RM-1VS-110 Ch 10) Form 1/2-ADM-0606.FO1: Channel Check 4.3.3.10.3.d Sampler Flow Rate Measuring 1MSP-43.19-1: Channel Calibration Device Form i/2-ENV-01.04.FO1: Channel Operational Test Pri: (RM-1VS-110 Ch 15) Form 1/2-ADM-1611. F03: Channel Check or Alt: (Rotometer: FM-iVS-103 and Form 1/2-ADM-0606.FO1: Channel Check Vacuum Gauge: PI-1VS-660 for RM-1VS-112)

-(Page 71 of 84) Procedure Number: Beaver Valley Power Station ___ ___ ____ ___ ____ ___ Proedre ___1/2-ODC- umer 1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: C 8 71 of 84 ATTACHMENT C Page 8 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-2 GASEOUS EFFLUENT MONITOR SURVEILLANCES Continued TABLE F: 3b 1/2-ODC-3.03, Attachment F Control 3.3.3.10: Maintain Gaseous Effluent Monitors in Table 3.3-13 OPERABLE APPLICABILITY: During Releases Through The Flow Paths ODCM SR DESCRIPTION PROCEDURE 4.3.3.10 Test Monitors at Table 4.3-13 Frequency 4.3.3.10.1 SLCRS Unfiltered Pathway NOTE: Actions for INOPERABLE monitors are documented (Ventilation Vent) in the Operations & Rad Effluent Shift Logs and 112-ENV-05.05 4.3.3.10.1.a Noble Gas Activity Monitor 2MSP-43.36-1: Channel Calibration Pri: (2HVS-RQ101B) 20ST-43.09: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 2-ENV-05.23: Source Check (DRMS Auto Function) 4.3.3.10.1.b Particulate & Iodine Sampler Form 1/2-ADM-1611.F04: Channel Check or Pri: Filter Paper and Charcoal Form 1/2-ADM-0606.F02: Channel Check Cartridge for (2HVS-RQ101A) 4.3.3.10.1.c Process Flow Rate Monitor 2MSP-43.36-1: Channel Calibration Pri: (Monitor Item 29 for 2HVS- 2MSP-43.36A-l: Channel Operational Test VP101) Work Request: Channel Calibration (Velocity Probe) Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 4.3.3.10.1.d Sampler Flow Rate Monitor 2MSP-43.36-1: Channel Calibration Pri: (2HVS-FIT101-1) 2MSP-43.36A-I: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 4.3.3.10.2 SLCRS Filtered Pathway NOTE: Actions for INOPERABLE monitors are documented (Elevated Release) in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.2.a Noble Gas Activity Monitor 2MSP-43.32-1: 2HVS-RQ109A Channel Calibration Pri: (2HVS-RQ109B) 2MSP-43.33-1: 2HVS-RQ109BC,D Channel Calibration 2OST-43.08: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 2-ENV-05.23: Source Check (DRMS Auto Function) 4.3.3.10.2.b Particulate & Iodine Sampler Form 112-ADM-1611.F04: Channel Check or Pri: Filter Paper and Charcoal Form 1/2-ADM-0606.F02: Channel Check Cartridge for (2HVS-RQ109A) 4.3.3.10.2.c Process Flow Rate Monitor 2MSP-43.32A-I: Channel Operational Test Pri: (Monitor Item 29 for 2HVS- 2MSP-43.33-1: 2HVS-RQ109B,C,D, Channel Calibration FR22) Form 1/2-ADM-1611.F04: Channel Check or 1tAlt: (2HVS-FI22A and F122C) Form 1/2-ADM-0606.F02: Channel Check 2nd Alt: (2HVS-FI22B and F122D) 4.3.3.10.2.d Sampler Flow Rate Monitor 2MSP-43.32-1: 2HVS-RQ109A Channel Calibration Pri: (Monitor Items 28 & 72 for 2MSP-43.32A-I: Channel Operational Test 2HVS-DAU109A) 2MSP-43.33-1: 2HVS-RQ109B,C,D, Channel Calibration Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check

(Page 72 of 84) Procedure Number: Beaver Valley Power Station 1/2-oDc-l.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Nuober: 1 8 72 of 84 ATTACHMENT C Page 9 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-2 GASEOUS EFFLUENT MONITOR SURVEILLANCES Continued TABLE F: 3b 1/2-ODC-3.03, Attachment F Control 3.3.3.10: Maintain Gaseous Effluent Monitors in Table 3.3-13 OPERABLE APPLICABILITY: During Releases Through The Flow Paths ODCM SR DESCRIPTION PROCEDURE 4.3.3.10.3 Decontamination Building NOTE: Actions for INOPERABLE monitors are documented Vent in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.3.a Noble Gas Activity Monitor 2MSP-43.35-1: Channel Calibration Pri: (2RMQ-RQ301B) 2OST-43.09: Channel Operational Test 2-ENV-05.23: Source Check (DRMS Auto Function) Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 4.3.3.10.3.b Particulate & Iodine Sampler Form 1/2-ADM-1611.F04: Channel Check or Pri: Filter Paper and Charcoal Form 1/2-ADM-0606.F02: Channel Check Cartridge for (2RMQ-RQ301A) 4.3.3.10.3.d Sampler Flow Rate Monitor 2MSP-43.35-1: Channel Calibration Pri: (2RMQ-FIT301-1) 2MSP-43.35A-I: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 4.3.3.10.4 Condensate Polishing NOTE: Actions for INOPERABLE monitors are documented Building Vent in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.4.a Noble Gas Activity Monitor 2MSP-43.38-1: Channel Calibration Pri: (2HVL-RQ112B) 20ST 2.43.09: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 2-ENV-05.23: Source Check (DRMS Auto Function) 4.3.3.10.4.b Particulate & Iodine Sampler Form 1/2-ADM-1611.F04: Channel Check or Pri: Filter Paper and Charcoal Form 1/2-ADM-0606.F02: Channel Check Cartridge for (2HVL-RQ1 12A) 4.3.3.10.4.d Sampler Flow Rate Monitor 2MSP-43.38-1: Channel Calibration Pri: (2HVL-FIT112-1) 2MSP-43.38A-l: Channel Operational Test Form 1/2-ADM-0606.F02: Channel Check 4.3.3.10.5 Waste Gas Storage Vault Vent NOTE: Actions for INOPERABLE monitors are documented in the Operations & Rad Effluent Shift Logs and 1/2-ENV-05.05 4.3.3.10.5.a Noble Gas Activity Monitor 2MSP-43.37-l: Channel Calibration Pri: (2RMQ-RQ303B) 2OST-43.09: Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check 2-ENV-05.23: Source Check (DRMS Auto Function) 4.3.3.10.5.b Particulate & Iodine Sampler Form 1/2-ADM-1611.F04: Channel Check or Pri: Filter Paper and Charcoal Form 1/2-ADM-0606.F02: Channel Check Cartridge for (2RMQ-RQ303A) 4.3.3.10.5.d Sampler Flow Rate Monitor 2MSP-43.37-1: Channel Calibration Pri: (2RMQ-FIT303-1) 2MSP-43.37A-I Channel Operational Test Form 1/2-ADM-1611.F04: Channel Check or Form 1/2-ADM-0606.F02: Channel Check

-(Page 73 of 84) Procedure Number: Beaver Valley Power Station l/2-ODC-1.0I

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 73 of 84 ATTACHMENT C Page 10 of 2l ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 LIQUID EFFLUENT CONCENTRATION SURVEILLANCES TABLE F: 4 1/2-ODC-3.03, Attachment G Control 3.11.1.1: Maintain Effluent Concentration within 10 Times 10CFR20 EC's APPLICABILITY: At All Times ODCM SR DESCRIPTION PROCEDURE 4.11.1.1.1.A Batch Waste Release Tanks: CHM CP 3: Sampling and Testing Sample and Analyze Radioactive CHM CP 5: Radiochemical Procedures Liquid Wastes per Table 4.11-1 CHM CP 8: Logs and Forms (Analysis) CHM CP 9: Conduct of Operation Form 1/2-ADM-1611.F03 & F04: LW Tank Sampling, or Form 1/2-ADM-0606.F01 & F02: LW Tank Sampling Form 1/2-ENV-05.01.F01: LW Tank Sampling Form 1/2-ENV-05. 11. F02: Rad Monitor Sampling 1/2-ENV-05.25: Sample Analysis Matrix 4.11.1.1.1.B Continuous Releases: CHM CP 3: Sampling and Testing Sample and Analyze Radioactive CHM CP 5: Radiochemical Procedures Liquid Wastes per Table 4.11-1 CHM CP 8: Logs and Forms (Analysis) CHM CP 9: Conduct of Operation Form 1/2-ADM-161 1.F03 & F04: LW Tank Sampling, or Form 1/2-ADM-0606.FO1 & F02: LW Tank Sampling Form 1/2-ENV-05.01.F01: LW Tank Sampling Form 1/2-ENV-05.11.F02: Rad Monitor Sampling 1/2-ENV-05.25: Sample Analysis Matrix 4.11.1.1.2 Use ODCM Methodology to Form 1/2-ENV-05.04. FO1: RWDA-L Assure Compliance 1/20M-17.4A.D: RWDA-L 4.11.1.1.3 Take Turbine Building Grab CHM CP 3: Sampling and Testing Sample When BV-1 Primary to CHM CP 5: Leak Rate Calculations Secondary Leakage Exceeds 0.1 CHM CP 8: Logs and Forms (Analysis) gpm (142 gpd) Form 1/2-ADM-1611.F03 & F04: Sump Sampling, or Form 1/2-ADM-0606.F01 & F02: Sump Sampling Form 1/2-ENV-05.01.F01: LW Tank Sampling Form 1/2-HPP-3.06.005.1F01: RWDA-L, or Form 1/2-ENV-05.04.FO1: RWDA-L Form 112-ENV-05.11.F02: Rad Monitor Sampling 1/2-ENV-05.25: Sample Analysis Matrix 4.11.1.1.4 Obtain Turbine Building Grab CHM CP 3: Sampling and Testing Sample When BV-2 Primary to CHM CP 5: Leak Rate Calculations Secondary Leakage Exceeds 0.1 CHM CP 8: Logs and Forms (Analysis) gpm (142 gpd) Form 1/2-ADM-161 1.F03 & F04: Sump Sampling, or Form 1/2-ADM-0606.FO1 & F02: Sump Sampling Form 1/2-ENV-05.01.F01: LW Tank Sampling Form 1/2-HPP-3.06.005.FO1: RWDA-L, or Form 1/2-ENV-05.04.1F01: RWDA-L Form 1/2-ENV-05. 11. F02: Rad Monitor Sampling 1/2-ENV-05.25: Sample Analysis Matrix 4.11.1.1.5 Obtain Grab Samples Prior to BV- Form 1/2-ADM-1611.F03 & F04: Sump Sampling, or 2 Recirculation Drain Pump Form 1/2-ADM-0606.F01 & F02: Sump Sampling Discharge to Catch Basin No. 16 Form 1/2-ENV-05.01.F01: LW Tank Sampling 20M-9.2: Rx Plant Vents and Drains (CB-16) 20M-9.4F: Drain RSS Pump Casing / Pit 20M 51: OM Clearance 51-86 (2DAS-P215A/B) 1/2-ENV-05.25: Sample Analysis Matrix

(Page 74 of 84) Pro~edure Number: yPower Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 74 of 84 ATTACHMENT C Page 11 of 2l ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 LIQUID EFFLUENT DOSE SURVEILLANCES TABLE F: 5 1/2-ODC-3.03. Attachment H Control 3.11.1.2: Liquid Effluent Dose APPLICABILITY: At All Times ODCM SR DESCRIPTION PROCEDURE 4.11.1.2. Using the ODCM - Determine Form 1/2-HPP-3.06.005.F01: RWDA-L, or 1 Cumulative Dose From Liquid Form 1/2-ENV-05.04.FO1: RWDA-L Effluents Every 31 Days SAP Order (Issue NPD3NRE Letter: Monthly Dose Projection) 1/20M-17.4A.D: RWDA-L

.(Page 75 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Index, Matrix and History of ODCM Changes Revision: 8 75 of 84 ATTACHMENT C Page 12 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 LIQUID EFFLUENT TREATMENT SURVEILLANCES TABLE F: 6 112-ODC-3.03. Attachment I Control 3.11,1.3: Liquid Effluent Treatment System APPLICABILITY: At All Times ODCM SR DESCRIPTION PROCEDURE 4.11.1.3. Using the ODCM - Project the Liquid Form 1/2-HPP-3.06.005.FO: RWDA-L, or 1 Release Dose Every 31 Days Form 1/2-ENV-05.04.FO1: RWDA-L SAP Order (Issue NPD3NRE Letter: Monthly Dose Projection) 1/20M-17.4A.D: RWDA-L

(Page 76 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes 8evision:Page oumber: 8 76 of 84 ATTACHMENT C Page 13 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 LIQUID STORAGE TANK ACTIVITY LIMIT SURVEILLANCES TABLE F: 7 1/2-ODC-3.03, Attachment J Control 3.11.1.4: Maintain Liquid Tank Activity within the following limits:

             <18 Curies in 1BR-TK-6A
             <18 Curies in 1BR-TK-6B
             <7 Curies in 1 LW-TK-7A
             <7 Curies in 1LW-TK-7B
             <6 Curies in 1QS-TK-1
             <62 Curies in 2QSS-TK21
             <10 Curies in Unit I and Unit 2 miscellaneous temporary outside radioactive liquid storage tanks.

APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE SR 4.11.1.4. Every 7 days Analyze a tank sample Form 1/2-ENV-05.01.F03: Activity Determination 1 when radioactive material is added Form 1/2-HPP-3.06.005.F01: RWDA-L, or to tanks except the RWST's. Form 1/2-ENV-05.04.FO1: RWDA-L 1/2-ENV-05.25: Sample Analysis Matrix For RWST's, analyze sample within 1OM-8.4.Z: Recirculate Test Tanks Thru Ion Exchanger 7 days of reactor cavity drain down IOM-17.4.AJ: LW Transfer to 1LW-TK-7A&B back to the RWST. 1OM-54.3 L5 Log Item 197: 1OM-54.3 L5 Log Item 132: 1OM-54.3 L5 Log Item 134: 1OM-54.3 L5 Log Item 200: 20M-1 7.4B: LW to SG Blowdown Tank

.- (Page 77 of 84) Beaver Valley Power Station odure1Number: Pni I /2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1 8 77 of 84 ATTACHMENT C Page 14 of 2l ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 GASEOUS EFFLUENT DOSE SURVEILLANCES TABLE F: 8 1/2-ODC-3.03, Attachment K Control 3.11.2.1: Gaseous Effluent Dose Rates APPLICABILITY: At All Times ODCM SR DESCRIPTION PROCEDURE 4.11.2.1.1 Using the ODCM - Determine the Form 1/2-HPP-3.06.006.FO1: RWDA-G, or Noble Gas Effluent Dose Rate Form 1/2-ENV-05.05.F01: RWDA-G Form 1/2-ENV-01.03.F01: Continuous Release Permit Form 1/2-HPP-3.06.012.F01: Abnormal Gaseous Releases, or Form 1/2-ENV-05.06.FO1: Abnormal Gaseous Releases 1OM-19.4E, H: RWDA-G for Unit 1 GWDT's 1/2OM-19.4A. B: RWDA-G for Unit 2 GWST's 4.11.2.1.2 Sample and Analyze per Table 4.11-2 to Determine Inhalation Pathway Dose 4.11.2.1.2.A Waste Gas Storage Tank - CHM CP 3: Sampling and Testing Grab Sample Each Tank CHM CP 5: Radiochemical Procedures CHM CP 8: Logs and Forms (Analysis) CHM CP 9: Conduct of Operation Form 1/2-ADM-1611 .F03 & F04: GW Tank Sampling, or Form 1/2-ADM-0606.FO1 & F02: GW Tank Sampling Form 1/2-ENV-05.02.FO1: GW Tank Sampling Form 1/2-HPP-3.06.006.FO1: RWDA-G, or Form 1/2-ENV-05.05.FO1: RWDA-G Form 1/2-ENV-05.11 .F01: Rad Monitor Sampling 1/2-ENV-05.25: Sample Analysis Matrix 4.11.2.1.2.B Containment Purge - CHM CP 3: Sampling and Testing Grab Sample Each Purge CHM CP 5: Radiochemical Procedures CHM CP 8: Logs and Forms (Analysis) CHM CP 9: Conduct of Operation Form 1/2-ADM-1611..F03 & F04: GW Tank Sampling, or Form 1/2-ADM-0606.FO1 & F02: GW Tank Sampling Form 1/2-ENV-05.05.FO1: RWDA-G Form 1/2-HPP-3.07.003.FO1: Air Sample Record Form 1/2-ENV-05.111.F01: Rad Monitor Sampling 1/2-ENV-05.25: Sample Analysis Matrix 4.11.2.1.2.C Ventilation Systems 4.11.2.1.2.C. 1 BV-1 Grab and Continuous CHM CP 3: Sampling and Testing thru Samples CHM CP 5: Radiochemical Procedures 4.11.2.1.C.3 CHM CP 8: Logs and Forms (Analysis) and CHM CP 9: Conduct of Operation 4.11.2.1.2.D.1 Form 1/2-ADM-1611.F03 & F04: GW Tank Sampling, or Form 1/2-ADM-0606.FO1 & F02: GW Tank Sampling thru Form 1/2-ENV-01.03.FO1: Continuous Release Permit 4.11.2.1.2. D.3 Form 1/2-ENV-05.1 1.F101: Rad Monitor Sampling Form 1/2-HPP-4.02.017.FO1 -90: RMS & DRMS Valve Verification, or Form 1/2-ENV-05.24.Fxx: RMS & DRMS Valve Verification 1-HPP-5.01.001: SA-9/10 Emergency Operation 1-HPP-5.01.002: SPING-4 Emergency Operation 1/2-ENV-05.25: Sample Analysis Matrix 4.11.2.1.2.C.4 BV-2 Grab and Continuous CHM CP 3: Sampling and Testing thru Samples CHM CP 5: Radiochemical Procedures 4.11.2.1.2.C.8 CHM CP 8: Logs and Forms (Analysis) and CHM CP 9: Conduct of Operation 4.11.2.1.2. D. 4 Form 1/2-ADM-1611.F03 & F04: GW Tank Sampling, or Form 1/2-ADM-0606.FO1 & F02: GW Tank Sampling thru Form 1/2-ENV-01.03.FO1: Continuous Release Permit 4.11.2.1.2. D. 8 Form 1/2-ENV-05.1 1.F01: Rad Monitor Sampling Form 1/2-HPP-4.02.017.F01-90: RMS & DRMS Valve Verification, or Form 1/2-ENV-05.24.FO1-90: RMS & DRMS Valve Verification 2-HPP-5.04.001: Emergency Operation of WRGM Assembly 1/2-ENV-05.25: Sample Analysis Matrix

(Page 78 of 84) Beaver Valley Power Station ~1/2-ODC-1.01 Procedure NubeCr:

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 78 of 84 ATTACHMENT C Page 15 of 21 ODCM CONTROLS PROCEDURE MATRIX

. (Page 79 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 1 8 79 of 84 ATTACHMENT C Page 16 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 GASEOUS EFFLUENT AIR DOSE SURVEILLANCES TABLE F: 9 1/2-ODC-3.03, Attachment L Control 3.11.2.2: Gaseous Effluent Air Doses APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE SR 4.11.2.2. Using the ODCM - Determine the Form 1/2-HPP-3.06.006.FO1: RWDA-G, or 1 Noble Gas Cumulative Dose Form 1/2-ENV-05.05.F01: RWDA-G Contributions Every 31 Days Form 1/2-ENV-01.03.FO1: Continuous Release Permit Form 1/2-HPP-3.06.012.F01: Abnormal Gaseous Releases, or Form 1/2-ENV-05.06.FO1: Abnormal Gaseous Releases Form 1/2-ENV-05.11. F01: Rad Monitor Sampling SAP Order (Issue NPD3NRE Letter: Monthly Dose Projection)

(Page 80 of 84) Beaver Valley PProcedure Power Station Number: 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODM Index, Matrix and History of ODCM Changes DRevision: Page Number: 8 80 of 84 ATTACHMENT C Page 17 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 GASEOUS EFFLUENT PARTICULATE AND IODINE DOSE SURVEILLANCES TABLE F: 10 1/2-ODC-3.03, Attachment M Control 3.11.2.3: Gaseous Effluent Particulate And Iodine Doses APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE SR I I 4.11.2.3. Using the ODCM - Determine the Form 1/2-HPP-3.06.006.FO1: RWDA-G, or 1 Particulate & Radioiodine Form 1/2-ENV-05.05.FO1: RWDA-G Cumulative Dose Contributions Form 1/2-ENV-01.03.FO1: Continuous Release Permit Every 31 Days Form 1/2-HPP-3.06.012.FO1: Abnormal Gaseous Releases, or Form 1/2-ENV-05.06.FO1: Abnormal Gaseous Releases Form 1/2-ENV-05.11.F01: Rad Monitor Sampling SAP Order (issue NPD3NRE Letter: Monthly Dose Projection)

. (Page 81 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.r1

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 81 of 84 ATTACHMENT C Page 18 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 GASEOUS EFFLUENT TREATMENT SURVEILLANCES TABLE F: 11 1/2-ODC-3.03, Attachment N Control 3.11.2.4: Gaseous Effluent Treatment System APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE SR 4.11.2.4. Using the ODCM - Project the Gas Form 1/2-HPP-3.06.006.FO1: RWDA-G, or 1 Release Dose from the Site Every 31 Form 1/2-ENV-05.05.FOI: RWDA-G Days Form 1/2-ENV-01.03.FOI: Continuous Release Permit Form 1/2-HPP-3.06.012.FO1: Abnormal Gaseous Releases, or Form 1/2-ENV-05.06.FO1: Abnormal Gaseous Releases SAP Order (Issue NPD3NRE Letter: Monthly Dose Projection)

(Page 82 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: S1/2 General Skill Reference Page Number: ODCM: Index, Matrix and History of ODCM Changes  :/ Revisin: 8* 82 of 84 ATTACHMENT C Page 19 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 GASEOUS STORAGE TANK ACTIVITY LIMIT SURVEILLANCES TABLE F: 12a 1/2-ODC-3.03, Attachment 0 Control 3.11.2.5: Maintain Gas Storage Tank Activity within the following limits: 1GW-TK-1A: <52000 Curies Noble Gas (Considered Xe-1 33) 1GW-TK-1B: <52000 Curies Noble Gas (Considered Xe-133) 1GW-TK-iB: <52000 Curies Noble Gas (Considered Xe-133) APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE SR 4.11.2.5. Determine Tank Gas Contents when Form i/2-ENV-05.02.FO1: GW Tank Sampling 1 Adding Rad Material & (RCS Activity 1OM-19.4.G: GW Disposal System

                            > 10ouCi/ml)                            1/2-ENV-05.25: Sample Analysis Matrix BV-2 GASEOUS STORAGE TANK ACTIVITY LIMIT SURVEILLANCES TABLE F: 12b 1/2-ODC-3.03, Attachment 0 Control 3.11.2.5: Maintain Gas Storage Tank Activity with the following limit:

2GWS-TK25A thru 25G: <19000 Curies Noble Gas (Considered Xe-133) in any connected group of Gas Storage Tanks APPLICABILITY: At All Times ODCM SR DESCRIPTION PROCEDURE 4.11.2.5. Determine Gaseous Waste Tank Form 1/2-ENV-05.02.FO1: GW Tank Sampling 1 Rad Material When Adding Rad 2OM-19.2: GW Precautions & Limitations Material to the Tank. 20M-19.4G: GW transfer from Unit 2 20M-54.3 L5 Log Item 133 1/2-ENV-05.25: Sample Analysis Matrix

.(Page 83 of 84) Procedure Number: Beaver Valley Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: 8 Page Number: 83 of 84 ATTACHMENT C Page 20 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 TOTAL DOSE SURVEILLANCES TABLE F: 13 1/2-ODC-3.03, Attachment P Control 3.11.4.1: Liquid And Gaseous Doses APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE SR 4.11.4.1. Using the ODCM -. Determine Form 1/2-ENV-01.05.FO1: Annual RETS Report (40CFR190) 1 Cumulative Gas & Liquid Dose per Form 1/2-HPP-3.06.005.FO1: RWDA-L, or Control 3.11.1.2, 3.11.2.2, 3.11.2.3 Form 1/2-ENV-05.04.FO1: RWDA-L Form 1/2-HPP-3.06.006.FO1: RWDA-G, or Form 1/2-ENV-05.05.FO1: RWDA-G Form 1/2-ENV-01.03.FO1: Continuous Release Permit Form 1/2-HPP-3.06.012.FO1: Abnormal Gaseous Releases, or Form 112-ENV-05.06.F01: Abnormal Gaseous Releases 1/2-ENV-01.04: Effluent Data Logs (40CFR190)

(Page 84 of 84) Procedure Number: Beaver Vallcy Power Station 1/2-ODC-1.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Index, Matrix and History of ODCM Changes Revision: Page Number: 8 84 of 84 ATTACHMENT C Page 21 of 21 ODCM CONTROLS PROCEDURE MATRIX BV-1 AND 2 REMP PROGRAM SURVEILLANCES TABLE F: 14 112-ODC-3.03, Attachment Q Control 3.12.1: Radiological Environmental Monitoring Program (REMP) APPLICABILITY: At All Times TABLE F: 15 1/2-ODC-3.03, Attachment R Control 3.12.2: Land Use Census APPLICABILITY: At All Times ODCM DESCRIPTION PROCEDURE

                   'SR 4.12.2.1     Using the Best Available Method -        1/2-ENV-02.01: Description of overall REMP Conduct a Land Use Census Yearly         1/2-ENV-04.02: Compliance to ODCM Control 3.12.2 Action a Between 6/1 & 10/1                       and b TABLE F: 16 1/2-ODC-3.03, Attachment S Control 3.12.3: Interlaboratory Comparison Program APPLICABILITY: At All Times ODCM                  DESCRIPTION                                          PROCEDURE SR 4.12.3.1     Include Analysis Results of the        1/2-ENV-02.01: Description of overall REMP Interlaboratory Comparison Program in the Annual Radiological Environmental Report

(Page 1 of 43) RTL #A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-2.01 ODCM: LIQUID EFFLUENTS Document Owner Manager, Nuclear Environmental and Chemistry Revision Number 7 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 05/30/09

(Page 2 of 43)

Title:

Beaver Valley Power Station I1/2-ODC-2.01 Procedure Number: Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUI EFFLUENTS 1M7 Revision: Page Number: 2 of 43 TABLE OF CONTENTS 1.0 PU RP O SE .......................................................................... ...................... 33.................... 2 .0 S C O PE .................................  : ... . ................................. .......................................... .................... 3

3.0 REFERENCES

AND COM MITM ENTS .............................................................................. .3 3 .1 R efere nc e s .... ..................................................................................................................... 3 3.2 Commitments ........................................................ 6 4.0 RECORD S AND FORM S .................................................................................. 6 4 .1 R e c o rd s .............................................................. ................................................. ...6 1 . 6 4 .2 F orm s ................................................................................................................................. 6 5.0 PRECAU TION S AN D LIMITATION S .............................................................................. ý.;..... 6 6.0 ACCEPTAN CE CRITERIA ................................................................................................. 7 7 .0 PRE RE Q UISIT E S .................................................................................................................. 7 8 .0 PRO C ED URE ....................................................... ..................................................................... 8 8.1 Alarm Setpoints ..................................... . . .... ............... 8 8.1.1 BV- I Monitor Alarm Setpoint Determination ............................................... 8 8.1.2 BV-2 Monitor Alarm Setpoint Determination ............................................... 13 8.2 Compliance With 10 CFR 20 EC Limits (ODCM CONTROL 3.11.1.1) ................. 19 8.2.1 Batch Releases ...... 19 8.2 .2 C ontinuous Releases ......................................................................................... 22 8.3 Compliance With 10 CFR 50 Dose Limits (ODCM CONTROLS 3.11.1.2 And 3.11.1.3)..22 8.3.1 Cumulation Of Doses (ODCM CONTROL 3.11.1.2) ............ .............. 22 8.3.2 Projection Of Doses (ODCM CONTROL 3.11.1.3) ..................................... 24 8.4 L iquid R adw aste System .............................................................................................. 25

                           .8.4.1           BV-I Liquid Radwaste System Components ................................................ 25 8.4.2           BV-1 Laundry and Contaminated Shower Drain System Components ........... 26 8.4.3           BV-2 Liquid Radwaste System Components. ................................................                                                      27 ATTACHM ENT A .............................................................................                             LIQUID SOURCE TERM S 9 ATTACHMENT B.................................                                                                          RECIRCULATION TIMES 3 ATTACHMENT C ........................................... INGESTION DOSE COMMITMENT FACTORS 5 ATTACHMENT D .....................................................................                            LIQUID RADWASTE SYSTEM 0 ATTACHMENT E .............................................                       SITE BOUNDARY FOR LIQUID EFFLUENTS 13

(Page 3 of 43) Beaver Valley Power Station ProcedureNumber: 1/2-ODC-2.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number:

                                                                                                   -7                3 of 43 1.0        PURPOSE 1.1        This procedure provides the calculational methodology to be used for determination of the following release parameters as denoted in [CTS] the Administrative Controls Section of the Unit 1/2 Technical Specifications [ITS] T.S. 5.5.2(3.21) 1.1.1      Liquid effluent monitor alarm setpoints ([CTS] Technical Specification 6.8.6.a, Item 1

[ITS] T.S. 5.5.2.a) 1.1.2 Liquid effluent release concentration calculations ([CTS] Technical Specification 6.8.6.a, Item 2 [ITS] T.S. 5.5.2.b) 1.1.3 Liquid effluent dose projection and cumulative dose calculations (lCTS] Technical Specification 6.8.6,a, Items 4 and 5[ITS] T.S. 5.5.2.d and T.S. 5.5.2.e) 1.2 This procedure also provides information related to the following: 1.2.1 Liquid Radwaste Treatment System ([CTS] Technical Specification 6.8.6.a, Item 6 [ITS] T.S. 5.5.2.f) 1.2.2 Site Boundary used for liquid effluents 1.3 Prior to issuance of this procedure, these items were contained in Section 1 of the old ODCM. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 References For BV- I Liquid Effluent Monitor Setpoints 3.1.1.1 Beaver Valley Power Station, Appendix I Analysis - Docket No. 50-334 and 50-412; Table 2.1-3 3.1.1.2 Beaver Valley Power Station, Appendix I Analysis - Docket No. 50-3 34 and 50-412; Table 2.1-2 3.1.1.3 10 CFR 20, Appendix B, (20.1001-20.2402) Table 2, Column 2 EC's 3.1.1.4 Calculation Package No. ERS-SFL-92-039, Isotopic Efficiencies For Unit 1 Liquid Process Monitors 3.1.1.5 Calculation Package No. ERS-ATL-93-021, Process Alarm Setpoints For Liquid Effluent Monitors

(Page 4 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM LIQUID EFFLUENTS Revision: Page Number: 7 4 of43 3.1.1.6 Stone and Webster Calculation Package No. UR(B)-160, BVPS Liquid Radwaste Releases and Concentrations - Expect and Design Cases (per Unit and Site) 3.1.2 References for BV-2 Liquid Effluent Monitor Setpoints 3.1.2.1 10 CFR 20, Appendix B, (20.1001-20.2402) Table 2, Column 2 EC's 3.1.2.2 Calculation Package No. ERS-SFL-86-026, Unit 2 DRMS Isotopic Efficiencies 3.1.2.3 Stone and Webster Computer Code LIQ1BB; "Normal Liquid Releases From A Pressurized Water Reactor" 3.1.2.4 Calculation Package No. ERS-JWW-87-015, Isotopic Efficiencies For 2SGC-RQ100 3.1.2.4.1 The Isotopic Efficiencies for 2SGC-RQ100 are superceded by the values presented in Calculation Package No. ERS-SFL-86-026. 3.1.2.5 Calculation Package No. ERS-WFW-87-021, Conversion Factor for 2SGC-RQ 100 3.1.2.5.1 The Monitor Conversion Factor (CF 11 ) for 2SGC-RQ1OO is superceded by the value presented in Calculation Package No. ERS-ATL-93-021.

                      ,3.1.2.6      Calculation Package No. ERS-ATL-93-021, Process Alarm Setpoints For Liquid Effluent Monitors 3.1.2.7      Stone and Webster Calculation Package No. UR(B)-160, BVPS Liquid Radwaste Releases and Concentrations - Expect and Design Cases (per Unit and Site) 3.1.3      References used for Other Portions of this procedure 3.1.3.1      NUREG-0 133, Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants 3.1.3.2      NUREG-1301, Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-0 1, Supplement No. 1) 3.1.3.3       NUREG-0017; Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents from PWR's, Revision 0 3.1.3.4       Regulatory Guide 1.113; Estimating Aquatic Dispersion of Effluents from Accidental and Routine Reactor Releases for the Purpose of Implementing Appendix 1, April 1977 3.1.3.5       Regulatory Guide 1.109;: Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance to 10CFR Part 50, Appendix I

-(Page 5 of 43) Procedure Number: Beaver Valley Power Station ____________________________________________1/2-ODC-2.01 Proedre umer

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 5 of 43 3.1.3.6 Calculation Package No. ERS-ATL-83-027; Liquid Waste Dose Factor Calculation for HPM-RP 6.5, Issue 3 and Later 3.1.3.7 NUREG-0172; Age-Specific Radiation Dose Commitment Factors for a One-Year Chronic Intake 3.1.3.8 UCRL-50564; Concentration Factors of Chemical Elements in Edible Aquatic Organisms, Revision 1, 1972 3.1.3.9 1/2-ADM-1640, Control of the Offsite Dose Calculation Manual 3.1.3.10 1/2-ADM-0 100, Procedure Writers Guide 3.1.3.11 NOP-SS-3001, Procedure Review and Approval 3.1.3.12 1/2-ODC-3.03, ODCM: Controls for RETS and REMP Programs 3.1.3.13 CR 02-06174, Tracking of Activities for Unit 1 RCS Zinc Addition Implementation. CA-014, Revise ODCM Procedure 1/2-ODC-2.01 (Tables 1.1-la and lb) to include the addition of Zn-65 to the ODCM liquid source term. 3.1.3.14 CR 03-02466, RFA-Radiation Protection Effluent Control Provide Recommendation on Processing when Performing Weekly Sample of [ILW-TK-7A/7B]. CA-02, Revise ODCM Procedure 1/2-ODC-2.01, (Attachment D) to show the liquid waste flow path cross-connect between Unit 1 and Unit 2. 3.1.3.15 CR 05-03306, Incorporated Improved Technical Specifications (ITS). 3.1.3.16 CR 05-03854, ODCM Figure for Liquid Effluent Release Points Need Updated. CA-01, revise ODCM procedure 1/2-ODC-2.01 (ODCM: Liquid Effluents) Attachment D, Figure 1.4-3 to incorporate amodified version of Plant Drawing No. 8700-RM-27F. 3.1.3.17 Unit I Technical Specification Amendment No. 275 (LAR IA-302) to License No. DPR-66. This amendment to the Unit 1 license was approved by the NRC on July 19, 2006. 3.1.3.18 Vendor Calculation Package No. 8700-UR(B)-223, Impact of Atmospheric Containment Conversion, Power Uprate, and Alternative Source Terms on the Alarm Setpoints for the Radiation Monitors at Unit 1. 3.1.3.19 Engineering Change Package No. ECP-04-0440, Extended Power Uprate. 3.1.3.20 CR 06-04908, Radiation Monitor Alarm Setpoint Discrepancies. CA-03; revise ODCM procedure 1/2-ODC-2.01 to update the alarm setpoints of [RM- IRW- 100] and [RM-IDA-100] for incorporation of the Extended Power Uprate per Unit 1 TS Amendment No. 275.

(Page 6 of -43)

                                'Beaver Valley Power Station                         .....      ProeureuNum      oDC 2

Title:

Unit: vel Of Use: 1/2 General Skill Reference ODCM LIQUID EFFLUENTS Revision: 7

                                                                                                          ,Page    Number:

6 of 43 3.1.3.21 CR 06-6476, Procedure 1/2-ODC-2.01 needs revised for Plant Uprate. CA-01; revise ODCM procedure 1/2-ODC-2.01 to update the alarm setpoints of [2SWS-RQ101] for incorporation of the Extended Power Update at Unit 2 (ECP-04-0441) per Unit 2 TS Amendment No. 156 3.2 Commitments 3.2.1 ICTS] Unit 1/2 Technical Specification 6.8.6.a [ITS] T.S. 5.5.2 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (e.g.; letter or calculation package) with an appropriate RTL number. 4.2 Forms 4.2.1 None 5.0 PRECAUTIONS AND LIMITATIONS 5.1 BV-1 and BV-2 utilize the concept of a shared liquid radioactive waste system according to NUREG 0133.-3131) This permits the mixing of liquid radwaste for processing and allocating of dose due to release as defined in Section 8.4. 5.1.1 In Section 8.1 of this procedure, effluent monitor setpoints for a conservative mix are based on the individual Units' specific parameters, but effluent monitor setpoints for analysis prior to release permit use of the total dilution flow available at the site. 5.2 There is a difference in alarm setpoint terminology presentations for the radiation monitoring systems of BV-1 and BV-2. 5.2.1 Where HIGH and HIGH-HIGH terminology are used for BV-1 monitors, Alert and High terminology is used for BV-2 monitors. 5.2.2 BV-2 setpoints are presented in uCi/ml rather than cpm as in BV-1. This difference is due to BV-2 software which applies a conversion factor to the raw data (cpm). Note that the uCi/ml presentation is technically correct only for the specific isotopic mix used in the determination of the conversion factors. Therefore, BV-2 setpoints determined on analysis prior to release will be correct for properly controlling dose rate, but the indicated uCi/ml value may differ from the actual value.

(Page 7 of 43) Procedure Number: Beaver Valley Power Station l/2-ODC-2.0l

Title:

Unit: Level OfUse: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 7 of 43 5.3 This procedure also contains information that was previously contained in Section 5 of the previous BV-I and 2 Offsite Dose Calculation Manual. 5.3.1 In regards to this, the site boundary for liquid effluents was included in this procedure. 5.3.2 The Site Boundary for Liquid Effluents is shown in ATTACHMENT E Figure 5-1. 5.4 This procedure includes Improved Technical Specifications ([ITS]) information that is NOT applicable to current Technical Specifications ([CTSJ) and [CTS] information that is NOT applicable in [ITS]. The [CTS] information shall be used prior to the [ITS] effective date. The [ITS] information shall be used on or after the [ITS] effective date. 6.0 ACCEPTANCE CRITERIA 6.1 All changes to this procedure shall contain sufficient justification that the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50, and not adversely 3 13 2 impact the accuracy or reliability of effluent dose or alarm setpoint calculation.( ) 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-0100(3'"3 10°) and 1/2-ADM-1640.(3 "3 9 ) 6.1.2 All changes to this procedure shall be reviewed and approved in accordance with NOP-SS-300 133) and 1/2-ADM-1640 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and format.

(Page 8 of 43) Procedure Nuniber: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference [Revision: Page Number: ODCM: LIQUID EFFLUENTS 7_ 8 of 43 8.0 PROCEDURE 8.1 Alarm Setpoints 8.1.1 BV-1 Monitor Alarm Setpoint Determination This procedure determines the monitor HIGH-HIGH Alarm Setpoint that indicates if the concentration of radionuclides in the liquid effluent released from the site to unrestricted areas exceeds 10 times the EC's specified in 10 CFR 20, Appendix B (20.1001-20.2402), Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases or exceeds a concentration of 2E-4 uCi/mI for dissolved or entrained noble gases. (3.1.1.5) The methodology described in Section 8.1.1.2 is an alternative method to be used to determine the (RM-lLW-104 or RM-1LW-1 16) monitor HIGH-HIGH Alarm Setpoint (HHSP). The methodology in Section 8.1.1.2 may be used for any batch release and shall be used when the respective total gamma activity concentration of the liquid effluent prior to dilution exceeds 3.14E-3 uCi/ml and 7.33E-3 uCi/mnl. This concentration is equivalent to the respective HHSP's derived in Section 8.1.1.13 1and 1 5) allows for respective tritium concentrations up to 4.26E+0 uCi/ml and 9.94E+0 uCi/ml.( 8.1.1.1 BV-1 Setpoint Determination Based On A Conservative Mix The Alarm Setpoints for the liquid monitors shall be set at the values listed in the following table: BV- I LIQUID MONITOR SETPOINTS cpm Above Background Monitor CR HI-ISP HSP Liquid Waste Effluent Monitor RM-1LW-104 3.53E+5 < 3.53E+5 < 2.47E+5 Laundry And Contaminated RM-1LW-116 8.24E+5 < 8.24E+5 < 5.77E+5 Shower Drains Monitor Component Cooling! RM-1RW-100 2.57E+4 < 2.09E+4 < 1.46E+4 Recirculation Spray Hx River Water Monitor Component Cooling Hx River RM-1RW-101 9.02E+3 <*9.02E+3 < 6.32E+3 Water Monitor Aux Feed Pump Bay Drain RM-1DA-100 1.22E+4 11.20E+4 < 8.43E+3 Monitor I The setpoints for RM-1LW-104 and RM-1LW- 116 are based on the following conditions. The setpoint bases for all monitors can be found in Calculation Package ERS-ATL-93-021 and/or S&W Calculation Package No. 8700-UR(B)-223.(3.318)

-(Page 9 of 43) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 9 of 43

  • Source terms given in ATTACHMENT A Table 1.1-la. These source terms (without Zn-65) have been generated from the GALE Computer Code, as described in NUREG-0017.( 3 1-3
                                                          .3) The inputs to GALE are given in 1/2-ODC-3.01 Appendix B.

The Zn-65 source term was generated via Calculation Package No. ERS-ATL 021 (3.1.1.5, 3.1.3.13)

  • Dilution water flow rate of 22,800 gpm== (15,000 gpm BV-1 + 7,800 gpm BV-2).
  • Discharge flow rate prior to dilution of 35 gpm for the Liquid Waste Effluent Monitor (RM- 1LW-104).
                           " Discharge flow rate prior to dilution of 15 gpm for the Laundry and Contaminated Shower Drains Monitor (RM- 1LW- 116).

The above setpoints for (RM-1LW-104 and RM-1LW-1 16) can be varied based on actual operating conditions resulting in changes in the discharge and dilution flow rates as follows: HHSp = 542F .. [1.1(1)-i] f where: HHSP = Monitor HIGH-HIGH Alarm Setpoint above background (ncpm). 542 = Most restrictive proportionality constant based on nominal flow conditions: 542 = 3.53E+5 ncpm x 35 gpm 22,800 gpm (RM-1LW-104) 542 = 8.24E+5 ncpm x 15 gpm -22,800 gpm (RM-1LW-116) F = Dilution water flow rate (gpm), BV-I plus BV-2 Cooling Tower Blowdown Rate (not including release through the Emergency Outfall Structure). f = Discharge flow rate prior to dilution (gpm). 8.1.1.1.1 BV- I Mix Radionuclides The "mix" (radionuclides and composition) of the liquid effluent was determined as follows:

  • The liquid source terms that are representative of the "mix" of the liquid effluent were determined. Liquid source terms are the radioactivity levels of the radionuclides in the effluent from ATTACMENT A Table 1. 1-la.
  • The fraction of the total radioactivity in the liquid effluent comprised by radionuclide "i" (Si) for each individual radionuclide in the liquid effluent was determined as follows:

S- Ai [1.1(1)-2]

(Page 10 of 43) Beaver Valley Power Station PrcedurNu/ODC2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 10 of 43 Z A, where: Ai = Annual release of radionuclide "i" (Ci/yr) in the liquid effluent from ATTACHMENT A Table 1.1-la. 8.1.1.1.2 BV-1 Maximum Acceptable Concentration (All Radionuclides) The maximum acceptable total radioactivity concentration (uCi/ml) of all radionuclides in the liquid effluent prior to dilution (Ct) was determined by: Ct = F [1.1(1)-3] fZ Si i OECi where: F Dilution water flow rate (gpm), BV-I plus BV-2 Cooling Tower Blowdown Rate (not including release through the Emergency Outfall Structure). 22,800 gpm = (15,000 gpm BV-I + 7,800 gpm BV-2) f =Maximum acceptable discharge flow rate prior to dilution (gpm).

                                      = 35 gpm for Liquid Waste Effluent Monitor (RM- 1LW- 104).
                                      = 15 gpm for Laundry and Contaminated Shower Drains Monitor (RM-lLW-116).

OECi The ODCM liquid effluent concentration limit for radionuclide 'i" (uCi/ml) from ATTACHMENT A Table 1.1-1 a. The OEC is set at 10 times the new 10 CFR 20, Appendix B (20.1001-20.2402) Table 2, Col. 2 EC values. Si The fraction of total radioactivity attributed to radionuclide "i", from Equation [1.l(1)-2]. 8.1.1.1.3 BV-1 Maximum Acceptable Concentration (Individual Radionuclide) The maximum acceptable radioactivity concentration (uCi/ml) of radionuclide "i" in the liquid effluent prior to dilution (Ci) was determined by: Ci = Si C, [1.1(1)-4]

-(Page 11 of 43) Beaver Valley Power Station PoedureNumber: 1/2-ODC-2.01

Title:

Unit: Level O fUse: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 1 7 11 of 43 8.1.1.1.4 BV-I Monitor Count Rate The calculated monitor count rate (ncpm) above background attributed to the radionuclides; (CR) was determined by: CR = Y Ci Ei [1.1(1)-5] where: Ei = Detection efficiency of the monitor for radionuclide "i" (cpm/uCi/ml) from ATTACHMENT A Table 1.1-1 a. If not listed there, from Calculation Package ERS-SFL-92-039. (3.1.1.4) 8.1.1.1.5 BV-1 Monitor HHSP The monitor HIGH-HIGH Alarm Setpoint above background (ncpm) should be set at the CR value. Since only one tank can be released at a time, adjustment of this value is not necessary to compensate for release from more than one source. 8.1.1.2 BV-I Setpoint Determination Based On Analysis Prior To Release The following method applies to liquid releases when determining the setpoint for the maximum acceptable discharge flow rate prior to dilution and the associated HIGH-HIGH Alarm Setpoint based on this flow rate for the Liquid Waste Effluent Monitor (RM-ILW-104) and the Laundry and Contaminated Shower Drains Monitor (RM-1LW-1 16) during all operational conditions. The monitor alarm setpoint is set slightly above (a factor of 1.25) the count rate that results from the concentration of gamma emitting radionuclides in order to avoid spurious alarms. To compensate for this increase in the monitor alarm setpoint, the allowable discharge flow rate is reduced by the same factor. When the discharge flow rate is limited by the radwaste discharge pump rate capacity or by administrative selection rather than the allowable flow rate determined form activity concentration, the alarm setpoint will be proportionally adjusted based upon the excess dilution factor provided.

(Page 12 of 43) Procedure Number: Beaver Valcey Power Station 1/2-ODC-2.01

Title:

Unit Level fUse: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 12 of 43 8.1.1.2.1 BV- 1 Maximum Acceptable Discharge Flow Rate The maximum acceptable discharge flow rate (f) prior to dilution (gpm) is determined by: f= F [1.1(1)-6] 1.25 7 Ci i OECi where: F = Dilution water flow rate, BV-I plus BV-2 Cooling Tower Blowdown (gpm). The dilution water flow rate may include the combined cooling tower blowdown flow from both units exiting the discharge ý structure (but excluding emergency outfall structure flow) when simultaneous liquid discharges are administratively prohibited. Ci = Radioactivity concentration of radionuclide "i" in the liquid effluent prior to dilution (uCi/ml) from analysis of the liquid effluent -to be released. 1.25 A factor to prevent spurious alarms caused by deviations in the mixture of radionuclides which affect the monitor response. OECi The ODCM liquid effluent concentration limit for radionuclide "'T (uCi/ml) from ATTACHMENT A Table 1.1-1a. The OEC is set at 10 times the new 10 CFR 20, Appendix B (20.1001-20.2402) Table 2, Col. 2 EC values. 8.1.1.2.2 BV-I Monitor Count Rate The calculated monitor count rate (ncpm) above background attributed to the radionuclides, (CR) is determined by: CR = 1.25 Y_Ci Ei [1.1(1)-7] where: Ei = The detection efficiency of the monitor for radionuclide "I' (cpm/uCi/ml) from ATTACHMENT A Table 1.1-la. If not listed there, from Calculation Package ERS-SFL-92-039.(3.-4) 1.25 =A factor to prevent spurious alarms caused by deviations in the mixture of radionuclides which affect the monitor response.

(Page 13 of 43) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 1 7 13 of43 8.1.1.2.3 BV-I Monitor HHSP The liquid effluent monitor HIGH-HIGH Alarm Setpoint above background (ncpm) should be set at the CR value adjusted by any excess dilution factor provided as defined in the following equation: HHSP = CR f [1.1(1)-8] where: HSP= Monitor HIGH-HIGH Alarm Setpoint above background. CR = Calculated monitor count rate (ncpm) from equation [ 1.1(1)-7]. f = Maximum acceptable discharge flow rate prior to dilution determined by equation [ 1.1(1)-6].

                                                       = Actual maximum discharge flow rate to be maintained for the discharge. The reduced value off may be due to pump limitations or administrative selection.

8.1.2 BV-2 Monitor Alarm Setpoint Determination This procedure determines the monitor HIGH Alarm Setpoint that indicates if the concentration of radionuclides in the liquid effluent released from the site to unrestricted areas exceeds 10 times the EC's specified in 10 CFR 20, Appendix B (20.1001-20.2402), Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases or exceeds a concentration of 2E-4 uCi/ml for dissolved or entrained noble gases.("1.26) The methodology described in Section 8.1.2.2 is an alternative method to be used to determine the (2SGC-RQ100) monitor HIGH Alarm Setpoint (HSP). The methodology in Section 8.1.2.2 may be used for any batch release and shall be used when the total gamma radioactivity concentration of the liquid effluent prior'to dilution exceeds 1. 14E-3 uCi/ml. This concentration is equivalent to a monitor response and HIGH Alarm Setpoint derived in Section 8.1.2.1 and allows for a tritium concentration of up to 2.16E+0 uCi/ml. The setpoint was obtained by use of a conversion factor of 5.61E-9 uCi/ml/cpm determined for the nuclide mix. (3.1.2.6)

(Page 14 of 43) Pifcedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 14 of 43 8.1.2.1 BV-2 Setpoint Determination Based On A Conservative Mix The HIGH Alarm Setpoint for the liquid monitors shall be set at the values listed in the following Table: BV-2 LIQUID MONITOR SETPOINTS pCi/ml Above Background Monitor DV HSP ASP Liquid Waste Effluent 2SGC-RQIOO 1.14E-3 _ 1.14E-3 < 7.99E-4 Monitor Service Water Monitor 2SWS-RQ101 4.30E-5 < 4.30E-5 < 3.01E-5 Service Water Monitor 2SWS-RQ102 4.30E-5 _<4.30E-5 < 3.01E-5 The setpoint for 2SGC-RQ 100 is based on the following conditions, however, the setpoint bases for 2SWS-RQ101 and 2SWS-RQ102 can be found in Calculation Package ERS-ATL-93-021. (31.2.6)

  • Source terms given in ATTACHMENT A Table 1.1-lb. These source terms (without Zn-65) have been generated by using models and input similar to NUREG-0017. The inputs are given in 1/2-ODC-3.01. The Zn-65 source term was generated via Calculation Package No. ERS-ATL-93-021 (3.1..6, 3.1.3.13)
  • Dilution water flow rate of 22,800 gpm = (15,000 gpm BV-1 + 7,800 gpm BV-2).
                            " Discharge flow rate prior to dilution of 80 gpm for the Liquid Waste Effluent Monitor (2SGC-RQ 100).
                            " A software conversion factor of 5.61E-9 uCi/ml/cpm associated with Liquid Waste Effluent Monitor (2SGC-RQ 100).(3. 1.2.6)

(Page 15 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: _ 7 15 of43 Theabove setpoint for (2SGC-RQ 100) can be varied based on actual operating conditions resulting in the discharge and dilution flow rates as follows: HSP = 4.OOE-6 F [1.1(2)-i] f where: HSP = Monitor HIGH Alarm Setpoint (uCi/mI) above background. 4.OOE-6 = Proportionality constant based on nominal flow conditions: 4.OOE-6 = 1. 14E-3 net uCi/mI x 80 gpm - 22,800 gpm F = Dilution water flow rate, BV-1 plus BV-2 Cooling Tower Blowdown Rate (gpm). f = Discharge flow rate prior to dilution (gpm). 8.1.2.1.1 BV-2 Mix Radionuclides The "mix" (radionuclides and composition) of the liquid effluent was determined as follows:

  • The liquid source terms that are representative of the "mix" of the liquid effluent were determined. Liquid source terms are the radioactivity levels of the radionuclides in the effluent from ATTACHMENT A Table 1.1-lb.
                                    " The fraction of the total radioactivity in the liquid effluent comprised by radionuclide 'T' (Si) for each individual radionuclide in the liquid effluent was determined as follows:

Si = Ai [1.1(2)-2] Z Ai i where: Ai =Annual release of radionuclide "i" (Ci/yr) in the liquid effluent from ATTACHMENT A Table 1.1-lb.

(Page 16 of 43) PFocedure Number: Beaver Valley Power Station u /2-ODC-2.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference Revision: Page Number: ODCM LIQUD EFFLUENTS 1 7 16 of 43 8.1.2.1.2 BV-2 Maximum Acceptable Concentration (All Radionuclides) The maximum acceptable total radioactivity concentration (uCi/ml) of all radionuclides in the liquid effluent prior to dilution (Ct) was determined by: C, F [1.1(2)-3] f Yi Si OECi where: F - Dilution water flow rate (gpm), BV-1 plus BV-2 Cooling Tower Blowdown Rate (not including release out through the Emergency Outfall Structure).

                                       =  22,800 gpm = (15,000 gpm BV-I + 7,800 gpm BV-2).

f = Maximum acceptable discharge flow rate prior to dilution (gpm).

                                      =   80 gpm for Liquid Waste Process Effluent Monitor (2SGC-RQ 100).

OECi = The ODCM liquid effluent concentration limit for radionuclide "i" (uCi/ml) from ATTACHMENT A Table 1.1-lb. The OEC is set at 10 times the new 10 CFR 20, Appendix B (20.1001-20.2402) Table 2, Col. 2 EC values. Si = The fraction of total radioactivity attributed to radionuclide "i", from Equation [ 1.1 (2)-2]. 8.1.2.1.3 BV-2 Maximum Acceptable Concentration -(Individual Radionuclide) The maximum acceptable radioactivity concentration (uCi/ml) of radionuclide "i" in the liquid effluent prior to dilution (Ci) was determined by: Ci = Si Ct [1.1(2)-4]

(Page 17 of 43) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 1 7 17 of 43 8.1.2.1.4 BV-2 Monitor Display Value The calculated monitor Display Value (uCi/mi) above background attributed to the radionuclides; (DV), was determined by: DV = 5.61E-9 Y-i Ci Ei [1.1(2)-5] where: 5.61E-9 = Conversion factor (uCi/ml/cpm), an average determined for the source term mix. Ei . = Detection efficiency of the monitor for radionuclide "i" (cpm/uCi/ml) from ATTACHMENT A Table 1. 1-lb. If not listed there, from Calculation Package ERS-SFL-86-026.(3' 2 ) 8.1.2.1.5 BV-2 Monitor HSP The monitor HIGH Alarm Setpoint above background (uCi/ml) should be set at the DV value. 8.1.2.2 BV-2 Setpoint Determination Based On Analysis Prior To Release The following method applies to liquid releases when determining the setpoint for the maximum acceptable discharge flow rate prior to dilution and the associated HIGH Alarm Setpoint based on this flow rate for the Liquid Waste Effluent Monitor (2SGC-RQ 100) during all operational conditions. The monitor alarm setpoint is set slightly above (a factor of 1.25) the concentration reading that results from the concentration of gamma emitting radionuclides in order to avoid spurious alarms. To compensate for this increase in the monitor alarm setpoint, the allowable discharge flow rate is reduced by the same factor. When the discharge flow rate is limited by the radwaste discharge pump rate capacity or by administrative selection rather than the allowable flow rate determined form activity concentration, the alarm setpoint will be proportionally adjusted based upon the excess dilution factor provided.

(Page 18 of 43) Beaver Valley Power Station 1/2-ODC-2.01 Procedure Number:

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 7 18 of 43 8.1.2.2.1 BV-2 Maximum Acceptable Discharge Flow Rate The maximum acceptable discharge flow rate (f) prior to dilution (gpm) is determined by: f= F [1.1(2)-6] 1.25 Yi Ci OECi where: F = Dilution water flow rate, BV-I plus BV-2 Cooling Tower Blowdown (gpm). The dilution water flow rate may include the combined cooling tower blowdown flow from both units exiting the discharge structure (but excluding emergency outfall structure flow) when simultaneous liquid discharges from both plants are administratively prohibited. Ci = Radioactivity concentration of radionuclide "i" in the liquid effluent prior to dilution (uCi/ml) from analysis of the liquid effluent to be released. 1.25 = A factor to prevent spurious alarms caused by deviations in the mixture of radionuclides which affect the monitor response. OECi = The ODCM liquid effluent concentration limit for radionuclide "i" (uCi/ml) from Table 1.1-lb. The OEC is set at 10 times the new 10 CFR 20, Appendix B (20.1001-20.2402) ATTACHMENT A Table 2, Col. 2 EC values.

(Page 19 of 43) Beaver Valley Power Station y S1/2-ODC-2.01 Procedure Number:

Title:

Unit: evel Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 1 7 19 of 43 8.1.2.2.2 BV-2 Monitor Display Value The calculated monitor Display Value (uCi/ml) above background attributed to the radionuclides; (DV) is determined by: DV = (1.2r5) (5.61E-9) i Ci Ei [1.1(2)-7] where: Ei = The detection efficiency of the monitor for radionuclide "i" (cpm/uCi/ml) from ATTACHMENT A Table 1.1-lb. If not listed there, from Calculation Package ERS-SFL-86-026.3 12 2 ) 1.25 A factor to prevent spurious alarms caused by deviations in the mixture of radionuclides which affect the monitor response. 5.61E-9 = Conversion factor (uCi/ml/cpm), an average determined for the source term mix. 8.1.2.2.3 BV-2 Monitor HSP The liquid effluent monitor HIGH Alarm Setpoint above background (uCi/ml) should be set at the DV value adjusted by any excess dilution factor provided as defined in the following equation: HSP = DV f [1.1(2)-8] where: HSP = Monitor HIGH Alarm Setpoint above background. DV = Calculated monitor concentration reading (uCi/ml) from equation [1.1(2)- 7]. f = Maximum acceptable discharge flow rate prior to dilution determined by equation [ 1.1 (2)-6]. f = Actual maximum discharge flow rate to be maintained for the discharge. The reduced value of t may be due to pump limitations or administrative selection. 8.2 Compliance With 10 CFR 20 EC Limits (ODCM CONTROL 3.11.1.1) 8.2.1 Batch Releases 8.2.1.1 Pre-Release

(Page 20 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM LIQUID EFFLUENTS 7 20 of43 The radioactivity content of each batch release will be determined prior to release in accordance with 1/-2-ODC-3.03, Table 4.11-1. In order to assure representative samples, at least two tank volumes of entrained fluid from each tank to be discharged shall be recirculated through the mixing eductors. This will be accomplished by recirculating the tank contents for at least the time periods indicated in ATTACHMENT B Table 1.2-la and 1.2-lb. BV-1 and BV-2 will show compliance with ODCM Control 3.11.1.1 in the following manner: The activity of the various radionuclides in the batch release, determined in accordance with 1/2-ODC-3.03, Table 4.11-1, is divided by the minimum dilution flow to obtain the concentration at the unrestricted area. This calculation is shown in the following equation: Conci = Ci R [1.2-1] MDF where: Conci = Concentration of radionuclide "i" at the unrestricted area (uCi/ml). Ci = Concentration of radionuclide "i" in the potential batch release (uCi/ml). R = Release rate of the batch (gpm). MDF = Minimum dilution flow (gpm). (May be combined BV-1/BV-2 flow when simultaneous liquid discharges are administratively prohibited). The projected concentrations in the unrestricted area are compared to the OEC's. Before a release is authorized, Equation [1.2-2] must be satisfied. Ei (Conci/OECi) < 1 [1.2-2] where: OECi = The ODCM effluent concentration limit of radionuclide "i" (uCi/ml) from ATTACHMENT A Table 1.1-la and 1.1-lb. The OEC is set at 10 times the new 10 CFR 20, Appendix B, (20.1001-20.2402) Table 2, Col. 2 EC values. (3.1.1.3, 3.1.2.1) 8.2.1.2 Post-Release Following release from the batch tank, the Post Dose Correction Factor will be calculated in the following manner: PDCF = (VAt)/(DFA) [1.2-3] (V1t)/(DFI)

(Page 21 of 43) Beaver Valley Power Station P boe 1oroeur

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 21 of43 where: PCDF = Post Dose Correction Factor. VAt Actual Volume of tank released (gal). DFA Actual Dilution Flow during release (gpm). VIt Initial Volume authorized for release (gal). DFI = Initial Dilution Flow authorized for release (gpm). The concentration of each radionuclide following release from the batch tank will be calculated in the unrestricted area in the following manner when the Post Dose Correction Factor shown in equation [ 1.2-3 ] is > 1: The average activity of radionuclide "i" during the time period of release is divided by the actual dilution flow during the period of release to obtain the concentration in the unrestricted area. This calculation is shown in the following equation: Concik - Cik Vtk [1.2-4] ADFk where: Concik = The concentration of radionuclide "i" (uCi/ml) at the unrestricted area, during the release period of time k. NOTE: Since discharge is from an isolated well-mixed tank at essentially a uniform rate, the difference between average and peak concentration within any discharge period is minimal. Cik = Concentration of radionuclide "i" (uCi/ml) in batch release during time period k. Vtk = Volume of Tank released during time period k (gal). ADFk = Actual volume of Dilution Flow during the time period of release k (gal). To show compliance with ODCM CONTROL 3.11.1.1, the following relationship must be satisfied: Ei(Concik/OECi) < 1[ [1.2-5]

(Page 22 of 43) Bcaver Valley PProcedure Power Station Number: 1/2-ODC-2.01 Title  : Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 of 43 8.2.2 Continuous Releases Continuous releases of liquid effluents do not normally occur at BV-1 or BV-2. When they do occur, the concentration of various radionuclides in the unrestricted area would be calculated using Equationi[1.2-1] with Cik, the concentration of isotope i in the continuous release. To show compliance with ODCM CONTROL 3.11.1.1, Equation [1.2-5] must again be satisfied. 8.3 Compliance With 10 CFR 50 Dose Limits (ODCM CONTROLS 3.11.1.2 And 3.11.1.3) BV-1 and 2 utilize the concept of a shared liquid radioactive waste system according to NUREG 0133.(31 1) This permits mixing of the liquid radwaste for processing. Since the resulting effluent release cannot accurately be ascribed to a specific reactor unit, the treated effluent releases are allocated as defined below. 8.3.1 Cumulation Of Doses (ODCM CONTROL 3.11.1.2) The dose contribution from the release of liquid effluents will be calculated monthly for each batch release during the month and a cumulative summation of the total body and organ doses will be maintained for each calendar month, current calendar quarter, and the calendar year to date. The dose contribution will be calculated using the following equation: D, = UAF Z Ait YX mAtk Cik Fk [1.3-1] i k=l where: D= The cumulative dose commitment to the total body or any organ, -, from the liquid effluents for the total time period m Y-Atk (mrem) k=l Atk = The length of the kth release over which Cik and Fk are averaged for all liquid releases (hours). Cik = The average concentration of radionuclide, "I"(uCi/ml), in undiluted liquid effluent during time period Atk from any liquid release. A, = The site related ingestion dose commitment factor to the total body or any organ t for each identified principal gamma and beta emitter (mrem-ml per hr-uCi) from ATTACHMENT C Table 1.3-1. m = Number of releases: contributing to the cumulative dose, Dt.

(Page 23 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 1 7 23 of43 UAF = Unit allocation factor. Provides apportionment of dose between BV-1 and BV-2. Normally set at 0.5 for each unit. (Must total to < 1.0). Fk = The near field average dilution factor for Cik during any liquid effluent release. Defined as the ratio of the average undiluted liquid waste flow to the product of the average flow from the site discharge structure during the report period to unrestricted receiving waters, times 3. (3 is the site specific applicable factor for the mixing effect of the BV-I and BV-2 discharge structure).

                                 =      Waste Flow (3)(Dilution Water Flow)

The site specific applicable factor of 3 results in a conservative estimate of the near field dilution factor based upon Regulatory Guide 1.113(3-1.34) methodology and is a factor of 10 below the limit specified in NUREG-0 133, Section 4.3. (.3.1) The dose factor Ai, was calculated for an adult for each isotope using the following 3 .1.3 .1) equation from NUREG-0133.( Aizu= 1.14E5 (730/D,+21BFi)DFi, [1.3-2] where: 1.14E5 F 1E6 pCi x1[E3 ml [ lyr L uCi 1 8760 hr 730 Adult water consumption rate (liters/yr). Dw Far field dilution factor from the near field area within 1/4 mile of the release point to the potable water intake for adult water consumption. 21 = Adult fish consumption (kg/yr). BF = Bioaccumulation factor for radionuclide "i" in fish from Table A- 1 of Regulatory Guide 1.109(3.1.3.5) (pCi/kg per pCi/1). However, if data was not available from that reference, it was obtained from Table 6 of UCRL-50564.(3.13-8) The bioaccumulation factor for niobium (300 pCi/kg per pCi/1) was not obtained from either of the above references noted. It was otained from IAEA Safety Series No. 57. Justification for use of this value is documented in Appendix A to Calculation Package No. ERS-ATL 027 3.1.3.6)

(Page 24 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 1 7 1 24 of 43 DFi, Dose conversion factor for radionuclide "i" for adults for a particular organ - (mrem/pCi) from Table E-1 1 of Regulatory Guide I .1093135) or NUREG-0172(3 1.37) A table of Ai, values for an adult at BV-1 and BV-2 are presented in ATTACHMENT C Table 1.3-1. The far field dilution factor (Dw) for BV-I and BV-2 is 200. This value is based on a total dilution factor of 600 applicable to the Midland water intake located 1.3 miles downstream and on the opposite bank from BV-1 and BV-2 (i.e., 200 = 600 - 3). The total dilution factor of 600 represents a conservative fully mixed annual average condition. Since the Midland intake is located on the opposite bank and is below the water surface, essentially fully mixed conditions would have to exist for the radioactive effluent to be transported to the intake. The cumulative doses (from each reactor unit) for a calendar quarter and a calendar year are compared to ODCM CONTROL 3.11.1.2 as follows: For the calendar quarter, D, < 1.5 mrem total body [1.3-3] D, < 5 mrem any organ [1.3-4] For the calendar year, D, < 3 mrem total body [1.3-5] D, < 10 mrem any organ [1.3-6] If any of the limits in Equation [1.3-3] through [1.3-6] are exceeded, a Special Report pursuant to ODCM Control 3.11.1.2 of 1/2-ODC-3.03 is requried. 3 1 2n 8.3.2 Projection Of Doses (ODCM CONTROL 3.11.1.3) Doses due to liquid releases shall be projected at least once per 31 days in accordance with ODCM CONTROL 3.11.1.3 and this section. The Liquid Radwaste Treatment System shall be used to reduce the radioactive materials in each liquid waste batch prior to its discharge, when the projected doses due to liquid effluent releases from each reactor unit, when averaged over 31 days would exceed 0.06 mrem to the total body or 0.2 mrem to any organ. Doses used in the projection are obtained according to equation [1.3-1]. The 31-day dose projection shall be performed according to the following equations: When including pre-release data, D = A31 31+C [1.3-7]

(Page 25 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of use: 1/2 General Skill Reference Revision: Page Numnber: ODCM: LIQUID EFFLUENTS 1 7 25 of 43 When not including pre-release data, D 31 =[IA] 31+C [1.3-8] where: D31= Projected 31 day dose (mrem). A = Cumulative dose for quarter (mrem). B = Projected dose from this release (mrem). T = Current days into quarter. C = Value which may be used to anticipate plant trends (mrem). 8.4 Liquid Radwaste System The liquid radwaste system has the capability to control, collect, process, store, recycle, and dispose of liquid radioactive waste generated as a result of plant operations, including anticipated operational occurrences. This system also uses some of the components of the steam generator blowdown system for processing. Simplified flow diagrams of the liquid radwaste systems for BV-I and BV-2 are provided as ATTACHMENT D Figures 1.4-1 and 1.4-2 respectively. A diagram showing the liquid effluent release points is provided as ATTACHMENT D Figure 1.4-3. A diagram of the site boundary for liquid effluents is provided as ATTACHMENT E Figure 5-1. Since the concept of a shared liquid radwaste system is used, then any liquid waste generated can be stored, processed and discharged from either BV-I or BV-2. 8.4.1 BV-1 Liquid Radwaste System Components 8.4.1.1 1LW-TK-2A/2B: High Level Waste Drain Tanks There are two of these tanks, each tank has a capacity of 5,000 gallons. They are located on the northwest wall of the Auxiliary Building (elevation 735'). They receive liquid wastes from the vent and drain system. 8.4.1.2 1LW-TK-3A/3B: Low Level Waste Drain Tanks There are two of these tanks, each tank has a capacity of 2,000 gallons. They are located in the northwest corner of the Auxiliary Building (elevation 735'). They also receive liquid wastes from the vent and drain system. 8.4.1.3 ILW-I-2: Liquid Waste Pre-Conditioning Filter & Demineralizer The main purpose of the pre-conditioning filter & demineralizer is to clean liquid waste water of particulate and dissolved radioactive contaminants that is stored in 1LW-TK-2A/2B and 1LW-TK-3A/3B. There are four resin beds and a pre-

(Page 26 of 43) Procedui~e Number: Beaver Valley Power Station o /20oDC-2.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference Page Number: ODCM LIQUID EFFLUENTS Revision: 7 26 of 43 conditioning filter associated with this system. The pre-conditioning filter can be customized with varying grades of activated charcoal intended -for removal of radionuclides in a colloidal state. Each of the demineralizer beds can be customized with different resins for effective removal of chemical contaminants along with radioactive contaminants. Generally, beds 1 and 2 contain a Cation Resin and beds 3 and 4 contain a Mixed Bed Resin. This system is located in the Decontamination Building (elevation 735'). 8.4.1.3.1 An evaporator (6 gpm) was originally used to process liquid waste at Unit 1. However, this evaporator was retired prior to initial issue of the ODCM, because of concerns for creating a mixed-waste. 8.4.1.4 1LW-TK-7A/7B: Steam Generator Drain Tanks There are two of these tanks, each tank has a capacity of 34,500 gallons. They are located in the Fuel Pool Leakage Monitoring Room (elevation 735'). They normally receive liquid waste that has been processed through the liquid waste demineralizer. These tanks can also receive liquid waste from Unit 2. Upon completion of filling operation, the tank is placed on recirculation through the demineralizer untilthe radioactivity concentration is acceptable for discharge. A minimum of two tank volumes must be recirculated prior to sampling for discharge permit preparation. 8.4.1.5 RM-ILW-104: Liquid Waste Discharge Radiation Monitor This off-line gamma scintillator radiation monitor continuously analyzes liquid waste as it is being discharged. The upper activity alarm on this radiation monitor has a setpoint that would indicate we are approaching OEC limits for radioactive water

                                    -leaving the site. If an upper activity alarm on this radiation monitor is received, it
                                    .automatically terminates the discharge by closing the discharge line isolation valve.

8.4.2 BV-1 Laundry and Contaminated Shower Drain System Components 8.4.2.1 1LW-TK-6A/6B: Laundry and Contaminated Shower Drain Tanks There are two of these tanks, each has a capacity of 1200 gallons. They are located in the northwest corner of the Auxiliary Building (elevation 722'). They receive laundry and contaminated shower drains waste from the Service Building. These tanks can also receive mop water waste from Unit 2. The waste in these tanks is not sent to the liquid waste demineralizer for cleanup because this waste may contain organic compounds that will deplete a resin bed. Upon completion of filling operation, the tank must be recirculated a minimum of two tank volumes prior to sampling for discharge permit preparation. 8.4.2.2 RM-1LW-1 16: Laundry and Contaminated Shower Drains Tank Discharge Radiation Monitor

(Page 27 of 43) Procedure Number: Beaver Valley Power Station 1/2-0DC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 1 7 27 of 43 This off-line gamma scintillator radiation monitor continuously analyzes laundry and contaminated shower drains waste as it is being discharged. The upper activity alarm on this radiation monitor has a setpoint that would indicate we are approaching OEC limits for radioactive water leaving the site. If an upper activity alarm on this radiation monitor is received, it automatically terminates the discharge by closing the discharge line isolation valve. 8.4.3 BV-2 Liquid Radwaste System Components 8.4.3.1 2LWS-TK21A/21B: Waste Drain Tanks There are two of these tanks, each tank has a capacity of 10,000 gallons. They are located in the northeast comer of the Auxiliary Building (elevation 710'). They receive liquid wastes from the vent and drain system. These tanks can also receive liquid wastes from Unit 1. IF further processing is not necessary, THEN it may be placed on recirculation. A minimum of two tank volumes must be recirculated prior to sampling for discharge permit preparation. 8.4.3.2 2SGC-IOE21A/21B: Steam Generator Blowdown Cleanup Ion Exchangers The main purpose of the ion exchangers is to clean liquid waste water of particulate and dissolved radioactive contaminants through an ion exchange process. There is a resin bed, outlets strainer, and cleanup filter associated with each of these ion exchangers. They are located in the Waste Handling Building (elevation 722'). 8.4.3.2.1 Two evaporators (20 gpm each) were orignially used to process liquid waste at Unit 2. However, this evaporator was retired prior to initial issue of the ODCM, because of concerns for creating a mixed-waste. 8.4.3.3 2SGC-TK23A/23B: Steam Generator Blowdown Test Tanks There are two of these tanks, each has a capacity of 18,000 gallons. They are located in the Auxiliary Building (elevation 755'). They receive liquid waste that has been processed through the cleanup ion exchangers. Upon completion of filling operation, the tank is placed on recirculation through the demineralizer until the radioactivity concentration is acceptable for discharge. A minimum of two tank volumes must be recirculated prior to sampling for discharge permit preparation. 8.4.3.4 2SGC-TK21A/21B: Steam Generator Blowdown Hold Tanks

(Page 28 of 43) Procedure Number: Beaver-Valley _ ______ ______ _______ Power ____ __ __ _ Station __ _ _ _ _ _ _ _ _ __ __ _1 PrcdueNubr:- /2 -OD C-2 .0 1

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 1 7 28 of 43 There are two of these tanks, each has a capacity of 50,000 gallons. They are located in the Waste Handling Building (elevation 722'). These tanks are used to store liquid waste when the radioactive concentration of the steam generator blowdown test tank is not acceptable for discharge. . These tanks can also receive liquid wastes from Unit

1. The contents of this tank may be drained or processed through the Unit 1 or Unit 2 Liquid Radwaste Treatment System until the radioactivity concentration is acceptable for discharge. A minimum of two tank volumes must be recirculated prior to sampling for discharge permit preparation.

8.4.3.5 2SGC-RQ100: Liquid Waste Effluent Monitor This off-line gamma scintillator radiation monitor continuously analyzes liquid waste as it is being discharged. The upper activity alarm on this radiation monitor has a setpoint that would indicate we are approaching OEC limits for radioactive water leaving the site. If an upper activity alarm is received, it automatically terminates the discharge by closing the discharge line isolation valves.

                                                                                 - END -

(Page 29 of 43) Beaver Valley Power Station Procere Numer: 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 29 of 43 ATTACHMENT A Page 1 of 4 LIQUID SOURCE TERMS TABLE 1.1-1a BV-I LIQUID SOURCE TERM (4) Ei (3) DETECTION ANNUAL RELEASE Ow EFFICIENCY NUCUDE (Ci) Cr-51 13E-3 5E-3 1.18E+7 Mn-54 3.1E-4 3E-4 8.59E+7 Fe-55 1.6E-3 1E-3 (5) Fe-59 83E-4 IE-4 9.17E+7 Co-58 1.4E-2 2E-4 1.16E+8 Co-60 2.OE-3 3E-5 1.73E+8 Zn-650 .1.3.13) 2.69E-2 5E-5 4.67E+7 Np-239 1.4E-4 2E-4 8.49E+7 Br-83 2-5E-5 9E-3 136E46 Br-84 2.5E-5 4E-3 9.75E+7 Br-85 2.7E-6 (5) 6.19E+6 Rb-86 75E-5 7E-5 (5) Sr-89 2.9E-4 8E-5 (5) Sr-90 1.1E-5 5E-6 (5) Y-90 9.4E-6 7E-5 (5) Y-91m 8.7E-6 2E-2 8.98E+7 Y-91 5.7E-5 8E-5 2.60E+5 Y-93 7.4E-7 2E-4 (5) Zr-95 5.1E-5 2E-4 8.60E+7 Nb-95 5.2E-5 3E-4 8.64E+7 Sr-91 1.3E-5 2E-4 6.97E+7 Mo-99 1.1E-2 2E-4 2.84E+7 Tc-99m 1.1E-2 1E-2 8.96E+7 Ru-103 3.4E-5 3E-4 9.5E+7 Ru-106 1OE-5 3E-5 (5) Rh-103m 3.4E-5 6E-2 (5) Rh-106 1.OE-5 (5) (5) Te-125m 2.5E-5 2E-4 1.83E+5 Te- 127m 2.6E-4 9E-5 4.09E+4 Te-127 2.7E-4 1E-3 1.38E+6 Te-129m 1.1E-3 7E-5 4.02E+6 Te-129 6.7E-4 4E-3 1.12E+7 1-130 1.2E-4 2E-4 3.08E+8 Te-13hin 1.6E-4 8E-5 1.82E+8 Te-131 3E-5 8E-4 1.20E+8 1-131 1.6E-1 1E-5 1.11E+8 Te-132 4.3E-3 9E-5 1.17E+8 1-132 4.9E-3 IE-3 2.66E+8 1-133 4.OE-2 7E-5 9.90E+7

(Page 30 of 43) BProcedure Number: Beaver Valley Power Station 1/2-ODC-2:O1

Title:

Unit Level OfUse: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: 7 Page Number: 30 of 43 ATTACHMENT A Page 2 of 4 LIQUID SOURCE TERMS 1-134 8.OE-5 4E-3 2.70E+8 Cs-134 4.6E-2 9E-6 1.99E+8 1-135 4.3E-3 3E-4 1.19E+8 Cs-136 8.9E-3 6E-5 2.80E+8 Cs-137 3.3E-2 1E-5 8.01E+7 Ba-137m 3.1E-2 1E-5 8.01E+7 Ba-140 1.IE-4 8E-5 4.37E+7 La-140 1.1 E-4 9E-5 2.OOE+8 Ce- 141 5.1E-5 3E-4 5.07E+7 Ce-143 2.8E-6 2E-4 7.27E+7 Ce-144 3.2E-5 3E-5 1.06E+7 Pr-143 2.7E-5 2E-4 1.04E+0 Pr- 144 3.2E-5 6E-3 2.25E+6 H-3 5.50E+2 1E-2 (5) TOTAL"' 4.05E-1 (1) Excluding Tritium and Entrained Noble Gases (2) Source Term for (RM-1LW-104 and RM-1LW-1 16) from Stone and Webster Calculation Package UR(B)-160 (311.) (3) ODCM Effluent Concentration Limit = 10 times the EC values of 10 CFR 20 (31.3) (4) Detection Efficiency for (RM-1LW-104 and RM-I1LW-1 16) from Calculation Package ERS-SFL-92-039 (3.14) (5) Insignificant

'(Page 31 of 43) Beaver Valley Power Station ProcdureCNumber: 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 31 of 43 ATTACHMENT A Page 3 of 4 LIQUID SOURCE TERMS TABLE 1.1-1b BV-2 LIQUID SOURCE TERM (2) (4) (3) DEIECIION ANNUAL RELEASE OEQ EFFICIENCY NUCLIDE. (0) Cr-51 1.00E-4 5E-3 2.01E+7 Mn-54 2.50E-5 3E-4 1.27E+8 Fe-55 1.30E-4 1E-3 (5) Fe-59 6.50E-5 1E-4 1.26E+8 Co-58 1.10E-3 2E4 1.82E+8 Co-60 1.60E-4 3E-5 2.38E+8 Z-i-65 (3.1.3.13) 5.1OE-2 5E-5 6.50E+7 Np-239 3.20E-5 2E-4 1.65E+8 Br-83 2.90E-5 9E-3 2.42E+6 Br-84 5.90E-9 4E-3 1.38E+8 Rb-86 3.70E-5 7E-5 1.04E+7 Sr-89 2.20E-5 8E-5 1.83E+4 Sr-90 8.50E-7 5E-6 (5) Sr-91 5.30E-6 2E-4 1.04E+8 Mo-99 2.30E-3 2E14 4.47E+7 Tc-99m 2. 1OE-3 JE-2 1AOE+8 Te-125m 1.90E-6 2E-4 3.94E+5 Te-127m 2.10E-5 9E-5 1.26E+5 Te-127 2.50E-5 1E-3 2.43E+6 Te-129m 8.20E-5 7E-5 6.53E+6 Te-129 5.30E-5 4E-3 1.96E+7 1-130 2.30E-4 2E-4 5.18E+8 Te-131m 5.20E-5 8E-5 2.85E+8 Te-131 9.40E-6 8E-4 1.88E+8 1-131 1.00E-1 1E-5 1.96E+8 Te-132 7.80E-4 9E-5 1.76E+8 1-132 2.30E-3 IE-3 4.22E+8 1-133 6.50E-2 7E-5 1.73E+8 1-134 4.60E-6 4E-3 4.06E+8 Cs-134 3.OOE-2 9E-6 3.25E+8 1-135 9.20E-3 3E-4 1.71E+8 Cs-136 3.90E-3 6E-5 4.28E+8 Cs-137 2.20E-2 IE-5 1.28E+8 Ba-137m 2. 1OE-2 1E-5 1.33E+8 Ba-140 9.30E-6 8E-5 7.50E+7 La-140 8.4OE-6 9E-5 3.08E+8

(Page 32 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 32 of43 ATTACHMENT A Page 4 of 4 LIQUID SOURCE TERMS TABLE 1.1-1b (continued) BV-2 LIQUID SOURCE TERM (2) (4) Ai Ei ANNUAL (3) DETECTION RELEASE OECi EFFICIENCY NUCLIDE (ni) (uCi/ml) (cpm/uCi/ml) Y-90 6.OOE-7 7E-5 Y-91m 3.60E-6 2E-2 1.59E+8 Y-91 4.40E-6 8E-5 3.55E+5 Y-93 3.OOE-7 2E-4 2.03E+7 Zr-95 4.OOE-6 2E-4 1.35E+8 Nb-95 4.OOE-6 3E-4 1.33E+8 Ru-103 2.70E-6 3E-4 1.71E+8 Ru-106 8.20E-7 3E-5 (5) Rh-103m 2.70E-6 6E-2 (5) Rh-106 8.20E-7 5.65E+7 Ce-141 4.OOE-6 3E-4 7.75E+7 Ce-143 8.60E-7 2E-4 1.20E+8 Ce-144 2.60E-6 3E-5 1.87E+7 Pr- 143 2.30E-6 2E-4 1.63E+0 Pr-144 2.60E-6 6E-3 3,.40E+6 H-3 5.50E+2 1E-2 (5) TOTAL")* 2.40E-1 (1) Excluding Tritium and Entrained Noble Gases Source Term for (2SGC-RQ100) from Computer Code LIQ1BB (3.1.2.3) (2) (3) ODCM Effluent Concentration Limit = 10 times the EC values of 10 CFR 20 (3.1.2.1) (4) Detection Efficiency for (2SGC-RQ 100) from Calculation Package ERS-SFL-86-026 (3.1.2.2) (5) Insignificant

"(Page 33 of 43)

                                                                                              'Procedure Number:

Beaver Valley Power Station 1o2-uDCr2.0e

Title:

Unit: Level Of Use: 1/2 I General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 1 7 33 of43 ATTACHMENT B Page 1 of 2 RECIRCULATION TIMES TABLE 1.2-1a BV-I RECIRCULATION TIMES REQUIRED BEFORE SAMPLING OF LIQUID DISCHARGE TANKS APPROXIMATE RECIRCULATION TIME() TANK DESCRIPTION ASSET NO. (Based on Historical Recirculation Rates) Laundry And Contaminated 1LW-TK-6A/6B 2.5 hrs - (1200 gal) (2) / (16 gpm) Shower Dam Tanks Low Level Waste Drain Tanks 1LW-TK-3A/3B 1.5 hrs = (2000 gal) (2) / (45 gpm) High Level Waste Drain Tanks 1LW-TK-2A12B 3.4 hrs = (5000 gal) (2) / (50 gpm) Respirator Test Tanks 1LW-TK-5A15B 1.4 hrs = (3000 gal) (2) / (73 gpm) Steam Generator Drain Tanks 1LW-TK-7A/7B 17.2 hrs -(35000 gal) (2)/(68 gpm) Boron Recovery Test Tanks lBR-TK-2A/2B 9.7 hrs =(13,000 gal) (2)/(45 gpm) () The times listed are those approximated for two recirculations of a full tank with one recirculation pump in. operation (using historical recirculation rates). Recirculation times for a partially full tank are directly proportional to the fraction of the tank capacity occupied by the entrained liquid waste (after isolation). Actual recirculation times are determined prior to sampling using actual tank volumes and actual recirculation rates available in the BV-1 Control Room.

(Page 34 of 43) Procedure Number: yPower Station 1/2-ODC-2.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 34 of 43

                                                             'ATTACHMENT B Page 2 of 2 RECIRCULATION TIMES TABLE 1.2-lb BV-2 RECIRCULATION TIMES REQUIRED BEFORE SAMPLING OF LIQUID DISCHARGE TANKS APPROXIMATE RECIRCULATION TIME(')

TANK DESCRIPTION ASSET NO. (Based on Historical Recirculation Rates) Liquid Waste Tanks 2LWS-TK21A/21B 11.5 hrs = (10,000 gal) (2)/(29 gpm) Steam Generator Blowdown 2SGC-TK21A/21B 25.8 hrs = (51,000 gal) (2)/(66 gpm) Hold Tanks Steam Generator Blowdown 2SGC-TK23A123B 9.1 hrs = (18,000 gal) (2)/(66 gpm) Test Tanks

The times listed are those approximated for two recirculations of a full tank with one recirculation pump in operation (using historical recirculation rates). Recirculation times for a partially full tank are directly proportional to the fraction of the tank capacity occupied by the entrained liquid waste (after isolation). Actual recirculation times are determined prior to sampling using actual tank volumes and actual recirculation rates available in the BV-2 Control Room.

(Page 35 of 43)

                                                  .Beaver Valley Power Station                                                                               ProcedureB Number:

1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 35 of43 ATTACHMENT C Page 1 of 5 INGESTION DOSE COMMITMENT FACTORS TABLE 1.3-1 Ait VALUES FOR THE ADULT FOR THE BEAVER VALLEY SITE (mrem/hr per uCi/mi) NUCLIDE BONE LIVER T-BODY THYROID KIDNEY LUNG GI-LLI H-3 0.OOE-01 270E-01 270E-01 2.70E-01 2.70E-01 270E-01 2.70E-01 C-14 3.13E04 626E03 6.26E 03 626E 03 626E03 626E03 626E03 Na-24 4.08E02 4.08E02 4.08E 02 4.08E 02 4.08E02 4.08E02 4.08E 02 P-32 4.62E07 2.87E06 1.79E06 O.OOE-01 O.OE-01 0.OOE-01 5.19E06 Cr-51 0.OOE-01 0.OOE-01 127E00 7.62E-01 2.81E-01 1.69E00 3.21E02 Mn-54 0.OOE-01 438E03 835E02 0.OOE-01 130E03 0.OOE-01 134E04 Mn-56 O.00E-01 1.10E02 1.95E01 0.OOE-01 1.40E02 0.00E-01 3.52E03 Fe-55 6.59E 02 4.56E 02 1.06E 02 0.OOE-01 0.OOE-01 254E 02 2.61E02 Fe-59 1.04E03 2.45E03 938E02 0.OOE-01 0.00E-01 6.83E02 8.15E03 Co-57 0.00E-01 2.10E01 3.50E 01 0.OOE-01 0.OOE-01 0.00E-01 533E02 Co-58 0.OOE-01 8.95E01 Z01E02 0.OOE-01 0.OOE-01 0.OOE-01 1.81E03 Co-60 0.OOE-01 2.57E 02 5.67E02 0.OOE-01 0.OOE-01 0.OOE-01 4.83E03 Ni-63 3.12E04 2.16E03 1.05E03 0.OOE-01 O.GOE-01 0.OOE-01 4.51E02 Ni-65 127E02 1.65E01 7.51E00 0.OOE-O1 0.OOE-O1 0.00E-O1 4.17E02 Cu-64 0.OOE-01 1.00E01 4.70E 00 0.OOE-01 2.52E 01 0.OOE-01 8.53E 02 Zh-65 232E04 737E 04 3.33E 04 0.OOE-01 4.93E 04 0.OOE-01 4.64E 04 Zm169 4.93E01 9.43E01 6.56E00 0.OOE-01 6.13E01 0.OOE-01 1.42E01 Br-83 0.00E,01 0.00E-01 4.04E01 0.OOE-01 0.OOE-01 0.00E-01 5.82E01 Br-84 0.00E-O1 0.OOE-01 5.24E01 0.OOE-01 0.OOE-01 0.OOE-01 4.1 1E-04 Br-85 O.OOE-01 0.OOE-01 215E00 0.OOE-01 0.OOE-01 0.OOE-01 0.OOE-01 Rb-86 0.OOE-01 1.01E 05 4.71E 04 0.OOE-01 0.OOE-01 0.OOE-01 1.99E 04 Rb-88 0.OOE-01 2.90E 02 1.54E02 0.OOE-01 0.OOE-01 0.OOE-01 4.OOE-09 Rb-89 0.OOE-01 1.92E 02 1.35E 02 .OOE-01 0.OOE-01 0.OOE-01 1.12E-11 Sr-89 2.22E04 0.OOE-01 639E02 0.O0E-01 0.O0E-01 0.O0E-01 3.57E 3 Sr-90 5.48E05 0.OOE-01 1_34E05 O.OOE-01 0.OOE-01 0.OOE-01 1.58E 04 Sr-91 4.10E02 0.OOE-01 1.65E01 0.OOE-01 0.OOE-01 0.OOE-01 1.95E03 Sr-92 1.55E02 0.00E-01 6.72E 00 0.OOE-01 0.OOE-01 0.0F-0I 3.08E03 Y-90 5.80E-01 0.OOE-01 1.55E-02 0.OOE-01 0.OOE-01 0.OOE-01 6.15E 03 Y-91m 5.48E-03 0.OOE-01 212E-04 O.OOE-01 0.OOE-01 0.OOE-01 1.61E-02

(Page 36, of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 7 36 of 43 ATTACHMENT C Page 2 of 5 INGESTION DOSE COMMITMENT FACTORS Y-91 8.50E00 O.OOE-01 227E-01 O.OOE-01 O.OOE-01 O.OOE-01 4.68E03 Y-92 5.09E,02 O.OOE-01 1.49E-03 O.OOE-01 O.OOE-01 O.OOE-01 8-92E02 Y-93 1.62E-01 0.00F-01 4.46F,03 O.OOE-0O1 0.00E01 O.OOE-01 5.12E 03 Zr-95 2.53E-01 8.11F,02 5.49E-02 O.OOE-01 127E-01 0.000E-1 2.57E02 Zr-97 1.40E-02 2.82E-03 129E-03 O.OOE-01 426E__3 O.OOE-01 8.73E 02 N1b-95 4.47E 00 249E00 1-34E 00 O.OOE-01 2.46E00 O.OOE-01 1.51E04 Nb-97 3.75E02 9.49E-03 3.46E,03 O.OOE.0O 1.11E-02 O.OOE-01 3.50E01

_(Page 37 of 43) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 137 of 43 ATTACHMENT C Page 3 of 5 INGESTION DOSE COMMITMENT FACTORS TABLE 1.3-1 Ait VALUES FOR THE ADULT FOR THE BEAVER VALLEY SITE (mrem/hr per uCi/ml) NUCLIDE BONE LIVER T-BODY THYROID KIDNEY LUNG GI-LIJ Mo-99 0.O0E-01 1.05E02 2.00E01 0.OOE-01 2.38E02 O.OOE-01 2.43E02 Tc-99n 8.97E-03 2.54E-02 323E-01 0.OOE-01 3.85E-01 124E-02 1.50E01 Tc-101 923E-03 133E02 1.30E-01 0.OOE-01 239E-01 6.79E-03 4.OOE-14 Ru-103 4.51E 00 .OOE-01 1.94E 00 0.OE-01 1.72E 01 0.OOE-01 5.26E02 Ru-105 3.75E,01 O.OOE-01 1.48E-01 0.OOE-01 4.85E00 O.OOE-01 229E 02 Ru-106 6.70E01 O.OOE-01 8.48E00 O.OOE-01 129E 02 0.OOE-01 4.34E03 Ag-110m 9.48E01 8.77E-01 521E-01 0.OOE-01 1.72E 00 0.OOE-01 3.58E 02 Sb-124 7.87E00 1.49E01 3.12E00 1.91E-02 O.OOE-01 6.13E00 223E02 Sb-125 5.03E00 5.62E-02 120E00 5.11E-03 O.OOE00 1 3.88E00 5.54E01 Te-125m 2.57E 03 9.30E02 3.44E02 7.72E 02 1.04E04 O.OOE-01 1.03E04 Te-127m 6.49E 03 2.32E 03 7.90E 02 1.66E 03 2.63E 04 O.OOE-01 2.17E04 Te-127 1.05E02 3.78E01 228E01 7.81E01 429E02 0.OOE-01 8.32E03 Te-129m 1.10E04 4.11E03 1.74E 03 3.78E03 4.60E 04 O.OOE-01 5.55E04 Te-129 3.01E01 1.13E01 7.33E 00 2.31E01 126E 02 0.OOE-01 227E01 Te-131m 1.66E03 8.10E02 6.75E02 128E03 8.21E03 O.OOE-01 8.05E04

                    -- -- --- --- - ---- -- -  .- .-  .-  .- 7..- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.

Te-131 1.89E01 7.88E00 5.96E00 1.55E01 8.27E01 O.OOE-01 2.67E00 Te-132 2.41E03 1.56E 03 1.47E03 1.72E 03 1.50E 04 0.OOE-01 7.39E 04 Te-134 3.10E01 2.03E01 125E01 2.71E01 1.96E 02 0.OOE-01 3.44E-02 1-129 1.19E02 1.02E02 3.35E02 2.63E 05 2.19E02 O.OOE-01 1.61E01 1-130 2.75E01 8.10E01 320E01 6.87E03 126E 02 O.OOE-01 6.97E01 1-131 151E02 2.16E02 124E02 7.08E04 3.71E02 0.00E-01 5.70E01 1-132 737E00 1.97E01 6.90E00 6.90E02 3.14E01 0.GOE-01 3.71E00 1-133 5.16E01 8.97E01 2.74E01 1.32E 04 1.57E02 O.OOE-01 8.06E01 1-134 3.85E00 1.05E01 3.74E00 1.81E02 1.66E01 0.OOE-01 9.12E-03 1-135 1.61E01 421E01 1.55E01 2.78E03 6.76E01 O.OOE-01 4.76E01 Cs-134 2.98E05 7.09E05 5.79E05 O.OOE-01 2.29E05 7.61E04 124E04 Cs-136 3.12E04 123E05 8.86E04 O.0CE-0I 6.85E04 9.39E 03 1.40E 04 Cs-137 3.82E 05 522E05 3.42E 05 0.OOE-01 1.77E 05 5.89E 04 1.01E04 Cs-138 2.64E02 522E02 2.59E02 0.OOE-01 3.84E02 3.79E01 223E-03

(Page 38 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit Level Of Use: 1/2 General Skill Reference ODCM: LIQUID EFFLUENTS Revision: Page Number: 7 38 of 43 ATTACHMENT C Page 4 of 5 INGESTION DOSE COMMITMENT FACTORS Ba-139 9.69E-l 6.90E-04 2.84E-02 O.OOE-01 6.45E-04 392E-04 1.72E00 Ba-140 2.03E02 255E_01 1.33E01 O.OOE-01 8.66E-02 1.46E-01 4.18E02 Ba-141 4.71E-01 3.56E-04 1.59E.02 O.OOE-01 3.31E-04 2.02E-04 2-22E-10 Ba-142 2.13E-01 2.19E-04 1.34E02 O.OOE-01 1.85E,04 124E-04 3.OOE-19 La-140 1.51E-01 7.59E4-2 2.01E-02 O.OOE-01 O.00E-01 O.OOE-01 5.57E 03 La-142 7.71E-03 3.51E-03 874E-04 O.OOE-01 O.OOE-01 O.OOE-01 2.56E 01 Ce-141 2.63E-02 1.78E-02 2.02E-03 O.OOE-01 826E-03 O.OOE-01 6.80E01

.(Page 39 of 43) Beaver Valley Power Station Procedure Number: B 1/2-ODC-2.01

Title:

Unit: Level DfUse: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 39 of 43 ATTACHMENT C Page 5 of 5 INGESTION DOSE COMMITMENT FACTORS TABLE 1.3-1 Ai, VALUES FOR THE ADULT FOR THE BEAVER VALLEY SITE (mrem/hr per uCi/ml) NUCLIDE BONE LIVER T-BODY THYROID KIDNEY LUNG GI-LLI Ce-143 4.64E-03 3.43E 00 3.79E-04 0.OOE-01 1.51E-03 0.0OOE-01 1.28E 02 Ce-144 1.37E00 5.73E-01 7.36E-02 0.OOE-01 3.40E-01 O.OOE-01 4.64E02 Pr-143 5.54E-01 2.22E-01 2.75E-02 0.OOE-01 1.28E-01 O.OOE-01 2.43E 03 Pr-144 1.81E-03 7.53E_04 9.22E-05 0.00E-01 4.25E-04 O.OOE-01 2.61E-10 Nd-147 3.79E-01 4.38E-01 2.62E-02 0.OOE-01 2.56E-01 O.OOE-01 2. 10E 03 W-187 2.96E02, 2.47E 02 8.65E01 O.OOE-01 0.OOE-01 0.OOE-01 8.10E04 Np-239 2.90E-02 2.85E-0-3) Np29 1.57E-03

                                                          .0E0 28E-30.OOE-01 8.89F,03         0.OOE-0l       5.85E 02

(Page 40 of 43) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 7 40 of 43 ATTACHMENT D Page 1 of 3 LIQUID RADWASTE SYSTEM STREAM UNIT 1: COLLECTION, TREATMENT, & DISCHARGE Containment Sump LIQUID WASTE DISCHARGES TO BVPS-1 COOLING TOWER BLOWDOWN AND ENVIRONMENT

,(Page 41 of 43) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.01

Title:

Unit: Level OfUse: 1/2 General Skill Reference Page Number: ODCM: LIQUID EFFLUENTS Revision: 1 7 41 of 43 ATTACHMENT D Page 2 of 3 LIQUID RADWASTE SYSTEM STREAM . UNIT 2: COLLECTION, TREATMENT, & DISCHARGE BVPS-1 Cooling Tower Blowdown 15,000 gpm BVPS-2 Cooling Tower Blowdownm 7,800 gpm BVPS l&2 Combined Cooling Tower Discharge Point 22;800 gpm LIQUID WASTE DISCHARGES TO BVPS-2 COOLING TOWER BLOWDOWN AND ENVIRONMENT

(Page 42 of 43) Procedure Number: Power Station .1/2-ODC-2.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: LIQUID EFFLUENTS 7 42 of43 TTAlICHMENT D Page 3 of 3 LIQUID RADWASTE SYSTEM FIGURE 1.4-3 BV-I AND 2 LIQUID EFFLUENT RELEASE POINTS

o ~ ('t~

                 -t

~J2 H t!1 Ci) 0 cj'~ 'ii zH 0 C) 0. z

               -~     ~-

Cr2 '~ 0 0 0 0 0

1 of 128) RTL #A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-2.02 ODCM: GASEOUS EFFLUENTS Document Owner Manager, Nuclear Environmental & Chemistry Revision Number 2 Level Of Use In-Field Reference Safety Related Procedure Yes Effective Date 08/30/06 M

(Page 2 of 128) Beaver Valley Power Station ________________________________________________1/2-ODC-2. Procedure Number: 02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revion: 2 Page Number: 2 of 128 TABLE OF CONTENTS 1.0 PU R P O SE ............ ............................... . ...................................................................................... 4 2.0 SCOPE ................................................................. 4

3.0 REFERENCES

AND COMMITMENTS ............................................................................... 4 3 .1 R e fe re n c e s .......................................................................................................................... 4 3 .2 C o m m itm e nts ..................................................................................................................... 6 4.0 RECORD S AN D FORM S ................................................................................................... 6 4 .1 Rec o rd s ......................................... ........................... . -............................................. .. . . 6 4 .2 F orm s ......................................................... ................... ..... ............... .6 5.0 PRECAUTIONS AND LIMITATIONS ................................................................................. 6 6.0 A CCEPTAN CE CRITERIA ................................................................................................. 8 7 .0 P RERE Q U ISITE S........................................................................................................................ 8 8 .0 P RO C EDU R E ............................................................................................................................... 8 8 .1 A larm S etp oin ts .................................................................................................................. 8 8.1.1 BV- I Monitor Alarm Setpoint Determination ................................................ 8 8.1.2 BV-2 Monitor Alarm Setpoint Determination .............................................. 17 8.1.3 BV-1/2 Monitor Alarm Setpoint Determination ............................................ 28 8.2 Compliance With 10 CFR 20 Dose RateLimits (ODCM CONTROL 3.11.2.1) ................................. 34 8.2.1 D ose R ate D ue To Noble G ases ........................................................................ 34 8.2.2 Dose Rate Due To Radioiodines And Particulates ....................................... 41 8.3 Compliance With 10 CFR 50 Dose Limits (ODCM CONTROLS 3.11.2.2 And 3.11.2.3) (G a se ou s) ......................................................................................................................... 44 8.3.1 D ose D ue To Noble G ases ............................................................................ 45 8.3.2 Dose Due To Radioiodines And Particulates ............................................... 52 8.4 G aseous R adw aste System .......................................................................................... 67 8.4.1 BV-I Gaseous Radwaste System Components ........................................... 67 8.4.2 BV-2 Gaseous Radwaste System Components ........................................... 68

(P e 3 of. 128) Procedure Number: BeyPower Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 1 2 3 of 128 TABLE OF CONTENTS ATTACHMENT A GA SEOU S SOU R CE TERM ........................................................................... 70 ATTACHMENT B GASEOUS EFFLUENT MONITOR DETECTION EFFICIENCIES ............... 72 ATTACHMENT C MODES OF GASEOUS RELEASE ............................................................ 74 ATTACHMENT D RAD IO NUC L ID E M IX ................................................................................... 75 ATTACHMENT E DISTANCES TO RELEASE POINTS ...................................................... 77 ATTACHMENT F 0-5 MILE DISPERSION PARAMETERS .................................................... 78 ATTACHMENT G NOBLE GAS DOSE FACTORS AND DOSE PARAMETERS ....................... 85 ATTACHMENT H ORGAN D O SE PARAM E TERS ...................................................................... 87 ATTACHMENT I MODES OF GASEOUS RELEASE ................................................................. 88 ATTACHMENT J P& I ORGAN D O SE FACTOR S ....................................................................... 89 ATTACHMENT K CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 MILES) ..... 108 ATTACHMENT L CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DIS T AN C E S) ................................................................................................ 115 ATTACHMENT M BATCH RELEASE DISPERSION PARAMETERS (SPECIAL D IS T AN C E S) ................................................................................................ 12 2 ATTACHMENT N BATCH RELEASE DISPERSION PARAMETERS (0 - 5 MILES) ............... 125 ATTACHMENT 0 GASEOUS RADWASTE SYSTEM ............................................................... 126 ATTACHMENT P BV-1 AND BV-2 GASEOUS EFFLUENT RELEASE POINTS .................... 127 ATTACHMENT Q SITE BOUNDARY FOR GASEOUS EFFLUENTS ...................................... 128

(Page 4 of 128)

                                                                                                                             &  I, Beaver Valley Power Station
  • ProcedureNumber:

1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 4 of 128 1.0 PURPOSE 1.1 This procedure provides the calculational methodology to be used for determination of the following release parameters. 1.1.1 Gaseous effluent monitor alarm setpoints 1.1.2 Gaseous effluent dose rate calculations 1.1.3 Gaseous effluent dose calculations 1.2 This procedure also provides information related to the following: 1.2.1 Gaseous Radwaste Treatment System. 1.2.2 Site Boundary used for gaseous effluents. 1.3 Prior to issuance of this procedure, these items were located in Section 2 and Section 5 of the old ODCM. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel (including subcontractors) that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 References for BV- I Gaseous Effluent Monitor Setpoints 3.1.1.1 Beaver Valley Power Station, Appendix I Analysis - Docket No. 50-334 and 50-412; Table 2.1-3 3.1.1.2 Beaver Valley Power Station, Unit 2 FSAR; Table 11.3-1 3.1.1.3 BVPS Specification No. BVS 414, Table V Nuclide Data,; Table 1 and Figure 1, Table 3, and Figure 2, May 30, 1974 3.1.1.4 Calculation Package No. ERS-SFL-85-03 1, Unit 1 Gaseous Effluent Monitor Efficiency Data 3.1.1.5 Calculation Package No. ERS-HHIIM-87-014, Unit 1/Unit 2 ODCM Gaseous Alarm Setpoint Determinations 3.1.1.6 Calculation Package No. ERS-ATL-87-026,BVPS-1 and BVPS-2 ODCM T Factor Justification

5 5Pa.* of ,128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 5 of 128 3.1.1.7 Letter ND1SSHP:776, dated February 12, 1988, BVPS-1 ODCM Table 2.2-2, Appendix B 3.1.1.8 Stone and Webster Calculation No. UR(B)-262, Gaseous Releases From Containment Vacuum Pumps 3.1.2 References for BV-2 Gaseous Effluent Monitor Setpoints 3.1.2.1 Calculation Package No.ERS-SFL-86-026, Unit 2 DRMS Isotopic Efficiencies 3.1.2.2 Calculation Package No. ERS-HETM-87-014, Unit I/Unit 2 ODCM Gaseous Alarm Setpoint Determinations 3.1.2.3 Beaver Valley Power Station, Unit 2 FSAR; Table 11.3-2 3.1.2.4 Calculation Package No. ERS-ATL-87-026, BVPS-1 and BVPS-2 ODCM T Factor Justification 3.1.2.5 Stone and Webster Calculation No. UR(B)-262, Gaseous Releases From Containment Vacuum Pumps 3.1.3 References Used for other portions of this procedure 3.1.3.1 NUREG-0133, Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants 3.1.3.2 NUREG-1301, Offsite Dose Calculation Manual Guidance; Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1) 3.1.3.3 NUREG-0324; XOQDOQ Program for the Meteorological Evaluation of Routine Releases at Nuclear Power Stations, September 1977 3.1.3.4 NUREG-0017; Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents form PWR's Revision 0. 3.1.3.5 Regulatory Guide 1.109, Calculation of Annual Dose to Man from Routine Releases of Reactor Effluents for the Purpose of Implementing Appendix 1, April 1977 3.1.3.6 NUREG-0172, Age - Specific Radiation Dose Commitment Factors for a one-year Chronic Intake 3.1.3.7 1/2-ADM-1640, Control of the Offsite Dose Calculation Manual 3.1.3.8 1/2-ADM-0 100, Procedure Writers Guide 3.1.3.9 NOP-SS-3001, Procedure Review and Approval

(Page 6 of 128) 41- jý Beaver Valley Power Station Procdu NuerODC 2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 6 of 128 3.1.3.10 CR03-04830, Containment Vacuum Pump Replacement Increases ODCM Source Term. CA-03, Revise Unit 1 Containment Vacuum Pump Source-Term in ODCM procedure 1/2-ODC-2.02, Attachment A, Table 2.1-1a. 3.1.3.11 CR 05-01169, Chemistry Action Plan for Transition of RETS, REMP and ODCM. CA-16, Revise procedure 1/2-ODC-2.02 to change document owner from Manager, Radiation Protection to Manager, Nuclear Environmental & Chemistry. 3.1.3.12 Unit I Technical Specification Amendment No. 275 (LAR IA-302) to License No. DPR-66. This amendment to the Unit 1 license was approved by the NRC on July 19, 2006. 3.1.3.13 Vendor Calculation Package No. 8700-UR(B)-223, Impact of Atmospheric Containment Conversion, Power Uprate, and Alternative Source Terms on the Alarm Setpoints for the Radiation Monitors at Unit 1. 3.1.3.14 Engineering Change Package No. ECP-04-0440, Extended Power Uprate. 3.1.3.15 CR 06-04908, Radiation Monitor Alarm Setpoint Discrepancies. CA-03; revise ODCM procedure 1/2-ODC-2.02 to update the alarm setpoints of gaseous effluent radiation monitor for incorporation of the Extended Power Uprate per Unit 1 TS Amendment No. 275.. 3.2 :Commitments 3.2.1 None 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (e.g.; letter or calculation package) with an appropriate RTL number. 4.2 Forms 4.2.1 None 5.0 PRECAUTIONS AND LIMITATIONS 5.1 ODCM CONTROLS applicable to dose rate apply to the site. The site dose rate is due to the summation of releases from both units. 5.2 ODCM CONTROLS applicable to accumulated dose apply individually to each unit.

(Pýe. 7 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 1 2 7 of 128 5.3 Releases at the Beaver Valley site may be ground level or elevated in nature. 5.3.1 All ground level releases are identified with a specific unit in the determination of site dose rate and dose attributed to that unit. 5.3.2 Elevated releases from both units are considered to originate from a shared radwaste system and are discharged from a common release point, the Process Vent, at the top of the BV-I cooling tower. 5.4 At BV-1 and BV-2, the dose from continuous and batch (Gas Waste Storage Tanks) releases via the shared radwaste system (Process Vent) are normally apportioned equally to the units. Other continuous and batch releases via non-shared radwaste systems shall be attributed to a specific unit. The only exception is a containment purge via the Process Vent which shall be attributed to a specific unit. 5.5 There is a difference in setpoint terminology presentations of the radiation monitoring systems of BV-1 and BV-2. 5.5.1 Where HIGH and HIGH-HIGH terminology are used for the BV-1 Victoreen monitors, ALERT and HIGH terminology are used for the BV-1 Eberline SPING monitors and the BV-2 monitors. 5.5.2 Also, BV-2 setpoints are presented in uCi/cc rather than cpm as in BV-1. This difference is due to BV-2 software which applies a conversion factor to the BV-2 raw data (cpm). The user is cautioned that the uCi/cc presentation is technically correct only for the specific isotopic mix used in the determination of the conversion factor. In practice, setpoints determined for a calculated mix are correct for that mix. Setpoints determined on analysis prior to release will be correct for properly controlling dose rate, but the indicated uCi/cc value may differ from the actual value. 5.5.3 All BV-1 and BV-2 effluent monitors specified herein have Upper Alarm Setpoints established at 60 percent of the site limit, and Lower Alarm Setpoints established at 30 percent of the site limit. 5.6 A release may be batch or continuous in nature. Batch refers to releases that are intermittent in radionuclide concentrations or flow, such as releases from gas storage tanks, containment purges and ventings of systems or components with infrequent use. 5.6.1 Batch releases may be due to operational variations which result in radioactive releases greater than 50% of the releases normally considered as continuous. Batch releases from these sources during normal operation, including anticipated operational occurrences, are defined as those which occur for a total of 500 hours or less in a calendar year, but not more than 150 hours in any quarter. 5.6.2 The batch relative concentration value has been calculated in accordance with the guidelines provided in NUREG-0324( 31 33 ) for short-term release.

(Page 8 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 8 of 128 5.6.3 IF simultaneous batch and continuous release out of one vent occurs, THEN use the lowest setpoint obtained according to Sections 8.1.1.1 through 8.1.3.2. 5.7 This procedure also contains information that was previously contained in Section 5 of the previous BV-I and BV-2 Offsite Dose Calculation Manual. 5.7.1 In regards to this, the site boundary for gaseous effluents was included in this procedure. 5.7.2 The Site Boundary for Gaseous Effluents is shown in ATTACHMENT P Figure 5-1. 6.0 ACCEPTANCE CRITERIA 6.1 All changes to this procedure shall contain sufficient justification that the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50, and not adversely impact the accuracy of effluent dose or alarm setpoint calculation. (3.1.3.2) 3 8) 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-0100(31 and 1/2-ADM-1640. (3.1.3.7) 6.1.2 All changes to this procedure shall be reviewed and approved in accordance with NOP-SS-300 1(3. 139) and 1/2-ADM- 1640. (3.1.3.7) 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and content. 8.0 PROCEDURE 8.1 Alarm Setpoints 8.1.1 BV-1 Monitor Alarm Setpoint Determination ODCM CONTROL 3. 11.2.1 require that the dose rate in unrestricted areas due to noble gas radionuclides in the gaseous effluent released from the site shall be limited to < 500 mrem/yr to the total body and to < 3000 mrem/yr to the skin. This section describes the methodology used to maintain the release of noble gas radionuclides within ODCM CONTROL 3.11.2.1 for the site, and determines monitor setpoints for BV-1. The methodologies described in Section 8.1.1.2, 8.1.2.2, and 8.1.3.2 provide an alternate means of determining monitor alarm setpoints that may be used when an analysis is performed prior to release. Control of the site dose rate limit due to noble gases is shown in the following Table. Dose rate control is exercised through a total of 8 effluent stream monitors, of which 3 are located at BV-I (alternates exists for these monitors), and 5 are located at BV-2. As previously noted, BV-1 and BV-2 elevated releases are via the PV-1/2 Process Vent.

(Pasaue 9 of ,.128) Beaver Valley Power Station Procedure N ODC 2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 9 of 128 Monitor Setpoint Specifications Based On Fraction Of Site Limit UNIT RELEASE POINT FRACTION OF SITE LIMITING DOSE MONITOR NO. RATE Upper Alarm Lower Alarm (VV-1) Unit 1, Auxiliary Building Vent Pri.: RM-1VS-101B or 60% (HIGH-HIGH) 30% (HIGH) Alt.: RM-1VS-109 (5) 60% (HIGH) 30% (ALERT) (CV-1) Unit 1, RX Containment/SLCRS Vent Pri.: RM-1VS-107B or 60% (HIGH-HIGH) 30% (HIGH) Alt.: RM-lVS-1 10 (5) 60% (HIGH) 30% (ALERT) (PV- 1/2), Unit 1/2, Gaseous Waste/Process Vent 30% (HIGH) Pri.: RM-1GW-108B or 60% (HIGH-HIGH) Alt.: RM-1GW-109 (5) 60% (HIGH) 30% (ALERT) (CV-2), Unit 2, SLCRS Filtered Pathway 2HVS-RQ109E 60% (HIGH) 30% (ALERT) (VV-2), Unit 2, SLCRS Unfiltered Pathway 2HVS-RQ101B 60% (HIGH) 30% (ALERT) (WV-2), Unit 2, Waste Gas Storage Vault Vent 2RMQ-RQ303B 60% (HIGH) 30% (ALERT) (DV-2), Unit 2, Decontamination Building Vent 2RMQ-RQ301B 60% (HIGH) 30% (ALERT) (CB-2), Condensate Polishing Building Vent 2HVL-RQ1 12B 60% (HIGH) 30% (ALERT) With the monitor setpoints based on fractions of the site limit as defined above, the following criteria may be applied to determine that the dose rate due to noble gas released from the site complies with ODCM CONTROL 3.11.2. 1:

                            " The site dose rate is 30% of the site dose rate limit when any monitor is indicating a Lower Alarm.
  • The site dose rate is 60% of the site dose rate limit when any two monitors are indicating Lower Alarms.
  • The site dose rate is 60% of the site dose rate limit when any monitor is indicating an Upper Alarm.
  • The site dose rate is 90% of the site dose rate limit when any monitor is indicating an Upper Alarm and any other monitor is indicating a Lower Alarm.

(Page 10 of 128) Procedure Number: Beaver Valley Power Station ____________________________________________1/2-ODC-2.02 Proedre umer

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 1 2 10 of 128 8.1.1.1 BV-1 Setpoint Determination Based On A Calculated Mix For VV-1 and CV-1 Ground Releases The table below gives the calculated monitor count rate above background (CR), in ncpm, and provides the equivalent monitor indication associated with the most limiting site dose rate limit (i.e.; 500 mrem/yr Total Border or 3000 mrem/yr skin). The monitor HIGH-HIGH alarm setpoint above background (HHSP), and the monitor HIGH alarm setpoint above background (HSP) for each vent and operational condition shall be as follows: BV-1 ALARM SETPOTNTS FOR GROUND RELEASES cpm ABOVE BACKGROUND 60%/ 3T/o (P)PRIMARY* SITE SITE MONITOR LIMIT LIMIT (A)ALTERNATE UPPER UPPER MONITOR CR ALARM ALARM

  • Continuous Release Via The BV-1 (P)RM-1VS-101B 3000 < 1800 <900 Auxilary Building Vent (VV-1) (A)RM- 1VS- 109(5) 1470 < 879 <440
  • Batch Release Of Containment (P)RM-1VS-101B 1200 < 718 *359 Purge Via The BV-1 Auxiliary (A)RM- 1VS-109(5) 1430 < 860 *430 Building Vent (VV- 1)
  • Continuous Release Via The BV-I (P)RM-1VS-107B 6440 <3870 1930 Rx Containment/SLCRS Vent (A)RM-1VS-110(5) 3380 <2030 1010 (CV-1)
  • Batch Release Of Containment (P)RM-IVS-107B 12,700 < 7630 *3810 Purge Via The BV-I Rx (A)RM-1VS-110(5) 6660 < 4000 *2000 Containment/SLCRS Vent (CV-1)
                           *IF the primary monitor is out of service, THEN ODCM CONTROL 3.3.3.10 is met for the respective alternate monitor. The alternate setpoints shall be utilized.

The setpoints were determined using the following conditions and information: 0 Source terms given in ATTACHMENT A Table 2.1-1a. The gaseous source terms were derived from Stone & Webster computer code GAStBB (similar to NUREG-0017),(3l34) and computer code DRAGON 4 (for the containment vacuum pump sources). ATTACHMENT A Table 2.1-la does not include particulates and iodines, which are not used in site noble gas dose rate calculations.

  • Onsite meteorological data for the period January 1, 1976 through December 31, 1980.
  • Discharge flow rate of 62,000 cfm for a VV-1 Continuous Release.

(Pase 11 of, 128) Procedure Number: Beaver Valley Power Station r /2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 11 of 128

  • Discharge flow rate of 92,000 cfm for a VV-1 Batch Release of Containment Purge.

This is comprised of 30,000 cfm from the containment purge plus 62,000 cfm for VV-1.

  • Discharge flow rate of 49,300 cfm for a CV-1 Continuous Release.
  • Discharge flow rate of 56,800 cfm for a CV-1 Batch Release of Containment Purge.

This is comprised of 7,500 cfm from the containment purge plus 49,300 cfm for CV-1.

  • Information listed under References for BV-I Gaseous Effluent Monitor Setpoints.

The calculation method given in Sections 8.1.1.1.1 through 8.1.1.1.7 was used to derive the monitor setpoints for the following operational conditions:

  • Continuous release via VV-1.
                       " Continuous release via CV-1.
  • Batch release of BV-1 Containment Purge via VV-1.
  • Batch release of BV-1 Containment Purge via CV-2.

8.1.1.1.1 BV-1 Mix Radionuclides The "mix" (noble gas radionuclides and composition) of the gaseous effluent was determined as follows:

  • The gaseous source terms that are representative of the "mix" of the gaseous effluent were selected. Gaseous source terms are the radioactivity of the noble gas radionuclides in the effluent. Gaseous source terms can be obtained from ATTACHMIENT A Table 2.1-l a.
                                     " The fraction of the total radioactivity in the gaseous effluent comprised of noble gas radionuclide "I"(Si) for each individual noble gas radionuclide in the gaseous effluent was determined by:

A, YAi [2.1(1)-1] where: Ai = The total radioactivity or radioactivity concentration of noble gas radionuclide "i" in the gaseous effluent from ATTACHMENT A Table 2.1-l a.

(Page 12 of 128) 5 A Procedure Number: Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 12 of 128 8.1.1.1.2 BV-1 Maximum Acceptable Release Rate (Whole Body Exposure) The maximum acceptable total release rate (uCi/sec) of all noble gas radionuclides in the gaseous effluent (Qt) based upon the whole body exposure limit was calculated by: 500 Qt = Si [2.1(1)-2] i where: (X/Q)v The highest calculated annual average relative concentration of effluents released via VV- 1 for any area at or beyond the unrestricted area boundary for all sectors (sec/i 3) from ATTACHMENT F Table 2.2-5. 1.03E-4 sec/mi3 for continuous releases. (X/q)w The highest calculated short term relative concentration of effluents released via VV-1 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT M Table 2.3-36.

                                         =    3.32E-4 sec/m 3 for batch release of containment purge.

(X/Q),v The highest calculated annual average relative concentration of effluents released via CV-1 for any area at or beyond the unrestrictedarea boundary for all sectors (sec/m 3) from ATTACHMENT F Table 2.2-4.

                                         =    9.24E-5 sec/m 3 for continuous releases.

(X/q)c~v The highest calculated short term relative concentration of effluents released via CV-1 for any area at or beyond the unrestricted area boundary for any sectors (sec/mr3) from ATTACHMENT M Table 2.3-35. 3.08E-4 sec/m 3 for batch release of containment purge. Ki = The total whole body dose factor due to gamma emissions from noble gas radionuclide "i" (mremryear/uCi/m 3) from ATTACHMENT G Table 2.2-11. Si= From equation [2. 1(1)-1] above.

(Page 13 off 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 .1'3 of 128 8.1.1.1.3 BV-1 Maximum Acceptable Release Rate (Skin Exposure) Q, was also determined based upon the skin exposure limit by: Qt = 3000 (X/Q) F*(Li + 1.1IMi ) Si where: Li= The skin dose factor due to beta emissions from noble gas radionuclide "i"(mrem/year/uCi/m 3) from ATTACHMENT G Table 2.2-11. Mi = The air dose factor due to gamma emissions from noble gas radionuclide "i"(mrad/year/uCi/m 3) from ATTACHMENT G Table 2.2-11. 1.1 = The ratio of the tissue to air absorption coefficients over the energy range of the photons of interest, (mrem/mrad). (X/Q) Same as in Section 8.1.1.1.2. 8.1.1.1.4 BV-1 Maximum Acceptable Release Rate (Individual Radionuclide) The maximum acceptable release rate (uCi/sec) of noble gas radionuclide "i" in the gaseous effluent (Qi) for each individual noble gas radionuclide in the gaseous effluent was determined by: Qi = Si Qt [2.1(1)-4] NOTE: Use the lower of the Qt values obtained in Section 8.1.1.1.2 and 8.1.1.1.3. 8.1.1.1.5 BV-1 Maximum Acceptable Concentrations (Individual Radionuclide) The maximum acceptable radioactivity concentration (uCi/cc) of noble gas radionuclide "i" in the gaseous effluent (Ci) for each individual noble gas radionuclide 'T' in the gaseous effluent was determined by: Ci = 2.12E -3 Qi [2.1(1)-5] F where: F = The maximum acceptable effluent flow rate at the point of release (cfm) as listed in Section 8.1.1.1. 2.12E-3 = Unit conversion factor (60 sec/min x 3.53E-5 ft3/cc).

(Page 14 of 128) 7,. Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 14 of 128 8.1.1.1.6 BV-1 Monitor Count Rate The calculated monitor count rate (ncpm) above background attributed to the noble gas radionuclide. CR was determined by: CR = Y-CiEi [2.1(1)-6)] where: Ei = The detection efficiency of the monitor for noble gas radionuclide "i" (cpm/uCi/cc) from ATTACHMENT B Table 2.1-2a. 8.1.1.1.7 BV-1 Monitor Setpoints The monitor alarm setpoints above background were determined as follows:

                                        " The monitor HIGH-HIGH Alarm Setpoint above background (ncpm) was determined by:

HJISP = 0.60 x CR [2.1(1)-7]

  • The monitor HIGH Alarm Setpoint above background (ncpm) was determined by:

HSP = 0.30 x CR [2..1(1)-8] NOTE: The values 0.60 for the HHSP and 0.30 for the HSP are fractions of the total radioactivity concentration that may be released via the monitored pathway to ensure that the site boundary limit is not exceeded due to simultaneous releases from both units. 8.1.1.2 BV-1 Setpoint Determination Based On Analysis Prior To Release For VV-1 and CV-1 Ground Releases When the setpoints established using "the calculated mix" for ground releases do not provide adequate flexibility for operational needs, the method described below may be used in lieu of that set forth in Step 8.1.1.1. In this case, the results of sample analysis are used to determine the source term "mix." This calculational method applies to gaseous releases via VV-1 and CV--1 when determining the setpoint for the maximum acceptable discharge flow rate and the associated HIGH-HIGH Alarm Setpoint based on this flow rate during the following operational conditions:

  • Batch release of Containment Purge via VV-I.
  • Batch release of Containment Purge via CV-1.

8.1,1.2.1 BV-1 Maximum Accentable Release Rate

(Pa* 15 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 1_2 Page Number: 15 of 128 The maximum acceptable discharge flow rate from VV-1 and CV-1 during purging is determined as follows: 0 The maximum acceptable gaseous discharge flow rate (f) from VV-1 and CV-1 (cfm) during purging based upon the whole body exposure limit is calculated by: 1.06 S T [2.1(1)-17] (X/q) Ki Ci where: 1.06 = 500 mrem/yr x 2.12E-3 500 mrem/yr = dose rate limit 2.12E-3 = unit conversion factor

                                                          = (60 sec/min x 3.53E-5 ft 3/cc)

S = Percent of site dose rate released via this pathway. Up to 60% of the site dose rate is permissible for one release point under the alarm set point rules of Section 8.1.1. T = Maximum valve for T is 16 based on the limiting restriction in ODCM CONTROL 3.11.2.1 where the dose rate for a containment purge may be averaged over a time period not to exceed 960 minutes. (As containment air volume change time period is 60 minutes; T = 960/60 = 16).(3116) (X!q),, The highest calculated short term relative concentration of effluents released via VV- 1 for any area at or beyond the unrestricted area boundary for all sectors (sec/mr3) from ATTACHMENT M Table 2.3-36. 3

                                      =   3.32E-4 sec/mr (X/q)ev        The highest calculated short term relative concentration of effluents released via CV-1 for areas at or beyond the unrestricted area boundary for all sectors (sec/mr3) from ATTACHMENT M Table 2.3-37.
                                     =    3.08E-4 sec/m 3 Ki        =    The total whole body dose factor due to gamma emissions from noble gas radionuclide "i" (mrem/year/uCi/m3) from ATTACHMENT G Table 2.2-11.

(Page 16 of 128) Procedure Number: yPower Station 1/2-ODC-2.02

Title:

Unit Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 16 of 128 Ci The undiluted radioactivity concentration of noble gas radionuclide "I"in the gaseous source (uCi/cc) as determined by analysis of the gas to be released. 0 The flow rate (f) is also determined based upon the skin exposure limit as follows: 6.36 S T (X/q) Y.(Li + 1.1lMj) Ci where: 6.36 = 3000 mrem/yr x 2.12E-3 3000 mremryr = dose rate limit 2.12E-3 , = unit conversion factor

                                                            = (60 sec/min x 3.53E-5 ft3/cc)

Li = The skin dose factor due to beta emissions from noble gas radionuclide "I"(mrem/year/uCi/m 3) from ATTACHIIENT G Table 2.2-11. Mi =The air dose factor due to gamma emissions from noble gas radionuclide "I"(mrad/year/uCi/m 3) from ATTACHMVIENT G Table 2.2-11. (X/q) Same as above. The flow rate (f) is determined by selecting the smaller of the calculated (f) values based on the whole body exposure limit, or the skin exposure limit shown above. The actual purge flow rate (cfm) must be maintained at or below this calculated (f) value or the discharge cannot be made from the vent. 8.1.1.2.2 BV-1 Monitor Setpoints The monitor alarm setpoints above background are determined as follows:

  • The calculated monitor HIGH-HIGH Alarm Setpoint above background (ncpm) attributed to noble gas radionuclides is determined by:

f- CiEi HHSP - F' where: f = The maximum acceptable gaseous discharge flow rate (cfm) determined in Section 8.1.1.2.1.

(Pa.e 17 of 128) Beaver Valley Power Station P1/2-ODC-2.02 Procedure uer:

Title:

Unit: LevelOfUse: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 17 of 128 F' = The maximum actual or design effluent flow rate (cfm) at the point of release.

                                               =   92,000 cfm for VV-1
                                               =   56,800 cfm for CV-1 Ci    =   The undiluted radioactivity concentration of noble gas radionuclide "i" in the gaseous source (uCi/cc) as determined by analysis of the gas to be released.

Ei = The detection efficiency of the monitor for noble gas radionuclide "i" (cpm/uCi/cc) from ATTACHMENT B Table 2.1-2a.

  • When a HIGH-HIGH set point has been calculated according to this section, the monitor HIGH Alarm Setpoint above background (ncpm) is determined as follows:

HSP = HHSP x 0.5 [2.1(1)-20] 8.1.2 BV-2 Monitor Alarm Setpoint Determination See Section 8.1.1 for a description of Monitor Alarm Setpoint Determinations. 8.1.2.1 BV-2 Setpoint Determination Based On A Calculated Mix For VV-2. CV-2, DV-2, WV-2 and CB-2 Ground Releases. The table below gives the calculated monitor count rate above background (CR) in ncpm, and provides the equivalent monitor indication (DV) in net uCi/cc associated with the most limiting site dose rate limit (i.e., 500 mrem/yr Total Body or 3000 mrem/yr Skin). The HIGH alarm setpoint (HSP) in uCi/cc above background, and the ALERT alarm setpoint (ASP) in uCi/cc above background for each vent and operational condition shall be as follows:

(Page 18 of 128) Procedure Number: Beaver Valley Power Station _____________________________________________i/2-ODC-2. 02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 18 of 128 BV2 ALARM SETPOINTS FOR GROUND RELEASES uCi/cc ABOVE BACKGROUND (unless otherwise specified) 60% 30% SITE SITE LIMIT LIMIT CR UPPER LOWER MONITOR ncpm DV ALARM ALARM

  • Continuous Release Via The BV-2 2HVS- 8260 3.01E-4 < 1.81E-4 9.04E-5 SLCRS Unfiltered Pathway (VV-2) RQ101B
  • Batch Release Of Containment 2HVS-RQ 10lB 2020 7.39E-5 *<4.43E-5 < 2.22E-5 Purge Via The BV-2 SLCRS Unfiltered Pathway (VV-2)
  • Continuous Release Via The BV-2 2HVS-RQ109E 4320 2940 < 1770 < 883 SLCRS Filtered Pathway (CV-2) gCi/sec gCi/sec gCi/sec o Batch Release Of Containment 2HVS-RQ 109E 16,400 1130
  • 676 *< 338 Purge Via The BV-2 SLCRS gCi/sec ACi/sec pCi/sec Filtered Pathway (CV-2)

Continuous Release Via The BV-2 2HVL-RQI 12B 28,900 1.61E-3 < 9.63E-4 _ 4.82E-4 Condensate Polishing Building Vent (CB-2)

  • Continuous Release Via The-BV-2 2RMQ-RQ301B 56,600 3.15E-3 _<1.89E-3 <9.44E-4 Decontamination Building Vent (DV-2)
                   " Continuous Release Via The BV-2 2RMQ-RQ3-03B  912A000    2.58E-2 < 1.55E-2 < 7.74E-3 Waste Gas Storage Vault Vent (WV-2)

(Pare 19 of, 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Uni: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 19 of 128 The setpoints were determined using the following conditions and information:

                         " Source terms given in ATTACHMENT A Table 2.1-lb. These gaseous source terms were derived from Stone & Webster computer code GAS 1BB (similar to NUREG-0017)(3 1 3 4) and computer code DRAGON 4 (for the containment vacuum pump sources). ATTACHMENT A Table 2.1-lb does not include particulates and iodines, which are not used in site noble gas dose rate calculations.
  • The Containment Building Purge radionuclide mix was utilized for the purposes of determining an alarm setpoint for the SLCRS Unfiltered Pathway on the basis of the proximity of the contiguous areas.
                         " The Decontamination Building and Condensate Polishing Building ventilation exhaust are not expected to be radioactive. However, for purposes of determining an alarm setpoint, it is conservatively assumed that Xe-133 is in the ventilation exhaust at concentrations that would result in the appropriate dose rate limits.
                         " The Waste Gas Storage Vault ventilation exhaust is also not normally radioactive. However, the monitor alarm setpoint is based on the assumption that the ventilation exhaust radionuclide spectrum is similar to the gaseous inventory in the system housed by the waste gas storage vault. This spectrum is listed in ATTACHMENT A Table 2.1-1b under Gaseous Waste System.
  • Onsite meteorological data for the period January 1, 1976 through December 31, 1980.
  • Discharge flow rate of 23,700 cfm for a VV-2 Continuous Release.
  • Discharge flow rate of 53,700 cfm for a VV-2 Batch Release of Containment Purge. This is comprised of 30,000 cfm from the containment purge plus 23,700 cfm from the CV-2.
  • Discharge flow rate of 59,000 cfm for a CV-2 Continuous Release.
                         " Discharge flow rate of 59,000 cfm for a CV-2 Batch Release of Containment Purge. This is comprised of 7,500 cfm from the containment purge plus 51,500 cfm from CV-2.
                         " Discharge flow rate of 30,556 cfm for a CB-2 Continuous Release.
                         " Discharge flow rate of 12,400 cfm for DV-2 Continuous Release.
  • Discharge flow rate of 2,000 cfm for WV-2 Continuous Release.

(Page 20 of 128)

                                                                                                                          -V Beaver Valley Power Station                                     Pr2-drC-2mer

Title:

Unit: Level Of Use: U1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 1 20 of 128

  • Information listed under References for BV-2 Gaseous Effluent Monitor Setpoints.

The calculation method given in Sections 8.1.2.1.1 through 8.1.2.1.7 was used to derive the alarm setpoints for the following operational conditions:

  • Continuous release via VV-2.
  • Continuous release via CV-2.
  • Batch release of BV-2 Containment Purge via VV-2.
  • Batch release of BV-2 Containment Purge via CV-2.
  • Continuous release via CB-2.
  • Continuous release via DV-2.
                             " Continuous release via WV-2.

8.1.2.1.1 BV-2 Mix Radionuclides The "miX" (noble gas radionuclides and composition) of the gaseous effluent was determined as follows: The gaseous source terms that are representative of the "mix" of the gaseous effluent were selected based on the relative stream composition and volumetric flowrate. Gaseous source terms are the radioactivity of the noble gas radionuclides in the effluent. Gaseous source terms can be obtained from ATTACHMENT A Table 2.1 -lb.

  • The fraction of the total radioactivity in the gaseous effluent comprised of noble gas radionuclide "i" (Si) for each individual noble gas radionuclide in the gaseous effluent was determined by:

Si = AiA [2.1(2)-i] where: Ai The radioactivity concentration of noble gas radionuclide "i" in the gaseous effluent (for VV-2, CV-2 and WV-2) is from ATTACHMENT A Table 2.1-lb. However, SINCE releases via CB-2 and DV-2 do not have a valid source term mix, THEN the noble gas radioactivity concentration is assumed to be Xe-133.

(PaVe 21 of, 128) Beaver Valley Power Station rocedure Number: 1/2-O1DC-2.02

Title:

t Lvel Of Use:

1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 21 of 128 8.1.2.1.2 BV-2 Maximum Acceptable Release Rate (Whole Body Exposure) The maximum acceptable total release rate (uCi/sec) of all noble gas radionuclides in the gaseous effluent (Qt) based upon the whole body exposure limit was calculated by: 500 Qt = 5[2.1 (2)-2] (X/Q) ZKi Si where: (X/Q)w The highest calculated annual average relative concentration of effluents released via VV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/mr3) from ATTACHMENT F Table 2.2-5. 1.03E-4 sec/m 3 for continuous releases. (X/q)v The short term relative concentration of effluents released via VV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/mi3) from ATTACHMENT M Table 2.3-36. 3.32E-4 sec/i 3 for batch release of containment purge. (X/Q),v The highest calculated annual average relative concentration of effluents released via CV-2 for any area at or be ,ond the unrestricted area boundary for all sectors (sec/m ) from ATTACHMENT F Table 2.2-4.

                                         =    9.24E-5 sec/m 3 for continuous releases.

(X/q), = The short term relative concentration of effluents released via CV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT M Table 2.3-35.

                                         =    3.08E-4 sec/m 3 for batch release of containment purge.

(X/Q)p = The highest calculated annual average relative concentration of effluents released via CB-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/mr3) from ATTACHMENT F Table 2.2-10.

                                         =   7.35E-5 sec/m 3 for continuous releases.

(Page 22 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 22 of 128 (X/Q)d = The highest calculated annual average relative concentration of effluents released via DV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/mr3) from ATTACHMENT F Table 2.2-8.

                                        =   9.24E-5 sec/m 3 for continuous releases.

(X-/Q).~ = The highest calculated annual average relative concentration of effluents released via WV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT F Table 2.2-9.

                                        =   9.24E-5 sec/m 3 for continuous releases.

Ki = The total whole body dose factor due to gamma emissions from noble gas radionuclide "I"(mrerrlyear/uCi/m 3)from ATTACHMENT G Table 2.2-11. Si = From equation [2.1(2)-1]. 8.1.2.1.3 BV-2 Maximum Acceptable Release Rate (Skin Exposure) Qt was also determined based upon the skin exposure limit by: 3000 (X/Q) I (Li + .1M.) Si [2.1(2)-3] where:

                                        =  The skin dose factor due to beta emissions from noble gas radionuclide "i"(mrem/year/uCi/m 3) from ATTACHMENT G Table 2.2-11.
                                        =  The air dose factor due to gamma emissions from noble gas radionuclide "i"(mrad/year/uCi/m 3) from ATTACHMENT G Table 2.2-11.

1.1 = The ratio of the tissue to air absorption coefficients over the energy range of the photons of interest, (mrem/mrad). (X/Q) = Same as in Section 8.1.2.1.2.

(Pare 23 of. 128) Beaver Valley Power Station Procedu-e Ni ODC 2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 23 of 128 8.1.2.1.4 BV-2 Maximum Acceptable Release Rate (Individual Radionuclide) The maximum acceptable release rate (uCi/sec) of noble gas radionuclide "i" in the gaseous effluent (Qi) for each noble gas radionuclide in the gaseous effluent was determined by: Qi = Si Qt [2.1(2)-4] NOTE: Use the lower of the Qt values obtained in Section 8.1.2.1.2 and 8.1.2.1.3. 8.1.2.1.5 BV-2 Maximum Acceptable Concentrations (Individual Radionuclide) The maximum acceptable radioactivity concentration (uCi/cc) of noble gas radionuclide "i" in the gaseous effluent (Ci) for each individual noble gas radionuclide in the gaseous effluent was determined by:

                                   =  2.12E-3 Qi                                                        [2.1(2)-5]

F where: F = The maximum acceptable effluent flow rate at the point of release (cfm) as listed in Section 8.1.2.1. 2.12E-3 = Unit conversion factor (60 sec/min x 3.53E-5 ft3/cc). 8.1.2.1.6 BV-2 Monitor Count Rate The calculated monitor count rate (ncpm) above background attributed to the noble gas radionuclide (CR) was determined by: CR= ZC Ei [2.1(2)-6)] where: Ei = The detection efficiency of the monitor for noble gas radionuclide "i" (cpm/uCi/cc) from ATTACHMENT B Table 2.1-2b.

(Page 24 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 24 of 128 8.1.2.1.7 BV-2 Monitor Setpoints The monitor alarm setpoints above background were determined as follows:

  • The monitor HIGH Alarm Setpoint above background (uCi/cc) was determined by:

0.60 x CR HSP EE i ave [2.1(2)-7] where; Ei ave = The CR of equation [2.1(2)-6] divided by the sum of the Ci for the respective mix.

  • The monitor ALERT Alarm Setpoint above background (uCi/cc) was determined by:

0.30 x CR ASP = E-ave [2.1(2)-8] 8.1.2.2 BV-2 Setpoint Determination Based On Analysis Prior To Release for VV-2 and CV-2 Ground Releases When the setpoints established using "the calculated mix" do not provide adequate flexibility for operational needs, the method described below may be used in lieu of that set forth in Section 8.1.2.1. In this case, the results of sample analysis are used to determine the appropriate nuclide mix. This calculational method applies when determining the setpoint for the maximum acceptable discharge flow rate and the associated HIGH Alarm Setpoint based on respective vent flow rate during the following operational conditions:

  • Batch release of Containment Purge via VV-2.
  • Batch release of Containment Purge via CV-2.

(Page 25 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2rr2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 25 of 128 8.1.2.2.1 BV-2 Maximum Acceptable Release Rate The maximum acceptable discharge flow rate from VV-2 or CV-2 during purging is determined as follows:

  • The maximum acceptable gaseous discharge flow rate (f) from VV-2 or CV-2 (cfm) during purging based upon the whole body exposure limit is calculated by:

1.06 S T f= (X/q) K C [2.1(2)-17] where: 1.06 = 500 mrem/yr x 2.12E-3 500 mrem/yr = dose rate limit, whole body exposure 2.12E-3 = unit conversion factor

                                                              = (60 sec/min x 3.53E-5 ft 3/cc)

S = Percent of site dose rate released via this pathway. Up to 60% of the site dose rate is permissible for one release point under the alarm setpoint rules of Section 8.1.2. T = Maximum value for T is 16 based on the limiting restriction in ODCM CONTROL 3.11.2.1 where the dose rate for a containment purge may be averaged over a time period not to exceed 960 minutes. (As containment air volume change time period is 60 minutes; T = 960/60 = 16).(31.2.4) (X/q),,, The highest calculated short term relative concentration of effluents released via VV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT M Table 2.3-36.

                                        =    3.32E-4 sec/m3 (X/q)o,,      The highest calculated short term relative concentration of effluents released via CV-2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT M Table 2.3-37.
                                        =   3.08E-4 sec/m3

(Page 26 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 26 of 128 Ki = The total whole body dose factor due to gamma emissions from noble gas radionuclide "i" (mrem/year/uCi/m 3) from ATTACHMENT G Table 2.2-11. Ci = The undiluted radioactivity concentration of noble gas radionuclide "i" in the gaseous source (uCi/cc) as determined by analysis of the gas to be released.

  • The flow rate (f) is also determined based upon the skin exposure limit as follows:

6.36 ST f= 6.6ST[2.1 (2)- 18] (X/q) Y.(Li + 1. 1M*j) Ci where: 6.36 = 3000 mrem/yr x 2.12E-3 3000 mrem/yr = dose rate limit, skin exposure 2.12E-3 = unit conversion factor

                                                         = (60 sec/min x 3.53E-5 ft3/cc)

Li = The skin dose factor due to beta emissions from noble gas radionuclide "i" (mrem/year/uCi/m 3) from ATTACHMENT G Table 2.2-11. Mi = The air dose factor due to gamma emissions from noble gas radionuclide "i" (mrad/year/uCi/m 3) from ATTACHMENT G Table 2.2-11. (X/q) = Same as above. The flow rate (f) is determined by selecting the smaller of the calculated (f) values based on the whole body exposure limit, or the skin exposure limit shown above. The actual purge flow rate (cfm) must be maintained at or below this calculated (f) value or the discharge cannot be made from the vent.

(Page 27 of 128) Beaver Valley Power Station Procedure Nume: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Revision: Page Number: ODCM: GASEOUS EFFLUENTS 2 27 of 128 8.1.2.2.2 BV-2 Monitor Setpoints The monitor alarm setpoints above background are determined as follows:

  • The calculated monitor HIGH Alarm Setpoint above background (net uCi/cc) attributed to the noble gas radionuclides is determined by:

f - Ci Ei HSP = F'Eiave [2.1(2)-19] where: f = The maximum acceptable containment purge flow rate (cfm) determined in Section 8.1.2.2.1. F' = The maximum actual or design effluent flow rate (cfm) at the point of release.

                                               =  53,700 cfm for VV-2
                                              =   59,000 cfm for CV-2 Ci         =   The undiluted radioactivity concentration of noble gas radionuclide "i"in the gaseous source (uCi/cc) as determined by analysis of the gas to be released.

Ei = The detection efficiency of the monitor for noble gas radionuclide "i" (cpmruCi/cc) from ATTACHMENT B Table 2.1-2b. Ei ave = The CR of equation [2.1(2)-6] divided by the sum of the Ci for the respective mix. NOTE: To enable maintaining a constant conversion factor from cpm to uCi/cc in the Digital Radiation Monitoring System software, the "calculated mix" is used rather than the analysis mix to calculate Ei ave above. This does not cause any change in the function of the monitor setpoint to properly control dose rate. However, the monitor indicated uCi/cc value may differ from the actual value.

  • When a HIGH Alarm Setpoint has been calculated according to this section, the monitor ALERT Alarm Setpoint above background (net uCi/cc) is determined as follows:

ASP = HSP x 0.5 [2.1 (2)-20]

(Page 28 of 128) Beaver Valley Power Station Procedure Number:

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 28 of 128 8.1.3 BV-1/2 Monitor Alarm Setpoint Determination See Section 8.1.1 for a description of Monitor Alarm Setpoint Determination. 8.1.3.1 BV-1/2 Setpoint Determination Based On A Calculated Mix For PV-1/2 Elevated Releases The calculated monitor count rate above background (CR), in ncpm, the monitor HIGH-HIGH alarm setpoint above background (HHSP), and the monitor HIGH alarm setpoint above background (HSP) for each operational condition are shown in the following Table: BV-1/2 ALARM SETPOINTS FOR ELEVATED RELEASES cpm ABOVE BACKGROUND 60% SITE 30% (P)PRIMARY* LIMIT SITE MONITOR UPPER LIMIT (A)ALTERNATE ALARM LOWER MONITOR CR ALARM

                                   " Continuous Release          (P)RM-1GW-108B          3.49E7        < 3.60E5          _ 1.20E5 (A)RM-1GW-109(5)        2.61E7         _*3.60E5
  • 1.20E5
  • Batch Release Of (P)RM-1GW-108B 3.93E5 *_ 2.36E5 _ 1.18E5 BV-1 Decay Tanks or (A)RM-1GW-109(5) 7.87E6 *_ 3.60E5 _ 1.20E5 BV-2 Storage Tanks
                                   *IF the primary monitor is out of service, THEN ODCM CONTROL 3.3.3.10 is met for the respective alternate monitor. The alternate setpoints shall be utilized:

The setpoints were determined using a calculated mix from the FSAR and discharge flow rate of 1450 cfm for PV-1/2. The calculational method below was used to derive the monitor setpoints for the following operational.conditions: 0 Continuous release via PV-1/2.

  • Batch release of BV-1 or BV-2 Waste Gas Decay Tank via PV-1/2.
  • Batch release of BV-1 orBV-2 Containment Purge via PV-1/2 is not shown in the above table. However, if it is necessary to perform a BV-1 or BV-2 Containment Purge via this release point, the alarm setpoint shall be calculated in accordance with Section 8.1.3.2.

8.1.3.1.1 BV-1/2 Mix Radionuclides The "mix" (noble gas radionuclides and composition) of the gaseous effluent was determined as follows:

(Pare 29 of 128) Procedure Number: Beaver Valley Power Station 1/2-eDCm2.02

Title:

Unit Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 29 of 128

                               "  The gaseous source terms that are representative of the "mix" of the gaseous effluent were evaluated. Gaseous source terms are the radioactivity of the noble gas radionuclides in the effluent. The gaseous source terms can be obtained from ATTACHMENT A Tables 2.1-la. and 2.1-lb.
  • The fraction of the total radioactivity in the gaseous effluent comprised by noble gas radionuclide "i" (Si) for each individual noble gas radionuclide in the gaseous effluent was calculated by:

Si =Ai *Ai [2.1-9] where: Ai =The total radioactivity or radioactivity concentration of noble gas radionuclide "i" in the gaseous effluent from ATTACHMENT A Table 2.1-la and 2.1.lb. 8.1.3.1.2 BV-1/2 Maximum Acceptable Release Rate (Whole Body Exposure) The maximum acceptable total release rate (uCi/sec) of all noble gas radionuclides in the gaseous effluent (Qt) based upon the whole body exposure limit was determined by: 500 Qt - [2.1.10] Vi Si where: Vi = The constant for noble gas radionuclide "i" accounting for the gamma radiation from the elevated finite plume (mrem/year/uCi/sec) from ATTACHMENT G Table 2.2-12. Si = From equation [2.1-9] 8.1.3.1.3 BV-1/2 Maximum Acceptable Release Rate (Skin Exposure) Qt was also determined based upon the skin exposure limit as follows: 3000 X [Li(X/Q),, +1.]Bi]Si where:

(Page 30 of 128) Procedure Number: Beaver Valley Power Statin 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 3 0 of 128 Li = The skin dose factor due to beta emissions from noble gas radionuclide "i"(mrem/year/uCi/m 3) from ATTACHMENT G Table 2.2-11. (X/Q)p, = The highest calculated annual average relative concentration of effluents releases via PV-1/2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT F Table 2.2-6.

                                         =   2.3 1E-6 sec/m3 (0.5 - 1.0 miles)

(~q)pv = The highest calculated short term relative concentration of effluents released via PV-1/2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT N Table 2.3-3 8.

                                         =    1.07E-5 sec/mr3 (0.5 - 1.0 miles)

Bi The constant for long term releases (greater than 500 hrs/year) for noble gas radionuclide "i" accounting for the gamma radiation dose from the elevated finite plume (mrad/year/uCi/sec) from ATTACHMENT G Table 2.2-12. 8.1.3.1.4 BV-1/2 Maximum Acceptable Release Rate (Individual Radionuclide) The maximum acceptable release rate (uCi/sec) of noble gas radionuclide "i" in the gaseous effluent (Qi) for each individual noble gas radionuclide in the gaseous effluent was determined by: Qi = Si Qt [2.1-12] NOTE: Use the lower of the Qt values obtained in Section 8.1.3.1.2 and 8.1.3.1.3. 8.1.3.1.5 BV-1/2 Maximum Acceptable Concentrations (Individual Radionuclide) The maximum acceptable radioactivity concentration (uCi/cc) of noble gas radionuclide "i" in the gaseous effluent (Ci) for each individual noble gas radionuclide in the gaseous effluent was determined by: Ci = [2.1-13] F where: 2.12E-3 = Unit conversion factor (60 sec/min x 3.53E-5 ft3/cc).

(Pare 31 of 128) Beaver Valley Power Station Proced0ureNumber. 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 31 of 128 F = The maximum acceptable effluent flow rate at the point of release (cfm) as listed in Section 8.1.3.1. 8.1.3.1.6 BV-1/2 Monitor Count Rate The calculated monitor count rate (ncpm) above background attributed to the noble gas radionuclide. (CR) was determined by: CR= Z CiEi [2.1-14] where: Ei = The detection efficiency of the monitor for noble gas radionuclide "i' (cpm/uCi/cc) from ATTACHMENT B Table 2.1-2a and 2.1-2b. 8.1.3.1.7 BV-1/2 Monitor Setpoints The monitor alarm setpoints above background were determined as follows:

                                        " The monitor HIGH-HIGH Alarm Setpoint above background (ncpm) was determined by:

HHSP = 0.60 x CR [2.1-15]

                                        " The monitor HIGH Alarm Setpoint above background (ncpm) was determined by:

HSP = 0.30 x CR [2.1-16] 8.1.3.2 BV-1/2 Setpoint Determination Based On Analysis Prior To Release For PV-1/2 Elevated Releases The following calculation method applies to gaseous releases via the PV-1/2 Gaseous Waste/Process Vent when the "calculated mix" does not provide adequate operational flexibility. This method is used to determine the setpoint for the maximum acceptable discharge flow rate and the associated HIGH-HIGH Alarm Setpoint based on this flow rate for the BV-1/2 Gaseous Waste Gas Monitor (RM-GW- 108B) or alternate (RM- 1GW-I109 CH 5) during the following operational conditions:

  • Continuous release via PV-1/2.

0 Batch release of BV-1 or BV-2 Waste Gas Decay Tank via PV-1/2.

  • Batch release of BV-1 or BV-2 Containment Purge via PV-1/2.

8.1.3. 2. 1 BV-1/2 Maximum Acceptable Release Rate

(Page 32 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 32 of 128 Determine the maximum acceptable discharge flow rate for the release from the Process Vent for the analyzed mix. 0 The maximum acceptable gaseous discharge flow rate (f) from the Process Vent (cfm) based upon the whole body exposure limit is determined by: 1.06 S [2.1-21] zVi Ci where: 1.06 500 mrem/yr x 2.12E-3 500 mrem/yr = dose rate limit, whole body exposure 2.12E-3 = unit conversion factor

                                                                = (60 sec/min x 3.53E-5 ft3/cc)

S = Percent of site dose rate released via this pathway. Up to 60% of the site dose rate is permissible for one release point under the alarm setpoint rules of Section 8.1.3. Vi = The constant for noble gas radionuclide "i" accounting for the gamma radiation from the elevated plume (mrem/year/uCi/sec) from ATTACHMENT G Table 2.2-12. Ci = The undiluted radioactivity concentration of noble gas radionuclide "i" in the gaseous source (uCi/cc) as determined by analysis of the gas to be released.

  • Based upon the skin exposure limit, (f) is calculated by:

6.36S5 f= 6.6S[2.1-22] I [Li (X/Q)p, +I .1Bi ] C[ where: 6.36 = 3000 mrem/yr x 2.12E-3 3000 mrem/yr = dose rate limit, skin exposure 2.12E-3 = unit conversion factor

                                                               = (60 sec/min x 3.53E-5 ft3/cc)

Li = The skin dose factor due to beta emissions from noble gas radionuclide "I' (mrem/year/uCi/m 3 ) from ATTACHMENT G Table 2.2-11.

(Page 33 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: evel fuse: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 3 of 128 (X/Q)pv The highest calculated annual average relative concentration of effluents released via PV-1/2 for any area at or beyond the unrestricted area boundary for all sectors (sec/m 3) from ATTACHMENT F Table 2.2-6. 3 2.31E-6 sec/m (X/q)pv The highest calculated short term relative concentration of effluents released via PV-1/2 for any area at or beyond the unrestricted area boundary for all sectors (sec/mr3) from ATTACHMENT N Table 2.3-38. 3

                                            -     1.07E-5 sec/m Bi                 The constant for long-term releases (greater than 500 hrs/year) for noble gas radionuclide 'i" accounting for the gamma radiation from the elevated finite plume (mrad/year/uCi/sec) from ATTACHMENT G Table 2.2-12.
  • Select the smaller of the calculated f values based on the whole body exposure limit and based on the skin exposure limit shown above. The actual discharge flow rate (cfm) must be maintained at or below this (f) value.

8.1.3.2.2 BV-1/2 Monitor Setpoints The monitor alarm setpoints above background are determined as follows:

  • The calculated monitor HIGH-HIGH Alarm Setpoint above background (ncpm) attributed to the noble gas radionuclides is determined by:

f Z Ci Ei HHSP I-{HSP

                                                 -      F F'                                                     [2.1-23]

where: f = The maximum acceptable gaseous discharge flow rate (cfm) determined in Section 8.1.3.2.1. F' = The maximum actual or design effluent flow rate (cfm) at the point of release.

                                          =    1450 cfm for PV-1/2 Ci     =    The undiluted radioactivity of noble gas radionuclide "i" in the gaseous source (uCi/cc) as determined by analysis of the gas to be released.

(Page 34 of 128) Procedure Number: yPower Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 34 of 128 Ei = The detection efficiency of the respective monitor (RM-1GW-108B) or (RM-1GW-109 CH 5) for noble gas radionuclide "I"(cpm/uCi/cc) from ATTACHMENT B Table 2.1-2a and 2.1-2b. When a HIGH-HIGH Alarm Setpoint has been calculated according to this section the monitor HIGH Alarm setpoint above background (ncpm) is determined by: HSP = HHSP x 0.5 [2.1-24] 8.2 Compliance With 10 CFR 20 Dose Rate Limits (ODCM CONTROL 3.1121) 8.2.1 Dose Rate Due To Noble Gases The dose rate in unrestricted areas resulting from noble gas effluents from the site is limited to 500 mrem/yr to the total body and 3,000 mrem/yr to the skin. Site gaseous effluents are the total of BV-1 and BV-2 specific ground releases and a shared elevated release, the PV-1/2 Gaseous Waste/Process Vent. Based upon NUREG-0133 (3,1-3-1) the following equations are used to show compliance with ODCM CONTROL 3.11.2.1 a. [VyQis + K (X/Q) Qi,]<500mrem/yr [2.2-1]

                            . ((Li(X/Q), + 1.1B,] Qj 5 +[Li + 1.1Mi I(X/Q)) Qi.]_< 3000 mrem/yr                     [2.2-2]

where: Ki = The total body dose factor due to gamma emissions for each identified noble gas radionuclide "i", mrem/year/uCi/m 3 . Li The skin dose factor due to beta emissions for each identified noble gas radionuclide "i", mrem/year/uCi/m 3 . Mi = The air dose factor due to gamma emissions for each identified noble gas radionuclide "i", mrad/year/uCi/m 3 . Vi = The constant for each identified noble gas radionuclide '"I accounting for the gamma radiation from the elevated finite plume, mrem/year/uCi/sec. Bi - The constant for long-term releases (greater than 500 hrs/year) for each identified noble gas radionuclide "i" accounting for the gamma radiation from the elevated finite plume, mrad/year/uCi/sec. 1.1 = The ratio of the tissue to air absorption coefficients over the energy range of the photon of interest, mrem/mrad. Qis The release rate of noble gas radionuclide "i" in gaseous effluents from free-standing stack, uCi/sec.

(Page 35 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.u2

Title:

Unit Level 0 Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 35 of 128 Qiv = The release rate of noble gas radionuclide "i" in gaseous effluents from all vent releases, uCi/sec. (X /Q ), = The highest calculated annual average relative concentration for any area at or beyond the unrestricted area boundary for elevated releases (sec/m 3). (X /Q )v= The highest calculated annual average relative concentration for any area at or beyond the unrestricted area boundary for elevated releases (sec/mr3). At the Beaver Valley site gaseous releases may occur from the following Release Points (RP's) as shown in ATTACHMENT P Figure 2.4.2: RP 1 & 4. The BV-I Auxiliary Building Vent and the BV-2 SLCRS Unfiltered Pathway atop the Auxiliary Buildings (VV- I and VV-2) RP 2 & 5. The BV-1 Rx Containment/SLCRS Vent and the BV-2 SLCRS Filtered Pathway atop the Containment Domes (CV-1 and CV-2) RP 3. The BV-1/2 Gaseous Waste/Process Vent atop the BV-I Cooling Tower (PV-1/2) RP 6. The BV-2 Condensate Polishing Building Vent (CB-2) RP 7. The BV-2 Waste Gas Storage Vault Vent (WV-2) RP 8. The BV-2 Decontamination Building Vent (DV-2) RP 9. The BV-2 Turbine Building Vent (TV-2)

  • The effluents from Release Point I & 4 are ground level in nature. At BV-1 the sources of these releases are Containment Purges and normal Auxiliary Building Ventilation. At BV-2 the sources of these releases are Containment Purges and Contiguous Area ventilation.
  • Effluent from the Release Point 2 & 5 are assumed ground level in nature. At BV-1 the source of these releases is the Supplementary Leak Collection and Release System (SLCRS). At BV-2 the source of these releases is normal Auxiliary Building Ventilation. It is also possible to release Containment Purges from these vents.
  • Release Points 6, 7, 8 and 9 are not normally radioactive release points.
                   " The effluent from Release Point 3 are elevated, and the sources of these releases are the Main Condenser Air Ejectors, the Waste Gas Decay Tanks and the Containment Vacuum Pumps.

Noble gas releases may normally occur from Release Points 1 through 5 above. To show compliance with the site limits of ODCM CONTROL 3.11.2.1. a, Equations [2.2-1] and [2.2-2] are expressed in terms of the actual release points for the site. Note that the expressions

(Page 36 of 128) Procedure Number: Beaver Valley Power Station P/2_ODC_2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Revision: Page Number: ODCM: GASEOUS EFFLUENTS 2 36 of 128 for release points 6, 7, 8 and 9 are included for use if radioactive releases via these release points are identified in the future. 8.2.1.1 Total Body Dose Rate (All Release Points)

                           *ZViQi         +Y.i Ki [(X/Q)cv Qi            +(X/Q)v       Qi     +(X/Q)cv          Qi       +(X/Q)w 1          pv                           cvl                    vvl                      cv2 Q          + (X/Q)     Q.-      + (X/Q)       Q        + (X/Q)     Q        + (X/Q)            Q.       I I1vvv2           tv     1tv2          cb     i cb2 c2dv                id2V/

dv2 V wv2

                          < 500 mrem/yr                                                                                           [2.2-3]

8.2.1.2 Skin Dose Rate (All Release Points) ZL.(X/Q) i (LQpv + 1.lB.1Qi 1 pv +Q 41 Li+ 1.1M. ][(X/Q)cQQi1 + (X/Q)vv Qi1 -,i + cv2 (X/Q)cv Qi + (X/Q)v Qi + (X/Q)tv Qi + (X/Q)cb Qi + (X/Q)dv cv2 wv2 tv2 cb2 Qi + (X/Q)v Qi ] - 3000 mrem/yr [2.2-4] dv2 wv2 where: Qi = Release rate of radionuclide "I"from the PV-1/2, uCi/sec. pv Qicvl = Release rate of radionuclide "i" from CV-1, uCi/sec.

                                          =   Release rate of radionuclide "i" from CV-2, uCi/sec.

cv2 Qi = Release rate of radionuclide "I"from VV-1 Auxiliary Building, uCi/sec. wvl Qi = Release rate of radionuclide "i' from VV-2, uCi/sec. vv2 Qi = Release rate of radionuclide "i" from TV-2, uCi/sec. tv2 Qi = Release rate of radionuclide "i" from CB-2, uCi/sec. cb

(Page 37 of 128) Beaver Valley Power Station ocdureNubODC 2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 3 7 of 128 Qi = Release rate of radionuclide "i"from DV-2, uCi/sec. dv2 Qi = Release rate of radionuclide "i" from WV-2, uCi/sec. (X/Q)p, = Highest calculated annual average relative concentration for releases from the PV-1/2, sec/m3. (X/Q )cv = Highest calculated annual average relative concentration for releases from CV-1 and CV-2, sec/m 3. (X/Q ), = Highest calculated annual average relative concentration for releases from VV-1 and VV-2, sec/m 3 . (X/Q )t, = Highest calculated annual average relative concentration for releases for TV-2, sec/m 3. (X/Q)cb = Highest calculated annual average relative concentration for releases for CB-2, sec/m 3 . (X/Q )dv = Highest calculated annual average relative concentration for releases for DV-2, sec/m 3. (X/Q )w, = Highest calculated annual average relative concentration for releases for WV-2, sec/m 3 . The release rate for a containment purge is based on an averaged release rate in uCi/sec for the entire purge (not to exceed 960 min in accordance with ODCM CONTROL 3 .11.2.1). All other terms remain the same as those defined previously. For the site, 4 potential modes of release are possible. The release modes identify the various combinations of sources of radioactivity and their release points which are used to determine the controlling locations. They are presented in ATTACHMIENT C Table 2.2-1. For Release Modes 1, 2, and 3, the controlling location for implementation of ODCM CONTROL 3.11.2.1.ais 0.35 miles NW. Inserting the appropriate X/Q's from ATTACHMENT F Tables 2.2-4 through 2.2-10 for this location, Equations [2.2-3] and [2.2-4] become:

(Page 38 of 128) Procedure Number: Beaver Valley Power Station ____________________________________________1/2-ODC-2.02 1o2eOm: C

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: _2 38 of 128 8.2.1.3 Total Body Dose Rate (at 0.35 Miles NW)

                             ~V.Q       +/-lK.[9.24E -5 Q,
                                        +                                   +1.03E-4 Qi          + 9.24E - 5 Q              +

PV p i cv 1 vv cv 2 1.03E - 4 Q. + 7.35E-5Qi + 9.24E - 5 Qi +9.24E-5Q 1 + 2 2v2 vv tv dv 2 7.35E - 5 Qi ] < 500mrem/yr [2.2-5] cb,2 8.2.1.4 Skin Dose Rate (at 0.35 Miles NW) Z[7.OE-10 L.. +1.1B.] Qi Z [Li. + 1. IMi ]+ 9.24E - 5 Q + 1.03E -4 1 pv 1 Q.1 v1 + 9.24E - 5 Qicv2 +1.03E- 4Qi + 7.35E - 5 Qitv2 + 9.24E - 5 Qidv2 + 9.24E - 5 Q i + 7.35E - 5 Qicb2 ] _*3000 mrem/yr [2.2-6] For Release Mode 4, the controlling location is 0.75 miles N. Inserting the appropriate X/Q's from ATTACHMENT F Tables 2.2-4 through 2.2-10 for this location, Equations [2.2-3 and 2.2-4] become: 8.2.1.5 Total Body Dose Rate (at 0.75 Miles N) ZYVi Qi + Y+/-K. [3.95E - 6 Q. + 4.99E - 6 Q.i + 3.95E - 6 Q.i + 4.99E - i pv i evI lvvl 1 CV2 6 Q.1 w21 + 4.26E - 6 Qi + 3.95E - 6 Qi +3.95E - 6Q.iw +4.26E- 6Qi ] 2 2 2 dv cb tv _<500 mremryr [2.2-7] 8.2.1.6 Skin Dose Rate (at 0.75 Miles N) Z [2.31E-6L.I + 1.lB.]Q. I

                                                                    +/-Y-[Li + 1.1M.i[3.95E-6Q.                  +4.99E-6Qi                   +

I i pv i v1 1v 3.95E-6Qi 2 + 4.99E - 6 Qi + 4.26E - 6 Qi + 3.95E-6Qi + 3.95E-vv2 2 12 dv tv 6Qi + 4.26E - 6Qi ] < 3000 mrem/yr [2.2-8]

                                %VV                  cb

(Page 39 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 39 of 128 8.2.1.7 Determination of Controlling Location The determination of controlling location for implementation of ODCM CONTROL 3.11.2.1 .a for noble gases is a function of the following parameters:

  • Radionuclide mix and their isotopic release rate
  • Release Mode
                             " Meteorology The incorporation of these 3 parameters into Equations [2.2-3] and [2.2-4] resulted in the equations for the controlling locations as presented in Equations [2.2-5 through 2.2-8].

The radionuclide mix used to determine controlling locations was based on source terms calculated with the Stone and Webster Engineering Corporation computer code GAS 1BB (similar to NUREG-0017.13 .1.3 4 ' Inputs were based on operating modes of the respective plants. The code inputs utilized are presented in 1/2-ODC-3.01. The source term is presented in ATTACHMENT D Tables 2.2-2a and 2.2-2b as a function of release type and Release Point. The X/Q values utilized in the equations for implementation of ODCM CONTROL 3.11.2.1 .a are based upon the maximum long-term annual average X/Q in the unrestricted area. ATTACHMENT E Table 2.2-3 presents the distances from the Release Points to the nearest unrestricted area for each of the 16 sectors as well as to the nearest vegetable garden, cow, goat, and beef animal. ATTACHMENT F Tables 2.2-4 through 2.2-10 present the long-term annual average (X/Q) values for all Release Points to the special locations presented in ATTACHMENT E Table 2.2-3. A description of their derivation is provided in 1/2-ODC-3.01. For Release Modes 1, 2, and 3, dose calculations were performed using the highest calculated site boundary X/Q values applicable to the release points involved and the projected radionuclide mix applicable to the release source. In that a simultaneous, continuous elevated release could contribute to the dose at a given location, the selection of the two highest sector X/Q values at the site boundary considered this contribution. From these results, the distance and sector associated with the highest calculated site boundary dose were selected as the controlling location. For Release Modes 1, 2, and 3 the controlling location is 0.35 miles NW. In Release Mode 1, the dominant release is via VV-1 and CV-2. In Release Modes 2 and 3, the dominant release is a Containment Purge from the VV-1 or VV-2.

(Page,40 of 128) Beaver Valley Power Station ocdure 1rODC2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 40 of 128 For Release Mode 4, a similar evaluation was performed. Long-term annual average X/Q values were calculated at the mid-point of the 10 standard distances listed in ATTACHMENT F Table 2.2-4 through 2.2-10. In that a simultaneous, ground level release could contribute to the dose at a given location, the selection of the two highest X/Q values at the controlling distance considered this contribution. Since the two maximum XIQ values occurred in the 0.5 - 1.0 mile radial band, the controlling distance was selected at 0.75 miles. From the calculated dose results, the controlling sector was shown to be North. In this Release Mode, the dominant release is a Containment Purge via the PV-1/2 Gaseous Waste/Process Vent. Neither of the controlling receptor locations are presently inhabited. Values for Ki, Li, and Mi, which were used in the determination of the controlling receptor location and which are to be used in Equations [2.2-5] through [2.2-8] to show compliance with ODCM CONTROL 3.11.2.1.2, are presented in Table 2.2-11. Values taken from Table B-1 of NRC Regulatory Guide 1.109, Revision 1,(3-1-35) were multiplied by 1E6 to convert picocuries to microcuries for use in ATTACHMENT G Table 2.2-11. Values for Vi and Bi for the finite plume model can be expressed as shown in Equation [2.2-9] and [2.2-10]. Values were calculated using the NRC code RABFIN at the site boundary location which would receive the highest total dose from all Release Points. These values are presented in ATTACHMENT G Table 2.2-12 and calculated from the following equation: K fjk Ali Ua E, [2.2-9] Bi =rYjYk1 uj[2-9 rd jk I 1U where: I = The results of numerical integration over the plume spatial distribution of the airborne activity as defined by the meteorological condition of wind speed (uj) and atmospheric stability class "k" for a particular wind direction. K = A numerical constant representing unit conversions.

                              -      (260 mrad)(radians) (m3 ) (transformation) F 16 sectors (sec)(Mev)(Ci) 1 L2n   radians]

1E -6 Ci 3.15E7 se__c uci yr_ S2. 1E4 mrad (m3 ) (transformation)/yr(Mev)(uCi). rd = The distance from the release point to the receptor location, meters. uj = The mean wind speed assigned to the "j"th wind speed class, meters/sec.

(Page 41 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/]2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 41 of 128 fik = The joint frequency of occurrence of the "j" th wind speed class and kth stability class (dimensionless). Ali = The number of photons of energy corresponding to the "1"th energy group emitted per transformation of the "i" th radionuclide, number/transformation. El = The energy assigned to the "1"th energy group, Mev. ua = The energy absorption coefficient in air for photon energy HI, meters The Vi factor is computed with conversion from air dose to tissue depth dose, thus:

                                   -* ---.I *.,z.z.,
                                                *'F*    jk   li  a      e       d Vi          r d    j k Iuf       Au Ele -UTT                                                  [2.2-10]

where: UT = The tissue energy absorption coefficient for photons of energy El, cm 2/gm. Td = The tissue density thickness taken to represent the total body dose 2 (5gm/cm ). 1.1 = The ratio of the tissue to air absorption coefficients over the energy range of photons of interest, mrem/mrad. 8.2.2 Dose Rate Due To Radioiodines And Particulates The dose rate in unrestricted areas resulting from the of inhalation of I-131, tritium, and all radionuclides in particulate form (excluding C-14) with half lives greater than 8 days released in gaseous effluents from the site shall be limited to 1,500 mrem/yr to any organ. Based upon NUREG-0133,(3*"') the following basic equation is used to show compliance with ODCM CONTROL 3. 11. 2. .b: ZP* [ X/Q~ Q~ + (X/Q)v Qi j < 1,500 mrem/yr [2.2-11] where: Pi, = Dose parameter for any organ z for each identified radionuclide "i", mrem/yr per uCi/m3. Qis = The release rate of radionuclide "i", in gaseous effluents from elevated releases, uCi/sec. Qiv = The release rate of radionuclide "i", in gaseous effluents from ground level releases, uCi/sec.

(Page 42 of 128) Procedure Nijijiber: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 42 of 128 (X/Q)5 = The highest calculated annual average relative concentration at the unrestricted area boundary for elevated releases, sec/n 3 . (X/Q)v = The highest calculated annual average relative concentration at the unrestricted area boundary for ground level releases, sec/m 3 . NOTE: The dispersion parameters specified in Section 8.2.2 are limited to the site boundary as defined above. Releases may occur from any Release Point in the Release Modes listed in ATTACHMENT C Table 2.2-1. To show compliance with ODCM CONTROL 3.11.2. 1.b, Equation [2.2-11] is now expressed in terms of the actual Release Points for the site. P'r [(X/Q)pv Qi + (X/Q)cv Qicv. + (X/Q)vv Qi + (X/Q)cv Qi + (X/Q)vv CV2 1pv vv (X/Q)tv QitvItv 2

                                        + (X/Q)cb cb2 Qi      + (X/Q)dv Qidv2 + (X/Q)wv Qi WiV1] < 1500 mrem/y:

[2.2-12] where: (X/Q), = Highest calculated annual average relative concentration for releases from PV-1/2, sec/m 3 . (X/Q), = Highest calculated annual average relative concentration for releases from CV-1 and CV-2, sec/m 3 . (X/Q), = Highest calculated annual average relative concentration for releases from VV-1 and VV-2, sec/m3 . (X/Q)v = Highest calculated annual average relative concentration for releases from TV-2, sec/m3 . (X!Q)Cb Highest calculated annual average relative concentration for releases from CB-2, sec/m 3. (X/Q),v = Highest calculated annual average relative concentration for releases from DV-2, sec/m 3.

(Page 43 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 .43)of 128 (X/Q)* = Highest calculated annual average relative concentration for release from WV-2, sec/m 3 . Qi = Long-term release rate of radionuclide "i" from PV-1/2, uCi/sec. pv Qicv1 = Long-term release rate of radionuclide "i" from CV-1, uCi/sec. Qicv2 = Long-term release rate ofradionuclide "I"from CV-2, uCi/sec. Qiw = Long-term release rate of radionuclide "i" from VV-1, uCi/sec. Qi12 = Long-term release rate ofradionuclide "i" from VV-2, uCi/sec. Qitv2 = Long-term release rate of radionuclide "i" from TV-2, uCi/sec. Q.1 = Long-term release rate of radionuclide "i" from CB-2, uCi/sec. bv2 Qi.v2 = Long-term release rate of radionuclide "i" from TV-2, uCi/sec. Q. = Long-term release rate of radionuclide "i" from CB-2, uCi/sec. 1wv2 All other terms are the same as those defined previously. TV-2, CB-2, DV-2 and WV-2 are not normal radioactive Release Points. These Release Points are included only for use if radioactive releases via these vents are identified in the future. In the calculation to show compliance with ODCM CONTROL 3.11.2.1 .b only the inhalation pathway is considered. Values of the organ dose parameters, Pi, were calculated using methodology given in NUREG-0133.( 3 1"3" For the child age group, the following equation was used for all nuclides. The Pip, values are presented in ATTACHMENT H Table 2.2-13. Pi = 3.79E9 DFA i [2.2-13] where: 3.7E9 = Breathing rate of child (3,700 m3/yr) x unit conversion factor (1E6 pCi/uCi).

(Page 44 of 128) Beaver Valley Power Station Procedure Number:1/2ODC2.02

Title:

Unit: evel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 44 of 128 DFAi, = The organ inhalation dose factor for a child from Table 6 of NTJREG-0172,(3136) for organ t, nuclide "i", in units of mrem/pCi. For Release Modes 1 through 4, the controlling location is the site boundary, 0.35 miles NW. Equation [2.2-12] becomes:

                          *3Pi  [7.OOE-10Q.i        +9.24E-5QiQ         +1.03E-4Q. Q         +7.35E-5QiQ            +

ilpv cvi VVl tvl 9.24E-5Q. cv2 + 1.03E-4Q.lvv2 +7.35E-5Qitv2 +7.35E-5Qicb2 +9.24E-5 Q.dv2 + 9.24E- 5 Q.i ]*-< 1500 mrem/yr [2.2-14] 8.2.2.1 Determination of Controlling Location The determination of the controlling location for implementation of ODCM CONTROL 3.11.2.1 .b for radioiodines and particulates is a function of the same 3 parameters as for noble gases plus a fourth, the actual receptor pathways. The incorporation of these parameters into Equation [2.2-12] results in the respective equations for each Release Mode at the site boundary controlling locations. The radionuclide mix was again based upon the source terms presented in ATTACHMENT D Tables 2.2-2a and 2.2-2b as a function of release type and Release Point. In the determination of the controlling site boundary for each Release Mode, the highest 2 site boundary X/Q values for each Release Point were utilized in conjunction with the radionuclide mix and the release rate for each Release Point to determine the controlling location. The Pi, values are presented in ATTACHMENT H Table 2.2-13. The X/Q values in Equation [2.2-14] were obtained from ATTACHMENT F Tables 2.2-4 through 2.2-10. A description of the derivation of the X/Q values is provided in 1/2-ODC-3.01. 8.3 Compliance With 10 CFR 50 Dose Limits (ODCM CONTROLS 3.11.2.2 And 3.11.2.3) (Gaseous) At the Beaver Valley site all elevated gaseous releases are considered to originate from a shared radwaste system. The effluent from both units are mixed and discharged from a common Release Point, the PV-I/2 Gaseous Waste/Process Vent, at the top of the Unit I Cooling Tower. The resulting dose for the purpose of implementing 10 CFR 50 is normally apportioned equally to each unit. The only exception would be a Containment Purge via the

(Page 45 of 128) Procedure Number: Beaver Valley Power Station 1/2ruDC-2.02

Title:

Unit: evel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 45 of 128 Process Vent. The resulting dose shall be attributed to the contributing reactor unit. Since this operation is expected to be rare, equations are shown throughout this section with the apportionment set at 0.5. 8.3.1 Dose Due To Noble Gases 8.3.1.1 Cumulation Of Doses Section 1I.B. 1 of Appendix I of 10 CFR 50 (ODCM CONTROL 3.11.2.2) limits the releases of gaseous effluents from each reactor such that the estimated annual gamma air dose is limited to 10 millirad and the beta air dose is limited to 20 millirad. In addition, ODCM CONTROL 3.11.2.4 requires use of radwaste system if air doses when averaged over 31 days exceed 0.2 mrad for gamma and 0.4 mrad for beta. Based upon NUREG-0133,(3131) the air dose limits in the unrestricted area due to noble gases released in gaseous effluents are defined by the following equations: 8.3.1.1.1 Gamma Radiation Quarter Limit 3.1 7E -8 Y i IM, [(XIQ)vQiv +(X/q)qij][B.Q + biq.] 5 mrad [2.3-1]. 8.3.1.1.2 Beta Radiation Quarter Limit 3.17E-8 Z N.I [(X-Q)vQiv +(X/q)vqiv + (X/Q)sQis +(X/q)sq < 10 mrad [2.3-2] i 8.3.1.1.3 Gamma Radiation Year Limit 3.17E-88 [Mi[(X/Q)v Qiv+(X/q)vqiv] +[BiQis +biqis)) < 10mrad 8.3.1.1.4 Beta Radiation Year Limit 3.17E-8 Ni [(X/Q)vQiv +(X/q)vqiv + (X/Q)sQis + (X/q)sqis] < 20mrad i [2.3-4] 8.3.1.1.5 Gamma Radiation Proiection Averaged Over 31 Days 3.17E-8Z[Mi. [(*/Q)vQiv +(X/q)vqiv]+ kBiQis +biqis < 0.2mrad [2.3-5] i

(Page 46 of 128) Beaver Valley Power Station roc.dure-Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 46 of 128 8.3.1.1.6 Beta Radiation Projection Averaged Over 31 Days 3.17E-8 Y Ni [(X/Q)vQiv +(X/q)vqiv + (X/Q)sQis +(X/q) 5 qIsq<0.4mrad [2.3-6] where: Mi = The air dose factor due to gamma emissions for each identified noble gas radionuclide "i" (mrad/yr per uCi/m 3). Ni = The air dose factor due to beta emissions 3 for each identified noble gas radionuclide "i' (mrad/yr per uCi/m ). (X/Q)v = The annual average relative concentration for areas at or beyond the unrestricted area boundary for long-term vent releases greater than 500 hrs/year (sec/m3). (X/q), = The relative concentration for areas at or beyond the unrestricted area boundary for short-term vent releases equal to or less than 500 hrs/year (sec/m 3). (X/Q), = The annual average relative concentration for areas at or beyond the unrestricted area boundary for long-term free standing stack releases greater than 500 hrs/year (sec/mr3). (X/q)5 = The relative concentration for areas at or beyond the unrestricted area boundary for short-term free standing stack releases equal to or less than 500 hrs/year (sec/mi3). qis Release of noble gas radionuclide "i" in gaseous effluents for short-term stack releases equal to or less than 500 hrs/year (uCi). qiv Release of noble gas radionuclide "i" in gaseous effluents for short-term vent releases equal to or less than 500 hrs/year (uCi). Qis Release of noble gas radionuclide "I"in gaseous effluents for long-term free standing stack releases greater than 500 hrs/year (uCi). Qi = Release of noble gas radionuclide "i' in gaseous effluents for long-term vent releases greater than 500 hrs/year (uCi). Bi The constant for long-term releases (greater than 500 hrs/year) for each identified noble gas radionuclide "I"accounting for the gamma radiation from the elevated finite plume (mrad/yr per uCi/sec).

(Page 47 of 128) Beaver Valley. Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 47 of 128 bi = The constant for short-term releases (equal to or less than 500 hrs/year) for each identified noble gas radionuclide "i" accounting for the gamma radiation from the elevated finite plume (mrad/yr per uCi/sec). 3.17E-8 = The inverse of the number of seconds in a year. NUREG 0133(3131) permits eliminating the short-term release term and short-term meteorological terms in the determination of doses when short-term releases are sufficiently random in both time of day and duration to be represented by annual average dispersion conditions. This special consideration is applied in Equations [2.3-1] through [2.3-6], however, a summary of the "real time" meteorological data coupled with the corresponding releases shall be included in the Annual Radioactive Effluent Release Report. Short-term releases are also evaluated annually in computer codes technically consistent with XOQDOQ and GASPAR for inclusion in the Annual Radiological Environmental Report. The incorporation of this option and the Release Modes of ATTACHMENT I Table 2.3-1 results in the following equations to show compliance with 10 CFR 50 for the calendar quarter or year. 8.3 .1.17 Gamma Radiation Dose Equation 3.17E - 8 Z [M. [(X/Q) Q. + (X/Q) Q + (X/Q)c Qi +(X/Q)dQi + I cv vv cb dv (X/Q) wvQi ]+0.5BiQi ] [2.3-7] wv pv

                            < 0.2 mrad (per 31 days), or
                            < 5.0 mrad (per quarter), or
                            < 10.0 mrad (per year)

(Page 48 of 128) Procedure Number: Beaver Valley Power Station 1/2oODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 48 of 128 8.3.1.1.8 Beta Radiation Dose Equation 3.17E-8 ZNi [(X/Q)c Qi + (X/Q)vv Qi + (X/Q)cb Qi + (X/Q)dv Qi + i Cv vv cb dv (X/Q)wvQi +0.5(X/Q)pv Qipv ] [2.3-8] WV~

                         <    0.4 mrad (per 31 days), or
                         < 10.0 mrad (per quarter), or
                         < 20.0 mrad (per year) where:

(X/Q)v = Annual average relative concentration for releases from CV-1 and CV-2 (sec/m 3). (X/Q), = Annual average relative concentration for releases f rom VV- 1 and VV-2 (sec/m 3). 3 (X/Q) p, = Annual average relative concentration for releases f rom PV-1/2 (sec/m ). (X/Q),= Annual average relative concentration for releases f om TV-2 (sec/m 3). Qi = Release of radionuclide 'i' from CV-1 and CV-2 (u Ci). cv Qi = Release or radionuclide "i' from VV-1 and VV-2 (u Ci). 1 vv Qi = Release of radionuclide "I' from PV-1/2 (uCi). pv Qi = Release of radionuclide "i" from TV-2 (uCi). tv Qi = Release of radionuclide "i" from the CB-2 (uCi). cb Q. = Release of radionuclide 'i' from DV-2 (uCi). dv V Qi = Release of radionuclide "I"from WV-2 (uCi).

(Page 49 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level f Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 49 of 128 For Release Modes 1, 2, 3, and 4 the controlling location is 0.35 miles NW. Substitution of the appropriate X/Q values into Equations [2.3-7] and [2.3-8] results in the following: 8.3.1.1.9 Gamma Radiation Dose Determination 3.17E-8.8[Mi[9.24E-5Qi +1.03E-4Qi +7.35E-5Qi +7.35E-5Qi + 1 cv vv tv cb 9.24E- 5 Qi + 9.24E- 5 Qi ]+0.5BiQi [2.3-9] dv Wv pv

  • 0.2 mrad (per 31 days), or
  • 5.0 mrad (per quarter), or
  • 10.0 mrad (per year) 8.3.1.1.10 Beta Radiation Dose Determination 3.17E-8 Ni[9.24E--5Qi +1.03E -4Qi +7.35E-5Qi +7.35E-5Qi +

1 cv vv tv cb 9.24E- 5 Qi +9.24E-5 Q. + (0.5) 7.OE- 10 Qi] [2.3-10] dv Wv pv

                      < 0.4 mrad (per 31 days), or
                      < 10.0 mrad (per quarter), or
                      < 20.0 mrad (per year) 8.3.1.1.11       Determination of Controlling Location The determination of the controlling locations for implementation of 10 CFR 50 is a function of the following parameters:
  • Radionuclide mix and their isotopic release
  • Release Mode
  • Meteorology The incorporation of these parameters into Equations [2.3-7] and [2.3-8]

resulted in the equations for the controlling locations as presented in Equations [2.3-9] and [2.3-10]. The radionuclide mix was based upon source terms calculated using the NRC GALE Code (see 1/2-ODC-3.01 for inputs) and are shown in ATTACHMENT D Tables 2.2-2a and 2.2-2b as a function of release type and Release Point.

(Page 50 of 128) Proce'dure Number: Beaver Valley Power Station 1/2-0Dc-2u02 Title" Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 50 of 128 As in Section 8.2.1, for each Release Mode, the two highest boundary X/Q values for each release point and release duration were utilized in conjunction with the radionuclide mix and release for each release point to determine the controlling site boundary location. Since elevated releases occur from the BVPS site and their maximum X/Q values may not decrease with distance (i.e., the site boundary may not have highest X/Q values), the two highest X/Q values for those distances, greater than the site boundary, were also considered in conjunction with the radionuclide mix to determine the controlling location. These values of X/Q were obtained for the midpoint of the 10 standard distance intervals previously presented in ATTACHMENT F Tables 2.2-4 through 2.2-10. For each Release Mode, a particular combination of Release Point mix and meteorology dominates in the determination of the controlling location. For Release Modes 1, 2, 3, and 4 the controlling release is VV-1 and VV-2. For Release Mode 3, the controlling release is CV-1 and CV-2. Values for Mi and'Ni, which were used in the determination of the controlling location and which are to be used by BV-I and BV-2 in Equations [2.3-9] and [2.3-10] to show compliance with 10 CFR 50 were presented in ATTACHMENT G Table 2.2-11. Values taken from Table B-1 of Regulatory Guide 1.109, Revision " were multiplied by 1E6 to convert from picocuries to microcuries for use in ATTACHMENT G Table 2.2-11. In determination of the controlling location for Release Modes 1, 2, 3, and 4, ATTACHMENT F Tables 2.2-4 through 2.2-7 are utilized for X/Q values. The Bi values to be utilized are the same values which were presented in ATTACHMIENT G Table 2.2-12. A description of the derivation of the various X/Q values is presented in 1/2-ODC-3.01. The following relationship must hold for BV-I or BV-2 to show compliance with ODCM CONTROL 3.11.2.2: For The Calendar Quarter Dy < 5.0 mrad [2.3-11] Dp < 10 mrad [2.3-12] For The Calendar Year D7 < 10 mrad [2.3-13] Dp < 20 mrad [2.3-14] where: D7= The air dose from gamma radiation (mrad).

(Page 51 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 51 of 128 Dp = The air dose from beta radiation (mrad). The quarterly limits given above represent one-half the annual design objective of Section II.B. 1 of Appendix I of 10 CFR 50. If any of the limits of Equations [2.3-11] through [2.3-14] are exceeded, a special report pursuant to both Section IV.A of Appendix I of 10 CFR 50 and ODCM CONTROL 3.11.2.2.a must be filed with the NRC at the identified locations. In addition, ODCM CONTROL 3.1.2.4 requires that the gaseous radwaste system must be used to reduce radioactive materials in that waste when projected doses from each reactor unit when averaged over 31 days exceed any of the following: D1 < 0.2 mrad [2.3-15] Dp < 0.4 mrad [2.3-16] 8.3.1.2 Proiection Of Doses (Noble Gas) Doses due to gaseous releases from BV-I and BV-2 shall be projected at least once per 31 days in accordance with ODCM CONTROL 4.11.2.4 and this section. (Also see Section 8.3.2.2 Projection Of Doses for additional specifications). The Gaseous Radwaste Treatment System and the Ventilation Exhaust Treatment System shall be used to reduce radioactive materials in gaseous waste prior to their discharge in accordance with ODCM CONTROL 3.11.2.4 when the projected gaseous effluent air dose due to gaseous effluent releases from each reactor unit, when averaged over 31 days, would exceed 0.2 mrad for gamma radiation and 0.4 mrad for beta radiation. (Also see Section 8.3.2.2 Projection Of Doses for additional specifications). The doses used in the 31-day dose projection will be calculated using Equations [2.3-9] and [2.3-10] as appropriate. The 31-day dose projection shall be performed according to the following equations: 8.3.1.2.1 When Including Pre-Release Data, D 31 ]

                                            =LA+B (31)+/-+C                                                       [2.3-17]

8.3.1.2.2 When Not Including Pre-Release Data, D, =[A] (3 1) + C [2.3-18] where: D31 = Projected 3 1 day dose (mrad). A = Cumulative dose for quarter (mrad).

(Page 52 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 52 of 128 B = Projected dose from this release (mrad). T = Current days into quarter. C = Value which may be used to anticipate plant trends (mrad). 8.3.2 Dose Due To Radioiodines And Particulates 8.3.2.1 Cumulation Of Doses Section II.C of Appendix I of 10 CFR 50 (ODCM CONTROLS 3.11.2.3 and 3.11.2.4) limits the release of radioiodines and radioactive material in particulate form from each reactor unit such that estimated dose or dose commitment to an individual in an unrestricted area from all pathways of exposure is not in excess of 15 mrem to any organ. In addition, ODCM CONTROL 3.11.2.4 requires the use of gaseous radwaste treatment system when the projected dose due to gaseous effluent releases from each reactor unit, when averaged over 31 days, would exceed 0.3 mrem to any organ. Based upon NUREG-0133,(3131) the dose to an organ of an individual from radioiodines and particulates, and radionuclides other than noble gases with half-lives greater than 8 days in gaseous effluents released to unrestricted areas, can be determined by the following equation: 8.3.2.1.1 Radioiodines and Particulates Month, Ouarter, and Year Limits 3.17E-8 .YR. [WsQ. + w q W Q. + W qiv] yri s is s is v IV v IV _ 0.3 mrem (per 31 days), or [2.3-19] _ 7.5 mrem (per quarter), or _ 15.0 mrem (per calendar year) where: Qis Release of radionuclide "i" for long-term free standing stack releases greater than 500 hrs/yr (uCi). Qiv =Release of radionuclide "i" for long-term vent releases greater than 500 hrs/yr (uCi). qis =Release of radionuclide "i" for short-term free standing stack releases equal to or less than 500 hrs/yr (uCi). qiv = Release of radionuclide "i" for short-term vent releases equal to or less than 500 hrs/yr (uCi). Ws Dispersion parameter for estimating dose to an individual at the controlling location for long-term free standing stack releases greater than 500 hrs/yr.

(Page 53 of 128) Beaver Valley Power Station Procdure ubODC2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 53 of 128 -4

                                          =   sec/m 3 for the inhalation pathway, (W/Q)s.
                                          =  meters 2 for the food and ground plane pathway, (D/Q )s.

Wv = The dispersion parameter for estimating the dose to an individual at the controlling location for long-term vent releases greater than 500 hrs/yr.

                                          =   sec/mr3 for the inhalation pathway, ( X/Q )v.
                                          =  meters-2 for the food and ground plane pathway, (D/Q           )v.

w% = Dispersion parameter for estimating the dose to an individual at the controlling location for short-term stack releases equal to or less than 500 hrs/yr.

                                          =  sec/m 3 for the inhalation pathway, (W/q)s.
                                          = meters 2 for the food and ground plane pathway, (D/q )s.

wv = The dispersion parameter for estimating the dose to an individual at the controlling location for short-term vent releases equal to or less than 500 hrs/yr.

                                          =  sec/m 3 for the inhalation pathway, (X/q   ),.
                                          =  meters-2 for the food and ground plane pathway, (D/q)v.

3.17E-8 = The inverse of the number of seconds in a year. Ri, = The dose factor for each identified radionuclide "i" for the organ "," of interest (mrem/yr per uCi/sec per m2 or mrem/yr per uCi/m 3). Radionuclides and particulates may be released from any of the BV-I and BV-2 Release Points in the Release Modes identified in ATTACHMENT I Table 2.3-1. As described previously in Section 8.3.1.1, NUREG 0133(3-131) permits use of long-term annual average dispersion calculations (which with the release modes of Table 2.3-1 results in the following equations) to show compliance with ODCM CONTROLS 3.11.2.3 and 3.11.2.4. For a particular organ, Equation [2.3-19] becomes:

(Page 54 of 128) Procedure Number: Beaver Valley Power Station ______________________________________________1/2-ODC-2. Proedre umer 02

Title:

Unit: evel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 54 of 128 8.3.2.1.2 Radioiodines and Particulates Dose Equation 3.17E-8YR. i 7 [0.5W Q. pv1

                                                               +   WvQ cv 1
                                                                                  +WQQ 1
                                                                                          +WtQ  tvv   tv
                                                                                                         +WQ       Q+/- +

cb cb WdvQi +Wwv Qi ] [2.3-20] dv wv

                                    < 0.3 mrem (per 31 days), or
                                    < 7.5 mrem (per quarter), or
                                    < 15.0 mrem (per calendar year) where:

0.5 Wpv = Dispersion parameter for releases from PV-1/2. The value of 0.5 represents the portion of dose assigned to each Unit due to this being a shared Release Point WCV = Dispersion parameter for releases from CV-1 and CV-2. Wvv = Dispersion parameter for releases from VV-1 and VV-2. Wtv = Dispersion parameter for releases from TV-2. Web = Dispersion parameter for releases from CB-2. Wdv = Dispersion parameter for releases from DV-2. Wwv = Dispersion parameter for releases from WV-2. Qi = Release of radionuclide "i" from PV-1/2 (uCi). pv Q. = Release of radionuclide "i" from CV-1 and CV-2 (uCi). cv Qi = Release of radionuclide "i" from VV-1 and VV-2 (uCi). vv Qi = Release of radionuclide "i" from TV-2 (uCi). tv Qi = Release of radionuclide "i" from CB-2 (uCi). cb Qi = Release of radionuclide "i" from DV-2 (uCi). dv

(Page 55 of 128) Beaver Valley Power Power Station St1/2-ODC-2.02 Procedure Number:

Title:

Unit: Level Of use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 55 of 128 Qi = Release of radionuclide "i" from WV-2 (uCi). Wv TV-2, CB-2, DV-2 and WV-2 are not normally radioactive Release Points. These are included only for use if a radioactive release is identified in the future. In determining the dose at a particular location, dispersion parameter W is a function of the pathway. For the food and ground plane pathway, W is in terms of D/Q. If the inhalation pathway is considered, W is in terms of XIQ. Incorporation of the various pathways into Equation [2.3-20] results in the following equation for a particular organ: 8.3.2.1.2.1 Radioiodines and Particulates Dose Determination

                                                               +RiTrM +l    R.B ] [0.5 W pvQipv           WcvQicV +

3.17E 8 l(( TV WVV vv + WtvQitv +Wcb Qicb +Wdv Qidv +WwvQi ]

                                                  +R      i[0.5          Q (XQ)pv Qpv  + (y/Qcv (X/Q)+ Qi~         (X/Q)w Q.i1 , +

(X/Q) Qi tv + (X/Q) Q cb

                                                                                   + (X/Q)d Qi            + (X/Q)       ]

dv QiwV I [2.3-21]

                                    <  0.3 mrem (per 31 days), or
                                    <  7.5 mrem (per quarter), or
                                    < 15.0 mrem (per year) where:

R.I"1G Dose factor for an organ "c" for radionuclide "i" for the ground plane exposure pathway (mrem/yr per uCi/sec per m-2), R. Dose factor for an organ "c" for radionuclide "i" for either the cow milk or goat milk pathway (mrem/yr per uCi/sec per M2). Ri Dose factor for an organ "C'for radionuclide "i" for the vegetable pathway (mrem/yr per uCi/sec per M-).

(Page 56 of 128) Beaver Valley Power Station ProcedureNumber: 1/2-ODC-2.02

Title:

Unit: Level OfUse: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 56 of 128 R. = Dose factor for an organ ",c" for radionuclide "i" for the meat 1TB pathway (mrem/yr per uCi/sec per M-). R. = Dose factor for an organ "t" for radionuclide "i" for the r1 I inhalation pathway (mremlyr per uCi/m 3). It should be noted that Wpv, W Wv,,,v Wtv, Wcp, Wdv, and Wwv in Equation [2.3-21] are in terms of D/Q(m-2). Values of the dose factor, Ri, were calculated using the methodology of NUREG-0133.( 3 .1. 3 "') The following equations were used for all nuclides except tritium: 8.3.2.1.2.2 Dose Factors For Inhalation Pathway R.1"T1 = K' (BR)a(DFAit)a 3

                                       = mrem/yr per uCi/m                                                    [2.3-22]

where: K' = A constant of unit conversion (1E6 pCi/uCi). (BR)a The breathing rate of the receptor of age group "a" (m3/yr). (DFAix)a = Each organ inhalation dose factor for the receptor of age group "a" for the "i" th radionuclide (mrem/pCi). Inhalation dose factors (DFAit) by organ for the various age groups are given in Table E-7 through E-10 of Regulatory Guide 1.109, Rev. 1(3.1.35) or Tables 5 through 8 of NUREG-0172.(3.13.6) The breathing rates (BR)a used for the various age groups are tabulated below, as given in Table E-5 of the Regulatory Guide 1.109.(3.1.3.5) Age Group(a) Breathing Rate (m3/ yr) Infant 1400 Child 3700 Teen 8000 Adult 8000 8.3.2.1.2.3) Dose Factors For Ground Plane Pathway

(Page 57 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 57 of 128 R. = K'K" (SF)DFGi,[(1 - e'*it)/O] 1l2G

                                      = m2 -mrem/yr per uCi/sec                                               [2.3-23]

where: K' = A constant of unit conversion (1E6 pCi/uCi). K" = A constant of unit conversion (8760 hr/year). xi = The decay constant for the "i" th radionuclide (sec 1 ). t = The exposure time (4.73E8 sec or 15 years). DFGi, = The groundplane dose conversion factor for organ "`" for the "i" th radionuclide (mrem/hr per pCi/mr2). A tabulation of DFGi, values is presented in Table E-6 of Regulatory Guide 1.109.(3135) SF = The shielding factor (dimensionless). A shielding factor of 0.7 as suggested in Table E-15 of Regulatory Guide 1.109 is used." 3 5 ) 8.3.2.1.2.4 Dose Factors For Cow Milk or Goat Milk Pathway

                                                                         -fpfs   (I-  ff,)e-Vih-        -Xitf R iTM         +

QF(xUi F (r)(DFL-,), f + (i-e

                                           =  m2 -mrem/yr per uCi/sec                                         [2.3-24]

where: K' = A constant of unit conversion (1E6 pCi/uCi). QF = The animal's consumption rate, wet weight (kg/day). Uap = The receptor's milk consumption rate, for age "a" (liters/yr). YP = The agricultural productivity by unit area of pasture feed grass (kg/m2). Ys = The agricultural productivity by unit area of stored feed (kg/m2). Fm = The stable element transfer coefficients (days/liter).

(Page 58 of 128) Beaver Valley Power Station . Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM GASEOUS EFFLUENTS Revision: Page Number: 2 58 of 128 r = Fraction of deposited activity retained on animals feed grass. (DFLi,) = The maximum organ ingestion dose factor for the "i" th radionuclide for the receptor in age group "a" (mrem/pCi). Ingestion dose factors (DFLi,)a for the various age groups are given in Table E-1 1 through E-14 of Regulatory Guide 1.109(3135) or Tables 1 through 4 of NUREG-0172.(3 1 3 6 ) X*i = The decay constant for the "i"th radionuclide (sec-I).

                                )w        =   The decay constant for removal of activity on leaf and plant surfaces by weathering 5.73E-7 sec-' (corresponding to a 14 day half-life).

tf = The transport time from pasture, to animal, to milk, to receptor (sec). th = The transport time from pasture, to harvest, to animal, to milk, to receptor (sec).

                                          = Fraction of the year that the animal is on pasture (dimensionless).
                                          =   Fraction of the animal feed that is pasture grass while the animal is on pasture (dimensionless).

Tabulated below are the parameter values used for cow's milk and their reference to Regulatory Guide 1. 109.(31,35)

(Page 59 of 128) Beaver Valley Power Station Procedure N :ODC 2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 59 of 128 Parameter Value RG. 1.109 Table r (dimensionless) 1.0 for radioiodine E-15 0.2 for particulates E-15 Fm (days/liter) each stable element E-1 (cow milk) E-2 (goat milk) Up (liters/yr) - infant 33)0 E-5

                                                            -o0 child       .330                            E-5 teen        400                             E-5 adult       310                             E-5 (DLFi,)a (mrem/pCi)            each radionuclide               E-11 to E-14 Yp (kg/m 2)                    0.7                             E-15 Y, (kg/m 2)                    2.0                             E-15 tf(seconds)                    1.73E5 (2 days)                 E-15 th (seconds)                   7.78E6 (90 days)                E-15 QF (kg/day)                    50                              E-3 fp                             0.5 fs                             1.0 For goat's milk, all values remain the same except for QF, which is 6 kg/day.

8.3.2.1.2.5 Dose Factors For Meat Pathway R. T Kp RQFfUapF( X"+ X 'f+/-ITa ff y s + I1-f f je-?'ith Y 1s _ ,itf

                                        =  m2 -mrem/yr per uCilsec                                            [2.3-25]

where: Ff = The stable element transfer coefficients (days/kg). Uap = The receptor's meat consumption rate for age "a" (kg/yr). tf = The average time from slaughter of meat animal to consumption (sec).

(Page 60 of 128) cValleyNumber: '_.. Beaver Power Station Proedure 1/2-ODC-2.02

Title:

Unit: ,Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: ' Page Number: 2 60 of 128 th = The transport time from crop field to receptor (sec). All parameter values are the same as the milk pathway parameter values except Ff which is obtained from Table E-1. Parameter tf is obtained from Table E-15, and Uap is obtained from Table E-5. These values, as obtained from Regulatory Guide 1.109,(313"5) are as follows: Parameter Value RG-1.109 Table Ff (days/kg) each stable element E-1 tf (seconds) 1.73E6 (20 days) E-15 Uap (kg/yr) - infant 0 E-5 Child 41 E-5 Teen 65 E-5 Adult 110 E-5 Man is considered to consume 2 types of vegetation (fresh and stored) that differ only in the time period between harvest and consumption; therefore: 8.3.2.1.2.6 Dose Factors For Vegetation Pathway R. = K' v y

                                                   , (r)    1 i + Xw ]

(DFL. ) UL ra a

                                                                                 - XitL + u~fe -Xithl a g            I
                                       = m 2 -mrem/yr per uCi/sec                                             [2.3-26]

where: K' = A constant of unit conversion (1E6 pCi/uCi). UL = The consumption rate of fresh leafy vegetation by the receptor in age group "a" (kg/yr). Us= The consumption rate of stored vegetation by the receptor in age group "a" (kg/yr). fL = The fraction of the annual intake of fresh leafy vegetation grown locally. fg = The fraction of the annual intake of stored vegetation grown locally. tL = The average time between harvest of leafy vegetation and its consumption (seconds).

(Page 61 of 128) Beaver Valley Power Station Proced m1/2ODC2.2

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 61 of 128 th = The average time between harvest of stored vegetation and its consumption (seconds). Y, = The vegetation area density (kg/m 2). all other factors are defined previously. Tabulated below are the appropriate parameter values and their reference to Regulatory Guide 1. 1 0 9 .(p1.3r5) Parameter Value RG-1.109 Table r (dimensionless) 1.0 for radioiodines E-15 0.2 for particulates E-15 (DFLi,)a (mrem/pCi) each stable element E-11 toE-14 UL (kg/yr) -infant 0 E-5 a Child 26 E-5 teen 42 E-5 adult 64 E-5 US (kg/yr) - infant 0 E-5 a child 520 E-5 teen 630 E-5 adult 520 E-5 fL (dimensionless) 1.0 E-15 Fg (dimensionless) 0.76 E-15 tL (seconds) 8.6E4 (1 day) E-15 th (seconds) 5.18E6 (60 days) E-15 Yv (kg/rm 2) 2.0 E-15 As discussed in Section 8.2.2 for tritium, the parameter W for the food pathway is based upon X/Q. The ground plane pathway is not appropriate for tritium. Therefore, the left-hand portion of Equation [2.3-20] may be expressed for purposes of implementation of 40 CFR 190, discussed in 1/2-ODC-2.04, as follows:

(Page 62 of 128) Beaver Valley Power Station Procdure umber:ODC2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: __2 Page Number: 62 of 128 8.3.2.1.2.7 Tritium Dose Equation 3.17E-8(RTM +RTv + Rc B + RTr ) [0.5 (XIQ)pvQTPv +(X/Q)cvQT v + (X/Q)vvQT + (X/Q~tvQT + (X/Q)cb Qb + (X/Q)dvQ + (X/Q) wv ] vv tv cb dv wv [2.3-27] where: RT-M = Dose factor for organ "'" for tritium for the milk pathway (mrem/yr per uCi/m 3). RTrv = Dose factor for organ "u" for tritium for the vegetable pathway (mrem/yr per uCi/m 3 ). RTTB = Dose factor for organ "t" for tritium for the beef pathway (mrem/yr per uCi/m 3 ). RTc I = Dose factor for organ "c"for tritium for the inhalation pathway (mrem/yr per uCi/m 3 ). Equation [2.3-27] is used to show compliance with 40 CFR 190, as discussed in 1/2-ODC-2.04. The concentration of tritium in milk is based on the airborne concentration rather than the deposition. Therefore, the RTuM is based on[X/JQ: 8.3.2.1.2.8 Tritium Dose Factors For Milk Pathway RTTz = K'K" FmQFUap(DLFiT)a[0. 7 5 (0.5/H)]

                             = mrem/yr per uCi/m 3                                                          [2.3-28]

where: K" = A constant of unit conversion (1000 gm/kg). H = Absolute humidity of the atmosphere (8 gm/rm3). 0.75 = The fraction of total feed that is water. 0.5 = The ratio of the specific activity of the feed grass water to the atmospheric water.

(Page 63 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODCu2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 63 of 128 and other parameters and values are the same as for R'itM. The concentration of tritium in vegetation is based on the airborne concentration rather than the deposition. Therefore, the Rttv is based on [X/Q]: 8.3.2.1.2.9 Tritium Dose Factors For Vegetation Pathway RT =K'K"-LUfL +USafg (DFLi )a [0.75(0.5/H)]

                                   = mrem/yr per uCi/m 3                                                        [2.3-29]

where all terms have been defined above. The concentration of tritium in meat is based on its airborne concentration rather than the deposition. Therefore, the RTTB is based on[X/Q]: 8.3.2.1.2.10 Tritium Dose Factors For Beef Pathway RT  ::= K'KFtfQFU (DFL.i) [0.75(0.5/H] B

                                 -   mrem/yr per uCi/m 3                                                       [2.3-30]

where all terms have been defined above. To show compliance with ODCM CONTROLS 3.11.2.3 and 3.11.2.4, Equation [2.3-21] is evaluated at the controlling pathway location. For Release Modes 1 through 4, the controlling location is a residence 0.89 miles in the NW sector. Inserting appropriate X/Q values from ATTACHMENT F Tables 2.2-4 to 2.2-10 and D/Q values from ATTACHMENT L Tables 2.3-28 to 2.3-34, Equation [2.3-21] becomes: 8.3.2.1.3 Radioiodines and Particulates Dose Determination 3.17E-8 Zi ((RiTG + R.v ] [(0.5)4.22E- 10 Qipv +1.56E-8 Qcv +1.56E-8 Q.155-8 + 1.55E-8Q +l.56E-8Q +1.56E-8 Qivv + 1.55E-8Qitv - Qicb - Qidv Q. ]+Ri [(0.5)7.30E-9Q. +2.00E-5Qi 1 +2.71E-5 Q. Iwv ITIlpv cv Ivv

                                      + 2.22E-5Qitv + 2.22E- 5 Q ib + 2.00E- 5 Qidv + 2.00E- 5 Qiwv J

(Page 64 of 128) Procedure Number: Beaver Valley Power Station 1/2PODCd2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 64 of 128

  • 0.3 mrem (per 31 days), or [2,3-31]
                               < 7.5 mrem (per quarter), or
                               <15.0 mrem (per year)

For tritium, for purposes of implementation of 40 CFR 190, as discussed in 1/2-ODC-2.04, Equation [2.3-28] reduces to: 3.17E - 8 [RTTv + RTT ] [(0.5)7.30E - 9 QiPV + 2.OOE - 5 Qicv + 2.71E - 5Q.i + 2.22E-5Qi.tv + 2.22E-5 Qi b +2.OOE-5Qidv + 2.OOE - 5 Qiwv ] [2.3-32] 8.3.2.1.4 Determination of Controlling Location The determination of a controlling locating for implementation of ODCM CONTROLS 3.11.2.3 and 3.11.2.4 for radioiodines and particulates is a function of:

  • Radionuclide mix and their isotopic release
  • Release Mode
  • Meteorology 0 Exposure pathway
  • Receptor's age The incorporation of these parameters into Equation [2.3-19] results in the respective equations for each Release Mode at the controlling location.

In determination of the controlling location for each Release Mode, the radionuclide mix of radioiodines and particulates was based upon the source terms calculated using the GALE code. This mix was presented in ATTACHMENT D Tables 2.2-2a and 2.2-2b as a function of Release Mode and Release Point. For the ground plane exposure pathway, all radionculides (excluding H-3 and C-14) were considered in determination of the controlling location. For the inhalation and food pathways H-3 and C-14 were also considered in determination of the controlling location. In determination of the controlling location for each Release Mode, all of the exposure pathways, as presented in ATTACHMENT E Table 2.2-3, were evaluated. These include cow milk, goat milk, beef and vegetable ingestion and inhalation and ground plane exposure. An infant was assumed to be present at all milk pathway locations. A child was assumed to be present at all vegetable garden and beef animal locations. The ground plane and inhalation exposure pathways were considered to be present at all locations.

(Page 65 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 65 of 128 For determination of the controlling location, the highest D/Q and X/Q values for each Release Point and Release Mode for the vegetable garden, cow milk, and goat milk pathways were selected. The organ dose was 'calculated at each of these locations using the radionuclide mix and Release Points of ATTACHMENT D Tables 2.2-2a and 2.2-2b Based upon these calculations, it was determined that the controlling location for Release Modes 1 through 4 is the residence (vegetable garden)/child pathway. For Release Modes 1 through 4, the controlling Release Point and mix is VV-1 and VV-2. ATTACHMENT J Tables 2.3-2 through 2.3-20 present Ri values for the total body, GI-LLI, bone, liver, kidney, thyroid, and lung organs for the ground plane, inhalation, cow milk, goat milk, vegetable, and meat ingestion pathways for the infant, child, teen, and adult age groups as appropriate to the pathways. These values were calculated using the methodology described in NUREG-0133(3'-3) using a grazing period of 6 months. In determination of the controlling location for Release Modes 1-4, ATTACHMENT F Tables 2.2-4 through 2.2-10 are utilized for X/Q's, and ATTACHMENT L Tables 2.3-28 through 2.3-34 are utilized for long term D/Q values. A description of the derivation of the various'XlQ and D/Q values is presented in 1/2-ODC-3.01. Long-term D/Q values for PV-1/2, CV-I, CV-2, VV-1, VV-2, TV-2, CB-2, DV-2 AND WV-2 are provided for the midpoints of the following distances: 0.0-0.5 mi., 0.5-1.0 mi., 1.0-1.5 mi., 1.5-2.0 mi., 2.0-2.5 mi., 2.5-3.0 mi., 3.0-3.5 mi., 3.5-4.0 mi., 4.0-4.5 mi., 4.5-5.0 mi. The values appear in ATTACHMENT K Tables 2.3-21 through 2.3-27. These values may be utilized if an additional special location arises different from those presented in the special locations of ATTACHMENT E Table 2.2-3. The following relationship must hold for BV-I or BV-2 to show compliance with ODCM CONTROL 3.11.2.3. For The Calendar Quarter: D, < 7.5 mrem to any organ [2.3-33] For The Calendar Year: D, < 15 mrem to any organ [2.3-34] where: D, = The dose to any organ from radioiodines and particulates (mrem).

(Page 66 of 128) Procedure Number: Beaver Valley Power Station 1/2ouDC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 66 of 128 The quarterly limits given above represent one-half the annual design objective of Section II.C of Appendix I of 10 CFR 50. If any of the limits of Equations [2.3-33] and [2.3-34] are exceeded, a Special Report pursuant to both Section IV.A of Appendix I of 10 CFR 50 and ODCM CONTROL 3.11.2.3.a must be filed with the NRC at the identified locations. 8.3.2.2 Projection Of Doses (Radioiodines And Particulates) Doses due to gaseous releases from BV-I or BV-2 shall be projected at least once per 31 days in accordance with ODCM CONTROL 4.11.2.4 and this section. (Also see Section 8.3.1.2, Projection Of Doses for additional specifications). The appropriate portions of the Ventilation Exhaust Treatment System shall be used to reduce radioactive materials in gaseous waste prior to their discharge in'accordance with ODCM CONTROL 3.11.2.4 when the projected doses due to gaseous effluent releases from each reactor unit, when averaged over 31 days, would exceed 0.3 mrem to any organ. (Also see Section 8.3.1.2, Projection Of Doses for additional specifications). Doses resulting from the gaseous effluent release of radioiodines and particulates will be calculated for use in the 31-day dose projection using Equation [2.3-31]. The 31-day dose projection shall be performed according to the following equations: 8.3.2.2.1 When Includin2 Pre-Release Data, D31 =[-*-] (31) + C [2.3-35] 8.3.2.2.2 When Not Including Pre-Release Data, D 31 =[A] (31)+ C [2.3-36] where: D3 1 = Projected 31 day dose (mrem). A = Cumulative dose for quarter (mrem). B = Projected dose for this release (mrem). T Current days into quarter. C = Value which may be used to anticipate plant trends (mrem).

(Page 67 of 128) Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 67 of 128 8.4 Gaseous Radwaste System The gaseous radwaste system has the capability to control, collect, process, store, recycle, and dispose of gaseous radioactive waste generated as a result of plant operations, including anticipated operational occurrences. A simplified flow diagram of the gaseous radwaste system for BV-1 and BV-2 is provided as ATTACHMENT N Figure 2.4-1. A diagram showing the gaseous effluent Release Points is provided as ATTACHMENT P Figure 2.4-2. Since the concept of a shared gaseous radwaste system is used, then gaseous waste generated can be stored, processed, and discharged from either BV-1 or BV-2. 8.4.1 BV-1 Gaseous Radwaste System Components 8.4.1.1 BR-1EV-2A/2B: De2asifiers There are two Degasifiers. They are designed to continuously process reactor coolant letdown for reducing entrained noble gases in the liquid. 8.4.1.2 GW-1E-1A/1B: Waste Gas Chillers There are two Chillers. Non-condensable gases from the degasifiers are directed by. system pressure to the Waste Gas Chillers. 8.4.1.3 GW-1TK-3A thru 3D: Gaseous Waste Charcoal Delay Beds There are four Charcoal Beds. The dry effluent from the Chillers is directed to the Waste Gas Charcoal Delay Beds for holdup of xenon and krypton and adsorption of radioiodines. When four beds are operated in series, they provide a holdup of xenon isotopes for about 30 days. 8.4.1.4 GW-1FL-SA/5B: Overhead Gas Compressor Prefilters There are two Prefilters. The gaseous effluent (primarily hydrogen) is directed from the Gaseous Waste Charcoal Delay Beds to one of the Overhead Gas Compressor Prefilters. The filters remove carbon solids from the gas stream. 8.4.1.5 GW-1C-1A/1B: Gas Compressors There are two Compressors. The waste gas enters one of the compressors after passing through the Prefilters. 8.4.1.6 GW-1TK-2: Gaseous Waste Surge Tank There is one Surge Tank. It has a capacity of 52 cuft. After compression to about 65 psig, the waste gas is sent to the Surge Tank. This can be done automatically or manually. 8.4.1.7 GW-1TK-1A thru IC: Waste Gas Decay Tanks

(Page 68 of 128) Beaver Valley Power Station Proco Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 68 of 128 There are three Decay Tanks. Each has a capacity of 132 cuft. The contents of the Surge Tank is transferred to the Decay Tanks for storage and decay. After 30 days of storage, all xenon and iodine should have decayed, and the resulting predominant nuclide should be krypton 85. 8.4.1.8 RM-1GW-108 And RM-1GW-109: Gaseous Effluent Radiation Monitors There are redundant Radiation Monitors on the combined PV-1/2 Gaseous Waste/Process Vent release path. These Radiation Monitors continuously analyze gaseous waste as it is being discharged. Gaseous Monitor RM-1GW-108B is an off-line gamma scintillator, while RM-1GW-109 Channel 5 is an off-line beta scintillator. The upper activity alarm on the gaseous Channels of these Radiation Monitors have setpoints thatwould indicate, we are approaching the Total Body Dose Rate or Skin Dose Rate limits for radioactive gas leaving the site. If an upper activity alarm on RM- 1GW- 108B is received, it automatically terminates the discharge by closing an isolation valve downstream of the Decay Tanks. 8.4.2 BV-2 Gaseous Radwaste System Components 8.4.2.1 2BRS-EV21A/21B: Degasifiers There are four Degasifiers (two at Unit 1 and two at Unit 2). They are designed to continuously process reactor coolant letdown for reducing entrained noble gases in the liquid. 8.4.2.2 2GWS-E21A/21B: Waste Gas Chillers There are four Chillers (two at Unit I and two at Unit 2). Non-condensable gases from the degasifiers are directed by system pressure to the Waste Gas Chillers. 8.4.2.3 2GWS-TK22A thru 22D: Waste Gas Charcoal Delay Beds There are four Charcoal Beds (four at Unit I and four at Unit 2). The dry effluent from the Chillers is directed to the Waste Gas Charcoal Delay Beds for holdup of xenon and krypton and adsorption of radioiodines. When four beds are operated in series, they provide a holdup of xenon isotopes for about 30 days. 8.4.2.4 2GWS-FLT24A/24B: Overhead Gas Compressor Prefilters There are two Prefilters. The gaseous effluent (primarily hydrogen) is directed from the Waste Gas Charcoal Delay Beds to one of the Overhead Gas Compressor Prefilters. The filters remove carbon solids from the gas stream. 8.4.2.5 2GWS-C21A/21B: Gas Compressors There are two Compressors. The waste gas enters one of the compressors after passing through the Prefilters.

(Page 69 of 128) Beaver Valley Power StationnProcedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 PageNumber: 69 of 128 8.4.2.6 2GWS-TK21: Gaseous Waste Surge Tank There is one Surge Tank. It has a capacity of 52 cuft. After compression to about 65 psig, the waste gas is sent to the Surge Tank. This can be done automatically or manually. 8.4.2.7 2GWS-TK25A thru 25G: Gaseous Waste Storage Tanks There are seven Storage Tanks. Each has a capacity of 132 cuft. The contents of the Surge Tank is transferred to the Storage Tanks for storage and decay. After 30 days of storage, all xenon and iodine should have decayed, and the resulting predominant nuclide should be krypton 85. 8.4.2.8 RM-1GW-108 And RM-1GW-109: Gaseous Effluent Radiation Monitors Previously described in Section 8.4.1.

                                                                      - END -

(Page 70 of 128) Beaver Valley Power Station roceu /2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number:

                                                                                                      .2             70 of 128 ATTACHMENT A Page 1 of 2 GASEOUS SOURCE TERM TABLE 2.1-la BV-I RADIONUCLIDE MIX FOR GASEOUS EFFLUENTS (Ci/yr)

RX AUXILIARY CONTAINMENT/ BUILDING SLCRS VENT VENT GASEOUS WASTE/PROCESS VENT Long Term, And AUXILIARY MAIN CONTAINMENT GASEOUS CONTAINMENT BUILDING CONDENSER/ VACUUM3 WASTE NUCLIDE(2) BUILDING(1 ) VENTILATION AIR EJECTOR pUMPS( ) SYSTEM Short Term Long Term Long Term Long Term Short Term Kr-83m 2.2E-02 4.2E-01 2.7E-0 1 5.2E-03 0.0 Kr-85m 1.5E-01 1.9E+00 1.2E+00 5.5E-02 7.3E-02 Kr-85 6. IE+01 2.5E+00 1.6E+00 1.OE+01 2.3E+02 Kr-87 5.4E-02 1.3E+00 8.2E-01 1.IE-02 0.0 Kr-88 2.4E-0 1 3.8E+00 2.4E+00 7.OE-02 0.0 Kr-89 4.7E-04 1.2E-01 7.7E-02 4.3E-05 0.0 Xe-131m 7.4E-01 1.3E-01 8.OE-02 1.8E-01 1.3E+00 Xe-133m 8.9E-01 8.9E-01 5.6E-0 I 3.1E-01 0.0 Xe-133 8.9E+01 3.6E+01 2.3E+01 2.7E+01 2.3E+0 1 Xe-135m 4.5E-03 3.2E-01 2.OE-0 I 6.2E-04 0.0 Xe-135 7.OE-01 4.5E+00 2.8E+00 2.7E-01 0.0 Xe-137 1.0E-03 2.1E-01 1.3E-01 8.8E-05 0.0 Xe-138 1.5E-02 1.1E+00 6.6E-0 1 1.7E-03 0.0 Ar-41 2.5E+O1 0.0 0.0 0.0 0.0 Containment can be purged via VV-1 (Auxiliary Building Vent), CV-1 (Rx Containment/SLCRS Vent), or PV-1/2 (Gaseous Waste/Process Vent) (2) Source Term from BVPS-2 UFSAR Table 11.3.1(3112) (3) Original Source Term from Calculation No. UR(B)-262 was adjusted for a factor of 14 increase in pump flowrate due to installation of high capacity pumps during IR15. This change in Source Term is documented in Condition Report CR03-04830 and Calculation No. ERS-HHM 014. (3.1.1.5) (3.1.1.8) (3.1.3.10)

(Page 71 of 128) Beaver Valley Power Station ProcedureNumber: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: PageNumber: 2 71 of 128 ATTACHMENT A Page 2 of 2 GASEOUS SOURCE TERM TABLE 2.1-lb BV-2 RADIONUCLIDE MIX FOR GASEOUS EFFLUENTS (Ci/yr) SLCRS SLCRS TURBINE UNFILTERED FILTERED BUILDING PATHWAY PATHWAY VENT GASEOUS WASTE/PROCESS VENT Long Term, And AUXILIARY TURBINE MAIN CONTAINMENT GASEOUS NUCLIDE(2 CONTAINMENT BUILDING BUILDING CONDENSER/ VACUUM 3 WASTE BUILDING(1 ) VENTILATION VENTILATION AIR EJECTOR pUMpS( ) SYSTEM Short Term Long Term Long Term Long Term Long Term Short Term Kr-83m 4.OE-05 4.2E-0 1 3.9E-05 2.7E-01 3.7E-04 0.0 Kr-85m 1.4E-02 1..9E+00 1.7E-04 1.2E+00 3.9E-03 1.2E-02 Kr-85 6.1E+01 2.5E+00 2.3E-04 1.6E+00 7.2E-01 2.3E+02 Kr-87 5.3E-06 1.3E+00 1.1E-04 8.2E-01 7.8E-04 0.0 Kr-88 4.IE-03 3.8E+00 3.5E-04 2.4E+00 5.OE-03 0.0 Kr-89 0.0 1.2E-01 1.1E-05 7.7E-02 3. 1E-06 0.0 Xe-131m 7.2E-01 1.3E-01 1.2E-05 8.OE-02 1.3E-02 8.3E-01 Xe-133m 7.6E-0 1 8.9E-01 8.1E-05 5.6E-01 2.2E-02 0.0 Xe-133 8.4E+0I 3.6E+01 3.4E-03 2.3E+01 1.9E-00 8.2E+00 Xe-135m 0.0 3.2E-01 2.9E-05 2.OE-01 4.4E-05 0.0 Xe-135 2.4E-01 4.5E+00 4.2E-04 2.8E+00 1.9E-02 0.0 Xe-137 0.0 2.1E-01 2. IE-05 1.3E-01 6.3E-06 0.0 Xe-138 0.0 1.1E+00 9.7E-05 6.6E-0I 1.2E-04 0.0 Ar-41 2.5E+01 0.0 0.0 0.0 0.0 0.0 () Containment can be purged via VV-2 (SLCRS Unfiltered Pathway), CV-2 (SLCRS Filtered Pathway), or PV-1/2 (Gaseous Waste/Process Vent) (2) Source Term from BVPS-2 UFSAR Table 11.3.2(3.1.2.3) (3) Source Term from Calculation No. UR(B)-262(3 2. 5.

(Page 72 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 72 of 128 ATTACHMENT B Page 1 of 2 GASEOUS EFFLUENT MONITOR DETECTION EFFICIENCIES TABLE 2.1-2a BV- I MONITOR DETECTOR EFFICIENCIES (cprm/uCi/cc) GASEOUS WASTE/ Rx CONTAINMENT/ NUCLIDE AUXILIARY BUILDING VENT PROCESS VENT SLCRS VENT PRIMARY ALTERNATE PRIMARY ALTERNATE 2 PRIMARY ALTERNATE MONITOR(" MONITOR"' MONITOR"' MONITOR( 1 MONITOR") MONITOR(2) RM-VS-101B RM-VS-109 RM-GW-108B RM-GW-109 RM-VS-107B RM-VS-1 10 Channel 5 Channel 5 Channel 5 Kr-83m Kr-85m 9.80 E7 2.39 E7 9.00 E7 2.43 E7 5.16 E7 2.57 E7 Kr-85 3.88 E5 2.47 E7 3.56 E5 2.51 E7 5.04 E7 2.67 E7 Kr-87 7.38 E7 2.95 E7 6.78 E7 3.00 E7 9.60 E7 3.19 E7 Kr-88 1.14 E8 2.11 E7 1.05 E8 2.14 E7 5.16 E7 2.28 E7 Kr-89 1.39 E8 2.93 E7 1.28 E8 2.98 E7 9.59 E7 3.16 E7 Kr-90 1.34 E8 3.05 E7 1.23 E8 3. 10 E7 9.87 E7 3.29 E7 Xe-13 lm 2.25 E6 1.56 E7 2.07 E6 1.59 E7 2.94 E7 1.68 E7 Xe-133m 1.26 E7 1.94 E7 1.16 E7 1.97 E7 4.17 E7 2.09 E7 Xe-133 1.01 E7 1.24 E7 9.24 E6 1.26 E7 2.28 E7 1.33 E7 Xe-135m 7.15 E7 5.70 E6 6.58 E7 5.80 E6 1.51 E7 6.15 E6 Xe-135 1.12 E8 2.91 E7 1.03 E8 2.96 E7 6.42 E7 3.14 E7 Xe- 137 3.16 E7 2.96 E7 2.91 E7 3.01 E7 1.05 E8 3.19 E7 Xe-138 1.15 E8 2.66 E7 1.06 E8 2.70 E7 7.35 E7 2.87 E7 Ar-41 7.17 E7 3.00 E7 6.59 E7 3.05 E7 7.19 E7 3.23 E7 (1) The listed detector efficiencies for the respective primary monitors (Victoreen) are corrected for the reduced pressures observed and documented during operation. (2) The alternate monitors (Eberline SPING Channel 5) efficiencies are corrected for detector unique installation factors. (Pressure corrections are not required for the SPING Monitors.) See Calculation Package ERS-SFL-85-031 for additional information. (3.1.1.4)

(Page 73 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODCo2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 73 of 128 ATTACHMENT B Page 2 of 2 GASEOUS EFFLUENT MONITOR DETECTION EFFICIENCIES TABLE 2.1-2b BV-2 MONITOR DETECTOR EFFICIENCIES (cpmluCi/cc) SLCRS SLCRS WASTE GAS CONDENSATE UNFILTERED FILTERED STORAGE DECON POLISHING NUCLIDE(') PATHWAY PATHWAY VAULT VENT BUILDING VENT BUILDING VENT 2HVS-RQIOB 2HVS-RQ109B 2RMQ-RQ303B 2RMQ-RQ301B 2HVL-RQI 12B Kr-83m Kr-851n 3.20E7 5.83E7 3.20E7 3.20E7 3.20E7 Kr-85 3.60E7 7.19E7 3.60E7 3.60E7 3.60E7 Kr-87 3.73E7 8.85E7 3.73E7 3.73E7 3.73E7 Kr-88 3.05E7 6.80E7 3.05E7 3.05E7 3.05E7 Kr-89 1.72E7 8.73E7 3.72E7 3.72E7 3.72E7 Kr-90 3.86E7 8.80E7 3.86E7 3.86E7 3.86E7 Xe-131m 2.44E7 4.6 1E4 2.44E7 2.44E7 2.44E7 Xe-1331n 2.86E7 6.06E4 2.86E7 2.86E7 2.86E7 Xe-133 1.80E7 2.94E7 1.80E7 1.80E7 I.80E7 Xe-135m 7.22E6 1.55E4 7.22E6 7.22E6 7.22E6 Xe-135 3.86E7 7.48E7 3.86E7 3.86E7 3.86E7 Xe-137 3.78E7 9.07E7 3.78E7 3.78E7 3.78E7 Xe-138 3.52E7 7.74E7 3.52E7 3.52E7 3.52E7 Ar-41 3.79E7 7.90E7 3.79E7 3.79E7 3.79E7 (i) Efficiencies from Calculation Package ERS-SFL-86-026.( 3' 2 1)

(Page 74 of 128) Procedure Nunmber: Beaver _ _____Valley _ _____ _______Power ___ __ _ __ Station _ __ _ __ _ _ __ _ __ _ __1 ProceuDe-n.er/2 -O DC-2 . 02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 74,of 128 ATTACHMENT C Page 1 of 1 MODES OF GASEOUS RELEASE Table 2.2-1 MODES OF GASEOUS RELEASE FROM BEAVER VALLEY SITE VENTS FOR IIMPLEMENTATION OF 10 CFR 20 AND 10 CFR 50 RELEASE RELEASE RELEASE RELEASE RELEASE POINT MODE 1 MODE 2 MODE 3 MODE 4 RP 1; VV-1, Auxiliary Aux. Bldg. Containment Same As Mode 1 Same As Mode 1 Building Vent0') Ventilation Purge(3) RP 2; CV-1, Rx Leakage Collection Same As Mode 1 Same As Mode 1 Same As Mode l Containment/SLCRS Vent0') Exhaust and Containment Purge(3) RP 3; PV-1/2, Gaseous 2 Main Cond. Air Same As Mode I Same As Mode 1 Same As Mode 1 Waste/Process Vent( ) Ejector, Waste Gas, and Containment Containment Purge Vacuum RP 4; VV-2 SLCRS Contiguous Areas Containment Same As Mode 1 Same As Mode 1 Unfiltered Pathway(l) Purge(3) RP 5; CV-2, SLCRS Filtered Aux. Bldg. Same As Mode 1 Same As Mode 1 Same As Mode 1 Pathway Vent(l) Ventilation and Containment Purge(3) (4) (4) (4) (4) RP 6; CB-2, Condensate 1 Polishing Bldg VentO ) (4) (4) (4) (4) RP 7; WV-2, Waste Gas Storage Vault Vent(1) (4) (4) (4) (4) RP 8; DV-2, Decontamination Bldg 1 Vent( ) (4) (4) (4) (4) RP 9; TV-2. Turbine Bldg Vent(l) NOTE: For the purpose of implementing 10 CFR 50, batch discharges may use continuous meteorology since short term meteorology is used at the time of the annual report. ( Continuous ground level meteorology is applicable (2) Continuous elevated meteorology is applicable (3) Mode established by purge from one unit, all other release points remain same as Mode 1 (4) Not normally a radioactive release point

(Page 75 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Revision: Page Number: ODCM: GASEOUS EFFLUENTS 2 75 of 128 ATTACHMENT D Page 1 of 2 RADIONUCLIDE MIX TABLE 2.2-2a BV-1 RADIONUCLIDE MIX FOR GASEOUS EFFLUENTS (Ci/yr) RX CONTAINMENT/ AUXILIARY SLCRS VENT BUILDING VENT GASEOUS WASTE/PROCESS VENT Long Term, And AUXILIARY MAIN CONTAINMENT NUCLIDE12 CONTAINMENT BUILDING CONDENSER/ VACUUMM GASEOUS BUILDING(') VENTILATION AIR EJECTOR PUMPS(B) WASTE SYSTEM Short Term Long Term Long Term Long Term Short Term Kr-83m 2.2E-02 4.2E-0I 2.7E-01 5.2E-03 0.0 Kr-85m 1.5E-01 1.9E+00 1.2E+00 5.5E-02 1.2E-02 Kr-85 6.1E+01 2.5E+00 1.6E+00 1.OE+01 2.3E+02 Kr-87 5.4E-02 1.3E+00 8.2E-01 1.1E-02 0.0 Kr-88 2.4E-0 1 3.8E+00 2.4E+00 7.OE-02 0.0 Kr-89 4.7E-04 1.2E-01 7.7E-02 4.3E-05 0.0 Xe-131m 7.4E-01 1.3E-01 8.OE-02 1.8E-01 8.3E-01 Xe-133m 8.9E-01 8.9E-01 5.6E-01 3.1E-01 0.0 Xe-133 8.9E+01 3.6E+0 1 2.3E+01 2.7E+01 8.2E+00 Xe-135m 4.5E-03 3.2E-01 2.OE-01 6.2E-04 0.0 Xe-135 7.OE-01 4.5E+00 2.8E+00 2.7E-01 0.0 Xe-137 1.OE-03 2.1E-01 1.3E-01 8.8E-05 0.0 Xe-138 1.5E-02 1.1E+00 6.6E-01 1.7E-03 0.0 1-131 1.2E-03 4.6E-02 2.1E-02 6.6E-03 0.0 1-132 0.0 0.0 0.0 3.5E-05 0.0 1-133 2.OE-04 6.7E-02 3.OE-02 1.2E-03 0.0 1-134 0.0 0.0 0.0 6.6E-06 0.0 1-135 0.0 0.0 0.0 2.OE-04 0.0 Co-58 7.5E-04 6.OE-02 0.0 2.2E-04 0.0 Co-60 3.4E-04 2.7E-02 0.0 1.OE-04 0.0 Mn-54 2.2E-04 1.8E-02 0.0 6.9E-05 0.0 Fe-59 7.5E-05 6.0E-03 0.0 2.2E-05 0.0 Sr-89 1.7E-05 1.3E-03 0.0 5.2E-06 0.0 Sr-90 3.OE-06 2.0E-04 0.0 9.2E-07 0.0 Cs-134 2.2E-04 1.8E-02 0.0 6.9E-05 0.0 Cs-137 3.8E-04 3.OE-02 0.0 1.2E-04 0.0 C-14 1.OE+00 0.0 0.0 0.0 7.OE+00 Ar-41 2.5E+01 0.0 0.0 0.0 0.0 (1) Containment can be purged via VV-1 (Auxiliary Building Vent), CV-1 (Rx Containment/SLCRS Vent), or PV- 1/2 (Gaseous Waste/Process Vent) (2) Source Term from BVPS-2UFSAR Table 11.3-1(3.1.12) (3) See Note (3)from ATTACHMENT A Table 2.1-1a (3.1.1.5)(3.1.1.8)(3.1.3.10)

(Page 76 of 128) Beaver Valley Power StationProcedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 76 of 128 ATTACHMENT D Page 2 of 2 RADIONUCLTDE MIX TABLE 2.2-2b BV-2 RADIONUCLTDE MIX FOR GASEOUS EFFLUENTS (Ci/yr) SLCRS SLCRS UNFILTERED FILTERED TURBINE PATHWAY PATHWAY BUILDING VENT GASEOUS WASTE/PROCESS VENT Long Term, And AUXILIARY TURBINE MAIN CONTAINMENT GASEOUS NUCLIDE(2 CONTAINMENT BUILDING BUILDING CONDENSER/ VACUUM3 WASTE BUILDING(') ) VENTILATION VENTILATION AIR EJECTOR pUMPS( SYSTEM Short Term Long Term Long Term Long Term Long Term Short Term Kr-83m 4.OE-05 4.2E-0 1 3.9E-05 2.7E-0 1 3.7E-04 0.0 Kr-85m 1.4E-02 1.9E+00 1.7E-04 1.2E+00 3.9E-03 1.2E-02 Kr-85 6.1E+01 2.5E+00 2.3E-04 1.6E+00 7.2E-01 2.3E+02 Kr-87 5.3E-06 1.3E+00 1.E-04 8.2E-01 7.8E-04 0.0 Kr-88 4. 1E-03 3.8E+00 3.5E-04 2.4E+00 5.OE-03 0.0 Kr-89 0.0 1.2E-01 1.1E-05 7.7E-02 3. 1E-06 0.0 Xe-131m 7.2E-01 1.3E-01 1.2E-05 8.OE-02 1.3E-02 8.3E-01 Xe-133m 7.6E-01 8. 9E-0 1 8.1E-05 5.6E-01 2.2E-02 0.0 Xe-133 8.4E+01 3.6E+01 3.4E-03 2.3E+01 1.9E-00 8.2E+00 Xe-135m 0.0 3.2E-01 2.9E-05 2.OE-01 4.4E-05 0.0 Xe-135 2.4E-01 4.5E+00 4.2E-04 2.8E+00 1.9E-02 0.0 Xe-137 0.0 2. 1E-0 1 2. 1E-05 1.3E-01 6.3E-06 0.0 Xe-138 0.0 1.1E+00 9.7E-05 6.6E-01 1.2E-04 0.0 1-131 2.7E-05 4.6E-03 6.5E-04 2. 1E-02 4.7E-04 0.0 1-132 0.0 0.0 0.0 0.0 2.5E-06 0.0 1-133 2.6E-06 6.7E-03 8.7E-04 3.OE-02 8.4E-05 0.0 1-134 0.0 0.0 0.0 0.0 4.7E-07 0.0 1-135 0.0. 0.0 0.0 0.0 1.4E-05 0.0 Co-58 7.5E-02 6.OE-04 0.0 0.0 1.6E-05 0.0 Co-60 3.4E-02 2.7E-04 0.0 0.0 7.4E-06 0.0 Mn-54 2.2E-02 1.8E-04 0.0 0.0 4.9E-06 0.0 Fe-59 7.5E-03 6.0E-05 0.0 0.0 1.6E-06 0.0 Sr-89 1.7E-03 1.3E-05 0.0 0.0 3.7E-07 0.0 Sr-90 3.OE-04 2.OE-06 0.0 0.0 6.6E-08 0.0 Cs-134 2.2E-02 1.8E-04 0.0 0.0 4.9E-06 0.0 Cs-137 3.8E-02 3 .OE-04 0.0 0.0 8.4E-06 0.0 C-14 1.0E+00 0.0 0.0 0.0 0.0 7.OE+00 Ar-41 2.5E+01 0.0 0.0 0.0 0.0 0.0 (1) Containment can be purged via VV-2 (SLCRS Unfiltered Pathway), CV-2 (SLCRS Filtered Pathway), or PV-1/2 (Gaseous Waste/Process Vent) (2) Source Term from BVPS-2UFSAR Table 11.3-2(3.1.1.3) (3) See Section 8.1.1.1

TABLE 2.2-3 oi DISTANCES OF LIMITING MAXIMUM INDIVIDUAL RECEPTORS TO RELEASE POINTS FOR ANNUAL X/Q VALUES (meters) C.- VEGETABLE MILK COW MILK GOAT MEAT ANIMAL 0M Ct DOWNWIND SITE BOUNDARY* GARDEN RESIDENT W SECTOR /l .rn

                                ,    C C* , ,-      .   .   .

tJL\AUINJi rlED~ V n.1',JU1NIJ EL1EV GROUND ELEV GROUND ELEV GROUND ELEV GROUND ELEV Itr ITI (1) (2) 0 N 670 579 413 2,623 2,423 --- --- 4,651 4,418 4,152 3,919 2,527 2,295 NNE 535 792 632 2,740 2,461 --- --- 6,276 6,033 2,848 2,605 2,639 2,461 0 NE 490 442 327 724 901 7,741 7,526 20,760 20,545 7,741 7,526 708 790 ENE 490 448 394 1,674 1,658 --- --- 6,824 6,671 --- --- 708 1,562 E 545 546 551 1,979 1,922 7,065 6,998 4,265 4,200 4,265 4,200 756 1,922 ESE 575 607 672 1,577 1,619 --- --- 2,865 2,899 1,577 1,619 1,577 1,650 SE 575 701 815 1,835 1,961 5,729 5,848 5,729 5,848 3,299 3,420 1,835 1,961 SSE 655 762 912 1,738 1,933 5,053 5,244 9,977 10,166 1,770 1,964 1,432 1,628 0/ H . 0.< S 850 887 1,054 3,138 3,372 3,347 3,539 --- --- 2,253 2,487 2,189 2,423 C/ SSW 975 1,064 1,226 2,317 2,560 3,347 3,590 5,616 5,859 2,317 2,560 1,223 1,466 z SW 1,435 1,439 1,574 2,221 2,439 --- --- 2,993 3,210 2,414 2,632 2,221 2,439 WSW 595 561 660 2,301 2,463 5,182 5,341 --- --- 2,446 2,608 2,301 2,463 W 685 640 681 3,556 3,635 5,118 5,195 --- --- 4,088 4,166 3,556 3,635 0-t WNW NW 810 701 676 3,605 3,590 4,538 4,521 22,529 22,507 3,605 3,590 3,605 3,590 z1. . C-)O) 655 567 482 1,464 1,415 --- --- 10,944 10,832 4,570 4,461 1,432 1,383 NNW 645 558 420 1,464 1,285 --- --- 15,450 15,262 3,959 3,774 1,143 1,253

  • Distances for ground releases are measured from the center point between the BV-I and BV-2 Containment Buildings. Distances for elevated release are measured from the BV-1 Cooling Tower. Elevated release is applicable to PV-1/2. Ground release is applicable to all other release points. z
                                                                                                                                                     = C (1) TV-2 and CB-2                                                                                                                             -0.0    '0 (2) VV-i, CV-1, VV-2, CV-2, DV-2, WV-2 I-I-I-

TABLE 2.2-4 CV-1 AND CV-2 ANNUAL AVERAGE, GROUND LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E. TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS (1E-7 sec/m) INDIVIDUAL RECEPTORS DISTANCES TO THE CONTROL LOCATION, IN MILES tri DOWN- SITE VEGE-WIND BOUND TABLE MILK MILK MEAT SECTOR -ARY GARDEN COW GOAT ANIMAL DENCE RESI- 0-0.5 0.5-1.0 1.0-1.5 1.5-2.0 2.0-2.5 2.5-3.0 3.0-3.5 3.5-4.0 4.0-4.5 4.5-5.0 z7 N 125.0 12.80 -- 5.360 6.27 13.50 233.0 39.5 18.70 11.80 7.68 5.82 4.240 3.480 2.660 2.280 NNE 50.2 6.92 -- 2.040 6.42 7.16 148.0 26.8 10.80 6.62 4.60 3.44 2.690 2.190 1.830 1.560 NE 102.0 47.40 1.200 0.265 1.20 49.10 120.0 21.6 11.60 6.99 4.81 3.55 2.370 1.910 1.450 1.230 ENE 85.8 12.50 -- 0.124 -- 42.20 103.0 18.4 9.55 5.70 4.14 3.04 2,340 1.880 1.260 1.060 0 E 54.5 6.16 0.807 1.910 1.91 32.60 89.5 15.7 6.08 3.65 2.49 1.83 1.300 1.040 0,859 0.726 ESE 31.1 6.92 -- 3.010 6.92 6.92 59.1 10.5 5.16 3.10 1.95 1.43 1.020 0.815 0.612 0.517 SE 27.8 6.70 0.994 0.994 2,74 6.70 65.9 12.0 5.89 3.54 2.41 1.77 1.160 0.931 0.768 0.649 cnl SSE 24.1 6.68 1.030 0.372 6.50 9.01 67.2 -12.0 5.46 3.30 1.91 1.41 0.997 0.803 0.665 0.563 ~ci-JD 0 S 27.5 3.40 3.090 -- 5.57 5.81 99.9 17.5 6.77 4.11 2.84 2.10 1,490 1.200 0.999 0.848 SSW 23.8 6.31 3.700 1.740 6.31 19.30 110.0 19.9 7.83 4.80 3.33 2.48 1,940 1.580 1.190 1.020 SW 22.3 13.90 -- 9.050 12.30 13.90 160.0 29.2 16.10 9.94 5.85 4.37 3.430 2.790 2.110 1.800 WSW 163.0 19.30 5.720 -- 17.70 19.30 283.0 49.8 23.50 14.60 10.30 7.72 5.690 4.650 3.620 3.090 W 278.0 15.70 9.540 -- 13.00 15.70 615.0 103.0 49.00 31.00 15.40 11.70 9.320 7.660 6.460 5.550 WNW 487.0 40.70 30,100 1.810 40.70 40.70 1290.0 203.0 92.10 59.20 40.60 31.20 25.000 20.700 14.200 12.200 NW 924.0 194.00 -- 8.660 40.50 200.00 1710.0 262.0 123.00 79.80 55.00 42.30 34.000 28.200 19.400 16.700 Ca

                                                                                                                                        ,0n NNW     302.0    63.00   --      1.720  15.40   92.30    547.0   86.4   40.80 26.20   17.60 13.50 10.100 8.350 6.560 5.660

0 TABLE 2.2-5 VV-1 AND VV-2 ANNUAL AVERAGE, GROUND LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES C/i (IDENTIFIED IN ATTACHMENT E, TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS 3 (1E-7 sec/m ) INDIVIDUAL RECEPTORS DISTANCES TO THE CONTROL LOCATION, IN MILES 0 trj DOWN- SITE VEGE- C--i WIND BOUND TABLE MILK MILK MEAT RESI- 0- 0.5- 1.0- 1.5- 2.0- 2.5- 3.0- 3.5- 4.0- 4.5-SECTOR -ARY GARDEN COW GOAT ANIMAL DENCE 0.5 0 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 0 tz N 152.0 15.00 -- 5.980 7.06 15.90 276.0 49.9 22.70 13.70 8.75 6.52 4.69 3.810 2.900 2.470 NNE 62.3 7.66 -- 2.150 7.08 7.95 189.0 32.0 12.20 7.31 4.99 3.69 2.87 2.320 1.920 1.630 NE 132.0 57.90 1.240 0.269 1.24 60.20 156.0 24.8 12.70 7.51 5.09 3.73 2.47 1.980 1.500 1.270 ENE 110.0 13.60 -- 1.270 -- 50.40 135.0 20.6 10.20 6.01 4.31 3.14 2.41 1.930 1.290 1.080 CD E 67.8 6.66 0.828 1.990 1.99 38.80 116.0 17.7 6.57 3.86 2.61 1.90 1.34 1.070 0.883 0.774 ESE 38.0 7.64 -- 3.200 7.64 7.64 76.7 11.9 5.59 3.29 2.05 1.49 1.05 0.842 0.630 0.531 SE 33.3 7.27 1.030 1.030 2.88 7.27 86.2 13.5 6.37 3.75 2.53 1.84 1.20 0.960 0.790 0.666 SSE 29.1 7.41 1.080 0.382 7.19 10.10 87.0 13.7 5.98 3.53 2.02 1.48 1.04 0.833 0.688 0.531 S 32.8 .3.65 3.300 -- 6.10 6.38 127.0 20.3 7.56 4.48 3.04 2.23 1.57 1.260 1.050 0.885 SSW 28.7 7.08 4.040 1.850 7.08 22.90 140.0 23.6 8.87 5.28 3.60 2.66 2.07 1.670 1.260 1.070 SW 26.2 15.70 -- 9.980 13.80 15.70 204.0 34.8 18.40 11.40 6.38 4.71 3.66 2.960 2.230 1.900 WSW 201.0 22.40 6.230 -- 20.40 22.40 347.0 61.3 27.70 16.60 11.40 8.49 6.19 5.020 3.880 3.300 c/i 0 W 345.0 18.00 10.600 -- 14.70 18.00 715.0 132.0 60.30 NJ 36.50 17.70 13.20 10.40 8.440 7.060 6.040 WNW 598.0 48.60 35.000 1.920 48.60 48.60 1410.0 269.0 120.00 73.00 48.50 36.40 28.70 23.400 15.900 13.600 NJ NW 1030.0 262.00 --- 9.520 47.80 271.00 1820.0 350.0 164.00 100.00 66.60 50.10 39.50 32.300 21.900 18.800 NNW 345.0 83.40 -- 1.840 18.10 121.00 601.0 114.0 52.80 32.20 21.00 15.80 11.60 9.460 7.360 6.310 z

                                                                                                                                      '0 0

0 0 0

1 TABLE 2.2-6 PV-1/2 ANNUAL AVERAGE, ELEVATED LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES 0~

(IDENTIFIED IN ATTACHMENT E, TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS (1E-7 sec/m)3 0 INDIVIDUAL RECEPTORS DISTANCES TO THE CONTROL LOCATION, IN MILES TJ~ 0 DOWN- SITE VEGE- Cn tz WIND BOUND TABLE MILK MILK MEAT RESI- 0- 0.5- 1.0- 1.5- 2.0- 2.5- 3.0- 3.5- 4.0- 4.5-SECTOR -ARY GARDEN COW GOAT ANIMAL DENCE 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 N 0.0082 6.720 -- 1.910 2.27 6.790 0.0289 23.1000 8.2700 5.32 2.56 1.91 1.480 1.200 0.996 0.846 0 NNE 0.0280 6.690 -- 1.430 6.14 6.890 0.0175 14.5000 6.9800 5.47 3.27 2.69 1.770 1.430 1.290 1.100 NE 0.0110 .074 1.610 0.350 1.61 0.055 0.0069 0.1160 .2300 7.10 5.38 3.68 2.880 2.090 1.880 1.570 ENE 0.0110 9.090 -- 1.770 -- 0.525 0.0135 0.3310 7.2800 6.02 4.75 3.22 2.620 2.030 1.710 1.100 0'- CD' E 0.0360 8.300 1.240 2.870 2.87 8.300 0.0124 17.1000 7.8600 6.20 3.67 2.83 2.190 1.730 1.280 1.200 0,,, ESE 0.0420 11.600 -- 4.570 11.60 11.200 0.0208 12.7000 8.1400 4.78 3.00 2.20 1.360 1.160 0.830 0.737 ri-SE 0.0750 7.890 1.230 1.230 3.05 7.890 0.4770 7.4000 7.5700 4.45 2.79 2.05 1.460 1.180 0.811 0.686 SSE 0.2060 7.390 1.160 0.357 7.20 9.770 0.3030 9.4400 6.9300 4.06 2.58 1.89 1.170 0.937 0.646 0.546 S 5,740 3.760 3.490 -- 6.06 6.310 0.7960 8.5100 8.4900 4.98 3.37 2.47 1.380 1.110 0.774 0.655 SSW 7.640 3.610 2,140 0.872 3.61 5.820 26.1000 9.1000 4.0300 3.11 2.11 1.56 1.030 0.834 0.807 0.684 SW 6.500 3.900 -- 2.560 3.47 3.900 36.1000 15.9000 4.9300 3.12 1.77 1.57 1.201 1.060' 1.150 0.977 WSW 0.126 4.350 1.420 -- 3.98 4.350 0.3870 17.8000 4.9000 3.53 2.36 1.64 1.460 1.210 0.920 0.781 C" W 0.029 2.490 0.764 -- 2.02 2.490 0.0147 8.7200 6.2300 3.68 2.50 1.84 0.741 1.120 0.851 0.795 WNW 0.033 2.530 1.780 0.163 2.53 2.530 0.0202 0.0549 0.0809 3.07 2.50 1.84 1.110 0.686 0.791 0.731 z NW 0.007 0.074 -- 0.305 1.67 0.073 0.0084 0.0650 0.1170 3.66 2.30 1.69 1.210 0.903 0.804 0.683 NNW 0.008 6.460 -- 0.224 1.81 6.590 0.0135 6.7800 5.0200 2.96 1.93 1.49 1.050 0.849 0.705 0.599 00 0z

  • Elevated release XIQ value at site boundary location where ground level release X/Qs mnaximuize.

Ct 00o :t' C.)n CD

                                                                                                                                           .5-~       -

TABLE 2.2-7 0 TV-2 ANNUAL AVERAGE, GROUND LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E, TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS (1E-7 sec/m)3 INDIVIDUAL RECEPTORS DISTANCES TO THE CONTROL LOCATION, IN MILES c/) DOWN-, SITE VEGE-WIND BOUND TABLE MILK MILK MEAT RESI- 0- 0.5- 1.0- 1.5- 2.0- 2.5- 3.0- 3.5- 4.0- 4.5-SECTOR -ARY GARDEN COW GOAT ANIMAL DENCE 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5,0 N 105.0 14.00 -- 5.740 6.74 14.80 244.0 42.6 20.50 12.70 8.18 6.15 4.45 3.640 2.770 2.380 NNE 102.0 7.37 -- 2.130 6.83 7.64 161.0 28.8 11.40 6.94 4.79 3.56 2.78 2.250 1,870 1.590 NE ENE 96.6 84.1 51.90 13.20 -- 1.230 0.268 1.280 1.23 53.80 46.30 132.0 115.0 23.0 19.4 12.10 9.89 7.24 5.85 4.95 4.23 3.64 3.09 2.42 2.38 1.950 1.900 1.480 1.270 1.250 1.070 I' E 60.7 6.49 .829 1.980 1.98 35.70 99.2 16.6 6.32 3.75 2.55 1.87 1.32 1.060 0.871 0.735 ESE 37.1 7.25 -- 3.100 7.25 7.25 65.8 11 1 5.36 3.19 2.00 1.46 1.03 0.829 0.621 0.524 SE 41.8 7.06 1.020 1.020 2.85 7.06 73.5 12.6 6.12 3.64 2.47 1.81 1.18 0.945 0.779 0.658 CI) SSE 34.0 7.16 1.070 0.384 6.96 9.69 74.2 12.7 5.71 3.41 1.97 1.45 1.02 0.818 0.676 0.572 t0 S 32.7 3.64 3.310 -- 6.00 6.27 109.0 18.6 7.13 4.29 2.94 2.17 1.53 1.230 1.020 0.866 SSW 29.7 6.73 3.890 1.800 6.73 20.90 120.0 21.3 8.31 5.03 3.46 2.57 2.00 1.620 1.230 1.040 SW 24.1 14.80 -- 9.550 13.10 14.80 174.0. 31.2 17.20 10.40 6.10 4.54 3.54 2.870 2.170 1.850 WSW 159.0 20.80 6.010 -- 19.10 20.80 301.0 53.6 25.30 15.60 10.80 8.09 5.93 4.830 3.750 3.200 W 264.0 16.90 10.100 -- 13.90 16.90 636.0 111.0 53.90 33.50 16.50 12.40 9.82 8.040 6.760 5.790 WNW 404.0 44.50 32.5(1(0 1.870 44.50 44.50 1310.0 218.0 104.00 65.40 44.20 33.60 26.70 22.000 15.000 12.900 NW 735.0 216.00 -- 9.100 43.90 222.00 1720.0 279.0 140.00 88.80 60.30 45,90 36.60 30.100 20.600 17.700 z NNW 247.0 71.00 -- 1.820 17.00 99.40 557.0 924.0 45.90 28.90 19.20 14.60 10.80 8.880 6.950 5.980

(Page 82 of 128) Beaver Valley PowerStation Procedure Number: Beaver__ ValleyPowerStation_1/2-ODC-2.02 Title Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 82 of 128 ATTACHMENT F Page 5 of 7 0-5 MILE DISPERSION PARAMETERS TABLE 2.2-8 DV-2 ANNUAL AVERAGE, GROUND LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E, TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS (1E-7 sec/m 3) Same as Table 2.2-4

(Page 83 of. 128) Procedure Number: Beaver Valley Power Station 1/2o0DCe2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS Revision: 2 go'3 of 128 ATTACHMENT F Page 6 of 7 0-5 MILE DISPERSION PARAMETERS TABLE 2.2-9 WV-2 ANNUAL AVERAGE, GROUND LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E, TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS (1E-7 sec/m 3)

                                               . Same as Table 2.2-4

(Page 84 of 128) Procedure Number: yPower Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 84 of 128 ATTACHMENT F Page 7 of 7 0-5 MILE DISPERSION PARAMETERS TABLE 2.2-10 CB-2 ANNUAL AVERAGE, GROUND LEVEL, X/Q VALUES FOR CONTINUOUS RELEASES, SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E, TABLE 2.2-3), AND SELECTED CONTROL LOCATIONS Same as Table 2.2-7

(Pagg 85 of, 128) Beaver Valley Power Station Procedure2u

Title:

Unit: Level O fUse: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 85 of 128 ATTACHMENT G Page 1 of 2 NOBLE GAS DOSE FACTORS AND DOSE PARAMETERS TABLE 2:2-11 DOSE FACTORS FOR NOBLE GASES AND DAUGHTERS Ki Li Mi TOTAL BODY SKIN DOSE GAMMA AIR BETA AIR DOSE NUCLIDE~1 ' DOSE FACTOR FACTOR DOSE FACTOR FACTOR mrem/yr mrem/yr mrad/yr mrad/yr Per 3 Per 3 Per 3 Per 3 uCi/m uCi/m uCi/m uCi/m Kr-83m 7.56E-02 1.93E+0I 2.88E+02 Kr-85m 1.17E+03 1.46E+03 1.23E+03 1.97E+03 Kr-85 1.61E+01 1.34E+03 1.72E+01 1.95E+03 Kr-87 5.92E+03 9.73E+03 6.17E+03 1.03E+04 Kr-88 1.47E+04 2.37E+03 1.52E+04 2.93E+03 Kr-89 1.66E+04 1.0 1E+04 1.73E+04 1.06E+04 Kr-90 1.56E+04 7.29E+03 1.63E+04 7.83E+03 Xe-13 1m 9.15E+01 4.76E+02 1.56E+02 1.11E+03 Xe-133m 2.5 1E+02 9.94E+02 3.27E+02 1.48E+03 Xe-133 2.94E+02 3.06E+02 3.53E+02 1.05E+03 Xe-135m 3.12E+03 7.11E+02 3.36E+03 7.39E+02 Xe-135 1.81E+03 1.86E+03 1.92E+03 2.46E+03 Xe- 137 1.42E+03 1.22E+04 1.5 1E+03 1.27E+04 Xe-138 8.83E+03 4.13E+03 9.2 1E+03 4.75E+03 Ar-41 8.84E+03 2.69E+03 9.30E+03 3..28E+/-03 (1) The listed dose factors are for radionuclides that may be detected in gaseous effluents.

(Page 86 of 128) Procedure Nuhiber: Beaver Valley Power Station 1/2-ODC-2.02 i

Title:

Un t Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 86 of 128 ATTACHMENT G Page 2 of 2 NOBLE GAS DOSE FACTORS AND DOSE PARAMETERS TABLE 2.2-12 DOSE PARAMETERS FOR FINITE ELEVATED PLUMES Bi(1), (2) Mi(3) Bi(3) Vi(1) TOTAL BODY GAMMA AIR TOTAL BODY GAMMA AIR NUCLIDE(4) DOSE FACTOR DOSE FACTOR DOSE FACTOR DOSE FACTOR mremryr mrad/yr mrem/yr mrad/yr Per Per Per Per uCi/sec uCi/sec uCi/sec uCi/sec Kr-83m 3.19E- 10 1.75E-8 4.58E-8 3.96E-5 Kr-85m 7.81E-5 1.16E-4 4.70E-4 7.06E-4 Kr-85 1.55E-6 2.35E-6 5.54E-6 8.40E-6 Kr-87 5.13E-4 7.74E-4 1.45E-3 2.19E-3 Kr-88 1.39E-3 2.09E-3 4.09E-3 6.16E-3 Kr-89 7.99E-4 1.20E-3 1.25E-3 1.88E-3 Xe-131 m 1.64E-5 2.47E-5 1.67E-4 3.09E-4 Xe-133m 1.38E-5 2.11E-5 1.32E-4 2.61E-4 Xe-133 1.05E-5 1.56E-4 1.54E-4 2.76E-4 Xe-135m 2.41 E-4 3.66E-4 6.21E-4 9.50E-4 Xe-135 1.41E-4 2.12E-4 6.96E-4 1.05E-3 Xe-137 6.OOE-5 9.05E-5 9.66E-5 1.46E-4 Xe-138 8.11 E-4 1.22E-3 2.22E-3 3.34E-3 Ar-41 1.02E-3 1.53E-3 2.68E-3 4.02E-3 (1) Vi and Bi values used to implement Modes 1, 2, and 3 of Section 2.2.1 (10CFR20) (2) Bi values used to implement Modes 1, 2, 3, and 4 of Section 2.3.1 (10CFR50) (3) Vi and Bi values to implement Mode 4 of Section 2.2.1 (10CFR20) and to implement monitor setpoint determinations of Section 2.1.2 and 2.1.4 (4) The listed dose parameters are for radionuclides that may be detected in gaseous effluents.

(Page 87 of. 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 87 of 128 ATTACHMENT H Page 1 of 1 ORGAN DOSE PARAMETERS Table 2.2-13 P VALUIS FOR A CHILD FOR71 HUMViLLK, SITI

                                                             "(,*e/fyr per uCi/cu meter)

Ruclide Bone Liver T. Body Thyroid Kidney Lug GI-LLI I H-3 O.O01+O01.121*03 1.12103 1.12!+03 1.121+03 1.12.I03 1.121+03 2 P-32 2.601+08 1.141+05 9.881+04 0.001+00 0.001+00 0.009+00 4.221+04 3 Cr-4! 0.O+008 + 010÷00 1.541E02 8.551+01 2.431+01 1.701+04 1.081+03 4 on-54 0.00140 4.291+04 9.511+03 O.O+00 1.001-04 1.581+06 2.291+04 5 !e-59 2.071+04 3.341+04 1.671+04 0.009+00 0.001*00 1.271+06 7.071+04 6 Co-57 0.00+O 9.039+02 1.071+03 0.001+00 O.0OOi 5.078405 1.321+04 7 Co-58 O.O9140 1.779+03 3.161403 0.001+00 0.00[+00 1.113+06 3.441+0t 8 Co-60 0.001+00 1.311,04 2.261+04 0.001+000.001+00 7.071+06 9.621+04 9 Zn-65 4.251+04 1.131[05 7.031*04 0.001+00 7.141+04 9.951+05 1.631404 10 Rb-86 0.001+00 1.98105 1.141t05 O.OOX+0O0.001+00 0.001+00 7.991+03 11 Sr-89 5.991+05 M.0U1M00 1.721+04 0,00*040 0.001+00 2.161+06 1.671+05 12 Sr-90 1.011408 0.00940 6.014+06 0.001+00 0.001+00 1.488+07 3.431405 13 Y-91 9.1411+05 O.OOg+OM 2.44X+04 0.001+00 0.001+002.631+06 1.8d+05 14 Zr-95 1.909,05 4.18[+04 3.701+04 0.001+00 5.961+04 2.239+06 6.111+04 15 lb-95 2.359+04 9.1M1U03 6.553+03 0.00+00 8.621+03 6.149+05 3.701+04 16 Xb-97 4.291-01 7.701-02 3.601-02 0.001+00 8.155-02 3.421+03 2.713+04 17 No-99 0.00t+00 1.721+02 4.261t01 0.001+00 3.921+02 1.351+05 1.271+05 18 Tc-99m 1.781-03 3.481-03 5.177-02 0.001+00 5.071-02 9.511+02 4.811+03 19 Ru-103 2.791403 0.001400 1.071+03 0.001+00 7.031+03 6.621+05 4.481+04 20 OR-I00 1.363+05 0.OO00O91.6914040.001+00 1.841405 1.431+07 4.291+05 21 Ag-liOn 1.691+04 1.149404 9.14X+03 0.001+00 2.121W04 5.481+06 1.001+05 22 Sb-124 5.741904 7.401402 2.001+04 1.260+02 0.00+00 3.241+06 1.654+05 23 Sb-125 9.641+04 7.59!i02 2.071+04 9.1AMM0 O.OO01iO2.321+06 4.031+04 24 Te-127, 2.491+04 8.551+03 3.029+03 6.071+03 6.391+04 1.481+08 7.14!t4 25 Te-129z 1.929404 6.851+03 3.041+03 6.331+03 5.031404 1.761+06 1.8219+05 26 1-131 4.811+04 4.619+04 2.739Kt04 1.629410 7.881+04 O.OOM+GM 2.841+03 27 1-133 1.861+04 2.031+04 17.01+03 3.859+06 3.381+04 0.001+00 5.481+03 28 Cs-134 6.511+05 1.011+06 2.259+05 0.001+00 3.301+05 1.211+05 3.851+03 29 Ce-136 6.51W+O4 1.711+05 1.16$+05 0.001+00 9.551+04 1.459+04 4.181+03 30 Cs-137 9.079+05 8.259+05 1.28+05 0.00140 2.821+05 1.041+05 3.821+03 31 Ba-140 7.401+04 6.48101 4.331403 0.001+00 2.111+01 1.7414+8 1.021+05 32 la-140 6.441tO2 2.251+02 7.551+01 D.AMNtOO0.001+00 1.8314+5 2.261405 33 Ce-141 3.92K+04 1.951+04 2.901+03 M.00UMO0 8.551W03 5.441EM5 5.651+04 34 Ce-I(4 6.771+06 2.121+06 3.11+05 O.O0+00 1.171+06 1.201+07 3.091+05 Ca*culated per ODCHI equation 22-13

(Page 88 of 128) Beaver Valley Power Station Beaver__ ValleyPowerStation_1/2-ODC-2.02 Procedure Number:

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 88 of 128 ATTACHMENT I Page 1 of 1 MODES, OF GASEOUS RELEASE TABLE 2.3-1 MODES OF GASEOUS RELEASE FROM BEAVER VALLEY SITE VENTS FOR IMPLEMENTATION OF 10 CFR 20 AND 10 CFR 50 RELEASE RELEASE RELEASE RELEASE RELEASE POINT MODE 1 MODE 2 MODE 3 MODE 4 RP 1; VV-1, Auxiliary Aux. Bldg. Containment Same As Mode 1 Same As Mode I 1 Building Vent( ) Ventilation Purge(3 ) RP 2; CV-1, Rx Leakage Collection Same As Mode 1 Same As Mode 1 Same As Mode I 1 Containment/SLCRS Vent( ) .Exhaust and Containment Purge(3) RP 3;- PV-1/2, Gaseous Main Cond. Air Same As Mode 1 Same As Mode 1 Same As Mode 1 Waste/Process Vent(2) Ejector, Waste Gas, and Containment Containment Purge Vacuum RP 4; VV-2 SLCRS Contiguous Areas Containment Same As Mode 1 Same As Mode 1 Unfiltered PathwayOl) Purge(3) RP 5; CV-2, SLCRS Filtered Aux. Bldg. Same As Mode 1 Same As Mode 1 Same As Mode 1 PathwayOl) Ventilation and Containment Purge(3) (4) (4) (4) (4) RP 6; CB-2, Condensate Polishing Bldg Vent(') (4) (4) (4) (4) RP 7; WV-2, Waste Gas Storage Vault Vent(') (4) (4) (4) (4) RP 8; DV-2, Decontamination Bldg 1 Vent( ) (4) (4) (4) (4) RP 9; TV-2, Turbine Bldg Vent( 1) NOTE: For the purpose of implementing 10 CFR 50, batch discharges may use continuous meteorology since short term meteorology is used at the time of the annual report. (1) Continuous ground level meteorology is applicable (2) Continuous elevated meteorology is applicable (3) Mode established by purge from one unit, all other release points remain same as Mode 1 (4) Not normally a radioactive release point

(Page.89 of 128) Procedure Number: Beaver Valley Power Station 1/2rODC-2.m2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 89 of 128 ATTACHMENTJ Page 1 of 19 P&I ORGAN DOSE FACTORS Table 2.3-2 SVALUES FORBRAVER VALLEY SITE (area/yr per uCI/cu eater) Pathway Inhalation Age Group z Adult Nuclide Bone Liver T. Body Thyroid lidney Lug GI-lLI 16-3 0.001O0 1.261+03 1.261*03 1.269*03 1.20HI03 1.268+03 1.261+03 2 P-32 1.326+08 7.711404 5.011+04 0.O09o000.OO010 0.001*008. 46+04 3 Cr-51 0.001+000.0010+01.001+025.951+01 2.281+01 1.441#04 3.321+03 4 Ho-54 0.001+00 3.981+04 6.301+03 0.0014009.841+03 1.401#00 7.741+04 5 Pa-59 1.181+04 2.7BI+04 1.061+04 0.00+00 0.0010*01.021+06 1.881+05 6 Co-57 0.OO01406.921*02 6.711+02 0.00OO000.0OO1+03.701+05 3.141+04 7 Co-58 0.006+00 1.581+03 2.071603 0.006+00 0.0010*0 9.281+05 1.061+05 0 Co-60 0.006+00 1.151+04 1.480104 0.001+000.0011005.911+06 2.851+05 9 2n-65 3.241+4 1.031+05 4.689*04 0.001+006.901+04 6.641405 5.346+04 10Rb-86 O.OO1+001.351+05 5.901+04 0.001+000.001+000.0000 1.061+04 11 Sr-89 3.046+05 0.001+00 8.726+03 0.001+00 0.001+00 1.401+06 3.501405 12 Sr-90 9.921+07 0.001+00 6.10R+06 0.001+00 0.001+00 9.601+06 7.221+05 13 Y-91 4.621+05 0.001+00 1.246104 0.001+00 0.001+00 1.706+06 3.856+05 14 Zr-95 1.076+05 3.441+04 2.331+04 0.001+00 5.421+04 1.771+08 1.506+05 15 Khb-95 1.411+04 7.821*03 4.21103 0.001*00 7.741.03 5.056+05 1.041+05 16 Hb-97 2.221-01 5.621-02 2.051-02 0.001+00 6.541-02 2.406+03 2.421+02 17No-99 0.006*001.211+02 2.301*010.006+002.911+02 9.126+04 2.481+05 18 TC-99S 1.036-03 2.911-03 3.706-02 0.001+00 4.421-02 7.641*02 4.169+03 19 hu-103 1.53E603 0.001+006.586+02 0.001*00 5.831*03 5.056+05 1.101+05 20 hu-108 6.916+04 0.001+008.721+03 0.001+00 1.341+05 9.3601069.121+05 21 Ag-lI0a 1.086+04 1.001+04 5.941*03 0.001*00 1.971+04 4.631408 3.021+05 22 Sb-124 3.121+04 5.890+02 1.246+04 7.551*01 0.001+002.481406 4.06X+05 23 Sb-125 5.341+04 5.951+02 1.281+04 5.401+01 0.001+00 1.741+08 1.011+05 24 Te-127u 1.266+04 5.771+03 1.571+03 3.299103 4.501+04 9.001+05 1.501+05 25 Te-129u 9.769+03 4.671+03 1.581+03 3.446*03 3.661*04 1.166408 3.831+05 26 1-131 2.521+04 3.581+04 2.051+04 1.199+07 0.133+04 O.0400 8.208+03 27 1-133 8.641+03 1.4B8+04 4.526*03 2.151*00 2.586104 O.OO400 0 8.881+03 28 Cn-134 3.731+05 8.481+05 7.281+05 0.001+00 2.876+05 9.761+04 1.041+04 29 Ca-136 3.901+04 1.483+051.103+05 0.001*00 8.536104 1.20M+04 1.179+04 30 Ca-137 4.78R+05 6.211+05 4.281+05 O.O+00 2.22105 7.521+04 8.401+03 31 Ba-140 3.90R+04 4.901+01 2.571403 0.006+00 1.071+01 1.271+08 2.161+05 32 La-140 3.446+02 1.746*02 4.580+010.006+00 0.001+001.361+05 4.580105 33 Ce-141 1.999+04 1.351+04 1.531+03 0.001*00 6.261+03 3.621+05 1.209+05 34 Ce-144 3.431+06 1.431*06 1.841+05 0.001*00 8.481+05 7.781+06 8.160105 Calculated per ODCH equation 2.3-22

(Page 90 of 128) Beaver Valley Power Station ProcedureNumber: 1/2-ODC-2.02

Title:

Unit: evel of use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number:

                                                                                                                *2          J12890 of ATTACHMENT J Page 2 of 19 P&I ORGAN DOSE FACTORS Table 2.3-3 R VALU*ISFORBUM11VALLEY     SITE (Wrem/yr per uCi/cu jetar)

Patbvay : Inhalation AgeGroup = Teen Ruclide Bone Liver T. Body thyroid fidney Lung G1-GLI I H-3 0.001+001.271+03 1.271003 1.271+03 1.271+03 1.278+03 1.271+03 2 P-32 1.690*06 1.101+05 7.161044 0M000+00 0.000+00 0.00400 9.201+04 3 Cr-5l 0.0000 0.0010+01.350÷02 7.501+01 3.070+01 2.10K404 3.001+03 4 Xn-54 0.000+005.111+04 8.401+03 0.001+00 1.270+04 1.980+06 6.680+04 5 Fe-59 1.590*04 3.7014041.431*04 0,001+00 0.001+001.538046 1.781+05 8 Co-57 0.001+00 9.441+02 9.200102 0,001+000.001+005.866+05 3.141+04 7 Co-58 0.000*002.071P03 2.700+03 0.001OO 0.00+00 1.349+06 9.521+04 8 Co-60 0.000+00 1.511M04 1.980*04 0.001+00 0.000+00 8.720+06 2.591+05 9 Zu-85 3.B81+04 1.341W05 6.201+04 0.001+00 8.641+04 1.24M0U0 4.661+04 10 lb-6S 0.0014001.901405 8.400.04 0.001400 0.001+00 0.009+00 1.770+04 11Sr-89 4.341+05 0.00140 1.251044 0.00+00 0.000+00 2.420+06 3.711+05 12Sr-90 1.081+08 0.001+00 6.680*06 0.001+00 0.000+00 1.650+07 7.605+05 13 T-91 6.611+05 0.001+00 1.779104 0.001+00 0.000+00 2.941+06 4.090*05 14 Zr-95 1.480005 4.580404 3.151*04 0.0014006.740+04 2.69R+06 1.490+05 15 Nb-95 1.861+04 1.030+04 5.661*03 0.001+001.000+04 7.511*05 9.681+04 16Nb-97 3.140-01 7.760-02 2.841-02 0.000100 9.121-02 3.930+03 2.170+03 17No-99 0.000+001.690+02 3.221+01 0.00M+00 4.110+02 1.541+05 2.691+05 18 TC-993 1.309-03 3.861-03 4.990-02 0.000+00 5.761-02 1.151+03 6.131+03 19 Ou-103 2.100+030.001*00 8.99R*02 0.009+00 7.430*037.830+05 1.090+05 20 Ru-106 9.840+04 0.001+001.241+04 0.00R+001.900+05 1.611+07 9.600+05 21Ag-liOn 1.384+04 1.311*04 7.991*03 0.001+00 2.509+04 6.751+00 2.731+05 22 Sb-124 4.300+04 7.941+02 1.950104 9.761+01 0.00+00 3.340+06 3.981+05 23 Sb-125 7.380+04 8.081+02 1.721+04 7.040+01 0.000+00 2.749006 9.921+04 24 Te-127m 1.M00004 0.160+03 2.100+034.380003 6.549+04 1.660+06 1.590+05 25 Te-129a 1.391+04 5.581+03 2.250*03 4.580+03 5.191*04 1.900+06 4.051+05 26 1-131 3.540+04 4.911+04 2.640*04 1.460+07 8.400*04 0.000+00 6.490+03 27 1-133 1.220+04 2.051+04 6.221+03 2.920+06 3.599+04 0.001+00 1.031+04 28 Ca-134 5.029+05 1.139+06 5.401905 0.000+003.751+05 1.461+05 9.761+03 29 Ca-136 5.150*04 1.941+05 1.371*05 0.009+00 1.101+05 1.780104 1.091+04 30 Cs-137 6.700+05 8.401+05 3.111*05 0.000+003.041*05 1.211+05 8.46R+03 31 la-140 5.4790+4 6.701001 3.521*03 0.0010*0 2.280101 2.030+06 2.290+05 32 La-140 4.790+02 2.361+02 6.281+01 0.001+00 0.009+00 2.141+05 4.0711+05 33 Ce-141 2.84R+04 1.901*04 2.171*03 0.000+00 8.081+03 6.140+05 1.260+05 34 Ce-144 4.891+06 2.020+06 2.6210*5 0.000+00 1.210+06 1.340+07 8.640+05 Calculated per ODCO equation 2.3-22

(Pag- -91 of . 128) r Be e VProcedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 91 of 128 ATTACHMENT J Page 3 of 19 P&I ORGAN DOSE FACTORS Table 2.3-4 R VALUJS F0RHVIR VALLESIT] (mrea/yr per uCi/cu meter) Pathway = Inhalation AgeGroup Child Nuclide Bone Liver T. Body Thyroid lidney Lung G[-LI I R-3 0.00MU00 1.12W+03 1.121+03 1.121+03 1.121+03 1.121+03 1.129+03 2 P-32 2.601106 1.141+05 9.080+04 0.001+00 0.001+00 0.001+00 4.221+04 3 Cr-51 0.001+00 0.00+00 1.54R+02 8.559+01 2.431+01 1.701+04 1.081+03 4 Ka-54 0.001+00 4.291+04 9.510+03 0.001400 1.001+04 1.581106 2.291+04 5 re-59 2.071÷04 3.340+04 1.679+04 0.00140 0.001400 1.27R+06 7.071+04 6 Co-57 0.001+00 9.030+02 1.071+03 0.001+00 0.00M+00 5.071+05 1.321+04 7 Co-S5 0.001+00 1.771+03 3.161+03 0.001+00 0.001+00 1.111+06 3.441+4 8 Co-60 0.001+00 1.311+04 2.261+04 0.001+00 0.001+00 7.071+06 9.621+04 9 ZZ-85 4.251044 1.131+05 7.031+04 0.001+00 7.141+04 9.951+05 1.631+04 10 Rb-O6 0.001+00 1.961+05 1.141+05 0.001+00 0.001+00 0.001+00 7.991+03 11 Sr-89 5.991+05 0.001+00 1.72R+04 0.001+00 0.001+00 2.161+06 1.671+05 12 Sr-90 1.011+08 0.000+00 6.441+06 0.001+00 0.001+00 1.481W07 3.431+05 13 0-91 9.141+05 0.001+00 2.441+04 0.001+00 0.001+00 2.831+06 1.841+05 14 Zr-95 1.901+05 4.181+04 3.701+04 0.003+00 5.961304 2.231406 6.111+04 15 Ah-95 2.351+04 9.180+03 6.551÷03 0.001+00 8.621+03 6.141+05 3.701+04 16 05-97 4.291-01 7.701-02 3.601-02 0.001+00 8.550-02 3.421+03 2.781+04 17 8o-99 0.001+00 1.721+02 4.261+01 0.00g+00 3.921+02 1.351405 1.271+05 18 Te-99Sm 1.700-03 3.481-03 5.771-02 0.001+00 5.071-02 9.511+02 4.811+03 19 Ru-I03 2.791+03 0,000+00 1.071+03 0.001+00 7.031+03 0.321+06 4.481+04 20 Ru-O06 1.361+05 0.001+00 1.691+04 0.001+00 1.841+05 1.431+07 4.291+05 21 Ag-liOn 1.691+04 1.141+04 9.143+03 0.001+00 2.120+04 5.480+06 1.001+05 22 Sb-124 5.741004 7.401+02 2.001+04 1.260+02 0.001+00 3.24+06 1.641+05 23 5-125 9.841+04 7.590+02 2.071+04 9.101+01 0.000+00 2.321+06 4.031+004 24 Te-127? 2.491+04 8.551+03 3.028+03 6.070+03 6.360+04 1.481+06 7.141+04 25 te-129a 1.921+04 8.851+03 3.041+03 6.331+03 5.031+04 1.761+06 1.821+05 26 1-131 4.819+04 4.311+04 2.731+04 1.821+07 7.881+04 0.009+00 2.843+03 27 1-133 1.661÷04 2.031+04 7.701+03 3.851+06 3.381+04 0.001+00 5.480+03 28 C6-134 6.511÷05 1.011+06 2.25K+05 0.000+00 3.301+05 1.211+05 3.851+03 29 Cs-13 6.51M+04 1.711+05 1.161+05 0.001+00 9.551+04 1.45P+04 4.181+03 30 CB-137 9.071+05 8.256+05 1.280÷05 0.001+00 2.821+05 1.041+05 3.621+03 31 I+-140 7.401+04 6.481+01 4.331+03 0.009+00 2.111+01 1.740+06 1.021+05 32 La-140 6.441+02 2.250+02 7.551+01 0.000+00 0.000+00 1.831+05 2.261+05 33 Ct-141 3.921+04 1.951+04 2.901+03 0.001+00 8.551+03 5.441+05 5.660+04 34 Ce-144 6.771÷06 2.121+06 3.619+05 0.000+00 1.170+06 1.200+07 3.891+05 Calculated per 01)8 eguntion 2.3-22

(Page 92 of 128) Beaver Valley Power Station ProcedreNumer: 1/2-ODC-2.02

Title:

Unit: vel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 Q? of 128 ATTACHMENT J Page 4 of 19 P&I ORGAN DOSE FACTORS Table 2.3-5 R VALUES FOR8BAVER VALLEY SITE (nrem/yr per uCt/cu seter) Pathway Inhalation AgoGroupInfant Nuclide Bone Liver T. Body Thyroid lidney Lung GI-LLI I H-3 0.001O+0 6.471402 6.471*02 6.471*02 6.47E+02 6.471*02 6.47E+02 2 P-32 2.038+08 1.121+05 7.741*04 0.00100 0.001OO0 0.001+00 1.611+04 3 Cr-51 0.001+00 0.001+00 8.951+01 5.751*01 1.32E+01 1.281+04 3.578402 4 Hn-54 0.00+00 2.539+04 4.981+03 M.00M*04.981÷03 1.001+06 7.061+03 5 fe-59 1.361404 2.351+04 9.481+03 0.00+00 O.0O0800 1.011+06 2.482+04 6 Co-57 0.008+W0 6.518+02 8.418+02 0.00O0 0.001+06 3.791005 4.861+03 7 Co-58 0.000+00 1.221403 1.821+03 0.001+00 0.000+00 7.771+05 1.011+04 8 Co-60 0.000+00 8.02E+03 1,18NE04 0.008*0 0.001+00 4.518+06 3.199044 9 Zn-65 1.931+04 6.260+04 3.111+04 0.000+00 3.251+04 6.471+05 5.14E+04 10lb-86 0.001+00 1.901*05 8.828104 M.UM8tO0.00+00 0.001+00 3.040+03 11Sr-89 3.989+05 0.001+00 1.141+04 0.010*00 0.0010+0 2.038+06 6.401+04 12 Sr-90 4.090+07 0.000+00 2,591+08 0.008+00 0,001M00 1.121+07 1.311+05 13 T-91 5.881+05 0.0040+0 1,570404 0.001*00 0.001+00 2.458+06 7.031+04 14Zr-95 1.151+05 2.790404 2,030*04 0.008*00 3.111*04 1.751+06 2.171+04 15 Rb-95 1.578+04 6.438003 33789403 0.008+00 4.721+03 4.791*05 1.271+04 16Nb-97 3.428-01 7.299-02 2.830-02 0.001+00 5.701-02 3.321+03 2.691+04 17 No-99 0.008+00 1.650+02 3.230+01 0.001+00 2.651+02 1.351+05 4.870+04 18 Tc-992 1.401-03 2.881-03 3.723-02 M.0ONO0 3.111-02 8 111+022.031+03 19 ho-103 2.020+03 0.008+00 6.790+02 0.008*00 4.241*03 5.521+05 1.611+04 20 lu-109 8.68R004 0.001+0 1.090+04 0.008*00 1.078*05 1.161+07 1.641+05 21 A0-11OR9.901+03 7.220+03 5.001+03 0.001+00 1.091+04 3.678*06 3.301+04 22 lb-124 3.791+04 5.560+02 1.201+04 1.010+02 0.01OO10 2.651+06 5.911+04 23 Sb-125 5.17R+04 4.771+02 1.09E+04 6.230901 0.001+00 1.64+*06 1.471+04 24 Te-127s 1.670+04 6.900+03 2.078+03 4.871+03 3.751+04 1.311+06 2.730+04 25 Te-129a 1.419+04 6.091+03 2.232+03 4.210+03 3.181404 1.681+06 6.901+04 26 1-131 3.799044 4.441+04 1.961+04 1.461407 5.181+04 0.00OO10 1.061+03 27 1-133 L.329+04 1.921+04 5.608+03 3.566406 2.248+04 0.001+00 2.161+03 28 Ce-134 3.960+05 7.038+05 7.45R+04 0.0010+0 1.901+05 7.971+04 1.331+03 29 Ce-136 4.83*+04 1.351+05 5.29R+04 0.001+00 5.648+04 1.180104 1.431+03 30 Co-137 5.491+05 6.121+05 4.55R+04 0.008+00 1.721+05 7.131+04 1.338+03 31 Ba-140 5.601+04 5.601+01 2.90R+03 0.008+00 1.341+01 1.601*06 3.684+04 32 La-140 5.051+02 2.009+02 5.150+01 0.00+00 0.001+00 1.681+05 8.481+04 33 Ce-141 2.T77+04 1.671+04 1.999+03 0.008+00 5.259+03 5.171+05 2.161+04 34 Ce-144 3.19K+06 1.218+06 1.761+05 0.00+00 5.381+05 9.841+06 1.480+05 Calculated per ODCO equation 2.3-22

(Page 93 of. 128) Beaver Valley Power Station ProedureNuber C2 2

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 93 of 128 ATTACHMENT J Page 5 of 19 P&I ORGAN DOSE FACTORS Table 2.3-6 1 VALUES 706 BEAVER VALLEY SITE (aq neter-ure-/yr per uCi/nee) Pathway Ground Nuclide Bone Liver T. Body Thyroid lidney Lug GI-LLK 1 H-3 0.001+00 0.001+00 0.00100 0.001+00 0.001÷00 0.0010*0 M.O01W00 2 P-32 0.001+00 0.001800 0.001#00 0.001+00 0.001+00 0.001+00 0.00100 3 Cr-5t 4.661+06 4.661+06 4.681+06 4.661+06 4.661+06 4.661+06 4.661+06 4 Mn-54 1.399+09 1.391+09 1.391+09 1.391409 1.391+09 1.390+09 1.391+09 5 Fe-59 2.734*08 2.736+08 2.736+08 2.731*08 2.731+08 2.731+08 2.731+08 6 Co-57 0.001+00 0.001+00 0.001400 0.001*00 0.001+00 0.001+00 0.001+00 7 Co-58 3.791.08 3.791+00 3,791408 3.791*083.791406 3.7,9408 3.79100 8 Co-60 2.151410 2.151+10 2.151+10 2.151+10 2.151+10 2.15E+10 2.151*1O 9 Zn-65 7.471,08 7.471+08 7.4714087.471+08 7.471+06 7.47*+08 7.471408 10 lb-86 8.991+06 8.991+06 8.99E406 8.991*06 8.991+06 6.991+06 8.991+06 11 Or-89 2.161404 2.161+04 2.161+04 2.161+04 2.161+04 2.161404 2.181+04 12 Sr-90 0.0010+00.001+00 0.006+000.001*00 0.001+00 0.001400 0.001+00 13 Y-91 1.071*06 1.071+06 1.071+08 1.070+06 1.071+06 1.07*+06 1.071308 14 Zr-95 2.45108 2.451+08 2.451+08 2.451+08 2.456+082.451*08 2.451+08 15 Ib-95 1.371+08 1.371+08 1.378108 1.371*08 1.371+08 1.371408 1.371+08 16 Hb-97 0.001+00 0.001+00 0.001400 0.001+000.001+00 0.001+00 0.001*00 17 Eo-99 0.001+06 4.001+06 4.001+06 4.001*06 4.001+06 4.001+06 4.001*06 18 Tc-99a 1.841+05 1.841+05 1.846+05 1.641+05 1.841+05 1.841+05 1.841+05 19 Ru-l03 1.081+08 1.081+08 1.001+08 1.089+08 1.081+08 1.068+06 1.061+08 20 Ru-106 4.226+08 4.221+08 4.221+08 4.221*08 4.221108 4.221+08 4.221*08 21 Ag-lOR 3.441+09 3.441+09 3.44R+09 3.441+09 3.441+09 3.441+09 3.441*09 22 Sb-124 0.001+000.001+00 0.009+00 0.001+00 0,009+00 0.001+00 0.001+00 23 Sb-12 0.009+00 0.001+00 0.006+00 0.001+00 0.001+000.006+00 0.001+00 24 Te-12tR 9.171+04 9.171+04 9.176+04 9.176+04 9.171+049.171+04 9.171*04 25 Te-129I 1.98]+07 1.981+07 1.986+07 1.981+07 1.980+07 1.98R+07 1.981*07 26 1-131 , 1.721+071.721+07 1.726+07 1.721+07 1.721+07 1.721+07 1.726+07 27 1-133 2.458+06 2,451+06 2.451+06 2.451+00 2,451+06 2.451i+06 2.45*+00 20 Ca-134 6,866+09 8.866109 6.861+09 0.806+09 6.860+09 0.861+09 6,862409 29 Ce-136 1.51+00 1.511+00 1.511+08 1.51*+08 1.519+06 1.51+00 1.516408 30 Cs-137 1.036+10 1.031+10 1.031+10 1.031+10 1.031+101.031+10 1.031*+10 31 8a-140 2.051+07 2.051*072.051+07 2.051+07 2.051+07 2.051-+07 2.059*07 32 La-140 1.921+07 1.92X+07 1.920+07 1.92R+07 1.921+07 1.921+07 1.921*07 33 Ce-141 1.37+*071.37*+07 1.376+07 1.376+07 1.3711+07 1.371+071.371+07 34 Ce-144 6.961+07 6.961+07 6.966+07 6.966+07 6.961+07 6.961+07 6.960+07 Calculated per ODCH equation 2.3-23

(Page 94 of 128) I Procedure Number: Beaver Valley Power Station 1/2rODCr2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 94 of 128 ATTACHMENT J Page 6 of 19 P&I ORGAN DOSE FACTORS Table 2.3-7 RVALUIS FOR BRERTHVALLEY SITE (sq meter-area/ir per uCi/aec) Pathway Vegetation AgeGroup A*Adult Ruclide Bone Liver T. Body Thyroid liduey Lsng GI-LII I H-3 0.001+00 2.288+03 2.261+03 2.26MU03 2.261+03 2.261+03 2.268+03 2 P-32 1.401+09 8.741+07 5.431+07 0.001+00 0.00100 0.001+00 1.561+08 3 Cs-51 0.001+00 0.001+00 4.641+04 2.781+04 1.021+04 6.161+04 1.171+07 4 ME-54 0.001+00 3.131+08 5.971+07 0.008+00 9.311+07 0.001+00 9.591+00 5 Fe-59 1.261+08 2.961+08 1.141+08 0.000+00 0.001+00 0.288+07 9.881+08 6 Co-57 0.00*+00 1.171+07 1.951+07 0.001400 0.001+00 0.001+00 2.971+08 7 Ce-58 0.0041*0 3.071+07 8.891+07 0.001+00 0.001+00 0.008+00 6.231+08 8 Co-60 0.008+00 1.671+08 3.691+08 0.001+00 0.001+00 0.001+00 3.141*09 9 Zn-65 3.171+08 1.018409 4.561+08 0.009+00 6.751+08 0.001+00 6.361+08 10 lb-86 0.001+00 2.191408 1.021+08 0.001+00 0.001+00 0.001+00 t.331+07 11Sr-89 9.971+09 0.R0+00 2.806+08 0.001+00 0.001+00 0.008+00 1.601+09 12 sT-90 6.058+11 0.001+00 1.480+11 0.001+00 0.008+00 0.008+00 1.751+10 13 Y-91 5.111+06 0.001+00 1.371+05 0.001+00 0.001+00 0.001+00 2.811409 14 Zr-95 1.171+06 3.771+05 2.551+05 0.001+00 5.981+05 0.001+00 1.191+09 15 !lb-95 1.421+05 7.921+04 4.261+04 0.001+00 7.831+04 0.001+00 4.811+08 16 Nb-97 2.161-06 5.468-07 1.991-07 0.001+00 6.371-07 0.001+00 2.021-03 17 No-99 0.009+00 6.158+06 1.171+06 0.001+00 1.398+07 0,008+00 1.438+07 18 Tc-99m 3.101+00 8.771+00 1.120+02 0.OO+00 1.338*02 4.301+00 5.199+03 19 Ru-103 4.771+06 0.001+00 2.063+08 0.001+00 1.821+07 0.001+00 5.571+08 20 hu-106 1.931+08 0.001+00 2.448+07 0.001+00 3.721+08 0.001+00 1.251+10 21 Ag-11Om1.051+07 9.758+08 5.791+06 0.009*00 1.921+07 0.001+00 3.988+09 22 Sh-124 1.040+08 1.961+06 4.111+07 2.511+05 0.001+00 8.071+07 2.941+09 23 Sb-125 1.378+08 1.538+08 3.251+07 1.391+05 0.00+00 1.051+08 1.501+09 24 Te-127z 3.498+00 1.251+08 4.261+07 8.921+07 1.421+09 0.008+00 1.171+09 25 Te-129z 2.518+08 9.381+07 3.981+07 B.641+07 1.051+09 0.001+00 L.271+09 26 1-131 8.081+07 1.161+08 6.621+07 3.791+10 1.98R+08 0.001+00 3.051+07 27 1-133 2.099+06 3.631+06 1.111+06 5.331+08 6.331+08 0.001+00 3.208+06 28 Co-134 4.671+09 1.111+10 9.081+09 0.001+00 3.591+09 1.191+09 1.941+08 29 Cs-136 4.271+07 1.691+08 1.211+08 0.001+00 9.394107 1.291+07 1.911+07 30 Ca-137 6.361+09 8.708+09 5.701+09 0.001+00 2.951*09 9.819+08 1.081+08 31 Ba-l10 1.298+08 1.618+05 8.421+08 0.001+00 5.491+04 9.248+04 2.651+08 32 La-140 1.980+03 9.971+02 2.638102 0,001+00 0.001+00 0.001+00 7.321+07 33 Ce-141 1.971+05 1.330+05 1.511+04 0.001+00 6.191+04 0,001+00 5.108+08 34 Ce-144 3.291+07 1.381+07 1.770+06 0.00+40 8.161+06 0.008+00 1.118+10 All uuclides (except H-3) calculated per ODCH equation 2.3-26 H-3 calculated per ODC) equation 2.3-29

(Page 95 of- 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 95 of 128 ATTACHMENT J Page 7 of 19 P&I ORGAN DOSE FACTORS Table 2.3-8 RVALI.S FORBEAM VAILEY SITE (sq meter-areu/yr per uCi/see) Pathway : Vegetation AgeGroup = Teen Muclide Boan Liver T.Bady Thyroid Kidney Lung GI-LLI 1 R-3 0.00W*00 2.591+03 2.591+03 2.591+03 2.591+03 2.591+03 2.591+03 2 P-32 1.611+09 9.981+07 6.241+07 0.0010*0 0.001+00 0.001+00 1.351+08 3 Cr-51 0.00K+00 0.001+00 6.171+04 3.431+04 1.351+04 8.811+04 1.041+07 4 Hn-54 0.001800 4.541+08 9.011+07 0.001+00 1.361+08 0.001+00 9.321+08 5 Fe-59 1.791+08 4.191+08 1.621+08 0.0014+0 0.001+00 1.321+08 9.901+08 6 Co-57 0.001+00 1.791+07 3.001+07 0.001+00 0.001+00 0.001+00 3.331+08 7 lo-58 0.001+00 4.36R+07 1.001+08 0.001+00 0.001+00 0.010+00 6.011+08 8 Co-0 0.001+00 2.491+08 5.601+08 0.001400 0.001+00 0.001+00 3.241+09 9,Zn-65 4.24C+08 1.471+09 0.870+06, 0.009+00 9.421008 0.001+00 6.231+08 10Rb-86 0.001+00 2.741+08 1.291+08 0.001+00 0.001+00 0.001+00 4.051+07 11Sr-89 1.511+10 0.001+00 4.341+08 0.001+00 0.001+00 0.001+00 1.801+09 12Sr-90 7.511+11 0.001+00 1.851+11 0.001*00 0.001+00 0.001+00 2.110+10 13T-91 7.841+06 0.001+00 2.101+05 0.001+00 0.001+00 0.000+00 3.211+09 14 Or-95 1.721206 5.431+05 3.741+05 0.0014+0 7.981+05 0.001+00 1.251+09 15Mb-95 1.921+05 1.071+05 5.871+04 0.001+00 1.031405 0.001+00 4.561+08 16Mb-97 2.008-06 4.978-07 1.011-07 0.001+00 5.811-07 0.001+00 1.191-02 17No-99 0.008+00 5.651+06 1.081+06 0.001+00 1.291+07 0.001+00 1.011+07 18rc-99S 2.741400 7.641+00 9.901+01 0.001+00 1.140+02 4.241+00 5.021+03 19Ru-lO3 63.29+06 0.001+00 2.921406 0.001+00 2.411+07 0.001+00 5.701+08 20 Ru-106 2.381+08 0.00+00 3.901+07 0.001+00 5.971+08 0.008+00 1.481+10 21Ag-lIOn1.529+07 1.438+07 8.729+06 0.008+00 2.741+07 0.001+00 4.031+09 22Sb-124 1.541+00 2.841+06 6,021+07 3.501+05 0.001+00 1.351+08 3.111+09 23 Sb-125 2.141+08 2.348+06 5.018+07 2.051+05 0.001+00 1.088+08 1.671+09 24 Te-127, 5.52.+09 1.961408 6.561+07 1.311+08 2.241+09 0.001400 1.371+09 25 Te-129a 3.62R+08 1.348+08 5.731+07 1.171+08 1.511+09 0.001+00 1.361+09 26 1-131 7.690+07 1.06808 5.781+07 3.141+10 1.851+08 0.001+00 2.131+07 27 1-133 1.941+08 3.291+06 1.001+06 4.591+08 5.771+06 0.001+00 2-491+00 28 Co-134 7.108+09 1.671+10 T.758+09 0.001+00 5.311+09 2.031+09 2.081+08 29 Cs-I36 4.381+07 1.721+08 1.168+08 0.001+00 9.371+07 1.481+0? 1.391+07 30 Cs-137 1.011+10 1.358+10 4.691+09 0.008+00 4.591+09 1.781+09 1.921+08 31 Ba-140 1.38808 1.691+05 8.901+06 0.001+00 5.741+04 1.141+05 2.131+08 32 L,-140 1.811+03 8.881+02 2.368+02 0.00100 O0.008+00 0.001+00 5.100+07 33 Ce-141 2.831+05 1.891+05 2.171404 0.001U00 6.901+04 0.008+00 5.411+08 34 Ce-144 5.278+07 2.18+E07 *2.831+06 0.001+00 1.301+07 0.001+00 1.331+10 All nuclides {except H-3) calculated per OCH0 equation 2.3-26 H-3celculated per 000 equation 2.3-29

(Page 96 of 128) Beaver Valley Power Station Procdure Nomber:1/2-ODC-2,02 .

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: i2 96 of 128 ATTACHMENT J Page 8 of 19 P&I ORGAN DOSE FACTORS Table 2.3-9 1 VALUES Y01BEAVER VAiLLE SITE (sq meter-oreh/yr per uCi/aec) Pathway = Vegetation AgeGroup Child Nutlide Bone Liver T. Body Thyroid Kidney Lung GI-LLI 1 H-3 0.001+00 4.011+03 4.011+03 4.011+03 4.011+03 4.011+03 4.011+03 2 P-32 3.371+09 1.589+08 1.301+05 0.001+00 0.001+00 0.00+400 9.321+07 3 Cr-51 0.001+00 0.010 1.171+0'5 6.501+04 1.781+04 1.191+05 6.211+06 4 b-54 0.001*00 8.851+08 1.771+08 0.001+00 1.861+09 0.001+00 6.581+08 5 Fe-59 3.981+08 6.431+08 3.201+08 0.001+00 0.009+00 1.871+08 6.701+08 6 Co-57 0.001+00 2.991+07 8.041+07 0.001+00 0.009400 0.008+00 2.451+08 7 Co-58 0.001+00 6.441+07 1.971+08 0.001+00 0.001+00 0.001+00 3.7M1+08 8 Co-60 0.001+00 3.780108 1.121+09 0.001+00 0.001+00 0.001+00 2.101+09 9 Zn-65 8.13E+08 2.171+09 1.351+09 0.001+00 1.301+09 0.001+00 3.801+08 10 Rb-86 0.001400 4.521+08 2.781+08 0.001+00 0.001+00 0.001+00 2.911+07 11Sr-89 3.601+10 0.001+00 1.031+09 0.001+00 0.001+00 0.001+00 1.391+09 12 Sr-S0 1.241+12 0.001+00 3.151+11 0.001+00 0.008+00 0.001+00 1.678+10 13Y-91 1.861+07 0.001+O0 4.991+05 0.001+00 0.001+00 0.001+00 2.488+09 14 Zr-O5 3.861+06 8.481+05 7.559+05 0.001+00 1.211+06 0.001+00 8.851*08 15 Nb-95 4.111+05 1.601+05 1.141+05 0.001+00 1.501+05 0.009+00 2.968+08 106b-97 3.651-06 6.591-07 3.080-07 0.001+00 7.318-07 0.001+00 2.038-01 17Mo-99 0.001+00 7.711+06 1.91K+06 0.001+00 1.651+07 0.008+00 6.381+06 18 Tc-99x 4.711+00 9.24.+00 1.539+02 0.001+00 1.348+02 4.698+00 5.268+03 19 Ru-103 1.531+07 0.001+00 5.90006 0.009+00 3.881+07 0.001400 3.971+08 20 Ru-106 7.451*08 0.001+00 9.301+07 0.008+00 1.018+09 0.001+00 1.161*10 21Ag-110 3.211+07 2.171+07 1.731+07 0.00K+00 4.048+07 0.001+00 2.581+09 22 5b-124 3.528+08 4.571+06 1.239+08 7.771+05 0.001+00 1.951+08 2.208409 23 Sb-125 4.990+08 3.858+06 1.051+08 4.631+05 0.001+00 2.781+08 1.191100 24 Te-127n 1.321+09 3.58X+08 1.57K+08 3.161+08 3.778+09 0.001+00 1.079+09 25 Te-129v 8.418+08 2.358+08 1.319+08 2.7M1+08 2.471+09 0.001+00 1.039409 261-131 1.431+08 1.448108 8.171+07 4.761+10 2.361+08 O.008+00 1.28K+07 27 1-133 3.531+06 4.378+06 1.651+06 8.121+08 7.266+06 0.001+00 1.701+06 26 Ca-134 1.601+10 2.631+10 5.551+09. 0.001+00 8.158+09 2.938+09 1.421408 29 Ca-136 8.248+07 2.27E+08 1.471+08 0.001+00 1.218+08 1.808+07 7.906+06 30 Ce-137 2.391+10 2.290+10 3.381+09 0.001+00 7.461+09 2.681+09 1.439+08 31 Ba-140 2.770+08 2.421+07 1.02K+07 0.001+00 7.890+04 1.451+05 1.406+08 32 La-140 3.251+03 1.138+03 3.831+02 0.001+00 0.001+00 0.001+00 3.168+07 33 Ce-141 6.561+05 3.278+05 4.881+05 0.001+00 1.438+05 0.008+00 4.081+08 34Ce-144 1.271+08 3.981+07 6.781+08 0.001+00 2.218+07 0.008+00 1.048+10 A11nuclideB (except H-3) calculated per O0Q equation 2.3-26 H-3 calculated per00CM equation 2.3-29

(Pagq 97 of .128) Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 1 2 Page Number: 97 of 128 ATTACHMENT J Page 9 of 19 P&I ORGAN DOSE FACTORS Table 2.3-10 1 VALU*S FOIR BnAV*RVALLEY SITE lagmeter-area/rr per uCi/sec) Pathay = Heat Age Group Adult Xuclide Bone Liver T.Body Tyroid lidyee Lung Cl-LLI 1 B-3 0.O0K+00 3.251+02 3.251+02 3.251+02 3.251+02 3.251+02 3.251+02 2 P-32 3.951+09 2.461+08 1.531+06 0.001+00 0.001+00 0.001+00 4.441+08 3 Cr-51 0.001+00 0.001+00 5.861+03 3.501+03 1.291+03 7.781+03 1.471+06 4 Hn-54 0.001+00 6.491+06 1.241+06 0.001+00 1.931+06 0.001+00 1.991+07 5 Fe-59 2.141+08 5.041+08 1.931+08 0.006+00 0.001+00 1.411+08 1.681+09 6 Co-57 0.001+00 4.011+06 6.661+06 0.001+00 0.001+00 0.001+00 1.021+08 7 Co-58 0.001+00 1.42E+07 3.181+07 0.001+00 6.001+00 0.001+00 2.871+08 8 Co-60 0.001+00 5.121+07 1.131+08 0.001+00 6.001+00 0.001+00 9.MIM+08 9 Zn-65 2.541+08 8.091+08 3.661+06 0.001+00 5.411+08 0.001+00 5.101+08 10 Bb-86 0.00R+00 4.111+06 1.921+06 0.001+00 0.001+00 0.001+00 8.111+07 11Sr-89 2.411+08 0.001+00 6.921+06 0.001+00 0.001+00 0.001+00 3.871+07 L2Sr-90 8.418+09 0.001+00 2.061+09 0.001+00 0.001+00 0.001+00 2.431+08 13 Y-91 8.941+05 0.001+002.391+04 0.001+00 0.006+000.001+00 4.921+08 14 Zr-95 1.471+06 4.711+05 3.191+05 0.001+00 7.391+05 0.001+00 1.491+09 15n5-95 1.891+06 1.051+06 5.641+05 0.001+00 1.041+06 0.001+00 6.371+09 16 Nb-97 sIt! a***alu*i*iitii$** 0.001+00 +*aiteii+$! 0.001+00 MWtiasMuta 17 Mo-99 0,001+00 1.5.1+04 1.621+04 O.OOE+00 1.931+05 0.001+00 1.971+05 18Tc-99 3.831R-21 1.081-20 1.306-19 0.001+00 1.641-19 5.301-21 6.401-18 19 Ri-103 8.571+07 0.001+00 3.691+07 O.OOE+00 3.271+08 0,001+00 1.001+10 20 Ru-106 1.978+09 O.OO+00 2.491+08 0.001+00 3.800+09 0.001+00 1.271+11 21Ag-ll10 4.771+06 4.419+06 2.621+06 0.001+00 8.807+06 0.001+00 1.601+09 22 S5-124 0.001+00 0.001+00 0.001+00 0.006+00 0.001+00 0.001+00 0.001+00 23 Sb-125 0.001+00 0.0011+00 060+00 0.001+00 0.001+00 0.009+00 0.009+00 24 Te-127m 8.3681+08 3.001+08 1.021+08 2.141+08 3.401+09 0.009+00 2.611+09 25 Te-129* 9.331+08 3.481+08 1.481+0B 3.216+08 3.891+09 0.001+00 4.701+09 26 1-131 9.131+06 1.311+07 7.481+06 4.280+09 2.241+07 0.001+00 3.451+06 27 1-133 3.120-01 5.421-01 1.651-01 7.568+01 9.461-01 0.001+00 4.676-01 20Ce-134 4.530+08 1.061+09 8.811+06 0.001+00 3.490+08 1.161+08 1.891+07 29 CS-136 1.021+07 4.04107 2.911+07 0.001+00 2.258+07 .08B+06 4.591+06 30 Cs-137 5.908+08 8.061+00 5.281+08 0.001+00 2.74'+08 9.010+07 1.561+07 31 Ba-140 2.446+07 3.061+04 1.601+06 0.001+00 1.046+04 1.751+04 5.021+07 32 La-140 3.168-02 1.59R-02 4.211-03 0.001+00 0.000+00 0.001+00 1.171+03 33 Ce-141 1.161+04 7.631+03 6.060+02 0.001+00 3.641+03 0.008+00 2.991+07 34 Ce-144 1.038+06 4.321+05 5.515+04 0.001+00 2.561+05 0.001+00 3.501+08 All nuclides (except 11-3)calculated per ODCH equation 2.3-25 H-3 calculated per ODOC equation 2.3-30

(Page 98 of 128) t ,.41 BeaerVale' Beaver Valley r1/2-ODC-2.02Power Station Procedure Number:

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS -Revision: Page Number 2 98 of 128 ATTACHMENT J Page 10 of 19 P&I ORGAN DOSE FACTORS Table 2.3-11 R VALUWS FOR01AVIR VALL9Y SI1l (eqmeter-orea/yr per uCl/aec) 7athway : Heat AgeGroup = Teen Ruclide Bone liver T. Body Thyroid Kidney Lhng GI-113 I H-3 0.001+00 1.94W*02 1.94R*02 1.941+02 1.941+02 1.941+02 1.941+02 2 P-32 3.341109 2.071*08 1.291408 0.001+00 0.001+00 0.001+00 2.801+08 3 Cr-51 0.001+00 0.001*00 4.691+03 2.601+03 1.031+03 8.691+03 7.88E+05 4 Hn-54 0.001+00 4.951+08 9.811+05 O.001+00 1.481+06 0.001+00 1.011+07 5 Ye-59 1.711*08 4.00CMM 1.541+08 0.001+00 0.001+00 1.261480 9.451+01 6 Co-57 0.001+00 3.221*08 5.401÷06 0.001+00 0.001+00 0.001+00 6.011+07 7 Co-5B 0.001+00 1.081+07 2.521+07 O.OO1+00.001+00 0.001+00 1.511+08 8 Co-60 O.008+00 3.971+07 8.951+07 0.00*+00 0.001+00 0.001+00 5.178+08 9 Zn-65 1.791+00 6.211+08 2.901+08 0.001+00 3.971+08 0.008+00 2.639+08 10 Rb-86 0.000+00 3.431+08 1.611+08 0.001+00 0.001+00 0.008+00 5.081*07 HlSr-89 2.031+08 0.001+00 5.831+09 0.001+00 0.001+00 0.001+00 2.421+07 12 Sr-90 5.441+09 0.001+00 1.341+09 0.001+00 0.001+00 0.001+00 1.531+08 13 T-91 7.531*05 0.001+00 2.021904 0.001+00 0.001+00 0.001+00 3.091*06 14 Zr-95 1.181406 3.711+05 2.551+05 0.001*00 5.451+05 0.001+00 8.561+08 15Xb-95 1.47106 8.171+05 4.501+05 0.001*00 7.921+05 0.0010+0 3.491+09 16 mb-97 ***- ***.****** * $sesae* *- 0.001+00 *seMe*t**ee0.001+00 aeeevaeeeas 17Hs-99 0.001+00 7.031+04 1.341+04 0.00+00 1.611+05 0.001+00 1.260+05 16Is-99& 3.046-21 0.481-21 1.101-19 0.001+00 1.261-19 4C711-21 5.571-18 19RU-103 6.989017 0.001+00 2.98610T 0.001+00 2.461+68 0.00X+00 5.831+09 20 Ru-106 1.281+09 0.001+00 2.091+08 0.001+00 3.191+09 0.001+00 7.941+10 21 Ag-lla 3.019+06 3.421+00 2.080+09 0.003+00 6.521+08 0.003+00 9.601+08 22 Sb-124 0.00+*00 0.00X+00 0.001+00 0.001+00 0.001+00 0.001*00 0,001+00 23 Sb-125 0.000+00 0.001+00 0.001+00 0.001+00 0.001+00 0.001+00 0.001+00 24 Te-127e 7.07R+08 2.519+08 8.41R+07 1.6810*8 2.871+09 O.OOX+00 1.761+09 25 Te-129a 7.821+08 2.901+08 1.248108 2.520+08 3.271+09 0.000+00 2.931+09 26 1-131 7.59R+06 1.060+07 5.718+06 3.100+09 1.831+07 0.001+00 2.101+06 27 1-133 2.611-01 4,421-01 1.351-01 0.179+01 7,751-01 0.001*00 3.341-01 28 Ca-134 3.6008 8.481+00 3.931+08 0.001+00 2.691+08 1.038*08 1.050+07 29 Ca-130 7.980+06 3.141+07 2.111+07 0.001+00 1.711+07 2.691*+0 2.530+06 30 CB-137 4.90*+08 9.519+08 2.279+08 0.008+00 2.228+08 8.811+07 9.271+06 31 Ba-140 2.028407 2.471+04 1.309+06 0.001+00 8.381+03 1.661+04 3.119+07 32 La-140 2.608-02 1.281-02 3.401-03 0.009+00 0.001+00 0.00+00 7.331+02 33 Ce-141 9.72E+03 6.491+03 7.461*02 0.001+00 3.061+03 0.001+00 1.866+07 34 Ce-144 8.721405 3.618+05 4.681+04 0.001+00 2.151+05 0.001+00 2.198+08 Allnoclides (except H-3) calculated per 0C equation 2.3-25 H-3 calculated per 08CM eqintion 2.3-30

(Page 99 of. 128) Beaver Valley Power Station Procedure umber: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 1 2 99 of 128 ATTACHMENT J Page 11 of 19 P&I ORGAN DOSE FACTORS Table 2.3-12 R VALUISFORBEAVIR VALLEY SITE {eq beter-mreu/yrper uCi/sec) Patbway : Meat Age Group = Child Huclide Bone Liver T. Body Thyroid Kidney Lung GO-LLU 1 H-3 0.001400 2.341+02 2.341#02 2.341*02 2.341+02 2.349+02 2.34R+02 2 P-32 6.291009 2.941+08 2.432108 0.001+00 0.001+00 0.001+00 1.740+08 3 Cr-51 0.001400 0.001+00 7.311+03 4.060*03 1.111+03 7.411+03 3.081*05 4 Kn-54 0.001400 5.660*08 1.511+06 0.001+00 1.591+06 0.001+00 4.751+06 5 Fe-59 3.041+08 4.919+08 2.451+08 0.001+00 0.001+00 1.421+08 5.120+08 6 Co-57 0.001400 4.211+06 8.521+06 0.001+00 0.001+00 0.001400 3.45R+07 7 Co-58 0.000+00 1.281407 3.911407 0.001+00 0.001400 0.001+00 7.450+07 8 Co-60 0.001+00 4.721+07 1.391408 0.001+00 0.001+00 0.001+00 2.681+08 9 Zn-65 2.688+08 7.151+08 4.441+08 0.001+00 4.501+08 0.001+00 1.251+08 10 Eb-86 0.001+00 4.871408 2.991+00 0.+00100 0.001+00 0.001+00 3.131+07 llSr-89 3.851+08 0.000100 1.101+07 0.001+00 0.001+00 0.008+00 1.498+07 12Sr-90 7.031+09 0.001+00 1.788609 0.001+00 0.001+00 0.006+00 9.471+07 13T-91 1.420+06 0.001+00 3.811404 0.001+00 0.000+00 0.001+00 1.900+08 14Zr-95 2.090+06 4.590+05 4.090*05 0.001*00 6.571*05 0.000+00 4.791+08 15 Nb-95 2.540+06 9.909+05 7.076*05 0.001*00 9.301*05 0.OO÷00 0 1.631+09 06 Nb-97 *****.************* ****** 0.001+00 MU*****+ a 0.001+00 *s*se*-s 17 Mo-99 0.000+00 9.798904 2.421+04 0.001+00 2.091+05 0.001+00 8.098+04 18 Tc-99v 5.331-21 1.051-20 1.731-19 0.001*00 1.521-19 5.311-21 5.951-16 19Eo-103 1.266+08 0.001+00 4.851*07 0.001+00 3.180108 0.001+00 3.261+09 20 un-10 3.121+09 0.000+00 3.890+08 0.001+00 4.21109 0.001+00 4.850*10 21 Ag-J10i 5.999+06 4.040+06 3.231*06 0.001400 7.631+06 0.001+00 4.811+08 22 Gb-124 0.001+00 0.000*00 0.000+00 0.001*00 0.001+00 0.001+00 0.006+00 23 Sb-125 0.001+00 0.000+00 0.000+00 0.001*00 0.001*00 0.001+00 0.001+00 24 Te-127m 1.331*09 3.590+08 1.580*08 3.191+08 3.801*09 0.000+00 1.001+09 25 Te-129a 1.47E+09 4.110+08 2.291+08 4.751*08 4.331+09 0.001*00 1.800+09 26 1-131 1.411+07 1.421+07 8.049406 4.661+09 2.321*07 0.001+00 1.261+06 27 1-133 4.841-01 5.990-01 2.270-01 1.111*02 9.981-01 0.006+00 2.411-01 28 Cs-134 6.351+08 1.041409 2.201+08 0.001+00 3.231+08 1.136100 5.621+06 29 Ce-136 1.306+07 3.781+07 2.459+07 0.001+00 2.019+07 3.001+06 1.331+00 30 Ct-137 9.026+08 8.639+08 1.279808 0.001+00 2.81K+08 1.011+08 5.401+06 31.a-140 3.726+07 3.260+06 2.170*06 0.001+00 1.080+04 1.941*04 1.091+07 32 La-140 4.761-02 1.661-02 5.611-03 0.001+00 0.001+00 0.000+00 4.631+02 33 Ce-141 1.836+04 9.131+03 1.360+04 0.000*00 4.001+03 0.001+00 1.141+07 34 Ce-144 1.646+06 5.150+05 8.770+04 0.000+00 2.851*05 0.001+00 1.341+08 All nueliden fexcept 8-3) ealculated per ODCO equation 2.3-25 R-3 ealculated per 0M1 equatioe 2.3-30

(Page 100 of 128) Beaver Valley Beavr Power ValeyProcedure Station Number: 1/2r.ODC-2.2

Title:

Unit: Level of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 100 of 128 ATTACHMENT J Page 12 of 19 P&I ORGAN DOSE FACTORS Table 2.3-13 VALUS

                                                              , FORBEAVER    VALLEY   SIT1 (aqmeter-mren/yr per uCi/eec)

Pathway 7CoyMilk AgeGroup : Adult Nuclide Bone Liver T. B*dy Thyroid Kidney Lung GI-I1 I H-3 0.009+00 7.631*02 7.631*02 7.631+02 7.631402 7.631+02 7.631+02 2 P-32 1.451+10 9.011+0B 5.601+08 0.001+00 0.0091+00 0.001+00 1.036+09 3 Cr-5l 0.001+00 0.001*00 2.381+04 1.421+04 5.241903 3.151+04 5.981+06 4 Mn-54 0.001+00 5.951+06 1.131+06 0.001+00 1.771606 0.001+00 1.821+07 5 Pe-59 2.401*07 5.639407 2.160107 0.001+00. 0.001+00 1,579+07 1.881+08 6 Co-57 0.001+00 9.101+05 1.511060 0.001400 0.001+00 0.001+00 2.311+07 7 Co-58 0.001+00 3.671+06 8.221*06 0.001+00 0.006+00 0.001+00 7.431+07 8 Co-60 0.001+00 1.121+07 2.461+07 0.006+00 0.001+00 0.001+00 2.101+08 9 Za-65 9.801+08 3.121+09 1.411+09 0.001+00 2.091+09 0.001+00 1.961409 109b-86 0.001+00 2-19E+09 1.021+09 0.001+00 O.OO400 0 0.001+00 4.321+08 11Sr-89 1.161+09 0.001+00 3.331907 0.001+00 0.001+00 0.006+00 1.866+08 12Sr-90 3.101+10 0.001+00 7.761*09 0.0010+0 0.001+00 0.001+00 9.141+00 13 Y-91 6.781+03 0.001+00 1.811+02 0.006+00 0.001+00 0.001+00 3.731+06 14 Zr-95 7.401+02 2.371+02 1.611402 0.001+00 3.721+02 0.001+00 7.521+05 15 Nb-95 0.77D0+4 3.778+04 2.031*04 0.001+00 3.721*04 0.001*00 2.291.08 16 Nb-9? 2.811-12 7.111-13 2.600-13 0.001600 8.301-13 0.001+00 2.621-09 17 Mo-99 0.00+o00 2.111+07 4.011*06 0.001*00 4.771+07 0.001400 4.881+07 10 Tc-99a 2.831+00 7.991+00 1.021*02 0.00+00 1.211+02 3.911900 4.731403 19 hu-103 8.291+02 0.006+00 3.571*02 0.001+00 3.161+03 0.006*00 9.681+04 20 hu-106 1.439+04 0.001*00 1.816*03 0.001*00 2.771*04 0.009400 9.271605 21Ag-lOw 4.CH1+07 3.841+07 2.28M?07 0.001*00 7.516+07 0.001+00 1.571410 22 Sb-124 0.000+00 0.001*00 0.000*00 0.006*00 0.006+00 0.001+00 0.001+00 23 Sb-125 0.006+00 0.001+00 0.000+00 0.001+00 0.001*00 0.001*00 0.001+00 24 Te-127m 3.446*07 1.231+07 4.191+06 8.791*06 1.401+08 0.001+00 1.151*08 25 Te-129i 4.951+07 L.010+0T 7.849+00 1.701*07 2.071+08 0.006+00 2.491*06 26 1-131 2.526+08 3.601+00 2.060+08 1.066411 6.171608 0.001+00 9.501407 270-133 3.296+06 5.721+06 1.756+06 8.410408 9.991+06 0.001+00 5.041+40 28 Ce-134 3.099*09 9.276*09 7.501+09 0.006*00 3.009+09 9.961*08 10.26+08 29 Ca-136 2.236+08 8.821408 6.356+08 0.00*00 4.911+08 6.736+07 1.00t*00 30 Co-137 4.991M09 6.821+09 4.471+09 0.00R*00 2.321+09 7.701906 1.321*08 31Ba-140 2.280407 2.87*+04 1.491+06 0.009*00 9.741+03 1.641+04 4.706*07 32 La-140 3.84400 1.931*00 5.111-01 0.006*00 0.001*00 0.006+00 1.426*05 33 Ce-141 3.991+03 2.701+03 3.061+02 0.000+00 1.251+03 0.009+00 1.031*07 34 Ce-144 2.541+05 1.061145 1.300+04 0.006*00 6.291+04 0.006+00 8.581*07 All nuclides (except H-3) calculated per0DCM equation 2.3-24 0-3 calculated per 01CM equation 2.3-28

(Page 101 of. 128) Beaver Valley Power Station Procdure Number:1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: __2 101 of 128 ATTACHMENT J Page 13 of 19 P&I ORGAN DOSE FACTORS Table 2.3-14 R VALUIS OROlAVR VALL!! SIE (aqmeter-sref/yr per nCJ/eee) Pathway z Cowmilk AgeGroup Teen Nuclide Bone Liver T. Body Thyroid lidney Lung GI-LLI I 9-3 0-008+00 9.941+02 9.941+02 9.94X+02 9.941+02 9.941+02 9.941+02 2 P-32 2.781+30 .L669+09 1.041+09 0.001+00 0.001+00 0.001+00 2.251+09 3 Cr-51 0.001+00 0.00MN00 4.151+04 2.311+04 9.101+03 5.931+04 6.971*06 4 Hn-54 0.001+00 9.911+06 1.961+06 0.001+00 2.951+06 0.001+00 2.031+07 5 pe-59 4.188+07 9.761+07 3.771+07 0.001+00 0.008+00 3.08a+07 2.311+08 6 Co-57 0.001+00 1.601+06 2.881+08 0.008+00 0.008+00 0.001+00 2.981+07 7 Co-58 0.009+00 6.171+06 1.421+07 0.00K+00 0.001+00 0.001+00 6.511+07 0 Co-60 0.001+00 1.89Z+07 4.261+07 0.001+00 0,001+00 0.001+00 2.461+06 9 Zn-65 1.511+09 5.231+09 2.441+09 0.001+00 3.341+09 0.001+00 2,211+09 10Rb-86 0.001+00 3.991+09 1.871+09 0.001+00 0.001+00 0.008+00 5.911+08 11Sr-89 2.141+09 0.009+00 6.121+07 0.001+00 0.001+00 0.001+00 2,551+08 12Sr-90 4.471+10 0.001+00 1.101+10 0.001+00 0.001+00 0.001+00 1.251+09 13T-91 1.251+04 0.00X+00 3.359*02 0.001+00 0.001+00 0.001+00 5.111+06 14 Zr-95 1.299+03 4.08CM02 2.819+02 0.001+00 6.001+02 0.001+00 9,421+05 1500-95 1.160+05 6.411+04 3.531+04 0.00X+00 6.21X+04 0.001+00 2.741+00 16 Kb-97 5.138-12 1.271-12 4.651-13 0.001+00 1.491-12 0.008+00 3.041-08 17 0o-99 0.008+00 3.301+07 7.251+06 0.001+00 8.701+07 0,008+00 6.811+07 18Tc-99O 4.901+00 1.370+01 1.771+02 0.001+00 2.041+02 7.591+00 8.981+03 19 Ru-103 1.471+03 0.001+00 6.301+02 0.009+00 5.201+03 0.001+00 1.231+05 20 Ru-106 2.031+04 0.001+00 3.321+03 0.001+00 5.081+04 0.008+00 1.268+06 21 Ag-110 6.871+07 6.501+07 3.951+07 0.001+00 1.241+08 0.001+00 1.831+10 22 Sb-124 0_000+00 0,001+00 0.001+00 0.001+00 0.000+00 0.008+00 0.001+00 23 Sb-125 0.008+00 0.001+00 0.001+00 0.001+00 0.001+00 0.001+00 0.001+00 24 Te-127, 6.341+07 2.251+07 7.546+06 1.51W+07 2.571+06 0.008+00 1.581+06 25 Te-129I9.068+07 3.368+07 1.438+07 2.921+07 3.791+08 0.001+00 3.408+08 26 1-131 4.578+09 6.396+08 3.431+08 1.871+11 1.101+09 0.001+00 1.281+08 27 1-133 6.018+06 1.021+07 3.111+06 1.421+09 1.791+07 0.001+00 7.71R+06 28C5-134 6.761+09 1.596+10 7.381409 0.001+00 5.061+09 1.931+09 1.988+08 29Cs-136 3.801+08 1.508+09 1.011+09 0.009+00 8.151+06 1.288+08 1.201+08 30Ce-137 9.051+09 1.208+10 4.191+09 0.008400 4.101+09 1.598+09 1.711+00 31 Ba-140 4.12E+07 5.051+04 2.658+06 0.001+00 1.711+04 3.398+04 8.350+07 32 La-140 6.891+00 3.398+00 9.011-01 0.000+00 0.001+00 0.008+00 1.941+05 33 Ce-141 7.328+03 4.891+03 5.628+02 0.001+00 2.301+03 0.001+00 1.408+07 34 Ce-144 4.671+05 1.93R+05 2.511+04 0.001+00 1.151+05 0.001+00 1.171+08 All nuclides (except E-3) calculated per ODCH equation 2.3-24 0-3calculated per 01C equation 2.3-28

(Page 102 of 128) Beaver Valley Power Station BSProcedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 102 of 128 ATTACHMENT J Page 14 of 19 P&I ORGAN DOSE FACTORS Table 2.3-15 R VALUES FOR BAVEBR VALLEY SITE [sq seter-aeea/yr per uCI/aec) Pathway Cow1ilk Age Group = Child Naclide Bone Liver T. Body Thyroid lidney Lang GI-LLI 1 -3 0.001+00 1.571+03 1.571*03 1.571+03 1.571*03 1.571+03 1.571+03 2 P-32 6.591+10 3.091409 2.541*09 0.0010+00.0O01000.001+001.821+09 3 Cr-51 0.00+00 0.0010+08.461*04 4.701+04 1.281*04 8.581+04 4.491*06 4 Kn-54 0.001+00 1.481*07 3.951+06 0.001*00 4.161*06 0.00+00 1.241+07 5 Fe-59 9.701+07 1.57X408 7.821*07 0.0094000.00OO104.551+07 1.631+08 6 Co-57 0.001+00 2.731+06 5.528+08 0.008+00 0.001*00 0.008+00 2.241*07 7 Co-58 0.001+00 9.431+06 2.891*07 0.001+000.001+00 0.001+00 5.508107 8 Co-60 0.001+00 2.94MO07 8.671*07 0.001*00 0.001*00 0.008+00 1.631.08 9 Zn-65 2.959109 7.871+09 4.891+09 O.OOR+004.981+09 0.008+00 1.381*09 10 lb-66 0.01+00 7.408+09 4.551+09 0.001+00 0,00100 0.001+00 4.761+08 11Sr-89 5.291+09 0.0014001.511*08 0.001+00 0.001+00 0.00÷+002.051+08 12 Sr-90 7.551+10 0.001+001.911+10 0.001+00 0.001.00 0.001+00 1.021*09 13 Y-91 3.081+04 0.001+00 8.241+02 0.001+00 0.001*00 0.000+00 4.111+01 14Zr-95 3.001+03 6.801402 5.881*02 0.00,+009.451*02 0.001+00 6.891+05 15 $b-95 2.611+05 1.028+05 7.269*04 0.008+009.548*04 0.000*001.881+08 16Wb-97 1.251-11 2.251-12 1.058-12 0.001+002.501-12 0.001+00 6.941-07 17 Ho-99 0.008+00 8.921+07 1.711*07 0.001+00 1.488*06 0.008+00 5.728*07 18 Tc-99a 1.12K+01 2.20f0l0 3.851*02 0.OO+00 3.201*02 1.121+01 1.258+04 19 En-103 3.491+03 0.001+00 1,341*03 0,0040*08.781+03 0.008+00 9.011+04 20 nu-106 6.490104 M.00UM00 8.109003 0.001040 8.761+040.001+00 1.013406 21 Ag-lI1n 1.490+08 1.010+088.050+07 0.001+00 1.871+08 0.001+00 1.20B1I0 22 Sb-124 0.001+00 0.008+00 0.001+00 0.001+00 0.001*000.008+00 0.003+00 23 5b-125 0.001+00 0.009400 0.00O0 0.001+000.001*000.001+00 0.008+00 24 To-127m 1.56108+ 4.210+07 1.800+07 3.748*07 4.469+08 0.001+00 1.273408 25 Te-129m 2.231+08 6.241+07 3.471*077.206+07 6.561+08 0.001+00 2.721+08 26 1-131 1.118+09 1.111+09 6.339+08 3.080+11 1.838+09 0.001+00 9.928+07 27 1-133 1.461+07 1.818+076.83*+06 3.364+09 3.011*07 0.008+00 7.281406 28 Cs-134 1.561+10 2.581+10 5.40109 0.008+00 7.939+09 2.851+09 1.389+08 29 Co-136 8.581+08 2.361+09 1.531+09 0.000+001.268109 1.871+08 8.290+07 30 Co-137 2.180+10 2.090+10 3.081*090.00,+006.801*09 2.451+09 1.31008 31 Ba-140 9.941+07 8.710+06 5.801*06 0.00100 2.841*04 5.190+04 5.048+07 32 La-140 1.050+015.771+00 1.941*00 0.001+000.00*+000.001+00 1.68+05 33 Ce-141 1.808+04 8.998+03 1.341+04 O.OOK+003.9410+3 0.001+00 1.121+07 34 Ce-144 1.151+06 3.619+05 6.159+04 0.000+002.001*05 0.008*00 9.411+07 All n*elides aiecept 0-3) calculated per OX aequation 2.3-24 R-3calculated per ODCM equation 2.3-28

(Page 103 of' 128) Beaver Valley Power Station ProcedureNumber:. 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 103 of 128 ATTACHMENT J Page 15 of 19 P&I ORGAN DOSE FACTORS Table 2.3-18 1 VALUES FORBEAVR VALLI! SITE (sq .eter-ires/yr per uCl/sec) PathtayCoymilk Age Group : Infant acljde Bore Liver T. Body Thyroid lidaey Lang 61-LLI 1 K-3 0.001+00 2.381+03 2.381+03 2.38103 2.381+03 2.381+03 2.381+03 2 P-32 1.361+11 7.991+09 5.271,09 0.001+00 0.001+00 0.001+00 1.8641409 3 Cr-51 0.081+00 0.001+00 1.341+05 8.751+04 1.911+04 1.701+05 3.911+06 4 lKn-54 0.008+00 2.781+07 6.251+08 0.001+00 6.111+06 0.00X+00 1.011+07 5 fe-59 1.811+08 3.161+08 1.251+08 0.001+00 0.001+00 9.351407 1.511+08 6Co-57 0.001+00 6.361+06 1.031+07 0.00100 0.001+00 0O.0+O0 2.171+07 7 Cso-56 0.00+00 1.891+07 4.701+07 0.001+00 0.001+00 0.009+00 4.708+07 8 Co-60 0.008+00 6.001+07 1.421+08 0.001+00 0.00o+00 0.001+00 1.431+08 9 2n-65 3.971+09 1.381+10 L.271+09 0.001+00 6.600+09 0.00g+00 1.151+10 10 lb-86 0.001+00 1.881+10 9.28X+09 0.001+00 0.001+00 0.008+00 4.811+08 11 Sr-89 1.011+10 0.001+00 2.891+08 0.001+00 0.001+00 0.008+00 2.071+08 12Sr-90 8.221+10 0.001+00 2.091+10 0.00140 0.001+00 0.O08+0o 1.031+09 13 Y-91 5.791+04 0.001+00 1.541*03 0.001+00 0.001+00 0.001+00 4.151+06 14Zr-95 5.331+03 1.301+03 9.221+02 0.00E+00 1.408+03 0.001+00 8.471+05 15Eb-95 4.871+05 2.011+05 1.161+05 0.001+00 1.441+05 0.001400 1.691+08 16Hb-97 2.031-11 5.621-12 2.031-12 0.001+00 4.391-12 0.001+00 1.779-08 17H0-99 0.00X+00 1.771+08 3.451+07 0.008+00 2.841+08 0.008+00 5.831807 18Tc-99h 2.341+01 4.828+01 6.211+02 0.001+00 5.191+02 2.528+01 1.401+04 19Ru-103 7.001803 0,001+00 2.361+03 0.008+00 1.471+04 0.008+00 8.591+04 20 Ru-106 1.341+05 0.001+00 1.678+04 0.008+00 1.581+05 0.001+00 1.01K+08 21 A9-IlOs2.751+08 2.011+08 1.331+08 0.008+00 2.881+08 0.001+00 1.041+10 22 SW124 0.008+00 0.0018+/-0 0.001+00 0.001+00 0.001+00 0.008+00 0.001+00 23 Gb-125 0.008+00 0.008+00 0.008+00 0.001+00 0.001+00 0.001+00 0.001+00 24 le-127* 3.161+08 1.051+08 3.031+07 9.141+07 7.791+08 0.001+00 1.281+08 25 Te-129m 4.588+00 1.578+08 7.061+07 1.761+08 1.151+09 0.008+00 2.741+08 26 1-131 2.318+09 2.728+09 1.201+09 0.951+11 3.181+09 0.008+00 9.728+/-07 27 1-133 3.089+07 4.491+/-07 1.311+07 8.171+09 5.281+07 0.001+00 7.601+06 28 Ca-134 2.510+10 4.698410 4.731+09 0.001+00 1.211+10 4.958+09 1.271+08 29 CB-136 1.68E+09 4.931+09 1.848*09 0.001+00 1.978+09 4.02C+08 7.491907 30 Cs-137 3.48X+10 4.071+10 2.898+09 0.008+00 1.091+10 4.438+09 1.271+08 31 Ba-140 2.051+00 2.051+05 1.051+07 0.001+00 4.861+04 1.261+/-05 5.021+/-07 32 La-140 3.451+01 1.361+01 3.508+00 0.001+00 0.001+00 0.008+00 1.608+05 33 Ce-141 3.57R+04 2.189+04 2.571+03 0.008+00 6.721+03 0.00R+00 1.131+07 34 Ce-144 1.651+06 6.759+05 9.251+04 0.008+00 2.731+/-05 0.001+00 9.479+07 ALl nuclides (except X-3) calculated per 00CHequation 2.3-24 0-3 calculated per OCI( equation 2.3-28

(Page 104 of 128) Beaver Valley yPower P wrSainPoououbr Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 104 of 128 ATTACHMENT J Page 16 of 19 P&I ORGAN DOSE FACTORS Table 2.3-17 R VALUES *0RBEAV1R VA0LLE SITE (sq seter-orem/yr per uCi/sec) Pathway =Goat milk AgeGroup = Adult Nuclide Bone Liver T. Body 7hyroid Kidney Long G1-,L] 1 H-3 0.009,00 1.561+03 1.561+03 1.561+03 1.561403 1.561+03 1.561+03 2 P-32 1.74R+10 1.081+09 6.721+08 0.001*00 0.001+O0 0.001+00 1.961+09 3 Cr-SI 0.00400 0.009+00 2.051+03 1.70+03 0.281+02 3.781+03 7.171+05 4 Hn-54 0.001+00 7.141+05 1.361+05 0.00100 2.121+05 0.001+00 2.191+05 5 Fe-59 3.12MM057.321+05 2.811+05 0.000+00 0.001+00 2.051+05 2.441+06 6 Co-57 0.001+00 1.091+05 1.821+05 0.001400 0.0014+0 0.001+00 2.771+06 7 Co-58 0.00U+00 4.401+05 9.861+05 0.00+0*0 0.001+00 0.001+00 8.911+06 8 Co-fO M.ON+O0 1.341+06 2.961+06 0.010 0.001+00 0.001+00 2.521+07 9 ZU-65 1.106+08 3.741+08 1.691+08 0.001+00 2.500+08 0.001+00 2.361+08 10Rb-8B 0.001+00 2.630+08 1.221+08 0.001+00 0.001+00 0,001+00 5.181+07 11Sr-I9 2.431+09 0.000+00 6.991+07 0.00+00 0.001+00 0.003+00 3.911+08 12Sr-90 6.641+10 O.O+00 1.639+10 0.00+00 0.001+00 0.001+00 1.921+09 137-91 8.141+02 M.001+00 2.181+01 0.001+00 0.001+00 0.001+00 4.481+05 14Zr-95 R.871+01 2.651+01 1.939*01 0.00+0*0 4.471+01 0.001+00 9.021+04 15Hb-95 8.136+03 4.526+03 2.431+03 0.001+00 4.471+03 0.001+00 2.741+07 16Mb-9" 3.380-13 8.541-14 3.121-14 0.001000 9.961-14 0.001*00 3.151-10 17Mo-99 0.006+00 2.531+04.811+05 0.006+00 5.721+06 0.001+00 5.816+06 18Tc-99% 3.396-01 9.591-01 1.221*01 0.009000 1.461+01 4.701-01 5.671402 19Ro-103 9.959+01 0.001+00 4.29R+01 0.001+00 3.801+02 0.001+00 1.161+04 20 Ru-108 1.729+03 0.001+00 2.161+02 0.001000 3.321+03 0.001+00 1.111+05 21 Ag-Ill0 4.990+06 4.616+01 2.741*06 0.00X+00 9.070+06 0,001+00 1.881+09 22 Sb-124 0.001600 O001+00 0.001+00 0.001*00 0.006+00 0.001+00 0.006*00 23 Sb-125 0.001+00 0.000+00 0.00+00 0.00X+00 0.-01000 0.001+00 0.001+00 24 Te-127% 4.131*06 1.481+06 5.031*05 1.051*06 1.681*07 0.006+00 1.381+07 25 Te-129a 5.941+06 2.221+06 9.419+05 2.041+06 2.461+07 0.001+00 2.991+07 26 1-131 3.021+08 4.321+08 2.4816+0 1.426*11 7.401*08 0.001+00 1.141+08 27 1-133 3.959+06 6.071+06 2.099+06 1.010+09 1.200+07 0.001+00 6.170+00 28Cs-134 4.676+08 1:110+09 9.09150+ 0.006*00 3.601+08 1.191+08 1.951+07 29 Co-13 6.701008 2,859+09 1.906+09 O.OO+00 0 1.471+09 2.021+06 3.011+08 30 Co-137 1.501+10 2.050+10 1.341+10 0.001*00 6.951*09 2.311+09 3.910+08 31Ba-140 2.748+06 3.449+03 1.790+05 0.000+00 1.178+03 1.971+03 5.641+06 32 lU-140 4.600-01 2.321-01 6.131-02 0.00+0*0 0.008+00 0.006*00 1.700+04 33 Ce-141 4.796+02 3.241+02 3.886+01 0.001*00 1.511+02 0.001+00 1.241+06 34Ce-144 3.056+04 1.270*04 1.646+03 0.00O*07,551+03 0.006+00 1.03R+07 All nuclides (except H-3) calculated perOCM esUatino 2.3-24 H-3 calculated per 00CAequation 2.3-28

(Pagd 105 of' 128) r 7 Procedure Number:

Title:

In-Field Reference Page Number: ODCM: GASEOUS EFFLUENTS ATTACHMENT J Page 17 of 19 P&I ORGAN DOSE FACTORS Table 2.3-18 R VAWNS FORBRADVVALOL*! SITI (sq meter-mreI/Tr per 0Ct/aec) Pathway : Goat milk Age Group = 7een putlide Bete Liver T. Body Thyroid Ildney Lug GI-LLI 1 H-3 0.00+00 2.035*03 2.031*03 2.031U03 2.031+03 2.03103 2.031+03 2 P-32 3.21R+10 1.991*09 1.241+09 0.001+00 0.001*000.001+00 2.701+09 3 Cr-5l 0.001400 0.001+00 4.981+03 2.771+03 1.091#03 7.112+03 8.375+05 4 In-54 0.001900 1.191+6 2.361405 0.001*00 3.551+05 0.005+00 2.449+06 5 le-59 5.445+05 1.271*06 4.901+05 0.001+00 0.001*00 4.001+05 3.001+06 6 Co-57 0.001+001.925+05 3.211+05 0.001+000.001*00 0.00+00 3.571+06 7 Co-58 0.001+00 7.401*05 1.711+06 0.001#000ON0 0.00O+00 1.025+07 8 Co-SO 0.005+00 2.271*08 5.111+00 0.00140 0.005+00 0.001+00 2.961+07 9 Zn-65 1.801+08 6.271508 2.931+08 0.001+00 4.011+08 0.001+00 2.661+08 10 Rb-86 0.001+0 4.791+00 2.251+08 0.001+000.005+00 0.009+00 7.091+07 It Sr-89 4.491*09 0.001+00 1.291+08 0.001*00 0.001+00 0.001400 5.351+08 12 Sr-90 9.391+10 0.001+00 2.321+10 0.001+ 00+000.000 0.008+00 2.641+09 13 Y-91 1.501+03 0.001*H04.01140 0.00100 0.001+00 0.009+00 6.141+05 14 Zr-95 1.559+02 4.901+01 3.371+01 0.001+007.191+01 0.001+00 1.131+05 15 lb-95 L.395+04 7.095+03 4.231+03 0.001+00 7.451*03 0.005+00 3.291+07 16 06-97 6.151-13 1.531-13 5.571-14 0.001*00 1.791-13 O.001+00 3.65E-09 17Mo-99 O.O0+00 4.560+06 8.701+05 0.001+00 1.041+07 0.001+00 8.171+06 18Tc-990 5.885-01 1.641+00 2.131+01 0.001+00 2.45+01 9.111-01 1.081+03 19 No-103 1.775+02 0.001*007.561+01 0.001+00 6.241+020.001+00 1.481+04 20 hu-lOS 2.441+03 0.001+00 3.989+02 0.008400 6.101+*03 0.005+00 1.521+05 21 Ag-l10a 8.245+06 7.801+08 4.751+060.008+00 1.490+07 0.001+00 2.195+09 22 Sb-124 0.001+000.001+00 0.001+00 O.OO+00 0.005+00 0.001+00 0.005+00 23 Sb-125 0.001+000.001+00 0.001+00 0.0010+00.001+00 0.001+00 0.001+00 24 Te-127s 1.011+002.701+0M 9.05R+05 1.81906 3.001+070.005+00 1.901+07 25 To-129a 1.095+07 4.031+06 1.721+06 3.51*+08 4.55X407 0.001+00 4.081+07 26 1-131 5.489+08 7.671+08 4.121+08 2.241+11 1.321+09 0.005+001.525+08 27 1-133 7,211+06 1.221+07 3.731+06 1.711+09 2.L51+070.001+00 9.26R+06 28 C8-134 8.118+08 1.911+09 8.861+08 0.001+006.071+00 2.328+08 2.388+07 29 Ce-136 1.145+09 4.495+09 3.021+09 0.001*00 2.445*09 3.859+08 3.61R+08 30 Co-137 2.711+10 3.011+101.265+10 0.001+00 1.235110 4.775+09 5.141+08 31 Ba-140 4.941+08 6.061*03 3.181045 0.00O+00 2.05103 4.071403 7.625+06 32 La-140 0,271-01 4.061-01 1.081-01 0.001+000.0010*00.005+00 2.331+04 33 Ce-141 8.795+02 5.B79+02 6.741+01 0.008+00 2.761502 0.001+00 1.681*06 34 Cu-114 5.500+04 2.328+04 3.011+03 0.001+00 1.39004 0.001+00 1.415+07 All nuclideo (except E-3) calculated per 01H equation 2.3-24 0-3calculated per ODOCequation 2.3-28

(Page 106 of 128) Beaver Valley Power Station Proceure Number: 1/2-ODC-2.02

Title:

Unit: -evel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: __2 106 of 128 ATTACHMENT J Page 18 of 19 P&I ORGAN DOSE FACTORS RVALUES FORBEAVKR VALLEI SITE (sq neter-sres/yr per aCi/aec) Pathway = Goat milk AgeGroup = Child Nuclide Bone LiTer T. Body Thyroid Kidney Lung GI-LLI 1 H-3 0,OO0 3.201103 3.20K+03 3.201+03 3.201+03 3.20E403 3.20X+03 2 P-32 7.91E+1O 3.701+09 3.051+09 0.001+00 0.001+00 O.OO+÷O02.199+09 3 Cr-51 9OO0O 0.009+001.02R+04 5.849+03 1.541+03 1.039+045.399+05 4 Mn-54 9OOE+00 1.781406 4.74g+05 0.00g+00 4.991+05 0.00X.00 1.491+06 5 Fe-59 1,269+06 2.041+06 1.02E+06 O.OO+00 0.001+O005.911+05 2.121+06 6 Co-57 0.004+00 3.271+05 86.31+05 0.009+00 0.001+00 0.001+00 2.681+06 7 Co-58 0,001+00 1.13+06 3.461406 0.001+00 O.OOX+O O.0O0.014 6.609+06 8 Co-60 Ok0K0O0 3.539+06 1.041+07 0.001+0 0.001+00 0.001+00 1.9510T 9 Zu-65 3,54+OB 9.441+08 5.87148 o.O01+DO 5.951+00 0.001S00 1.661e05 10 Rb-06 0.009+00 8.841+08 5.461408 0.OO[s00 0.00++00 O.OOO0 5.719+07 11Sr-89 L,11K+1O 0.00400 3.171+08 O.OOE0 .+000.001+00 o.oI+ 4.301+08 12 Sr-90 1.59E+I1 O.OOR+O04.02O+10 0.009+00O.001+000.001+00 2.141+09 13 Y-9I 3.70R+030.001+00 9.89R+01 0.00+00 O.OoX0+OO.OO+O0 4.939+05 14Zr-95 3,801042 7.929+01 7.05N+01 O.00+OO 1.131+02 O.P00+O0 8.271+04 15 Kb-95 3,131+04 1.221+04 8.719+03 0.001+001.141+04 M.UMR+O02.251+07 16 Nb-97 1.499-12 2.701-13 1.261-13 0M08]M002.991-13 0.00DOOI8.331-08 17 Mo-99 kOO00+O08.301+06 2,059+060.009+00 1.771+070.0014006.81+06 18 Tc-991 1.359+00 2,659+00 4.39R+0I 0.001+40 3.841+01 1.341400 1.511+03 19 Ru-103 4.181+02 0.00+00 1.BLE+02O.OOE+O01.051+03 0.008400 1.081+04 20 Ru-106 7.791+03 0.001+00 9.72E+02 0.OOK+0O1.051+040.00.+00 1.211+05 21 Ag-1l0a 1.799i07 1.21+07 9.658406 0.001+00 2.251+07 0.004+00 1.411+09 22 Sb-124 0.OO+OO 8,00I+00 0.001+00 o0.00g+08 0.001+00 0.00o oo 0.009+00 23 Sb-125 O.OOK+OO 0.001+00 MUM 0O.OO+O0 0.001+00 0.00M+00 O.OOR+O0 24 le-127a i.888EO7 5.051+06 2.231406 4.48K+06 5.351+07 O.009+O0 1.529t04 25 Te-129a 2.6B8947 7.489+06 4.MSUMO58.641+06 7.871+07 O.O09+O0 3.27+107 26 1-131 1.339+09 1.349+09 7.60R+08 4.421+11 2.191+09 0.001+00 1.191+08 27 1-133 1.759+07 2.17+07 8.20E+06 4.039+09 3.611+07 0.001400 8.73E+06 28 Cs-134 1.879+09 3.071+09 6.48E+08 0.001+00 9.521+08 3.429+08 1.661+07 29 C-136 2.589+09 7.086109 4.539+09 O.OOtOO 3.771+09 5.02E+0B 2.491+08 30 CS-137 6.549+10 6.261+10 9.24E+09 0.001460 2.041+10 7.341+09 3.921+08 31 Ba-140 1.199+07 1.051+06 8.96R+05 O.OO+O0 3.401+03 8.238+03 6,041+06 32 La-140 1.989+00 6.921-01 2.33-01O 0.001+00 0.001+00 0.001+001.931+04 33 Ce-141 2.169+03 1.081+03 1.608+03 0.00g+00 4.739+02 O.OO+O0 1.359+06 34 Ce-144 1.389+05 4.33!404 7.379+03 O.00+OO 2.401+04 0.00X+OO1.139+07 All nuclidea (except 9-3) calculated per ODCH eqation 2.3-24 H-3 calculated per ODM egnation 2.3-2B

(Page 107 of, 128) Beaver Valley Power Station Beaver__ ValleyPower Procedure Number: _________1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference Revision: Page Number: ODCM: GASEOUS EFFLUENTS 2 107 of 128 ATTACHMENT J Page 19 of 19 P&I ORGAN DOSE FACTORS 7able 2.3-20 HR VALUES FOR BEAVERVAbLIT SITE (aqseter-mren/yr per uCi/fec) Pathway : Goat Hilk AgeGroup z Infant uctide Bone Liver T. Body Thyroid Kidney Lung GI-LLI I H-3 0.001+00 1.861+03 4.861+03 4.861+03 4.861+03 4.861+03 4.881+03 2 P-32 1.638+11 9.591+09 6,321+09 0.001+00 0.00+00 0.001+00 2.211+09 3 Cr-51 0.008+0 0.001+00 1.611+04 1.051+04 2.291+03 2.041+04 4.691+05 4 Mn-54 0.001+00 3.311+06 7.501+05 0.00M+00 7.331+05 0.001+00 1.211+06 5 Fe-59 2.351+06 (.111+06 1.621+06 0.008+00 0.001+00 1.211+06 1.961+06 6 Co-57 0.001+00 7.641+05 1.241+06 0.008+00 0.001+00 0.001+00 2.601+06 7 Co-58 0.008+00 2.261+06 5.641+06 0.008+00 0.001+00 0.001+00 5.641+06 8 Co-6O 0.001+00 7.201+06 1.701+07 6.008+00 0.001+00 0.001+00 1.711+07 9 Zn-65 4.761+08 1.631+09 7.531+08 0.001+00 7.921+08 O.0OE+001.381+09 10Rb-86 0.008+00 2.251+09 1.111+09 0.00X+00 0.001+00 0.001+00 5.771+07 II Sr-89 2.111+10 0.001+00 6.081+08 0.001+00 0.001+00 0.001+00 4.341+08 12Sr-90 1.731+11 0.001+00 4.39M+10 0.001+00 0.001+00 0.001+00 2.161+09 13Y-91 6.941+03 0.008+00 1.851+02 0.001+00 0,001+00 0.001400 4.981+05 14Zr-95 6.401+02 1.561+02 1.111+02 0.001+00 1.681+02 0.001+00 7.771+04 15Rb-95 5.841+04 2.411+04 1.391+04 0.001+00 1.728+04 0.001400 2.031+07 16Hb-97 3.168-12 6.748-13 2.431-13 0.001+00 5.271-13 0.0010*0 2.138-07 17Ho-99 O.O+00 2.128+07 4.141+06 0.008+00 3.171+07 0.001400 6.991+08 18Tc-99a 2.818+00 5.791+00 7.461+01 0.001+00 6.231+01 3.031+00 1.681+03 19 Ru-103 8.471+02 0.00K+00 2.831+02 0.008+00 1.768+03 0.001+00 1.031+04 20 Ru-lO6 1.608+04 0.001+00 2.001+03 0.008+00 1.901404 0.001+00 1.221+05 21Ag-lOOm3.301+07 2.411+07 1.801+07 0.001+00 3.451W07 0.00100 1.251+09 22 Sb-124 0.008+00 0.001+00 0.001+00 0.001+00 0.001900 0.001+00 0.001+00 23 5b-125 0.00+00 0.001+00 0001+O00 0.001+00 0.008400 0.001+00 0.001400 24Te-127& 3.801407 1.261+07 4.59E+06 3.101+07 9.351+07 0.001+00 1.538+07 25 Te-129z 5.501+07 1.891+07 6.471+06 2.118+07 1.388+08 0.001+00 3.281+07 26 1-131 2.771+09 3.271+09 1.414+09 1.078+12 3.82M 9 0.001O00 1.171+08 27 1-133 3.708+07 5.391+07 1.581+07 9.800+09 6.341807 0.001+00 9.121+06 20Ca-134 3.021+09 5.621+09 5.681+08 0.001+00 1.451+09 5.931408 1.531+07 29 Cs-136 5.031+09 1.481+10 5.52E+09 0.001+00 5.901+09 1.211409 2.251+08 30 Cn-137 1.048+11 1.221+11 8.660+09 0.001+00 3.281+10 1.331+10 3.821+08 31 Ba-140 2.458+07 2.453+04 1.261+06 0.008+00 5.83M+03 1.511+04 6.031406 32 La-140 4.141+00 1.631800 4.198-01 0.008+00 0.001400 0.008+00 1.921+04 33 Ce-141 4.291+03 2.621+03 3.088+02 0.008+00 8.079402 0.008+00 1.358+06 34Ce-144 1.981+05 8.111+04 1.118+04 0.009+40 3.281+04 0.008+00 1.141+07

                                .All nuclides (except H-3) calculated per O)CHequation 2.3-24 H-3 calculated per O)CH  equation 2.3-28
                                                                                                                                        ,.-.]

TABLE 2.3-21 PV- 1/2 DEPOSITION PARAMETERS (D/Q) FOR M CONTINUOUS RELEASES >500 HRS/YR OR >150 HRS/QTR (meters)-2 0 C-1 DISTANCES TO THE CONTROL LOCATIONS, IN MILES trl -t SECTOR 0.0-0.5 0.5 - 1.0 1.0- 1.5 1.5-2.0 2.0- 2.5 2.5 -3.0 3.0-3.5 3.5 -4.0 4.0-4.5 4.5 -5.0 N 6.OOE-10 8.60E-09 3.14E-09 1.76E-09 8.12E-10 5.70E-10 4.24E-10 3.29E-10 2.63E-10 2.15E-10 0 NNE 6.66E-10 5.64E-09 1.98E-09 2.55E-09 1.33E-09 1.07E-09 6.75E-10 5.23E-10 4.56E-10 3.74E-10 NE 1.03E-09 1.57E-09 1.32E-09 3.62E-09 2.63E-09 1.64E-09 1.23E-09 6.13E-10 7.85E-10 6.42E-10 t~l 0 ENE 1.13E-09 1.55E-09 3.69E-09 3.27E-09 2.3 1E-09 1.29E-09 1.21E-09 6.78E-10 6.72E-10 3.89E-10 zr~. 0 E 1.35E-09 1.28E-08 4.09E-09 3.12E-09 1.91E-09 1.36E-09 1.01E-09 7.83E-10 4.15E-10 5.10E-10 H ESE 9.82E-10 7.85E-09 4.40E-09 2.46E-09 1.03E-09 H 1.47E-09 5.65E-10 5.05E-10 3.25E-10 3.OOE-10 ~ 0c 0 (~~1 SE 2.76E-09 6.41E-09 3.52E-09 1.97E-09 1.18E-09 8.27E-10 5.68E-10 4.40E-10 2.93E-10 C/)0 2.43E-10 0 SSE 2.22E-09 4.66E-09 3.01E-09 1.68E-09 1.02E-09 7.14E-10 4.25E-10 3.29E-10 2.19E-10 1.80E-10 S 3.OOE-09 4.81E-09 3.76E-09 2.1OE-09 1.36E-09 9.52E-10 5.12E-10 3.96E-10 2.68E-10 2.20E-10 H SSW 1.44E-08 2.89E-09 7.83E-10 8.84E-10 5.70E-10 4.OOE-10 2.55E-I0 1.98E-10 1.84E-10 1.51E-10 C)2 SW 1.89E-08 5.55E-09 1.55E-09 8.7 1E-10 2.61E-10 3.94E-10 1.57E-10 2.50E-10 2.54E-10 2.08E-10 WSW 1.57E-09 6.63E-09 1.36E-09 1.04E-09 5.44E-10 2.39E-10 3.84E-10 2.98E-10 2.17E-10 1.78E-10 W 3.78E-10 2.95E-09 1.84E-09 1.03E-09 6.63E-10 4.66E-10 1.37E-10 2.68E-10 1.12E-10 1.75E-10 '0 0 WNW 4.54E-10 4.13E-10 3.09E-10 4.7 1E-10 7.35E-10 5.16E-10 1.93E-10 1.10E-10 1.12E-10 1.80E-10 0. NW 4.52E-10 4.09E-10 2.86E-10 1.18E-09 7.04E-10 4.94E-10 3.37E-10 2.1OE-10 2.09E-10 1.71E-10 0 NNW 3.40E-10 2.05E-09 1.63E-09 9.12E-10 5.86E-10 4.13E-10 2.79E-10 2.16E-10 1.73E-10 1.42E-10 z0 cdn 00 tO t'.) 00 C) 0 0 0 (1 i-i-I-

I ,..q I TABLE 2.3-22 0R CV-1 AND CV-2 DEPOSITION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES >500 HRS/YR OR >150 HRS/QTR

                                                            -2 (meters)                                                               c/

0 DISTANCES TO THE CONTROL LOCATIONS, IN MILES 0 SECTOR 0.0-0.5 0.5 - 1.0 1.0- 1.5 1.5-2.0 2.0 -2.5 2.5 -3.0 3.0- 3.5 3.5 -4.0 4.0 - 4.5 4.5 - 5.0 N, 4.46E-08 7.73E-09 3.24E-09 1.81E-09 1.08E-09 7.57E-10 5.16E-10 4,OOE-10 2.91E-10 2.38E-10 0 NNE 5.42E-08 9.39E-09 3.37E-09 1.89E-09 1.22E-09 8.54E-10 6.35E-10 4.92E-10 3.94E-10 3.22E-10 NE 7.32E-08 1.27E-08 6.21E-09 3.47E-09 2.24E-09 1.57E-09 1.00E-09 7.77E-10 5.69E-10 4.66E-10 0 0 ENE 7.77E-08 1.35E-08 6.5 1E-09 3 .64E-09 2.50E-09 1.76E-09 1.3 1E-09 1.01E-09 6.58E-10 5.39E-10 E 6.08E-08 1.05E-08 3.79E-09 2.12E-09 1.37E-09 9.59E-10 6.54E-10 5.06E-10 4.05E-10 3.32E-10 ESE 3.23E-08 5.60E-09 2.54E-09 1.42E-09 8.46E-10 5.94E-10 4.05E-10 3.14E-10 2.28E-10 1.87E-10 z

                                                                                                                                       .1 SE      3.29E-08 5.70E-09    2.59E-09   1.45E-09    9.32E- 10   6.55E-10  4.12E-10  3.19E-10  2.55E-10   2.09E-10                       0 SSE S

2.84E-08 3.67E-08 4.92E-09 6.37E-09 2.06E-09 2.26E-09 1.15E-09 1.26E-09 6.29E-10 8.14E-10 4.42E-10 5.71E-10 2.99E-10 3.86E-10 2.32E-10 2.99E-10 1.85E-10 2.39E-10 1.52E-10 1.96E-10 z SSW ýH 2.61E-08 4.52E-09 1.60E-09 8.97E-10 5.78E-10 4.06E-10 3.02E-10 2.34E-10 1.70E-10 1.39E-10 SW 3.06E-08 5.30E-09 2.62E-09 1.4'7E-09 8.01E-10 5.62E-10 4.18E-10 3.24E-10 2.35E-10 1.93E-10 WSW 4.60E-08 7.97E-09 3.34E-09 1.87E-09 1.20E-09 8.45E-10 5.87E-10 4.55E-10 3.38E-10 2.77E-10 W 6.49E-08 1,13E-08 4.72E-09 2.64E-09 1.19E-09 8.36E-10 6.22E-10 4.82E-10 3.85E-10 3.15E-10 C WNW 9.25E-08 1.60E-08 6.43E-09 3.60E-09 2.21E-09 1.55E-09 1.16E-09 8.96E-10 5.79E-10 4.75E-10 0. NW 1.19E-07 2.07E-08 8.68E-09 4,86E-09 2.99E-09 2.1OE-09 1.56E-09 1.21E-09 7.83E-10 6.41E-10 0 NNW 5.22E-08 9.04E-09 3.79E-09 2.12E-09 1.28E-09 9.OOE-10 6.25E-10 4.84E-10 3.59E-10 2.94E-10 z DO CD COD

(Page 110 of 128) Beaver Valley Power Station . ProceDureNumber 1/2-0DC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 110 of 128 ATTACHMENT K Page 3 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 MILES) TABLE 2.3-23 VV-1 AND VV-2 DEPOSITION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES >500 FRS/YR OR >150 HRS/QTR (meters-2) Same as Table 2.3-22

(Page 11,, o04 128) Beaver Valley Power StationProcedure N-ber:

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 111 of 128 ATTACHMENT K Page 4 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 MILES) TABLE 2.3-24 TV-2 DEPOSITION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES >500 HRS/YR OR >150 HRS/QTR (meters-2) Same as Table 2.3-22

(Page 112 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 1 2 112 of 128 ATTACHMENT K Page 5 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 MILES) TABLE 2.3-25 CB-2 DEPOSITION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES >500 HRS/YR OR >150 HRS/QTR (meters 2 ) Same as Table 2.3-22

(Page 113,, of ,128) Beavr Beaver Valley ValeyProcedure Power Station Number: 1/2Pr2*um2.,

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 113 of 128 ATTACHMENT K Page 6 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 MILES) TABLE 2.3-26 DV-2 DEPOSITION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES >500 HRS/YR OR >150 HRS/QTR (meters 2 ) Same as Table 2.3-22

(Page 114 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 114 of 128 ATTACHMENT K Page 7 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (0-5 MILES) TABLE 2.3-27 WV-2 DEPOSITION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES >500 HRS/YR OR >150 HRS/QTR (meters-2) Same as Table 2.3-22

(Page 115 of 128) Beaver ValleyPower Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 .In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 115 of 128 ATTACHMENT L Page 1 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-28 PV-1/2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                               >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(iE-9 meters-2) INDIVIDUAL RECEPTORS DOWNWIND SITE VEGETABLE MILK MILK MEAT SECTOR BOUNDARY GARDEN COW GOAT ANIMAL RESIDENCE N .600 2.340 .572 .707 2.510 NNE .673 3.220 .524 2.920 3.220 NE .766 1.280 .660 .111 .660 1.200 ENE 1.010 5.080 .702 1.760 E 1.370 4.420 .401 1.290 1.290 4.420 ESE .984 6.390 2.340 6.390 6.180 SE 11.000 3.680 .466 .466 1.300 3.680 SSE 7.060 3.220 .423 .105 3.140 4.320 S 5.780 1.540 1.410 2.610 2.730 SSW 2.040 1.040 .578 .208 1.040 1.460 SW 1.610 1.120 .693 .979 1.120 WSW 1.710 1.310 .370 1.190 1.310 W .377 .659 .138 .518 .659 WNW .424 .746 .497 .029 .746 .746 NW .447 .425 .070 .488 .422 NNW .340 1.840 .043 .545 1.92

(Page 116 of 128)

0. .

Beaver Valley Power Station Proce'ure0 OD2r

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 116 of 128 ATTACHMENT L Page 2 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-29 CV-1 AND CV-2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                              >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(1E-9 meters- 2) INDIVIDUAL RECEPTORS DOWNWIND SITE VEGETABLE MILK MILK MEAT SECTOR BOUNDARY GARDEN COW GOAT ANIMAL RESIDENCE N 25.40 2.05 .693 .847 2.19 NNE 18.80 2.02 .459 1.850 2.11 NE 63.40 29.30 .455 .078 .455 30.40 ENE 65.90 8.92 .661 32.20 E 38.00 3.90 .382 1.020 1.020 22.70 ESE 17.10 3.56 1.380 3.560 3.56 SE 13.80 3.03 .350 .350 1.100 3.03 SSE 10.50 2.65 .317 .094 2.570 3.68 S 10.60 1.05 .934 1.860 1.95 SSW 5.59 1.26 .663 .266 1.260 4.42 SW 3.94 2.21 1.3 20 1.920 2.21 WSW 27.50 2.65 .596 2.380 2.65 W 31.60 1.23 .645 .960 1.23 WNW 39.10 2.23 1.490 .045 2.230 2.23 NW 70.60 15.00 .276 1.990 15.60 NNW 31.50 6.52 .068 1.090 9.91

(Page 117 of 128) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Uvel Of use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 117 of 128 ATTACHMENT L Page 3 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-30 VV-1 AND VV-2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                            >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(lE-9 meters"2) Same as Table 2.3-29

(Page 118 of 128) Beaver Valley PowerPProcedure Station Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: __2 118 of 128 ATTACHMENT L Page 4 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-31 TV-2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                               >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(1E-9 meters"2) INDIVIDUAL RECEPTORS DOWNWIND SITE VEGETABLE MILK MILK MEAT SECTOR BOUNDARY GARDEN COW GOAT ANIMAL RESIDENCE N 20.20 2.05 .693 .847 2.190 NNE 34.90 2.02 .459 1.850 2.110 NE 54.20 29.30 .455 .078 .455 30.400 ENE 57.50 8.92 .661 32.20.0 E 38.10 3.90 .382 1.020 1.020 22.700 ESE 18.60 3.56 1.380 3.560 3.560 SE 19.00 3.03 .351 .351 1.100 3.030 SSE 13.30 2.65 .318 .094 2.570 3.690 S 11.30 10.40 .934 1.860 1.950 SSW 6.44 1.26 .664 .266 1.260 4.430 SW 3.95 2.21 1.320 1.920 2.210 WSW 25.10 2.65 .597 2.380 2.650 WN 28.40 1.23 .646 .961 1.230 WNW 30.90 2.23 1.490 .045 2.230 2.230 NW 56.10 14.90 .276 1.980 15.500 NNrW 25.10 6.53 .068 1.100 9.920

(Page 119 of 128) BPProcedure Number: Beaver Valley Power Station .1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 119 of 128 ATTACHMENT L Page 5 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-32 CB-2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                           >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(IE-9 meters"2) Same as Table 2.3-31

(Page 120 of 128)

                                                                                                        *j eaver rValley Va yPowerStation                    Procedure Number:

1/2-ODC-2.02

Title:

Unit vel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 120 of 128 ATTACHMENT L Page 6 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-33 DV-2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                          >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(1E-9 meters-2) Same as Table 2.3-29

(Page 121 of 128)

   .1 i I Beaver Valley Power Station                  Proced        onr Number:

1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 121 of 128 ATTACHMENT L Page 7 of 7 CONTINUOUS RELEASE DEPOSITION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-34 WV-2 DEPOSTION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES

                            >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(1E-9 meters-2) Same as Table 2.3-29

(Page 122 of 128) Be e-V l PProcedure Number: Beaver-Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 122 of 128 ATTACHMENT M Page 1 of 3 BATCH RELEASE DISPERSION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-35 CV-1 AND CV-2 DISPERSION PARAMETERS (X/Q) FOR BATCH RELEASES

                                Ž500 HRS/YR OR Ž>150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(sec/m 3) INDIVIDUAL RECEPTORS DOWNWIND SITE VEGETABLE MILK MILK MEAT SECTOR* BOUNDARY GARDEN COW GOAT ANIMAL RESIDENCE N 8.21E-5 8.38E-6 -- 3.72E-6 4.34E-6 8.82E-6 NNE 3.04E-5 4.71E-6 -- 1.40E-6 4.38E-6 4.87E-6 NE 4.59E-5 2.21E-5 6.05E-7 1.38E-7 6.05E-7 2.28E-5 ENE 3.72E-5 5.25E-6 -- 5.66E-7 -- 1.88E-5 E 2.93E-5 3.79E-6 5.15E-7 1.17E-6 1.17E-6 1.78E-5 ESE 2.47E-5 5.61E-6 -- 2.34E-6 5.61E-6 5.61E-6 SE 2.14E-5 5.OOE-6 8.13E-7 8.13E-7 2.03E-6 5.OOE-6 SSE 2.21E-5 6.31E-6 1.11E-6 3.92E-7 6.13E-6 8.49E-6 S 2.15E-5 3.03E-6 2.76E-6 -- 4.93E-6 5.14E-6 SSW 2.18E-5 6.58E-6 3.81E-6 1.82E-6 6.58E-6 1.78E-5 SW 1.82E-5 1.03E-5 -- 6.67E-6 9.12E-6 1.03E-5 WSW 1.09E-4 1.29E-5 4.1OE-6 -- 1.19E-5 1.29E-5 W 1.49E-4 1.05E-5 6.55E-6 -- 8.77E-6 1.05E-5 WNW 1.91E-4 1.72E-5 1.28E-5 1.23E-6 1.72E-5 1.72E-5 NW 3.08E-4 6.13E-5 -- 3.80E-6 1.36E-5 6.36E-5 NNW 1.80E-4 3.54E-5 -- 1.35E-6 9.27E-6 5.29E-5

             *Measured relevant to center point between BV-1 and BV-2 Containment Buildings Period of Record: 1976 - 1980

(Page 123 of 128) iif 8 Procedure Number: Beaver Valley Power Station 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 123 of 128 ATTACHMENT M Page 2 of 3 BATCH RELEASE DISPERSION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-36 VV- 1 AND VV-2 DISPERSION PARAMETERS (X/Q) FOR BATCH RELEASES

                                 Ž_500 HRS/YR OR Ž_150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(sec/m 3) INDIVIDUAL RECEPTORS DOWNWIND SITE VEGETABLE MILK MILK MEAT SECTOR* BOUNDARY GARDEN COW GOAT ANIMAL RESIDENCE IN 9.75E-5 I .UUL*-. 4.21E-6 4.95E-6 1.06E-5 NNE 3.78E-5 5.11E-6 1.43E-6 4.72E-6 5.30E-6 NE 6. 13E-5 2.70E-5 6.20E-7 1.40E-7 6.20E-7 2.81E-5 ENE 4.83E-5 5.58E-6 5.71E-7 2.24E-5 E 3.66E-5 3.99E-6 5.25E-7 1.19E-6 1.19E-6 2. 1OE-5 ESE 2.99E-5 6.13E-6 2.43E-6 6.13E-6 6.13E-6 SE 2.55E-5 5.29E-6 8.24E-7 8.24E-7 2.13E-6 5.29E-6 SSE 2.65E-5 6.72E-6 1. 12E-6 3.95E-7 6.53E-6 9.22E-6 S 2.52E-5 3.14E-6 2.83E-6 5.29E-6 5.53E-6 SSW 2.60E-5 7.34E-6 4.15E-6 1.92E-6 7.34E-6 2.09E-5 SW 2.13E-5 1.18E-5 7.41E-6 1.04E-5 1.18E-5 WSW 1.34E-4 1.51E-5 4.46E-6 1.38E-5 1.51E-5 W 1.77E-4 1.25E-5 7.40E-6 1.02E-5 1.25E-5 WNW 2.33E-4 2.07E-5 1.49E-5 1.30E-6 2.07E-5 2.07E-5 NW 3.32E-4 8.57E-5 4.24E-6 1.64E-5 8.85E-5 NNW 1.90E-4 4.69E-5 1.45E-6 1.09E-5 6.75E-5

             *Measured relevant to center point between BV-1 and BV-2 Containment Buildings Period of Record: 1976 - 1980

(Page 124 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: 2 Page Number: 124 of 128 ATTACHMENT M Page 3 of 3 BATCH RELEASE DISPERSION PARAMETERS (SPECIAL DISTANCES) TABLE 2.3-37 PV-1/2 DISPERSION PARAMETERS (X/Q) FOR BATCH RELEASES

                               >500 HRS/YR OR >150 HRS/QTR FOR SPECIAL DISTANCES (IDENTIFIED IN ATTACHMENT E TABLE 2.2-3)

(sec/m 3) INDIVIDUAL RECEPTORS DOWNWIND SITE VEGETABLE MILK MILK MEAT SECTOR* BOUNDARY GARDEN COW GOAT ANIMAL RESIDENCE N 3.09E-9 3.30E-6 1.13E-6 1.34E-6 3.36E-6 NNE 2.85E-9 2.68E-6 6.52E-7 2.47E-6 2.68E-6 NE 2.02E-10 7.42E-9 5.44E-7 1.24E-7 5.44E-7 5.51E-9 ENE 1.02E-9 3.21E-6 6.29E-7 1.67E-9 E 2.15E-9 2.91E-6 4.96E-7 1. 14E-6 1.14E-6 2.91E-6 ESE 6.90E-9 4.97E-6 1.95E-6 4.97E-6 4.81E-6 SE 2.91E-6 3.52E-6 6.02E-7 6.02E-7 1.43E-6 3.52E-6 SSE 4.91E-6 3.56E-6 6.53E-7 2.18E-7 3.47E-6 4.71E-6 S 2.41E-6 1.78E-6 1.65E-6 2.84E-6 2.96E-6 SSW 4.83E-6 2.52E-6 1.50E-6 6.60E-7 2.52E-6 3,96E-6 SW 4.82E-6 2.75E-6 1.78E-6 2.44E-6 2.75E-6 WSW 5.77E-7 2.81E-6 8.79E-7 2.57E-6 2.81E-6 W 2.88E-9 1.68E-6 4.89E-7 1,37E-6 1.68E-6 WNW 3.40E-9 1.61E-6 1.13E-6 1.1OE-7 1,61E-6 1.61E-6 NW 1.34E-9 3.3 1E-8 2.03E-7 1.07E-6 3. 1E-8 NNW 1.52E-9 3.73E-6 1.73E-7 1.3 1E-6 3.81E-6

             *Measured relevant to BV-I natural draft cooling tower Period of Record: 1976 - 1980

TABLE 2.3-38 ot PV-1/2 DISPERSION PARAMETERS (D/Q) FOR CONTINUOUS RELEASES Žt500 HRS/YR OR Ž_150 HRS/QTR (sec/m 3) o ct DISTANCES TO THE CONTROL LOCATIONS, IN MILES t.l SECTOR 0.0-0.5 0.5 - 1.0 1.0-1.5 1.5 - 2.0 2.0-2.5 2.5-3.0 3.0- 3.5 3.5- 4.0 4.0-4.5 4.5- 5.0 N 2.75E-15 1.07E-5 4.1OE-6 2.61E-6 1.51E-6 1.13E-6 8.84E-7 7.13E-7 5.93E-7 5.06E-7 (" NNE 5.90E-17 5.39E-6 2.83E-6 2.19E-6 1.36E-6 1.13E-6 8.05E-7 6.51E-7 5.64E-7 4.81E-7 trI NE 4.45E-16 1.67E-8 7.39E-8 2.28E-6 1.72E-6 1.19E-6 9.28E-7 6.76E-7 7.34E-7 5.32E-7 cn ENE 1.92E-15 8.87E-8 2.60E-6 2.21E-6 1.66E-6 1.13E-6 9.25E-7 7.23E-7 6.06E-7 3.82E-7 tt E 1.84E-15 5.1OE-6 2.77E-6 2.23E-6 1.44E-6 1.12E-6 8.74E-7 6.92E-7 5.11E-7 4.82E-7 ýd It ESE 2.96E-13 5.26E-6 3.48E-6 2.04E-6 1.34E-6 9.93E-7 6.70E-7 5.76E-7 4.37E-7 3.83E-7 cn P SE 9.16E-8 3.13E-6 3.38E-6 1.99E-6 1.31E-6 9.58E-7 7.14E-7 5.74E-7 4.32E-7 3.68E-7 SSE 3.50E-8 4.86E-6 3.33E-6 1.95E-6 1.29E-6 9.42E-7 6.55E-7 5.24E-7 3.95E-7 3.32E-7 S 1.22E-7 4.12E-6 3.97E-6 2.34E-6 1.59E-6 1.17E-6 7.75E-7 6.24E-7 4.74E-7 4.OOE-7 SSW 1.75E-5 6.22E-6 2.84E-6 2.18E-6 1.48E-6 1.08E-6 7.83E-7 6.31E-7 5.62E-7 4.77E-7 SW 2.08E-5 9.1IE-6 3.47E-6 2.19E-6 1.25E-6 1.11E-6 8.19E-7 7.17E-7 6.89E-7 5.85E-7 WSW 8.56E-8 9.35E-6 3.16E-6 2.29E-6 1.46E-6. 1.01E-6 9.06E-7 7.52E-7 5.99E-7 5.07E-7 I

  • 0 W 5.44E-17 4.52E-6 4.21E-6 2.49E-6 1.69E-6 1.25E-6 4.86E-7 7.68E-7 5.80E-7 5.48E-7 WNW 9.25E-18 1.44E-8 5.66E-8 1.92E-6 1.59E-6 1.17E-6 7.75E-7 4.61E-7 5.28E-7 4.89E-7 NW 2.61E-16 1.98E-8 8.37E-8 2.24E-6 1.46E-6 1.08E-6 8.09E-7 6.12E-7 5.42E-7 4.60E-7 -- e NNW 1.91E-15 3.91E-6 3.66E-6 2.15E-6 1.40E-6 1.08E-6 8.03E-7 6.48E-7 5.37E-7 4.56E-7 ,/)

CD 00

(Page 126 of 128) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.02

Title:

Unit: Level Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 126 of 128 ATTACHMENT 0

                                         . Page 1 of 1 GASEOUS RADWASTE SYSTEM FIGURE 2.4-1 BV-i AND 2 GASEOUS RADWASTESYSTEM

(Page 127 of 128) Beaver Valley Power Station ProcedureNubr 1/2-ODC-2.02

Title:

Unit: evel Of Use: 1/2 In-Field Reference ODCM: GASEOUS EFFLUENTS Revision: Page Number: 2 127 of 128 ATTACHMENT P Page 1 of 1 BV-1 AND BV-2 GASEOUS EFFLUENT RELEASE POINTS FIGURE 2.4-2 BV-I AND 2 GASEOUS EFFLUENT RELEASE POINTS

                                                   -Ohio      I(iver El E

sill Unit 1. Release Point Z Description ELevotion N

1. Unit 1: VentiLation Vent 79 feet 24 ietern
2. Unit 1: Contoinnent / SLCRS Vent 154 feet = 47 -ters
3. Unit 1L2: process Vent 475 feet = 145.meters /V
4. Unit 2: Vertiiation Vent 85 feet 26 -eter.
5. Unit 2: Containnent / SLCRS Vent 154 feet 47 4 meters
6. Unit 2: Condensate Potishing BuitdingJ Vent 80 feet 24 meters
7. Unit 2: Wiste Gas Storage Vault Vent W0 feet = 24 meters
a. Unit U: Detontmination Building Vent 80 feet - 24 wetern
9. Unit 2: lurbine Building Vent 109 feet 33 noters Note: The Release Point shoon for the Unit 2 Turbine Buiiding Vent Is a reprentative exhaust point for the 10 roef exhaust outlets.

(D co 0 -ZI.

'-*1 CD
     >0

(Page 1 of 23) RTL #A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-2.03 ODCM: Radiological Environmental Monitoring Program Document Owner Manager, Nuclear Environmental and Chemistry Revision Number I Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 12/29/06

(Page 2 of 23) Beaver Valley Power Station ProcedureDum

Title:

Unit: Level Of Use: ODCM. Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: I 1 2 of 231_ TABLE OF CONTENTS 1.0 PURPOSE ..... .......................................... ............... 3 2.0 SCOPE ................................................................. 3 3.0 REFEREN CES AND COM MITMEN TS ............................................................................. ....... 3 3 .1 R eferen c es ............................................................ ;....................................... ..3 3.3 Commitments ........................... .. 4 4.0 RE C O RD S A ND FO RM S .............................................................................................. ...... 4 4.1 Records .............. ............... 4 4.2 Forms .......... ................................................... 4 5.0 PRECAUTION S AND LIM ITATION S .................................................................................... 4 6.0 A CC E PT A N C E C R IT E RIA .................................................................................................. I....... 4 7.0 P RERE Q UISITE S............................................................... ................................................. 4 8.0 P R O C ED UR E ...................................................................................................................... .. 4 8.1 REM P O verv iew .......................................................................................... ...................... 4 8.2 Sam pling and A nalysis Program ............................................................................ ....... 5 8.3 C rosscheck Program ................................................................................................ ....... 8.4 Land Use Census Program ........... ......... ........... ............ 6 8.5 Direct Radiation Monitoring Program ................................................................ 7 ATTACHMENT A EXPOSURE PATHWAY AND SAMPLING REQUIREMENTS ........... .8 ATTACHMENT B LOCATION OF SAMPLING SITES ................................................. .. 12

.(Page 3 of 23) Procedure Number: Beaver Valley Power Station 1/2PODC-2.03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 3 of 23 1.0 PURPOSE 1.1 This procedure provides the Radiological Environmental Monitoring Program (REMP) requirements from the Radiological Branch Technical Position.(31 1 ) 1.1.1 Prior to issuance of this procedure, these items were located in Section 3 of the old ODCM. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 Radiological Branch Technical Position, Revision 1, 1979. 3.1.2 Regulatory Guide 1.109, Calculation of Annual Dose to Man From Routine Releases of Reactor Effluents For the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I, Revision 1, 1977. 3.1.3 NUREG-1301, Offsite Dose Calculation Manual Guidance; Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1). 3.1.4 Regulatory Guide 1.111, Methods For Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases From Light-Water-Cooled Reactors, Revision 1, July 1977. 3.1.5 1/2-ADM-1640, Control of the Offsite Dose Calculation Manual 3.1.6 1/2-ADM-0 100, Procedure Writers Guide 3.1.7 1/2-ADM-0101, Review and Approval of Documents 3.1.8 CR04-00149, Radiation Protection Performance Committee Actions Items. CA-12 required obtaining GPS satellite data for use in the REMP. 3.1.9 CR05-01169, Chemistry Action Plan for transition of RETS, REMP and ODCM. CA-17, revise procedure 1/2-ODC-2.03 to convert Radiation Protection responsibilities to Nuclear Environmental and Chemistry. 3.1.10 CR05-01390, Include GPS data in 2004 REMP Report and related 1/2-ODC and 1/2-ENV procedures. CA-02, revise ODCM procedure 1/2-ODC-2.03 to include an update of REMP sample locations (using the GPS Satellite data).

(Page 4 of 23) Beaver Valley Power Station Procedure Number: 1/2-ODC-2.03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 4 of 23 3.2 Commitments 3.2.1 10 CFR 50 Appendix I 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (e.g., letter or calculation package) with an appropriate RTL number. 4.2 Forms 4.2.1 None. 5.0 PRECAUTIONS AND LIMITATIONS 5.1 The specified detection capabilities are state-of-the-art for routine environmental measurements in industrial laboratories. 6.0 ACCEPTANCE CRITERIA 6.1 Any change to this procedure shall contain sufficient justification that the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50, and not adversely impactthe accuracy or reliability of effluent dose or setpoint calculation. 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-01 00(3.1.6) and 1/2-ADM-1640(3 1 5. . 6.1.2 All changes to this rocedure shall be reviewed and approved in accordance with 1/2-ADM-0101 i3..) and 1/2-ADM-1640 3.1.5). 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and format. 8.0 PROCEDURE 8.1 REMP Overview 8.1.1 Attachment A, Table 3.0-1 contains the site number, sector, distance, sample point description, sampling and collection frequency, analysis, and analysis frequency for various exposure pathways in the vicinity of the Beaver Valley Power Station for the REMP. Attachment B, Figures 3.0-1 through 3.0-6 show the location of the various sampling points.

,.(Page 5 of 23) Beaver Valley Power Station ProedueNumnber:lODC_2. 2 03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 5 of 23 8.2 Sampling and Analysis Program 8.2.1 Environmental samples shall be collected and analyzed according to Attachment A, Table 3.0-1. Analytical techniques used shall be such that the detection capabilities in 1/2-ODC-3.03, Table 4.12-1 are achieved. 8.2.2 The results of the radiological environmental monitoring are intended to supplement the results of the radiological effluent monitoring by verifying that the measurable concentrations of radioactive materials and levels of radiation are not higher than expected on the basis of the effluent measurements and modeling of the environmental exposure pathways. 8.2.2.1 The specified environmental monitoring program provides measurements of radiation and of radioactive materials in those exposure pathways and for those radionuclides which lead to the highest potential radiation exposures of individuals resulting from the station operation. 8.2.2.2 The initial radiological environmental monitoring program should be conducted for the first 3 years of commercial operation (or other period corresponding to a maximum burnup in the initial core cycle). Following this period, program changes may be proposed based on operational experience. 8.2.3 Deviations are permitted from the required sampling schedule if specimens are unobtainable due to hazardous conditions, seasonal unavailability, malfunction of automatic sampling equipment and other legitimate reasons. 8.2.3.1 IF specimens are unobtainable due to sampling equipment malfunction, THEN every effort shall be made to complete corrective action prior to the end of the next sampling period. 8.2.3.2 All deviations from the sampling schedule shall be documented in the annual REMP report. 8.3 Crosscheck Program 8.3.1 The laboratories of the licensee and licensee's contractors which perform analyses shall participate in the Environmental Protection Agency's (EPA's) Environmental Radioactivity Laboratory Intercomparisons Studies (Crosscheck) Program or equivalent program. 8.3.1.1 This participation shall include all of the determinations (sample medium-radionuclide combination) that are offered by EPA and that also are included in the monitoring program. 8.3.1.2 The results of analysis of these crosscheck samples shall be included in the annual REMP report. The participants in the crosscheck program may provide their program code so that the NRC can review the participant data directly in lieu of submission in the annual REMP report.

(Page 6 of 23) Procedure Number: Beaver Valley Power Station 1/2oODCe2ru3

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 6 of 23 8.3.1.3 IF the results of a determination in the crosscheck program are outside the specified control limits, THEN the laboratory shall investigate the cause of the problem and take steps to correct it. The results of this investigation and corrective action shall be included in the annual REMP report. 8.3.2 The requirement for the participation in the crosscheck program, is based on the need:for independent checks on the precision and accuracy of the measurements of radioactive material in environmental sample matrices as part of the quality assurance program for environmental monitoring in order to demonstrate the results are reasonably valid. 8.4 Land Use Census Program 8.4.1 A census shall be conducted annually during the growing season to determine the location of the nearest milk animal, and nearest garden greater than 50 square meters (500 sq. ft.) producing broad leaf vegetation in each of the 16 meteorological sectors within a distance of 8 kmn(5 miles). 8.4.1.1 For elevated releases as defined in Regulatory Guide 1.11 the census shall also identify the locations of all milk animals, and gardens greater than 50 square meters producing broad leaf vegetation out to a distance of 5 km (3 miles) for each radial sector. 8.4.1.2 IF it is learned from this census that the milk animals or gardens are present at a location which yields a calculated thyroid dose greater than those previously sampled, or if the census results in changes in the location used in ODCM dose calculations, THEN a written report shall be submitted to the Director of Operating Reactors, NRR (with a copy to the Director of the NRC Regional Office) within. 30 days identifying the new location (distance and direction). 8.4.1.2.1 Milk animal or garden locations resulting in higher calculated doses shall be added to the surveillance program as soon as practicable. 8.4.1.3 The sampling location (excluding the control sample location) having the lowest calculated dose may then be dropped from the surveillance program at the end of the grazing or growing season during which the census was conducted. Any location from which milk can no longer be obtained may be dropped from the surveillance program after notifying the NRC in writing that they are no longer obtainable at that location. 8.4.1.4 The results of the land-use census shall be reported in the.annual REMP report.

,(Page 7 of 23) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 7 of 23 8.4.1.5 The census of milk animals and gardens producing broad leaf vegetation is based on the requirement in Appendix I of 10 CFR Part 50(321) to "Identify changes in the use of unrestricted areas (e.g., for agricultural purposes) to permit modifications in monitoring programs for evaluating doses to individuals from principal pathways of exposure." The consumption of milk from animals grazing on contaminated pasture and of leafy vegetation contaminated by airborne radioiodine is a major potential source of exposure. Samples from milk animals are considered a better indicator of radioiodine in the environment than vegetation. 8.4.1.5.1 IF the census reveals milk animals are not present or are unavailable for sampling, THEN vegetation must be sampled. 8.4.1.6 The 50 square meter garden, considering 20% used for growing broad leaf vegetation (i.e., similar to lettuce and cabbage), and a vegetation yield of 2 kg/m2 , will produce the 26 kg/yr assumed in Regulatory Guide 1.109(3.12), for child consumption of leafy vegetation. 8.5 Direct Radiation Monitoring Program 8.5.1 The increase in the number of direct radiation stations is to better characterize the individual exposure (mrem) and population exposure (man-rem) in accordance with Criterion 64 - monitoring radioactivity releases, of 10 CFR Part 50, Appendix A. The NRC will place a similar amount of stations in the area between the two rings designated in 1/2-ODC-3.03, Table 3.12-1.

                                                                       - END -

TABLE 3.0-1 PROGRAM DETAILS EXPOSURE SAMPLING AND TYPE AND PATHWAY AND/OR SITE SECTOR COLLECTION FREQUENCY OF SAMPLE NO. MILES2 SAMPLE POINT DESCRIPTION3 FREQUENCY ANALYSES

1. AIRBORNE 13 11 1.49 Old Meyer Farm Continuous Radioiodine Cartridge:

Radioiodine and 30 4 0.43 Shippingport (Cook's Ferry S.S.) sampler operation 1-131 analysis weekly. 0* 0 Particulates 32 15 0.75 Midland (North S.S.) with collection at CD 46.1 2/3 2.28 Industry, McKeel's Service - Rt. 68 least weekly Particulate Sampler: 48 10 16.40 Weirton Water Tower, Collier Way Gross beta analysis 0 following filter change'; Gamma isotopic analysis on composite (by location) 0 0 G d

2. DIRECT RADIATION 10 13 14 3/4 11 11 0.94 1.49 2.53 Shippingport Post Office Old Meyer Farm Hookstown Boro Continuous measurement with quarterly Gamma dose quarterly.

H 00 Cf~ 15 14 3.75 Georgetown Post Office collection. 27 7 6.14 Brunton Farm H 1 Cn~ 0 28 8.60 Sherman Farm 29B 3 7.97 Friendship Ridge 30 4 0.43 Shippingport (Cook's Ferry S.S.) 32 15 0.75 Midland (North S.S.) 45 5 2.19 Christian House Baptist Chapel - Rt. 18 45.1 6 1.92 Racoon Twp., Kennedy's Corner 46 3 2.49 Industry, Midway Drive T 46.1 2/3 2.28 Industry - McKeel's Service - Rt. 68 I 0 47 14 4.88 East Liverpool Water Dept. 0~ 48 10 16.40 Weirton Water Tower, Collier Way 51 5 8.00 Aliquippa (Sheffield S.S.) z0 I 59 6 0.99 236 Green Hill Rd. 0~ 60 13 2.51 444 Hill Rd. F -' I 70 1 3.36 236 Engle Rd. 71 2 6.01 Brighton Twp., First Western Bank I I

                                                                                                                              .1-I   -I I-

TABLE 3.0-1 PROGRAM DETAILS oi EXPOSURE SAMPLING AND PATHWAY AND/OR SITE 2 SAMPLE POINT COLLECTION TYPE AND FREQUENCY SAMPLE NO. SECTOR' MILES DESCRIPTION3 FREQUENCY OF ANALYSES 0 0

2. DIRECT RADIATION 72 3.25 Ohioview Luthem Church - Rear Continuous Gamma dose quarterly.

(continued) 73 2.48 618 Squirrel Run Road measurement with a 0* 74 6.92 137 Poplar Ave. - CCBC quarterly 75 4.08 117 Holt Road collection. 76 3.80 Raccoon Elementary School o < 77 H 5.52 3614 Green Garden Road 78 2.72 Raccoon Municipal Building 79 4.46 106 Rt. 151 - Ted McWilliams Auto Body 0 80 8.27 Raccoon Park Office, Rt. 18 t.. 81 3.69 Millcreek United Presby. Church 0 82 6.99 2697 Rt. 18 83 4.26 735 Mill Creek.Road 84 8.35 Hancock Co. Senior Center C¢ 85 5.73 2048 Rt. 30 t7 86 6.18 1090 Ohio Ave., E. Liverpool 87 7.04 50103 Calcutta Smith's Ferry Rd. 88 2.74 110 Summit Rd., Midland Heights H 89 4.72 488 Smith Ferry Rd., Ohioville H 90 5.20 6286 Tuscarawms Rd. 91 3.89 Pine Grove & Doyle Roads 92 2.81 Georgetown Rd. (Georgetown S'S.) 93 1.10 104 Linden - Sunrise Hills 94 2.25 832 McCleary Road ,-. 0 0 0r 95 2.37 McCleary Road & Pole Cat 0 Hollow Rd. i-i-i-

                                                                                                                                               ,-q TABLE 3.0-1 (continued)

PROGRAM DETAILS EXPOSURE SAMPLING AND 0 PATHWAY AND/OR SITE SAMPLE POINT COLLECTION TYPE AND FREQUENCY SAMPLE NO. SECTOR' MILES 2 DESCRIPTION3 FREQUENCY OF ANALYSES

3. WATERBORNE a) Surface (River) 49 3 4.92 Upstream of Montgomery Dam 4 Composite sample Gamma isotopic analysis Dg W

CD with sample monthly; tritium analysis on 2.1 14 0(° 1.43 Midland - ATI Allegheny collection at least composite (by location) Ludlam monthly6 . 0

                                                                                                                            '.3 quarterly.                                zs b) Drinking Water       4    15     1.26   Midland Water Dept           Composite sample     1-131 analysis bi-weekly;                '© Cr 5    14     4.90   East Liverpool Water Dept. with sample          gamma isotopic analysis on               0 collection at least  composite (by location) bi-weekly6 .         monthly; tritium analysis on             0 composite (by location)                  0-i H. o quarterly.                                Z3         C) c) Ground Water                            None required7 d) Shoreline Sediment   2A   12     0.31   BVPS Outfall Vicinity        Semi-annually.       Gamma isotopic analysis semi-annually.

0 0,.a

4. INGESTION 25 10 2.10 Searight Farm At least bi-weekly Gamma isotopic and 1-131 0© a) Milk *8 when animals are analysis on each sample.
                         *8 on pasture; at least
                         *8 monthly at other 96    10    10.48   Windsheimer Farm             times.                                                                    0

[')

                                                                                                                                                       -z CD b) Fish                 2A   12     0.31   BVPS Outfall Vicinity        Semi-annually        Gamma isotopic analysis.

one sample of On edible portion. 49 3 4.92 Upstream of Montgomery available species. ~0 Cd Dam zCD tQo 0" 0~ 0 CC c) Food Products Three (3) locations within 5 Annually at harvest Gamma isotopic and 1-131 CD (Leafy Vegetables) miles of BVPS (Shippingport, time. analysis on edible portion. Industry, and-Georgetown) 9 One (1) control location (Weirton, W. Va. area) 9

TABLE 3.0-1 (continued) PROGRAM DETAILS 2 EXPOSURE SITE SECTOR' M[LES SAMPLE POINT SAMPLING AND TYPE AND FREQUENCY PATHWAY AND/OR NO. DESCRIPTION3 COLLECTION OF ANALYSES SAMIPLE FREQUENCY - o 0 (is. P 'Sector nmbers 1-16 correspond to the 16 compass direction sectors N - NNW. - 2 Distance (in miles) is as measured from the midpoint between Unit 1 and Unit 2 Containment Buildings. 5* 3 All Sample Points are in the Cormnonwealth of Pennsylvania and the states of Ohio and West Virginia. Maps showing the approximate 3 C0

                                                                                                                                              -                c locations of the Sample Points are provided as Attachmnent B, Figures 3.0-1 through 3.0-6 and Attachinent C.                                 >

4H "This is a Control Station and is presumed to be outside the influence of BVPS effluents. 0 0 fAgamma isotopic analysis is to be performed on each sample when the gross beta activity is found to be greater than 10 times the mean N " of the Control Station sample. C 6Composite samples are obtained by collecting an aliquot at intervals not exceeding 2 hours. For the upstream surface water location site -Po, 0-49, a weekly grab sample, composited each month is also acceptable. ., E 01 'Collection of Ground Water samples is not required as the hydraulic gradient or recharge properties are directed toward the river because of the high terrain in the river valley at the BVPS; thus, station effluents do not affect local wells and ground water sources in the area. These Sample Points will vary and are chosen based upon calculated annual deposition factors (highest). 9 Exact location may vary due to availability of food products. zz Z CD

                                                                                                                                                   *                   .*.D 0             C0 S    CD

(Page 12 of 23) Beaver Valley Power Station Proedure N ODCm2 3

Title:

Unit: Level Of Use: ODCM- Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 12 of 23 ATTACHMENT B Page 1 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-1 AIR SAMPLING LOCATIONS

'(Page 13 of 23) Procedure Number: yPower Station 1/2-ODC-2.03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 13 of 23 ATTACHMENT B Page 2 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-1 (Continued) AIR SAMPLING LOCATIONS Sector Site # Distance (miles) Location 11 13 1.49 Old Meyer Farm 4 30 0.43 Shippingport (Cook's Ferry S.S.) 15 32 0.75 Midland (North S.S.) 2/3 46.1 2.28 Industry - McKeel's Service - Rt. 68 10 { 48 16.40 Weirton Water Tower, Collier Way

(Page 14 of 23) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.03

Title:

Unit: Level Of Use: ODCM- Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 14 of 23 ATTACHMENT B Page 3 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-2 TLD LOCATIONS

-(Page 15 of 23) Beaver Valley Power Station ____ ___ ___ ____ ___ ___ ___1/2-ODC-2. 03

                                                                                                                                      /ProcedureNumber:

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 15 of 23 ATTACHMENT B Page 4 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-2 (continued) TLD LOCATIONS Southeast Sector Site# Distance Location Sector Site # Distance Location (miles) (miles) 7 27 6.14 Brunton Farm 7 78 2.72 Raccoon Municipal Bldg. 6 45.1 1.92 Raccoon Twp., Kennedy Corners 8 79 4.46 106 Rt. 151- Ted McWilliams Auto _____Body 5 51 8.00 Aiquippa (Sheffield S.S.) 9 80 8.27 Raccoon Park Office, Rt. 18 6 59 0.99 236 Green Hill Road 9 82 6.99 12697 Rt. 18 6 76 3.80 Raccoon Elementary School .i, 8 94 2.25 McCleary & Pole Cat Hollow Roads 6 77 5.52 3614 Green Garden Road __,__.............___________._________ .___________ Northwest Sector Site # Distance Location Sector Site # Distance Location (miles) (miles) 14 15 3.75 Georgetown Post Office .14 87 7.04 50103 Calcutta Smith's Ferry Rd. 15 32 0.75 Midland (North S.S.) 15 88 2.74 110 Summit Rd., Midland Heights 14 47 4.88 E. Liverpool Water Dept. 15 89 4.72 488 Smith Ferry Rd., Ohioville 13 60 2.51 444 Hill Road 16 90 5.20 6286 Tuscarawras Rd. 13 86 6.18 1090 Ohio Avenue, E. Liverpool 16 93 1.10 104 Linden - Sunrise Hills Northeast Sector Site # Distance Location Sector Site # Distance Location (miles) (miles) 3/4 10 0.94 Shippingport Post Office 1 70 3.36 236 Engle Rd. 1 28 8.60 Sherman Farm 2 71 6.01 Brighton Twp., First Westem Bank 3 29B 7.97 Friendship Ridge 3 72 3.25 Ohioview Luthern Church - Rear 4 30 0.43 Shippingport (Cook's Ferry S.S.) 4 73 2.48 618 Squirrel Run Rd. 5 45 2.19 Christian House Baptist 4 74 6.92 137 Poplar Ave. - CCBC Chapel - Rt 18 3 46 2.49 Industry, Midway Dr. 5 75 4.08 117 Holt Rd. 2/3 46.1 2.28 Industry - McKeel's Service - 2 91 3.89 Pine Grove Rd. & Doyle Rd. Rt 68 Southwest Sector Site # Distance Location Sector Site # Distance Location (miles) _______(miles) 11 13 1.49 Old Meyer Fannu 11 84 8.35 Hancock Co. Senior Center 11 14 2.53 Hookstown Boro ii. 12 85 5.73 2048 Ri. 30 10 48 16.40 Weirton Water Tower, Collier  !< 12 92 2. 81 Georgetown Rd. (Georgetown S.S.) Way 9 81 1 3.69 Millcreek-United Presby. Church

  • 10 95 2.37 832 McCleary Rd.

10 83 1 4.26 735 Mill Creek Rd. _______ __________________________

(Page 16 of 23) Procedure Number: Beaver Valley Power Station e 1/2-ODC-2.03o

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 16 of 23 ATTACHMENT B Page 5 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-3 SHORELINE SEDIMENT, SURFACE WATER, AND DRINKING WATER SAMPLINGLOCATIONS

,(Page 17 of 23) Beaver Valley Power Station ]ProdureNumbor: 03

Title:

Unit Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 17 of 23 ATTACHMENT B Page 6 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-3 (Continued) SHORELINE SEDIMENT, SURFACE WATER, AND DRINKING WATER SAMPL1NGLOCATIONS Sample Type Sector Site # Distance (miles) Location Surface Water 14 2.1 1.43 Midland - ATI Allegheny Ludlam Surface Water 3 49 4.92 Upstream of Montgomery Dam Sediment 12 2A 0.31 BVPS Outfall Vicinity Sediment* 3 49a 4.93 Upstream of Montgomery Dam Drinking Water 15 4 1.26 Midland Water Dept. Drinking Water 14 5 4.90 East Liverpool Water Dept. Site #49a added - control site.

(Page 18 of 23) Procedure Number: Beaver Valley.Power Station 1/2-ODC-2.03

Title:

Unit- Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 18 of 23 ATTACHMENT B Page 7 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-4 MILK SAMPNG-LOCATIONS

,(Page 19 of 23) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.03

Title:

Unit Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Rev  : Page Number: 1 19 of 23 ATTACHMENT B Page 8 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-4 (Continued) MILK SAMPLINGLOCATIONS Sector Site # Distance (miles) Location 10 25 2.10 Searight Farm 10 96 10.48 Windsheimner Farm

                                        *Three dairies based on highest deposition factors.

(Page 20 of 23) Beaver Valley Power Station Procedure O -r:2 O 3

Title:

. Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 20 of 23 ATTACHMENT B Page 9 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-5 FOODCROP SAMPLING LOCATIONS

(Page 21 of 23) Procedure Number: Beaver Valley Power Station e /2-ODC-2u03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2

                                                                          /Revision:

General Skill Reference Page Number: I - 21 of 23 ATTACHMENT B Page 10 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-5 (Continued) FOODCROP SAMPLTNGC LOCATIONS Site # Description 10a Shippingport Boro 15a Georgetown Boro 46a Industry Boro 48a Weirton Area

(Page 22 of 23) Procedure Number: Beaver Valley Power Station 1/2-oDC-2,m3

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 22 of 23 ATTACHMENT B Page 11 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-6 FISH SAMPLING LOCATIONS

1 (Page 23 of 23) Procedure Number: yPower Station 1/2-ODC-2.03

Title:

Unit: Level Of Use: ODCM: Radiological Environmental Monitoring Program 1/2 General Skill Reference Revision: Page Number: 1 23 of 23 ATTACHMENT B Page 12 of 12 LOCATION OF SAMPLING SITES FIGURE 3.0-6 (Continued) FISH SAMPLING LOCATIONS Sector Site # Distance (miles) Location 12 2A 0.31 BVPS Outfall Vicinity 3 49a 4.93 Upstream of Montgomery Dam

. 1Page 1 of 6) RTL#: A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-2.04 ODCM: Information Related to 40 CFR 190 Document Owner Manager, Nuclear Environmental & Chemistry Revision Number 1 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 12/29/06

(Page 2 of 6) Procedure Number: Beaver Valley Power Station 1/2-oDC-2.04

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Information Related to 40 CFR 190 Revision: Page Number: 1_ 2 of 6 TABLE OF CONTENTS 1 .0 P U RP O SE ......................................................................................... ..................... .. .............. 3 2 .0 SC O P E .................................................................... -.............................................. : ....: .i". ........ ........ 3

3.0 REFERENCES

AND COMMITMENTS ............................................................. 3 3.1 3. References. e e e c s ........................................................................................ *....

...I......
                                                                                                                                                           "..., : . . -: ............... 3 3 .2 C o mm itmen ts ...............................................................................................                             ........              3 3.........

4.0 R E C O RD S AN D F O RM S ......................................... 33...................... 4 .1 R e c o rd s ................................................................................... ............ .... ........................ 3 4 .2 Fo rm s ....................................................................................... .... .... ................. 44......... 5.0 PRECAUTIONS AND LIMITATIONS .......................................... 4 6.0 ACCEPTANCE CRITERIA TE S... .................................... ............ ... .. .. .. ... .. .. . 4 7.0 P RERE Q U ISITE S ........................................................................................ .................. . ......... 4 8.0 PROCEDURE ........ .................................................... 5 8.1 Information Related To 40 CFR 190 .................................................................. 5 8.2 Inside The Site Boundary Radiation Doses .................................. ......... ............ 6

JPage 3 of 6) Be aver Valley Power Station Procedure Number: 1/2-ODC-2.04

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Information Related to 40 CFR 190 Revision: Page Number: _ 1 3 of 6 1.0 PURPOSE 1.1 This procedure provides the steps to be taken when the Total Dose of ODCM Control 4.11.4.1 exceeds twice the limit of any of the ODCM Controls specifying an Offsite 3 12 Dose Lirmit.( ) 1.1.1 Prior to issuance of this procedure, these items were located in Section 4 of the old ODCM. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 40 CFR Part 190 3.1.2 1/2-ODC-3.03, ODCM: Controls for RETS and REMP Programs 3.1.3 1/2-ADM-1640, Control of the Offsite Dose Calculation Manual 3.1.4 1/2-ADM-0100, Procedure Writer's Guide 3.1.5 1/2-ADM-0101, Review and Approval of Documents 3.1.6 CR 05-01169, Chemistry Action Plan for Transition of RETS, REMP and ODCM. CA-18, Revise procedure 1/2-ODC-2.04 to change document owner from Manager, Radiation Protection to Manager, Nuclear Environmental & Chemistry. 3.2 Commitments 3.2.1 10 CFR 20.405(c), Special Reports 3.2.2 NUREG-1301, Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1) 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (e.g.; letter or calculation package) with an appropriate RTL number.

(Page 4 of 6) Procedure Number: Beaver Valley Power Station 1/2-ODC-2.04

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Information Related to 40 CFR 190 Revision: Page Number: 4.2 Forms 4.2.1 None 5.0 PRECAUTIONS AND LIMITATIONS 5.1 The Offsite Dose Limits used to show 'ompliance to this procedure are as follows: 5.1.1 ODCM Control 3.11.2.a; Liquid Effluents: < 1.5 mrem/quarter Total Body or

                              < 5 mrern/quarter any Organ.

5.1.2 ODCM Control 3.11.2.b; Liquid Effluents: < 3 mrem/year Total Body or

                              < 10 mrem/year any Organ.

5.1.3 ODCM Control 3.11.2.2.a; Gas Effluent-Noble Gas: < 5 mrad/quarter Gamma, or

                              <10 mrad/quarter Beta 5.1.4     ODCM Control 3.11.2.2.b; Gas Effluents-Noble Gas: < 10 mrad/year Gamma
                              < 20 mrad/year Beta 5.1.5     ODCM Control 3.11.2.3.a; Gas Effluents-Particulates & Iodines: <7.5 mrem/quarter any organ 5.1.6     ODCM Control 3.11.2.3.b; Gas Effluents-Particulates & Iodines: < 15 mrem/year any organ 5.1.7     ODCM Control 3.11.4.1; All Fuel Cycle Sources: < 25 mrem/year Total Body or any Organ, except the thyroid, which is limited to < 75 mrem/year 6.0        ACCEPTANCE CRITERIA 6.1        Any chanaes to this procedure shall contain sufficient justification that the chanle will maintain the level of radioactive effluent control required by 10 CFR 20.1.302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50, and not adversely impact the accuracy or reliability of effluent dose or setpoint calculation.(3.2) 31 4 6.1.1     All changes to this procedure shall be prepared in accordance with 1/2-ADM-0100( " ,

and 1/2-ADM-1640.(3 1 3 ) 6.1.2 All changes to this procedure shall be reviewed and approved in accordance with 1/2-ADM-0101(3..5) and 1/2-ADM-1640.(3.1.3) 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and content.

tPage 5 of 6) Beaver Valley Power Station ProedureNurODC 2 4

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Information Related to 40 CFR 190 Revision: Page Number: 1_ 5 of 6 8.0 PROCEDURE 8.1 Information Related To 40 CFR 190 8.1.1 CONTROL 3.11.4.1 requires that when the calculated doses associated with the effluent releases exceed twice the limits of ODCM CONTROL 3.11.1.2.a, 3.11.1.2.b, 3.11.2.2.a, 3.11.2.2.b, 3.11.2.3.a, or 3.11.2.3.b, the following shall be performed: 8.1.1.1 Calculations shall be made including direct radiation contributions from the units (including outside storage tanks, etc.) to determine whether the dose or dose commitment to any MEMBER OF THE PUBLIC from all facility releases of radioactivity and to radiation from uranium fuel cycle sources exceeds the limits of _ 25 mrem to the total body or any organ, except the thyroid, which is limited to _ 75 mrem for a calendar year. 8.1.1.1.1 If any of these limits are exceeded, prepare and submit to the Commission within 30 days a Special Report pursuant to 10 CFR 20.405(C).( 3 21 ) The following shall be included in the Special Report: 8.1.1.1.1.1 Define the corrective action to be taken to reduce subsequent releases to prevent recurrence of exceeding the limits of ODCM CONTROL 3.11.4.1. 8.1.1.1.1.2 Include the schedule for achieving conformance within the limits of ODCM CONTROL 3.11.4.1. 8.1.1.1.1.3 Include an analysis that estimates the radiation exposure (dose) to a MEMBER OF THE PUBLIC from uranium fuel cycle sources, including all effluent pathways and direct radiation, for the calendar year that includes the release(s) covered by this report. 8.1.1 .1.1.4 Describe levels of radiation and concentrations of radioactive material involved, and the cause of exposure levels or concentrations. 8.1.1.1.1.5 If the estimated dose(s) exceeds the limits of ODCM CONTROL 3.11.4.1, and if the release condition resulting in violation of 40 CFR Part 190 has not already been corrected, include a request for a variance in accordance with the provisions of 40 CFR Part 190. Submittal of the report is considered a timely request, and a variance is granted until staff action on the request is complete.

(Page 6 of 6) Procedure Number: Beaver Valley Powcr Station 1/2-ODC-2.04

Title:

Unit: Level Of Use:

  • 1/2 General Skill Reference Page Number:

ODCM: Information Related to 40 CFR 190 Revision: 1 6 of 6 8.2 Inside The Site Boundary Radiation Doses 8:2.1 In ýegards to assessment of radiation doses (from Radioactive Effluents) to MEMBERS OF THE PUBLIC due to their activities inside the site boundary, the following is provided:

                      ,.8.2.1 111C A separate assessment of radiation doses from radioactive effluents to MEMBERS OF THE PUBLIC due to their activities inside the site boundary is generally not necessary because the exposure time for individuals not occupationally associated with the plant site is minimal in comparison to the exposure time considered for the dose calculation at or beyond the site boundary.

8.2.1.2 For reporting purposes, separate guidance for calculating radiation doses to a MEMBER OF THE PUBLIC inside the site boundary is not needed because the dose assessments for an offsite MEMBER OF THE PUBLIC is also assumed to be for a MEMBER OF THE PUBLIC conducting activities onsite. 8.2.1.2.1 This is verified by showing that the ground release x/Q dispersion parameter used for dose calculation at the site boundary (0.352 n'l es NW) is greater than the x/Q dispersion parameter at the location where'a MEMBER OF-, THE PUBLIC would most likely have the maximum exposure time' (0-0.5 miles N and 0-0.5 miles NNW). A comparison of these x/Q dispersion parameters is as follows: X/QUsedforDose X/Q Whe anAssmed x/QRekrces Calculation MEMBER OF THE PUBLIC from Would Most Likely Have the Maximum 1/2-ODC-2.02 Exposure T___e Site Boundary Inside the Site Inside the Site See Atachnmt F 0.352 miles NW Boundary Boundary 0-0.5 milesN 0-0.5 miles NNW 9.24E-5 seci 3 2.33E-5 secm 3 5.47E-5 sJm 3 Table 2.2-4 1.03E-4 secAin3 2.76E-5 seri 3 6.01E-5 sec/m3 Table 2.2-5 7.35E-5 sec/in 3 2.44E-5 sec/in 3 5.57E-5 se/n 3 Table 2.2-7 9.24E-5 se/in3 2.33E-5 se/i 3 5.47E-5 szrm 3 Table 2.2-8 9.24E-5 sec/i 3 2.33E-5 seolm 3 5.47E-5 se*/in 3 Table 2.2-9 7.35E-5 sec/in 2.44E-5 sec/i 3 5.57E-5 sz/m 3 Table 2.2-10

                                                                           - END -

ýPage 1 of 12) RTL#: A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-3.01 ODCM: Dispersion Calculation Procedure and Source Term Inputs Document Owner Manager, Nuclear Environmental & Chemistry Revision Number 1 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 12/29/06

(Page 2 of 12) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 1 2 of 12 TABLE OF CONTENTS 1.0 P U RP O S E .................................................................................................................................... 3 2 .0 S C OP E ......................................................................................................................................... 3 3.0 REFEFEREN CES AND COMMITM EN TS ........................................................................... 3 3 . 1 Re fe re n c e s .......................................................................................................................... 3 3 .2 C o m m itm e nts ..................................................................................................................... 4 4.0 RECORD S AND FORM S .................................................................................................... 4 4 .1 Re c o rd s .............................................................................................................................. 4 4 .2 Fo rm s ................................................................................................................................. 4 5.0 PRECAUTION S AND LIMITATION S ................................................................................. 4 6.0 ACCEPTAN CE CRITERIA .................................................................................................. 4 7.0 PREREQUISITES ....................................................................................................................... 4 8 .0 PR O C E D URE .............................................................................................................................. 5 8.1 Summary of Dispersion and Deposition Methodology ........................... 5 8.2 Sum m ary of Source Term Inputs .................................................................................... 7 8.2.1 Liquid Source Term Inputs ........................................................................... 7 8.2.2 Gaseous Source Term Inputs ......................................................................... 7 ATTACHMENT A BV- 1 AND 2 RELEASE CONDITIONS ...................................................... 8 ATTACHMEN T B LIQUID SOURCE TERM INPUTS .............................................................. 9 ATTACHM EN T C GASEOU S SOURCE TERM INPUTS ............................................................. 11

XPage 3 of 12) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.0t

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 3 of 12 1.0 PURPOSE 1.1 This procedure contains the basic methodology that was used for calculating dispersion (x/Q) and deposition (D/Q). 1.1.1 Prior to issuance of this procedure, these items were located in Appendix A of the old ODCM. 1.2 This procedure also contains the input parameters to the various computer codes used by the Licensee and its subcontractors for determination of the liquid and gaseous source term mixes. 1.2.1 Prior to issuance of this procedure, these items were located in Appendix B of the old ODCM. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel (including subcontractors) that are qualified to perform activities as described and referenced in this procedure. 3.0 REFEFERENCES AND COMMITMENTS 3.1 References 3.1.1 NUS-2173, Development Of Terrain Adjustment Factors For Use At the Beaver Valley Power Station, For the Straight-Line Atmospheric Dispersion Model, NUS Corporation, June 1978 3.1.2 NUREG/CR-2919, XOQDOQ: Computer Program For The Meteorological Evaluation Of Routine Effluent Releases At Nuclear Power Stations, September, 1982 3.1.3 Regulatory Guide 1.23, Meteorological Measurement Program for Nuclear Power Plants 3.1.4 Regulatory Guide 1.111, Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents In Routine Releases From Light-Water-Coded Reactors, Revision 1, July 1977 3.1.5 NRC Gale Code, 3.1.6 SWEC LIQ1BB Code, 3.1.7 SWEC GAS1BB Code, 3.1.8 NUREG-1301, Offsite Dose Calculation Manual Guidance, Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1) 3.1.9 1/2-ADM- 1640, Control of the Offsite Dose Calculation Manual

(Page 4 of 12) Beaver Valley Power Station Procedure Numbe: 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 4 of 12 3.1.10 1/2-ADM-0100, Procedure Writer's Guide 3.1.11 1/2-ADM-0101, Review and Approval of Documents 3.1.12 CR 05-01169, Chemistry Action Plan for Transition of RETS, REMP and ODCM. CA-19, Revise procedure 1/2-ODC-3.01 to change document owner from Manager, Radiation Protection to Manager, Nuclear Environmental & Chemistry. 3.2 Commitments 3.2.1 None 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting generation of dispersion, deposition, or source term mixes shall be documented, as appropriate, by a retrievable document (e.g.; letter or calculation package) with an appropriate RTL number. 4.2 Forms 4.2.1 *None 5.0 PRECAUTIONS AND LIMITATIONS 5.1 This procedure contains the information that was previously contained in Appendix A and Appendix B of the previous BV-I and 2 Offsite Dose Calculation Manual. 5.1.1 In regards to this, the Tables that were transferred from Appendix A and Appendix B to the appropriate ATTACHMENTS of this procedure will still contain a prefix denoting an "A" or "B". 6.0 ACCEPTANCE CRITERIA 6.1 Any change to this procedure shall contain sufficient justification that the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a and Appendix I to 10 CFR 50, and not adversely impact the accuracy or reliability of effluent dose or setpoint calculation. 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-01 00(3.1.10) and 1/2-ADM-1640.(3 1 9 ) 6.1.2 All changes to this procedure shall be reviewed and approved in accordance with 1/2 ADM-0101 3 1 1")and 1/2-ADM'1640. 3 1 9 ) 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and content.

rPage 5 of 12) Beaver Valley Power Station 1/2-ODC-3.01 Procedure Number:

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 5 of 12 8.0 PROCEDURE 8.1 Summary of Dispersion and Deposition Methodology 8.1.1 Annual average and grazing season average values of relative concentration (x/Q) and deposition (D/Q) were calculated for continuous and intermittent gaseous releases of activity from the site according to the straight-line airflow (Gaussian) model described in R G-I1.11l .(3 .1.4) 8.1.1.1 Undecayed and undepleted sector average x/Q and D/Q values were obtained for each of sixteen 22.5-degree sectors at the site boundary and maximum individual receptors. 8.1.1.2 For an elevated release, (i.e.; occurring at a height that is twice the height or more of a nearby structure) credit was taken for the effective release height which is comprised of the physical release height plus momentum plume rise minus the terrain height at a given receptor. 8.1.1.3 A building wake correction factor was used to adjust calculations for ground-level releases. 8.1.1.4 Airflow reversals were also accounted for by applying site-specific terrain 11 recirculation factors for both ground and elevated releases at the site.(3 ) 8.1.1.5 The methodology employed in the calculation of2intermittent release X/Q and D/Q values is that described in NUJREG/CR-2919.(31' ) 8.1.2 The site continuous gaseous release points that have been evaluated include the following: 8.1.2.1 PV-1/2: The Unit 1/2 Gaseous Waste/Process Vent attached to the Unit 1 natural draft cooling tower 8.1.2.2 CV-1 and CV-2: The Unit 1 Rx Containment/SLCRS Vented the Unit 2 SLCRS Filtered Pathway 8.1.2.3 VV-1 and VV-2: The Unit 1 Ventilation Vent and the Unit 2 SLCRS Unfiltered Pathway 8.1.2.4 TV-2: The Unit 2 Turbine Building Vent 8.1.2.5 CB-2: The Unit 2 Condensate Polishing Building Vent 8.1.2.6 DV-2: The Unit 2 Decontamination Building Vent 8.1.2.7 WV-2: The Unit 2 Gaseous Waste Storage Tank Vault Vent 8.1.3 The intermittent releases are from PV-1/2, VV-1, VV-2, CV-1 and CV-2.

ýPage 6 of 12) Procedure Number: yPower Station 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 6 of 12 8.1.4 Only PV-1/2 was considered to be an elevated release with all other release points being treated as ground level releases. A summary of the release characteristics and their locations is given in ATTACHMENT A. 8.1.5 Onsite meteorological data for the period January 1, 1976 through December 31, 1980 were used as input for the annual-average calculations. 8.1.5.1 The grazing season was represented by a six-month period from May 1 through October 31 for each year of the 5-year meteorological data base. This grazing season corresponds reasonably well with the growing season. 8.1.5.2 The data were collected according to guidance in NRC RG-1.23(3.1.3) as described in Section 2.3 of the BVPS-2 FSAR. 8.1.5.3 The parameters used in the x/Q and D/Q calculations consist of wind speed, wind direction, and AT as an indicator of atmospheric stability. The lower level winds (35 ft) and AT (150-35 ft) were used for all release points except the Process Vent which required the use of 500 ft winds and AT (500-35 ft) which are representative of the release height (510 ft). 8.1.6 The annual average and grazing season x/Q and D/Q values for the continuous and intermittent radioactive releases were calculated at the site boundary, nearest resident, nearest vegetable garden, nearest milk cow, nearest milk goat, and nearest meat animal. 8.1.6.1 In the case of the Process Vent releases, several of each receptor type were evaluated in each downwind sector to determine the maximum x/Q and D/Q values. 8.1.6.2 The distances of the limiting maximum individual receptors from the radioactive release points are given in ATTACHMENT E (Table 2.2-3) of 1/2-ODC-2.02. 8.1.6.3 The continuous release annual average yJQ values at the special locations for the Containment Vents, Ventilation Vents, Process Vent, Turbine Building Vents, Decontamination Building Vent, Waste Gas Storage Vault Vent, and Condensate Polishing Building Vent are given in ATTACHMENT F (Tables 2.2-4 through 2.2-10) of 1/2-ODC-2.02. Continuous release annual average X/Q's for these same release points are also given at ten incremental downwind distances of 0-5 miles. 8.1.6.4 Continuous release D/Q values for these same release points are given in ATTACHMENT K (Tables 2.3-21 through 2.3-27) of 1/2-ODC-2.02 for the same 0-5 mile incremental distances, and in ATTACHMENT L (Tables 2.3-28 through 2.3-34) of 1/2-ODC-2.02 for the special locations. 8.1.6.5 Due to their location adjacent to the Containment Building, the Decontamination Building and Gaseous Waste Storage Tank Vault X/Q's and D/Q's are the same as the Containment Vent XJQ's and D/Q's.

(Page 7 of 12) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 7 of 12 8.1.6.6 Likewise, the Turbine Building Vent x/Q's and D/Q's apply to the Condensate Polishing Building as well due to its location adjacent to the Turbine Building. 8.1.7 ATTACHMENT M (Tables 2.3-35 through 2.3-38) of 1/2-ODC-2.02 contain short term X/Q values for batch releases originating from the Containment Vent, Ventilation Vent, and Process Vent releases respectively. 8.1.7.1 The values in these tables are based on 32 hours per year of Containment and Ventilation Vent purges and 74 hours per year of Process Vent purges. 8.2 Summary of Source Term Inputs 8.2.1 Liquid Source Term Inputs 8.2.1.1 Inputs to the NRC Gale Code used for generation of BV-1 Liquid Source Term Mixes are shown in ATTACHMENT B (Table B: la). 8.2.1.2 Inputs to the SWEC LIQ1BB Code used for generation of BV-2 Liquid Source Term Mixes are shown in ATTACHMENT B (Table B: Ib) 8.2.2 Gaseous Source Term Inputs 8.2.2.1 Inputs to the SWEC GAS 1BB Code for generation of BV-1 Gaseous Source Term Mixes are shown in ATTACHMENT C (Table B:2a) 8.2.2.2 Inputs to the SWIEC GAS 1BB Code for generation of BV-2 Gaseous Source Term Mixes are shown in ATTACHMENT C (Table B:2b)

(Page 8 of 12) Beaver Valley Power Station Procedure Nubr: 3 01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM[ Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 8 of 12 ATTACHMENT A Page 1 of 1 BV-I AND 2 RELEASE CONDITIONS TABLE A:1 VV-1 CV-1 RX PV-1/2 GASEOUS TV-2 TURBINE VENTILATION CONTAINMENT/ WASTE/PROCESS BUILDING VENT VENT (PAB SLCRS VENT VENT EXHAUST) VV-2 SLCRS CV-2 RX UNFILTERED CONTAINMENT/ PATHWAY SLCRS FILTERED PATHWAY TYPE OF RELEASE GROUND LEVEL GROUND LEVEL ELEVATED GROUND LEVEL Long Tem And Long Tam And Long Tem And Long Tam And ShortTerm ShortTerm Short Tamn Short Term Release Point Height 26 47 155 33 (M) AdjacentBuilding 19 44 155 33 Height(i) Relative Location To E Side Of-imary Top Center Of Atop Cooling Tower Turbine Building Adjacent Structrs Auxiliary Bldg Containment Dome Exit Vdocity(rn/sec) NA NA 9.4 NA TItenal Stack NA NA 0.25 NA Diamte(m) Building Cross- 1600 1600 NA NA 2 Secdional Area (rn ) Purge Freueny 32 32 74 NA (hoursear) Purge Dation 8 8 NA NA

              *Appieease)
              *A\pplied to Short Tefi calculations only

. *Page 9 of 12) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: I 1 9 of 12 ATTACHMENT B Page 1 of2 LIQUID SOURCE TERM INPUTS TABLE B: I a INPUTS TO GALE CODE FOR GENERATION OF BV-1 LIQUID SOURCE TERM MIXES BV-I PWR INPUTS VALUE Thermal Power Level (megawatts) 2766.000 Plant Capacity Factor .800 Mass Of Primary Coolant (thousand lbs) 345.000 Percent Fuel With Cladding Defects .120 Primary System Letdown Rate (gpm) 60.000 Letdown Cation Demineralizer Flow 6.000 Number Of Steam Generators 3.000 Total Steam Flow (million lbs/hr) 11.620 Mass Of Steam In Each Steam Generator (thousand lbs) 6.772 Mass Of Liquid In Each Steam Generator (thousand lbs) 97.000 Total Mass Of Secondary Coolant (thousand lbs) 1296.000 Mass Of Water In Steam Generator (thousand lbs) 291.000 Blowdown Rate (thousand lbs/hr) 33.900 Primary To Secondary Leak Rate (lbs/day) 100.000 Fission Product Carry-Over Fraction .001 Halogen Carry-Over Fraction .010 Condensate Demineralizer Flow Fraction 0.000 Radwaste Dilution Flow (thousand gpm) 22.500 BV-1 LIQUID WASTE INPUTS COLLECTION DELAY DECONTAMINATION FLOW RATE FRACTION FRACTION TIME TIME FACTORS STREAM (gal/day) OF PCA DISCHARGE (days) (days) I Cs OTHERS Shim Bleed 1.32E4 1.000 0.000 11.260 7.220 1E7 1E7 1E7 Rate Equipment 6.00E2 1.000 0.000 11.260 7.220 1E7 1E7 1E7 Drains Clean Waste 7.50E1 1.000 1.000 0.071 0.648 lE5 2E4 1E5 Input Dirty Waste 1.35E3 0.035 1.000 0.071 0.648 1E5 2E4 lE5 Input Blowdown 9.75E4 1.000 0.071 0.648 lE5 2E4 1E5 Untreated 0.0 Blowdown

(Page 10 of 12) Beaver Valley Power Station ProcedureCum

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 10 of 12 ATTACHMENT B Page 2 of 2 LIQUID SOURCE TERM INPUTS TABLE B: lb INPUTS TO SWEC LIQ1BB CODE FOR GENERATION OF BV-2 LIQUID SOURCE TERM MIXES BV-2 PWR INPUTS VALUE Thermal Power Level (megawatts) 2766.000 Plant Capacity Factor .800 Mass Of Primary Coolant (thousand lbs) 385.000 Percent Fuel With Cladding Defects .120 Primary System Letdown Rate (gpm) 57.000 Letdown Cation Demineralizer Flow 5.700 Number Of Steam Generators 3.000 Total Steam Flow (million lbs/hr) 11.600 Mass Of Steam In Each Steam Generator (thousand lbs) 8.700 Mass Of Liquid In Each Steam Generator (thousand lbs) 100.000 Total Mass Of Secondary Coolant (thousand lbs) 2000.000 Mass Of Water In Steam Generator (thousand lbs) 298.000 Blowdown Rate (thousand lbs/br) 22.300 Primary To Secondary Leak Rate (lbs/day) 100.000 Fission Product Carry-Over Fraction .001 Halogen Carry-Over Fraction .010 Condensate Demineralizer Flow Fraction .700 Radwaste Dilution Flow (thousand gpm) 7.800 BV-2 LIQUID WASTE INPUTS COLLECTION DELAY DECONTAM[INATION FLOW RATE FRACTION FRACTION TIME TIME FACTORS STREAM (gal/day) OF PCA DISCHARGE (hrs) (hrs) I CsRb OTHERS Containment 40 1.000 1.0 35.5 6.2 1E3 IE4 1E4 Sump Auxiliary 200 0.100 1.0 35.5 6.2 1E3 1E4 1E4 Building Sump Miscellaneous 700 0.010 1.0 35.5 6.2 1E3 1E4 IE4 Sources Rx Plant 35 1.000 1.0 35.5 6.2 1E3 1E4 IE4 Samples Lab Drains 400 0.002 1.0 35.5 6.2 1E3 IE4 1E4 Cond. Demin. 2685 1.1E-4 1.0 35.5 6.2 IE3 1E4 1E4 Rinse Water CVCS 60 1.0 1300 173 1E4 4E3 1E5 Turbine 7200 1.0 Bldg.Drains

tPage 11 of 12) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General. Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 11 of 12 ATTACHMENT C Page 1 of 2 GASEOUS SOURCE TERM INPUTS TABLE B:2a INPUTS TO SWEC GAS 1BB CODE FOR GENERATION OF BV-I GASEOUS SOURCE TERM MIXES BV-I PWR INPUTS VALUE Thermal Power Level (megawatts) 2766.000 Plant Capacity Factor .800 Mass Of Primary Coolant (thousand lbs) 385.000 Percent Fuel With Cladding Defects .120 Primary System Letdown Rate (gpm) 57.000 Letdown Cation Demineralizer Flow 5.700 Number Of Steam Generators 3.000 Total Steam Flow (million lbs/hr) 11.600 Mass Of Steam In Each Steam Generator (thousand lbs) 8.700 Mass Of Liquid In Each Steam Generator (thousand lbs) 100.000 Total Mass Of Secondary Coolant (thousand lbs) 2000.000 Mass Of Water In Steam Generator (thousand lbs) 298.000 Blowdown Rate (thousand lbs/hr) 52.000 Primary To Secondary Leak Rate (bs/day) 100.000 Fission Product Carry-Over Fraction .001 Halogen Carry-Over Fraction .010 Condensate Demineralizer Flow Fraction 0.000 Radwaste Dilution Flow (thousand gpm) 15.000 BV-1 GASEOUS WASTE INPUTS VALUE There Is Not Continuous Stripping Of Full Letdown Flow Hold Up Time For Xenon (days) 39.000 Hold Up Time For Krypton (days) 2.000 Primary Coolant Leak To Auxiliary Building (lb/day) 160.000 Auxiliary Building Leak Iodine Partition Factor 7.5E-3 Gas Waste System Particulate Release Fraction 0.000 Auxiliary Building Charcoiodine Release Fraction 1.000 Auxiliary Building Particulate Release Fraction 1.000 Containment Volume (million cu-ft) 1.800 Frequency Of Primary Coolant Degassing (times/yr) 2.000 Primary To Secondary Leak Rate (lb/day) 100.000 There Is A Kidney Filter Containment Atmosphere Cleanup Rate (thousand cfm) 2.000 Purge Time Of Containment (hours) 8.000 There Is Not A Condensate Delineralizer Iodine Partition Factor (gas/liq) In Steam Generator 0.010 Frequency Of Containment Building High Vol Purge (times/yr)* 4.000 Containment Volume Purge Iodine Release Fraction 1.000 Containment Volume Purge Particulate Release Fraction 1.000 Steam Leak To Turbine Building (lbs/hr) 1700.000 Fraction Iodine Released From Blowdown Tank Vent 0.000 Fraction Iodine Released From Main Condensate Air Ejector 0.440 There Is Not A Crvomenic Off Gas System

                     *2 cold and 2 hot purges

(Page 12 of 12) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.01

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Dispersion Calculation Procedure and Source Term Inputs Revision: Page Number: 1 12 of 12 ATTACHMENT C Page 2 of 2 GASEOUS SOURCE TERM INPUTS TABLE B:2b INPUTS TO SWEC GAS 1BB CODE FOR GENERATION OF BV-2 GASEOUS SOURCE TERM MIXES BV-2 PWR INPUTS VALUE Thermal Power Level (megawatts) 2766.000 Plant Capacity Factor .800 Mass Of Primary Coolant (thousand lbs) 385.000 Percent Fuel With Cladding Defects .120 Primary System Letdown Rate (gpm) 57.000 Letdown Cation Demineralizer Flow 5.700 Number Of Steam Generators 3.000 Total Steam Flow (million lbs/hr) 11.600 Mass Of Steam In Each Steam Generator (thousand lbs) 8.700 Mass Of Liquid In Each Steam Generator (thousand lbs) 100.000 Total Mass Of Secondary Coolant (thousand lbs) 2000.000 Mass Of Water In Steam Generator (thousand lbs) 298.000 Blowdown Rate (thousand lbs/hr) 22.300 Primary To Secondary Leak Rate (bs/day) 100.000 Fission Product Carry-Over Fraction .001 Halogen Carry-Over Fraction .010 Condensate Demineralizer Flow Fraction .700 Radwaste Dilution Flow (thousand gpm) 7.800 BV-2 GASEOUS WASTE INPUTS VALUE There Is Not Continuous Strionine Of Full Letdown Flow Hold Up Time For Xenon (days) 45.800 Hold Up Time For Krypton (days) 2.570 Primary Coolant Leak To Auxiliary Building (lb/day) 160.000 Auxiliary Building Leak Iodine Partition Factor 7.5E-3 Gas Waste System Particulate Release Fraction 0.000 Auxiliary Building Charcoiodine Release Fraction 0.100 Auxiliary Building Particulate Release Fraction 0.010 Containment Volume (million cu-ft) 1.800 Frequency Of Primary Coolant Degassing (times/yr) 2.000 Primary To Secondary Leak Rate (lb/day) 100.000 There Is A Kidney Filter Containment Atmosphere Cleanup Rate (thousand cfm) 20.000 Purge Time Of Containment (hours) 8.000 There Is Not A Condensate Demineralizer Iodine Partition Factor (gas/liq) In Steam Generator 0.010 Frequency Of Containment Building High Vol Purge (times/yr)* 4.000 Containment Volume Purge Iodine Release Fraction 1.000 Containment Volume Purge Particulate Release Fraction 1.000 Steam Leak To Turbine Building (lbs/hr) 1700.000 Fraction Iodine Released From Blowdown Tank Vent 0.000 Fraction Iodine Released From Main Condensate Air Ejector 0.270 There Is Not A Crvoeenic Off Gas System

                     *2 cold and 2 hot purges
  • ?age 1 of 14)

RTL#: A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-3.02 ODCM: Bases For ODCM Controls Document Owner Manager, Nuclear Environmental and Chemistry Revision Number 2 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 12/29/06

Page 2 of 14) ¢ Beaver Valley Power Station Procedure Number:

1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 2 of 14 TABLE OF CONTENTS 1 .0 P URP O S E .................................................................................................................................... 3 2 .0 S C OP E .......................................................................................................................................... 3

3.0 REFERENCES

AND COMMITMENTS ................................................................................. 3 3 .1 R eferences .............................................................................................................. 3 3 .2 C om m itm e nts ..................................................................................................................... 4 4.0 RECORD S AN D FORM S .............................................................. ............................ ...... 4 4 .1 R e c ord s . ................................................ ................................. .......................................... 4 4 .2 Fo rm s ................................. . .................................................... .......................................... 5 5.0 PRECAUTIONS AND LIMITATIONS ................................................................................. 5 6.0 A CCEPTAN CE CRITERIA .................................................................................................. 5 7 .0 P RERE QU ISIT ES........................................................................................................................ 5 8.0 PR O C EDURE ........................ ..... ........... ......... ..... .... ....... .............................................. . . 5 ATTACHMENT A BASES FOR ODCM CONTROLS: INSTRUMENTATION ............................. 7 ATTACHMENT B BASES FOR ODCM CONTROLS: LIQUID EFFLUENTS .............................. 8 ATTACHMENT C BASES FOR ODCM CONTROLS: GASEOUS EFFLUENTS ........................ 10 ATTACHMENT D BASES FOR ODCM CONTROLS: TOTAL DOSE ........................................ 13 ATTACHMENT E BASES FOR ODCM CONTROLS: RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM (REMP) .............................................................. 14

'Page 3 of 14) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 3 of 14 1.0 PURPOSE 1.1 This procedure contains the Bases for the ODCM Controls that were transferred from the Bases Section of the Technical Specification per Unit 1/2 Amendments 1A-188/2A-70, and in accordance with Generic Letter 89-01 and NUTREG-1301 (Generic Letter 89-01, Supplement No. 1) [ITS] and T.S. 5.5.2.(315,3210) 1.1.1 Prior to issuance of this procedure, these items were located in Appendix D of the old ODCM. 1.2 This procedure also contains the Bases for the ODCM Controls (for Radiation Monitoring Instrumentation) that were duplicated from the Bases Section of the Technical Specification per Unit 1/2 Amendments 1A-246/2A-124, and in accordance with NIJREG-1431 (3.l.6, 3.2.11) 1.3 This procedure also contains the Bases for the ODCM Controls (for Liquid Holdup Tank Activity Limits and for Gas Decay/Storage Tank Activity Limits) that were transferred from the Bases Section of the Technical Specification per Unit 1/2 Amendments 1A-250/2A-130, and in accordance with NUREG- 1431 (3.1.7, 3.2.11) 2.0 SCOPE 2.1 This procedure is applicable to all station personnel that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 1/2-ODC-2.01, ODCM: Liquid Effluents 3.1.2 1/2-ODC-2.02, ODCM: Gaseous Effluents 3.1.3 1/2-ODC-3.03, ODCM: Controls for RETS and REMP Programs 3.1.4 1/2-ADM-1640, Control of the Offsite Dose Calculation Manual 3.1.5 Unit 1/2 Technical Specification 6.8.6, including Amendments 1A-188/2A-70 (LAR 1A-175/2A-37), Implemented August 7, 1995 3.1.6 Unit 1/2 Technical Specification 3.3.3.1, including Amendments 1A-246/2A-124 (LAR 1A-287/2A-159), Implemented April 11, 2002 3.1.7 Unit 1/2 Technical Specifications 3.11.1.4, 3.11.2.5 and 6.8.6, including Amendments IA-250/2A-130 (LAR 1A-291/2A-163), Implemented August 7, 2002 3.1.8 1/2-ADM-0100, Procedure Writer's Guide 3.1.9 1/2-ADM-0101, Review and Approval of Documents

(Page 4 of 14) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 4 of 14 3.1.10 CR 05-01169, Chemistry Action Plan for Transition of RETS, REMP and ODCM. CA-20, Revise procedure 1/2-ODC-3.02 to change document owner from Manager, Radiation Protection to Manager, Nuclear Environmental and Chemistry. CR 05-03306, Incorporated Improved Technical Specifications (ITS). 3.1.11 [ITS] T.S. 5.5.2 3.2 Commitments 3.2.1 10 CFR Part 20 3.2.2 10 CFR Part 50 3.2.3 40 CFR Part 141 3.2.4 40 CFR Part 190 3.2.5 Regulatory Guide 1.109, Calculation Of Annual Doses To Man From Routine Releases Of Reactor Effluents For The Purpose Of Evaluating Compliance With 10 CFR Part 50, Appendix I, Revision 1, October, 1977 3.2.6 Regulatory Guide 1.111, Methods For Estimating Atmospheric Transport And Dispersion of Gaseous Effluents In Routine Releases From Light-Water-Cooled Reactors, Revision 1, July, 1977 3.2.7 Regulatory Guide 1.113, Estimating Aquatic Dispersion Of Effluents From Accidental And Routine Reactor Releases For The Purpose Of Implementing Appendix I, April, 1977 3.2.8 NUREG-0133, Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants, October 1978 3.2.9 NUREG-0737, Clarification of TMI Action Plan Requirements, October, 1980 3.2.10 NUREG-1301, Offsite Dose Calculation Manual Guidance. Standard Radiological Effluent Controls For Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1) 3.2.11 NUREG-1431, Standard Technical Specifications - Westinghouse Plants Specifications 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (eg; letter or calculation package) with an appropriate RTL number.

tl'age 5 of 14) r T Procedure Number:

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 5 of 14 4.2 Forms 4.2.1 None 5.0 PRECAUTIONS AND LIMITATIONS 5.1 The numbering of each specific ODCM Bases contained in this procedure does not appear to be sequential. This is intentional, as all ODCM Bases numbers remained the same when they were transferred from the Technical Specifications. This was done in an effort to minimize the amount of plant procedure changes and to eliminate any confusion associated with numbering changes. 5.2 This procedure includes Improved Technical Specifications ([ITS]) information that is NOT applicable to current Technical Specifications ([CTS]) and [CTSJ information that is NOT applicable in [ITS]. The [CTS] information shall be used prior to the [ITS] effective date. The [ITS] information shall be used on or after the [ITS] effective date. 6.0 ACCEPTANCE CRITERIA 6.1 Any change to this procedure shall contain sufficient justification that the change will maintain the level of radioactive effluent control required by 10CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appenidx I to 10 CFR 50, and not adversely impact the accuracy or 3 21 0

                                                                                      )

reliability of effluent dose or setpoint calculation.( 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-0100(3.1.8) and 1/2-ADM-1640.(3 1 4 ) 6.1.2 All changes to this procedure shall be reviewed and approved in accordance with 1/2-ADM-0 101(3.1.9) and 1/2-ADM- 1640. (314) 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and content. 8.0 PROCEDURE 8.1 See ATTACHMENT A for a complete description of Bases for ODCM Controls associated with Instrumentation. 8.2 See ATTACHMENT B for a complete description of Bases for ODCM Controls associated with Liquid Effluents. 8.3 See ATTACHMENT C for a complete description of Bases for ODCM Controls associated with Gaseous Effluents. 8.4 See ATTACHMENT D for a complete description of Bases for ODCM 'Controls associated with Total Dose.

(Page 6 of 14) Beaver Valley Power Station Procu ODC*u* 2

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 6 of 14 8.5 See ATTACHMENT E for a complete description of Bases for ODCM Controls associated with the Radiological Environmental Monitoring Program (REMP).

                                                         -END-

C'age 7 of 14) B eaver Valley Power Station Procedure Number: 1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 'General Skill Reference Revision: Page Number: 2 7 of 14 ATTACHMENT A Page 1 of 1 BASES FOR ODCM CONTROLS: INSTRUMENTATION 3/4.3.3.1 RADIATION MONITORINGINSTRUMENTATION The OPERABILITY of the radiation monitoring channels ensures that: 1) the radiation levels are continually measured in the areas served by the individual channels; 2) the alarm or automatic action is initiated when the radiation level trip setpoint is exceeded; and 3) sufficient information is available on selected plant parameters to monitor and assess these variables following an accident. This capability is consistent with the recommendations of NUREG-0737.(329) 3/4.3.3.9 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION The radioactive liquid effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in liquid effluents during actual or potential releases of liquid effluents. The alarm/trip setpoints for these instruments shall be calculated in accordance with Section 1 of this manual to ensure that the alarm/trip will occur prior to exceeding the limits of 10 CFR Part 20. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50.(3'-2l- 3.2.2) 3/4.3.3.10 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The alarm/trip setpoints for these instruments shall be calculated in accordance with Section 2 of this manual to ensure that the alarm/trip will occur prior to exceeding the limits of 10 CFR Part 20. This instrumentation also includes provisions for monitoring (and controlling) the concentrations of potentially explosive gas mixtures in the waste gas holdup system. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50. (3.21' 3.2.2)

[Page 8 of 14) Beaver Valley Power Station ocedureNu :ODC 3 2

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 8 of 14 ATTACHMENT B Page 1 of 2 BASES FOR ODCM CONTROLS: LIQUID EFFLUENTS 3/4.11.1.1 LIQUID EFFLUENT CONCENTRATION This CONTROL is provided to ensure that the concentration of radioactive materials released in Liquid waste effluents from the site to unrestricted areas will be less than 10 times the EC's specified in 10 CFR Part 20, Appendix B (20.1001-20-2402), Table 2, Column 2. This limitation provides additional assurance that the levels of radioactive-materials in bodies of water outside the site will result in exposure within (1) the Section II.A design objectives of Appendix I, 10 CFR Part 50, to an individual and (2) the limits of 10 CFR Part 20.1302 to the population. The concentration limit for dissolved or entrained noble gases is based upon the assumption that Xe-135 is the controlling radioisotope and its MPC in air (submersion) was converted to an equivalent concentration in water using the methods described in International Commission on Radiological Protection (ICRP) Publication 2.(21-23.2.2) 3/4.11.1.2 LIQUID EFFLUENT DOSE This CONTROL is provided to implement the requirements of Sections II.A, III.A, and IV.A of Appendix I, 10 CFR Part 50. The Limiting Condition for Operation implements the guides set forth in Section II.A of Appendix I. The ACTION statements provide the required operating flexibility and at the same time implement the guides set forth in Section IV.A of Appendix I to assure that the releases of radioactive material in liquid effluents will be kept "as low as is reasonably achievable." Also, for fresh water sites with drinking water supplies which can be potentially affected by plant operations, there is reasonable assurance that the operation of the facility will not result in radionuclide concentrations in the finished drinking water that are in excess of the requirements of 40 CFR 141. The dose calculations in the procedure 1/2-ODC-2.01 implement the requirements in Section III.A of Appendix I that conformance with the guides of Appendix I is to be shown by calculational procedures based on models and data such that the actual exposure of an individual through appropriate pathways is unlikely to be substantially underestimated. The equations specified in procedurel/2-ODC-2.01 for calculating the doses due to the actual release rates of radioactive materials in liquid effluents are consistent with the methodology provided in Regulatory Guide 1.109, and Regulatory Guide 1.113. NUREG-0133 provides methods for dose calculations consistent with Regulatory Guides 1.109 and 1.113.(3.1.1, 3.2.2, 3.2.3, 3.2.5, 3.2.7, 3.2.8) This CONTROL applies to the release of liquid effluents for Beaver Valley Power Station, Unit No. 1 or Unit No. 2. These units have shared radwaste treatment systems, the liquid effluents from the shared system are proportioned among the units sharing that system.

'Page 9 of 14) Beaver Valley PowerY Station Procedure Number: 1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 9 of 14 ATTACHMENT B Page 2 of 2 BASES FOR ODCM CONTROLS: LIQUID EFFLUENTS 3/4.11.1.3 LIQUID WASTE TREATMENT SYSTEM The CONTROL that the appropriate portions of this system be used when specified provides assurance that the releases of radioactive materials in liquid effluents will be kept "as low as is reasonably achievable." This specification implements the requirements of 10 CFR Part 50.3 6a, General Design Criterion 60 of Appendix A to 10 CFR Part 50 and design objective given in Section II.D of Appendix I to 10 CFR Part 50. The specified limits governing the use of appropriate portions of the liquid radwaste treatment system were specified as a suitable fraction of the dose design objectives set forth in Section II.A of Appendix I, 10 CFR Part 50, for liquid effluents. This specification applies to Beaver Valley Power Station, Unit No. 1 or Unit No.

2. (3.2.2) 3/4.11.1.4 LIQUID HOLDUP TANKS Restricting the quantity of radioactive material contained in the specified tanks provides assurance that in the event of an uncontrolled release of the tanks' contents, the resulting concentrations would be less than the limits of 10 CFR Part 20, Appendix B, Table 2, Column 2, at the nearest potable water supply and the nearest surface water supply in an unrestricted area.

(Page 10 of 14) Beaver Valley Power Station ocedureNUODC 3 2

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 10 of 14 ATTACHMENT C Page 1 of 3 BASES FOR ODCM CONTROLS: GASEOUS EFFLUENTS 3/4.11.2.1 GASEOUS EFFLUENT DOSE RATE This CONTROL is provided to ensure that the dose at anytime at the site boundary from gaseous effluents from all units on the site will be within the annual dose limits of 10 CFR Part 20 for unrestricted areas. The annual dose limits are the doses associated with the concentrations of 10 CFR Part 20, Appendix B, Table II, Column 1. These limits provide reasonable assurance that radioactive material discharged in gaseous effluents will not result in the exposure of an individual in an unrestricted area, either within or outside the site boundary, to annual average concentrations exceeding the limits specified in Appendix B, Table II of 10 CFR Part 20 (10 CFR Part 20.106(b)). For individuals who may at times be within the site boundary, the occupancy of the individual will be sufficiently low to compensate for any increase in the atmospheric diffusion factor above that for the site boundary. The specified release rate limits restrict, at all times, the corresponding gamma and beta dose rates above background to an individual at or beyond the site boundary to < 500 mrem/year to the total body or to

                          < 3,000 mrem/year to the skin. These release rate limits also restrict, at all times, the, corresponding thyroid dose        rate above background of a child via the inhalation pathway 2.1) to  _<1,500  mrem/year.(3.

3/4.11.2.2 DOSE, NOBLE GASES This CONTROL is provided to implement the requirements of Sections II.B, III.A, and IV.A of Appendix I, 10 CFR Part 50. The CONTROL implements the guides set forth in Section II.B of Appendix I. The ACTION statements provide the required operating flexibility and at the same time implement the guides set forth in Section IV.A of Appendix I to assure that the release of radioactive material in gaseous effluents will be kept "as low as is reasonably achievable." The Surveillance Requirements implement the requirements in Section III.A of Appendix I that conformance with the guides of Appendix I be shown by calculational procedures based on models and data such that the actual exposure of an individual through the appropriate pathways is unlikely to be substantially underestimated. The dose calculations established in procedure 1/2-ODC-2.02 for calculating the doses due to the actual release rates of radioactive noble gases in gaseous effluents are consistent with the methodology provided in Regulatory Guide 1.109, and Regulatory Guide 1.111. The equations in procedure 1/2-ODC-2.02 are provided for determining the air doses at the exclusion area boundary, and are based upon the historical average atmospheric conditions. NUREG-0133 provides methods for dose calculations consistent with Regulatory Guides 1.109 and 1.111. This specifications applies to the release of gaseous effluents from Beaver Valley Power Station, Unit No. 1 or Unit No. 2 .(3,1.2, 3.2.2, 3.2.5, 3.2.6, 3.2.8) 3/4.11.2.3 DOSE, RADIOIODINES. RADIOACTIVE MATERIAL IN PARTICULATE FORM AND RADIONIJCLIDES OTHER THAN NOBLE GASES

(f'age 11 of 14) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 11 of 14 ATTACHMENT C Page 2 of 3 BASES FOR ODCM CONTROLS: GASEOUS EFFLUENTS This CONTROL is provided to implement the requirements of Sections II.C, III.A, and IV.A of Appendix I, 10 CFR Part 50. The CONTROLS are the guides set forth in Section II.C of Appendix I.(322) The ACTION statements provide the required operating flexibility and at the same time implement the guides set forth in Section IV.A of Appendix I to assure that the releases of radioactive materials in gaseous effluents will be kept "as low as is reasonably achievable." The calculational methods specified in the surveillance requirements implement the requirements in Section II.A of Appendix I that conformance with the guides of Appendix I be shown by calculational procedures based on models and data such that the actual exposure of an individual through appropriate pathways is unlikely to be substantially underestimated. The calculational methods in procedure 1/2-ODC-2.02 are for calculating the doses due to the actual release rates of the subject materials are consistent with the methodology provided in Regulatory Guide 1.109, and Regulatory Guide 1.111. These equations also provide for determining the actual doses based upon the historical average atmospheric conditions. The release rate specifications for radioiodines, radioactive material in particulate form, and radionuclides other than noble gases are dependent on the existing radionuclide pathways to man, in the unrestricted area. The pathways which are examined in the development of these calculations are: 1) individual inhalation of airborne radionuclides, 2) deposition of radionuclides onto vegetation with subsequent consumption by man, 3) deposition onto grassy areas where milk animals and meat producing animals graze with consumption of the milk and meat by man, and 4) deposition on the ground with subsequent exposure of man. This CONTROL applies to radioactive material in particulate form and radionuclides other than noble

                          *ases released from Beaver Valley Power Station, Unit No. 1 or Unit No.2. (312,3.2.2, 2.6, 3.2.7)

(Page 12 of 14) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.02

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 12 of 14 ATTACHMENT C Page 3 of 3 BASES FOR ODCM CONTROLS: GASEOUS EFFLUENTS 3/4.11.2.4 GASEOUS RADWASTE TREATMENT SYSTEM The CONTROL that the appropriate portions of these systems be used when specified provides reasonable assurance that the releases of radioactive materials in gaseous effluents will be kept "as low as is reasonably achievable." This specification implements the requirements of 10 CFR Part 50.3 6a, General Design Criterion 60 of Appendix A to 10 CFR Part 50, and design objective Section II.D of Appendix I to 10 CFR Part 50. The specified limits governing the use of appropriate portions of the systems were specified as a suitable fraction of the dose design objectives set forth in Sections II.B and II.C of Appendix I, 10 CFR Part 50, for gaseous effluents. This specification applies to gaseous radwaste from Beaver Valley Power Station, Unit No. 1 or Unit No. 2.(3,12, 3.2.2) 3/4.11.2.5 BV-1 GASEOUS WASTE STORAGE TANKS Restricting the quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tanks' contents, the resulting total body exposure to an individual located at the nearest exclusion area boundary for two hours immediately following the onset of the release will not exceed 0.5 rem. The specified limit restricting the quantity of radioactivity contained in each gas storage tank was specified to ensure that the total body exposure resulting from the postulated release remained a suitable fraction of the reference value set forth in 10 CFR 100.11 (a)(1). 3/4.11.2.5 BV-2 GASEOUS WASTE STORAGETANKS Restricting the quantity of radioactivity contained in any connected group of gaseous waste storage tanks provides assurance that in the event of an uncontrolled release of the tanks' contents, the resulting total body exposure to an individual located at the nearest exclusion area boundary for two hours immediately following the onset of the release will not exceed 0.5 rem. The specified limit restricting the quantity of radioactivity contained in any connected group of gaseous waste storage tanks was specified to ensure that the total body exposure resulting from the postulated release remained a suitable fraction of the reference value set forth in 10 CFR 100.11(a)(1). The curie content limit is applied individually to each gaseous waste storage tank and collectively to the number of unisolated gaseous waste storage tanks.

wage 13 of 14) Beaver Valley Power Station Procedure NuerODC 3 2

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 13 of 14 ATTACHMENT D Page 1 of 1 BASES FOR ODCM CONTROLS: TOTAL DOSE 3/4.11.4 TOTAL DOSE This CONTROL is provided to meet the dose limitations of 40 CFR Part 190 that have been incorporated into 10 CFR Part 20 by 46 FR 18525. The CONTROL requires the preparation and submittal of a Special Report whenever the calculated doses due to releases of radioactivity and to radiation from uranium fuel cycle sources exceed 25 mrems to the whole body or any organ, except the thyroid, which shall be limited to less than or equal to 75 mrems. For sites containing up to 4 reactors, it is highly unlikley that the resultant dose to a MEMBER OF THE PUBLIC will exceed the dose limits of 40 CFR Part 190 if the individual reactors remain within twice the dose design objectives of Appendix I, and if direct radiation doses from the units (including outside storages tanks, etc.) are kept small. The Special Report will describe a course of action that should result in the limitation of the annual dose to a MEMBER OF THE PUBLIC to within the 40 CFR Part 190 limits. For the purposes of the Special Report, it may be assumed that the dose commitment to the MEMBER OF THE PUBLIC from other uranium fuel cycle sources is negligible, with the exception that dose contributions from other nuclear fuel cycle facilities at the same site or within a radius of 5 miles must be considered. If the dose to any MEMBER OF THE PUBLIC is estimated to exceed the requirements of 40 CFR Part 190, the Special Report with a request for a variance (provided the release conditions resulting in violation of 40 CFR Part 190 have not already been corrected), in accordance with the provisions of 40 CFR 190.11 and 10 CFR 20.405c, is considered to be a timely request and fulfills the requirements of 40 CFR Part 190 until NRC staff action is completed. The variance only relates to the limits of 40 CFR Part 190, and does not apply in any way to the other requirements for dose limitation of 10 CFR Part 20, as addressed in ODCM CONTROL 3.11.1.1 and 3.11.2.1. An individual is not considered a MEMBER OF THE PUBLIC during any period in which he/she is engaged in carrying out any operation that is part of the 3 nuclear fuel cycle.(31 ' 3.2.1, 3.2.2, 3.2.4)

(Page 14 of 14) Procedure Number: Beaver Valley Power Station 1/2oODC-30

Title:

Unit: Level Of Use: ODCM: Bases For ODCM Controls 1/2 General Skill Reference Revision: Page Number: 2 14 of 14 ATTACHMENT E Page 1 of 1 BASES FOR ODCM CONTROLS: RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM (REMP) 3/4.12.1 MONITORING PROGRAM The radiological monitoring program required by this CONTROL provides measurements of radiation and of radioactive materials in those exposure pathways and for those radionuclides which lead to the highest potential radiation exposures of MEMBER(S) OF THE PUBLIC resulting from the station operation. This monitoring program thereby supplements the radiological effluent monitoring program by verifying that the measurable concentrations of radioactive materials and levels of radiation are not higher than expected on the basis of the effluent measurements and modeling of the environmental exposure pathways. The initially specified monitoring program will be effective for at least the first 3 years of commercial operation. Following this period, program changes may be initiated based on operational experience. The detection capabilities required by ODCM Control 3.12.1, Table 4.12-1 are state-of-the-art for routine environmental measurements in industrial laboratories. The LLD's for drinking water meet the requirements of 40 CFR 141.(313' 3.2.3) 3/4.12.2 LAND USE CENSUS ODCM CONTROL 3.12.2 is provided to ensure that changes in the use of unrestricted areas are identified and that modifications to the monitoring programs are made if required by the results of this census. The best survey information from the door-to-door survey, aerial survey, or by consulting with local agriculture authorities shall be used. This census satisfies the requirements of Section IV.B.3 of Appendix I to 10 CFR Part 50. Restricting the census to gardens of greater than 500 square feet provides assurance that significant exposure pathways via leafy vegetables will be identified and monitored since a garden of this size is the minimum required to produce the quantity (26 kg/year) of leafy vegetables assumed in Regulatory Guide 1.109 for consumption by a child. To determine this minimum garden size, the following assumptions were used: 1) that 20% of the garden was used for growing broad leaf vegetation (i.e., similar to lettuce and cabbage), and 2) a vegetation yield of 2 kg/square meter.(3. 3.2.2) 3/4.12.3 INTERLABORATORY COMPARISON PROGRAM The ODCM CONTROL 3.12.3 for participation in an Interlaboratory Comparison Program is provided to ensure that independent checks on the precision and accuracy of the measurements of radioactive material in environmental sample matrices are performed as part of a quality assurance program for environmental monitoring in order to demonstrate that the results are reasonably valid.1 '3

o I' (Page 1 of 86) RTL #A9.621B Beaver Valley Power Station Unit 1/2 1/2-ODC-3.03 ODCM: Controls for RETS and REMP Programs Document Owner Manager, Nuclear Environmental and Chemistry Revision Number 8 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 05/30/09

(Page 2 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level OfUse: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Rvso: Revision: Page ubr Pg Number: 8 2 of 86 TABLE OF CONTENTS 1.0 PUR P O S E ............. ...................................................................................................................... 3 2 .0 SC O P E ....................................................................... .................................................................. 3 3.0 REFEREN CES AND COM MITM EN TS ................................................................................. 3 3 .1 R e fe re n c e s .......................................................................................................................... 3 3.2 Com mitm ents ............................................................................................. ...................... 6 4.0 RECORD S AN D FORM S ............................................................................................................. 7 4 .1 Re c o rd s ............... ............................................................................................................... 7 4 .2 F o rms ................................................................................................................................. 7 5.0 PRECAU TION S AND LIMITATION S ..................................................................................... 8 6.0 ACCEPTAN CE CRITERIA ............................................................................................ ..... 8 7.0 PREREQUISITES ....................................................................................................................... 8 8.0 PROCEDURE .............................................................................................................................. 8 ATTACHMENT A ODCM CONTROLS: OPERATIONAL MODES AND FREQUENCY NO T A T IO N ............ .................................................................................... 10 ATTACHMENT B ODCM CONTROLS: DEFINITIONS ........................................................ 12 ATTACHMENT C ODCM CONTROLS: APPLICABILITY AND SURVEILLANCE R EQ U IR EM EN T S .......................................................................................... 15 ATTACHMENT D ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION 19 ATTACHMENT E ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EF FL UENT S.................................................................................................... 29 ATTACHMENT F ODCM CONTROLS. RETS INSTRUMENT FOR GASEOUS RELEASES... 39 ATTACHMENT G ODCM CONTROLS: LIQUID EFFLUENT CONCENTRATION .............. 54 ATTACHMENT H ODCM CONTROLS: LIQUID EFFLUENT DOSE ......................................... 59 ATTACHMENTI ODCM CONTROLS: LIQUID RADWASTE TREATMENT SYSTEM ......... 60 ATTACHMENT J ODCM CONTROLS: LIQUID HOLDUP TANKS .......................................... 61 ATTACHMENT K ODCM CONTROLS: GASEOUS EFFLUENT DOSE RATE .................... 62 ATTACHMENT L ODCM CONTROLS: D O SE- N OBLE GASES ............................................... 67 ATTACHMENT M ODCM CONTROLS: DOSE - RADIOIODINES AND PARTICULATES ...... 68 ATTACHMENT N ODCM CONTROLS: GASEOUS RADWASTE TREATMENT SYSTEM ..... 69 ATTACHMENT 0 ODCM CONTROLS: GAS STORAGE TANK S ............................................. 70 ATTACHMENT P ODCM CONTROLS: T O T AL D O SE ............................................................. 71 ATTACHMENT Q ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS ................... 72 ATTACHMENT R ODCM CONTROLS: REMP - LAND USE CENSUS ..................................... 81 ATTACHMENT S ODCM CONTROLS: REMP - INTERLABORATORY COMPARISON PR O GR AM ...................................................................................................... 82 ATTACHMENT T ODCM CONTROLS: ANNUAL REMP REPORT .......................................... 83 ATTACHMENT U ODCM CONTROLS: ANNUAL RETS REPORTS.; ....................................... 85

(Page 3 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference 0DCM: Controls for RETS and REMP Programs Revision: Page Number: 8 3 of 86 1.0 PURPOSE 1.1 This procedure includes selected Definitions and Tables as delineated in Section 1 of the Technical Specifications and selected Applicability and Surveillance Requirement statements as delineated in T.S. 3.0. 1.1.1 Prior to issuance of this procedure, these items were located in Appendix C of the old ODCM, and were added to this procedure for reference purposes, even though they are currently described in the Technical Specifications. 1.2 This procedure contains the controls for the Radiological Effluent Technical Specification (RETS) that were transferred from the Technical Specifications per Unit 1/2 Amendments 32 1A-188/2A-70, and in accordance with Generic Letter 89-01 and NUREG-1301.( 10) 1.2.1 Prior to issuance of this procedure, these items were located in Appendix C of.the old ODCM. 1.3 This procedure contains the reporting requirements for the Radioactive Effluent Release Report and the Annual Radiological Environmental Operating Report that were transferred from the Technical Specifications per Unit 1/2 Amendments 1A-188/2A-70 and in accordance with Generic Letter 89-01 and NUREG-1301. (3.2.10) 1.3.1 Prior to issuance of this procedure, these items were located in Appendix E of the old ODCM. 1.4 This procedure contains the controls for Radiation Monitoring Instrumentation that were transferred from the Technical Specification per Unit 1/2 Amendments 246/124, and in accordance with NUREG-1431. (3.2.11) 1.5 This procedure contains the controls for Liquid Holdup Tank Activity Limits and for Gas Decay/Storage Tank Activity Limits that were transferred from the Technical Specification per Unit 1/2 Amendment 250/130, and in accordance with NUREG-143 1.(3.1.6,3.2.11) 1.6 This procedure provides the.Radiological Effluent Controls and Reporting Requirements required for T.S. 5.5.1, T.S. 5.5.2, T.S. 5.5.8, T.S. 5.6.1, and T.S. 5.6.2. 2.0 SCOPE 2.1 This procedure is applicable to all station personnel that are qualified to perform activities as described and referenced in this procedure.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 1/2-ODC-2.01, ODCM: Liquid Effluents 3.1.2 1/2-ODC-2.02, ODCM: Gaseous Effluents

(Page 4 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 4 of 86 3.1.3 1/2-ODC-3.02, ODCM: Bases for ODCM Controls 3.1.4 Unit 1/2 Technical Specification 6.8.6, including Amendments 188/70 (LAR 1A-175/2A-137) Implemented August 7, 1995. 3.1.5 Unit 1/2 Technical Specification 3.3.3.1, including Amendments 246/124 (LAR lA-287/2A-159) Implemented April 11, 2002 3.1.6 Unit 1/2 Technical Specification 3.11.1.4, 3.11.2.5, 6.8.6 and 6.9.3, including Amendments 250/130 (LAR 1A-291/2A-163) Implemented August 7, 2002 3.1.7 1/2-ADM- 1640, Control of the Offsite Dose Calculation Manual 3.1.8 1/2-ADM-0 100, Procedure Writer's Guide 3.1.9* NOP-SS-3001, Procedure Review and Approval 3.1.10 CR 981489, ODCM Table 4.11-2 Row A (Waste Gas Storage Tank Discharge). CA-01, Revise Appendix C of the ODCM (Table 4.11-2) to add clarification as to where and when tritium samples are to be obtained for GWST discharges. 3.1.11 CR 981490, ODCM Table 4.11-2 Note e, and Related Chemistry Department Procedures. CA-01, Revise Appendix C of the ODCM (Table 4.11-2, note e) to specify the proper tritium sample point. 3.1.12 CR 993021, Apparent failure to test RM-IDA-100 trip function as required by ODCM. No ODCM changes are required for this CR. 3.1.13 CR 001682, ODCM Action 28 Guidance. CA-02, Revise Appendix C of the ODCM (Table 3.3-13, Action 28) to differentiate actions associated with Inoperable Process Flow Rate Monitors vs. Sample Flow Rate Monitors. 3.1.14 CR02-05711, TS and ODCM changes not reflected in 1OM.54.3.L5 Surveillance Log. CA-01, Revise 1/2-ODC-3.03 to add a requirement for applicable station groups notification of pending ODCM changes. 3.1.15 CR03-06123, Enhance Table 3.3-6 of 1/2-ODC-3.03 to Add More Preplanned Method of Monitoring. CA-01, Revise Table 3.3-6 and Table 4.3-3 to allow use of Eberline SPING Channel 5 as an additional 2 0dPMM when the Unit 1 Mid or High Range Noble Gas Effluent Monitors are Inoperable. 3.1.16 CR03-06281, Gaseous Tritium Sampling Required by ODCM (1/2-ODC-3.03) Unclear for Chemistry. CA-01, Revise procedure Attachment K Table 4.11-2 for RP & Chemistry sampling of Gaseous Effluent Pathways to show which effluent pathways need sampled for compliance to ODCM Control 3.11.2.1 requirements.

e (Page 5 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 5 of 86 3.1.17 CR03-07487, Results of NQA Assessment of the Radiological Effluents Program. CA-01, Revise Calculation Package No. ERS-ATL-95-007 to clarify the term "Surface Water Supply" per guidance presented in NUREG-0800 SRP 15.7.3. CA-05, Revise 1/2-ODC3.03 Control 3.11.1.4 to update the activity limits for the outside storage tanks. 3.1.18 CR03-07668, Benchmark Effluent & Environmental Programs VS Papers Presented at 13 th REMP/RETS Workshop. CA-01, Evaluate procedure Attachment K Table 4.11-2 to reduce the amount of Effluent Samples obtained during a power transient. 3.1.19 CR03-09288, LAR 1A-321 & 2A-193, Increased Flexibility in Mode Restraints. CA-19, Review LAR. 1A-321/2A-193 to identify the affected Rad Effluent procedures, programs, manuals, and applicable plant modification documents that will need to be revised to support implementing the LAR. 3.1.20 CR03-09959, RFA-Rad Protection Provide Clarification to ODCM 1/Day Air Tritium Sample. CA-01, Revise ODCM procedure 1/2-ODC-3.03 Attachment K (Table 4.11-2 note c & note e) to allow sampling of the appropriate building atmosphere. 3.1.21 CR03-11726, Typographical Error Found in ODCM 3.11.2.5. CA-01, Revise ODCM procedure 1/2-ODC-3.03, Attachment 0, Control 3.11.2.5 to correct a typographical error. Specifically, the final word in Action (a) needs changed from "nad" to "and". 3.1.22 CR04-01643, Procedure Correction - Typographical Error in the ODCM. CA-01, Revise ODCM procedure 1/2-ODC-3.03, Attachment F, (Table 3.3-13 and 4.3-13) to correct a typographical error. Specifically, the Asset Number for the Vacuum Gauge used for measurement of sample flow (from the Alternate Sampling Device) needs changed from [PI-1GW-13] to [PI-1GW-135]. 3.1.23 CR04-02275, Discrepancies in Table 3.3-13 of the ODCM. CA-01, Revise ODCM procedure 1/2-ODC-3.03, Attachment F, (Table 3.3-13 and 4.3-13) to add clarification that the "Sampler Flow Rate Monitors are the devices used for "Particulate and Iodine Sampling". 3.1.24 Unit 1 Technical Specification Amendment No. 275 (LARP 1A-302) to License No. DPR-66. This amendment to the Unit 1 license was approved by the NRC on July 19, 2006. 3.1.25 Vendor Calculation Package No. 8700-UR(B)-223, Impact of Atmospheric Containment Conversion, Power Uprate, and Alternative Source Terms on the Alarm Setpoints for the Radiation Monitors at Unit 1. 3.1.26 Engineering Change Package No. ECP-04-0440, Extended Power Uprate. 3.1.27 CR 06-04908, Radiation Monitor Alarm Setpoint Discrepancies. CA-03; revise ODCM procedure 1/2-ODC-3.03 to update the alarm setpoints of [RM-1VS-1 10] and [RM-1GW-109] for incorporation of the Extended Power Uprate per Unit I TS Amendment No. 275.

(Page 6 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs S Revision:

                                                                                                   .8 Page Number:

6 of 86 3.1.28 Calculation Package No. ERS-MPD-93-007, BVPS-1 Gaseous Radioactivity Monitor Emergency Action Levels. 3.1.29 SAP Order 200197646-0110: Revise ODCM procedure 1/2ODC-3.03, 1/2-HPP-3.06.001, 1/2-ENV-05-01, Form 1/2-HPP-3.06.001.F05 and Form 1/2-ENV-05.1.F05 to incorporate revised outside liquid storage tank activity limits via Calculation Package No. ERS-ATL-95-007, R2. 3.1.30 CR06-04944: ODCM 3.03 Attachment E conflict between Applicability and Action Statement. CA-01; revise ODCM procedure 1/2-ODC-3.03, Attachment E to clarify Applicability for tank level indicating devices is during additions to the tank. 3.1.31 CR05-03306: Incorporated Improved Technical Specifications. This includes transfer of programmatic controls for BV-2 Noble Gas Effluent Steam Monitors [2MS S-RQ 101A], [2MSS-RQ11IB] and [2MSS-RQIO1C] from the Technical Specifications to ODCM procedure 1/2-ODC-3.03 (Attachment D Tables 3.3-6 and 4.3-3). This was permitted via Unit 1/2 Technical Specification Amendments No. 278/161. 3.1.32 T.S. 5.5.1 3.1.33 T.S. 5.5.2 3.1.34 T.S. 5.5.8 3.1.35 T.S. 5.6.1 3.1.36 T.S. 5.6.2 3.1.37 SAP Order 200240681: Revise ODCM procedure 1/2-ODC-3.03 (Attachment E Table 3.3-12) to add an alternate Action when the primary Flow Rate Measurement Device [FT-1CW-101-1] is not OPERABLE. The alternate Action (25A) uses local measurements (as described in 1MSP-31.06-I) to determine a total dilution flow rate during liquid effluent releases. 3.1.38 CR07-12924 and SAP Order 200247228-0410: Revise ODCM procedure I/2-ODC-3.03 (Attachment F Tables 3.3-13 and 4.3-13) to clarify the Functional Location of the Sampler Flow Rate Monitors for the BV-2 gaseous effluent release pathways. Specifically, the procedure was changed to refer to Functional Location [2H1VS-FIT101-1] instead of [2HVS-FIT101], [2RMQ-FIT301-1] instead of [2RMQ-FIT301], [2HVL-FIT 112-1] instead of [2HVL-FIT 112], and [2RMQ-FIT303-1] instead of [2RMQ-FIT303]. 3.2 Commitments 3.2.1 10 CFR Part 20, Standards for Protection Against Radiation 3.2.2 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities

(1Page 7 of 86) r Procedure Number: I

Title:

ODCM: Controls for RETS and REMP Programs General Skill Reference Page Number: I1 3.2.3 40 CFR Part 141 3.2.4 40 CFR Part 190, Environmental Radiation Protection Standards For Nuclear Power Operations. 3.2.5 Regulatory Guide 1.109, Calculation Of Annual Doses To Man From Routine Releases Of Reactor Effluents For The Purpose Of Evaluating Compliance With 10 CFR Part 50, Appendix I, Revision 1, October 1977 3.2.6 Regulatory Guide 1.111, Methods For Estimating Atmospheric Transport And Dispersion Of Gaseous Effluents In Routine Releases From Light-Water-Cooled Reactors, Revision 1, July 1977 3.2.7 Regulatory Guide 1.113, Estimating Aquatic Dispersion Of Effluents From Accidental And Routine Reactor Releases For The Purpose Of Implementing Appendix I, April 1977 3.2.8 NUREG-0133, Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants, October 1978 3.2.9 NUREG-0737, Clarification of TMI Action Plan Requirements, October 1980 3.2.10 NUREG-1301, Offsite Dose Calculation Manual Guidance; Standard Radiological Effluent Controls For Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1) 3.2.11 NUREG-143 1, Standard Technical Specifications - Westinghouse Plants Specifications 3.2.12 NUREG-0800, Standard Review Plan, Postulated Radioactive Releases Due to Liquid-Containing Tank Failures, July 1981 3.2.13 Licensee Response to NRC Unresolved Item 50-334/83-30-05. The Radiation Monitor Particle Distribution Evaluation showed that the Licensee must continue to use correction factors to determine particulate activity in samples obtained from the effluent release pathways. 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 Any calculation supporting ODCM changes shall be documented, as appropriate, by a retrievable document (e.g.; letter or calculation package) with an appropriate RTL number. 4.2 Forms 4.2.1 None

(Page 8 of 86) Procedure Number: yPower Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 1 8 8 of 86 5.0 PRECAUTIONS AND LIMITATIONS 5.1 The numbering of each specific ODCM Control, ODCM Surveillance Requirement and ODCM Table contained in this procedure does not appear to be sequential. This is intentional, as all ODCM Control, ODCM Surveillance Requirement and ODCM Table numbers remained the same when they were transferred from the Technical Specifications. This was done in an effort to minimize the amount of plant procedure changes and to eliminate any confusion associated with numbering changes. 5.2 The numbering of each specific ODCM Report contained in this procedure does not appear to be sequential. This is intentional, as all ODCM Report numbers remained the same when they were transferred from the Technical Specifications. This was done in an effort to minimize the amount of plant procedure changes and to eliminate any confusion associated with numbering changes. 6.0 ACCEPTANCE CRITERIA 6.1 Any change to this procedure shall contain sufficient justification that the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR Part 190, 10 CFR 50.36a, and Appendix I to 10 CFR 50, and not 2 0 adversely impact the accuracy or reliability of effluent dose or setpoint calculation.(3 1 ) 6.1.1 All changes to this procedure shall be prepared in accordance with 1/2-ADM-0100"3 - 8 ) and 1/2-ADM-1640.(3' 7 ) 6.1.2 Pending changes to this procedure shall be provided to applicable station groups. For example, IF Control 3.11.1.1 is being changed, THEN the proposed changes shall be provided to the applicable station groups (i.e.; owner of the procedures), identified in the MATRIX of ODCM procedure 1/2-ODC-1.01. This will allow the station groups to revise any affected procedures concurrent with the ODCM change. (3.1.14) 6.1.3 All changes to this procedure shall be reviewed and approved in accordance with NOP-SS-3001 (3.1.9) and 1/2-ADM-1640.(3 1 7 ) 7.0 PREREQUISITES 7.1 The user of this procedure shall be familiar with ODCM structure and content. 8.0 PROCEDURE 8.1 See ATTACHMENT A for a Table of Operational Modes and a Table of Frequency Notation. 8.2 See ATTACHMENT B for a list of defined terms used throughout the ODCM. 8.3 See ATTACHMENT C thru ATTACHMENT S for a complete description of all ODCM Controls. 8.4 See ATTACHMENT T for a description of the Annual Report required by the REMP Controls.

IPage 9 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 9 of 86 8.5 See ATTACHMENT U for a description of the Annual Report required by the RETS Controls.

                                                      - END -

(Page 10 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 10 of 86 ATTACHMENT A Page 1 of 2 ODCM CONTROLS: OPERATIONAL MODES AND FREQUENCY NOTATION TABLE 1.1 MODES AVERAGE REACTOR REACTIVITY  % RATED COOLANT CONDITION THERMAL TEMPERATURE MODE TITLE (kff) POWER(a) (OF) 1 Power _ 0.99 >5 NA Operation 2 Startup Ž0.99 *5 NA 3 Hot Standby < 0.99 NA > 350 4 Hot < 0.99 NA 350 > Tavg > 2 00 Shutdown(b) 5 Cold < 0.99 NA < 200 Shutdown(b) 6 Refuelingc) NA NA NA (a) Excluding decay heat. (b) All reactor vessel head closure bolts fully tensioned. (c) One or more reactor vessel head closure bolts less than fully tensioned.

ýPage 11 of 86) Beaver Valley Power Station Procedure NuODC 3 3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM[ Controls for RETS and REMP Programs Revision: Page Number: 8 11 of 86 ATTACHMENT A Page 2 of 2 ODCM CONTROLS: OPERATIONAL MODES AND FREQUENCY NOTATION TABLE 1.2 FREQUENCY NOTATION NOTATION .FREQUENCY S At least once per 12 hours D At least once per 24 hours W At least once per 7 days M At least once per 31 days Q At least once per 92 days SA At least once per 184 days R At least once per 18 months S/U Prior to each reactor startup P Completed prior to each release N.A. Not applicable

(Page 12 of 86) Beaver Valley Power Station ProeureN eODC 3 .03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 12 of 86 ATTACHMENT B Page 1 of3 ODCM CONTROLS: DEFINITIONS The defined terms of this section appear in capitalized type and are applicable throughout these CONTROLS. ACTION shall be those additional requirements specified as corollary statements to each principal CONTROL and shall be part of the CONTROLS. CHANNEL CALIBRATION shall be the adjustment, as necessary, of the channel output such that it responds with the necessary range and accuracy to known values of the parameter which the channel monitors. The CHANNEL CALIBRATION shall encompass the entire channel including the sensor and alarm and/or trip functions, and shall include the CHANNEL OPERATIONAL TEST. The CHANNEL CALIBRATION may be performed by any series of sequential, overlapping, or total channel steps such that the entire channel is calibrated. CHANNEL CHECK shall be the qualitative assessment of channel behavior during operation by observation. This determination shall include, where possible, comparison of the channel indication and/or status with other indications and/or status derived from independent instrument channels measuring the same parameter. CHANNEL OPERATIONAL TEST shall be the injection of a simulated signal into the channel as close to the primary sensor as practicable to verify OPERABILITY including alarm and/or trip functions. FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.2. GASEOUS RADWASTE TREATMENT SYSTEM is any system designed and installed to reduce radioactive gaseous effluents by collecting primary coolant system offgases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment. MEMBER(S) OF THE PUBLIC (10 CFR 20 and/or 10 CFR 50) means any individual except when that individual is receiving an occupational dose. This definition is used to show compliance to ODCM CONTROL 3.11.1.1, 3.11.1.4, 3.11.2.1 and 3.11.2.5 that are based on 10 CFR Part 20. This definition is also used to show compliance to ODCM Controls 3.11.1.2, 3.11.1.3, 3.11.2.2, 3.11.2.3 and 3.11.2.4 that are based on 10 CFR Part 50. MEMBER(S) OF THE PUBLIC (40 CFR 190) means any individual that can receive a radiation dose in the general environment, whether he may or may not also be exposed to radiation in an occupation associated with a nuclear fuel cycle. However, an individual is not considered a MEMBER OF THE PUBLIC during any period in which he is engaged in carrying out any operation which is part of the nuclear fuel cycle. This definition is used to show compliance to an ODCM CONTROL 3.11.4.1 that is based on 40 CFR Part 190.

(Page 13 of 86) Beaver Valley Power Station rocedureNom 303

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 1 8 13 of 86 ATTACHMENT B Page 2 of 3 ODCM CONTROLS: DEFINITIONS OFFSITE DOSE CALCULATION MANUAL (ODCM) shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring Alarm/Trip Setpoints, and in the conduct of the Environmental Radiological Monitoring Program. The ODCM shall also contain (1) the Radioactive Effluent Controls and Radiological Environmental Monitoring Programs required by T.S. 5.5.2 and (2) descriptions of the information that should be included in the Radiological Environmental Operating and Annual Radioactive Effluent Release Reports that are also required by T.S. 5-6.1 and T.S. 5.6.2. OPERABLE/OPERABILITY A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function(s). Implicit in this definition shall be the assumption that all necessary attendant instrumentation, controls, normal and emergency electric power sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its function(s) are also capable of performing their related safety function(s). MODE shall correspond to any one inclusive combination of core reactivity condition, power level, and average reactor coolant temperature specified in ATTACHMENT A Table 1.1. PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration, or other operating conditions, in such a manner that replacement air or gas is required to purify the confinement. C0 RATED THERMAL POWER shall be a total reactor core heat transfer rate to the reactor coolant of 2900 MWt. REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50. SHUTDOWN means reactor power change to 0% power. SITE BOUNDARY shall be that line beyond which the land is neither owned, nor leased, nor otherwise controlled by the licensee. The Figure for Liquid Effluent Site Boundary is contained in 1/2-ODC-2.01. The Figure for Gaseous Effluent Site Boundary is contained in 1/2-ODC-2.02. STARTUP means reactor power change from 0% power. SOURCE CHECK shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source. THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant. UNRESTRICTED AREA means any area access to which is neither limited nor controlled by the licensee.

Page 14 of 86)

Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 14 of 86 ATTACHMENT B Page 3 of 3 ODCM CONTROLS: DEFINITIONS VENTILATION EXHAUST TREATMENT SYSTEM is any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate form in effluents by passing ventilation or vent exhaust gases through charcoal absorbers and/or HEPA filters for the purpose of removing iodines or particulates from the gaseous exhaust stream prior to the release to the environment (such a system is not considered to have any effect on noble gas effluents). Engineered Safety Feature (ESF) atmospheric cleanup systems are not considered to be VENTILATION EXHAUST TREATMENT SYSTEM components. VENTING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration or other operating conditions, in such a manner that replacement air or gas is not provided or required during VENTING. Vent, used in system names, does not imply a VENTING process.

Page 15 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 1 8 15 of 86 ATTACHMENT C Page 1 of 4 ODCM CONTROLS: APPLICABILITY AND SURVEILLANCE REQUIREMENTS CONTROLS: APPLICABILITY 3.0.1 ODCM CONTROLS shall be met during the MODES or other conditions specified in the Applicability; except as provided in ODCM CONTROL 3.0.2 3.0.2 Upon discovery of a failure to meet the ODCM CONTROL, the associated ODCM ACTION requirements shall be met, except as provided in ODCM CONTROL 3.0.5. If the ODCM CONTROL is met or no longer applicable prior to expiration of the specified time intervals, completion of the ODCM ACTION requirements is not required unless otherwise stated. 3.0.3 When an ODCM CONTROL is not met and the associated ODCM ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the ODCM CONTROL is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in: I. MODE 3 within 7 hours,

2. MODE 4 within 13 hours, and
3. MODE 5 within 37 hours.

Where corrective measures are completed that permit operation in accordance with the ODCM CONTROL or ACTIONS, completion of the actions required by ODCM CONTROL 3.0.3 is not required. Exceptions to these requirements are stated in the individual ODCM CONTROLS. 3.0.4 When an ODCM CONTROL is not met, entry into an MODE or specified condition in the Applicability shall only be made:

a. When the associated ODCM ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time, or
b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this ODCM CONTROL are stated in the individual ODCM CONTROLS, or
c. When an allowance is stated in the individual value, parameter, or other ODCM CONTROL.

This ODCM CONTROL shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ODCM ACTIONS or that are part of a shutdown of the unit.

(Page 16 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Controls for RETS and REMP Programs Revision: _8 16 of 86 ATTACHMENT C Page 2 of 4 ODCM CONTROLS: APPLICABILITY AND SURVEILLANCE REQUIREMENTS 3.0.5 Equipment removed from service or declared inoperable to comply with ODCM ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to ODCM CONTROL 3.0.1 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

(Page 17 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs DRevision: 8 Page Number: 17 of 86 ATTACHMENT C Page 3 of 4 ODCM CONTROLS: APPLICABILITY AND SURVEILLANCE REQUIREMENTS CONTROLS: SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the MODES or other conditions specified for individual ODCM CONTROLS unless otherwise stated in the ODCM Surveillance Requirement. Failure to meet an ODCM Surveillance, whether such failure is experienced during the performance of the Surveillance or between performance of the Surveillance, shall be failure to meet the ODCM CONTROL. Failure to perform a Surveillance within the specified Frequency, shall be failure to meet the ODCM CONTROL except as provided in ODCM Surveillance Requirement 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits. 4.0.2 The specified Frequency for each ODCM Surveillance Requirement is met if the Surveillance is performed within +/-1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met. For Frequencies specified as "once," the above interval extension does not apply. If a Completion Time requires periodic performance or "once per..." basis, the above Frequency extension applies to each performance after the initial performance. Exceptions to this Specification are stated in the individual Specifications. 4.0.3 If it is discovered that an ODCM Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the ODCM CONTROL not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified surveillance interval, whichever is greater. This delay period is permitted to allow performance of the ODCM Surveillance. A risk evaluation shall be performed for any ODCM Surveillance delayed greater than 24 hours and the risk impact shall be managed. If the ODCM Surveillance is not performed within the delay period, the ODCM CONTROL must immediately be declared not met, and the applicable ODCM ACTION(s) must be entered. When the ODCM Surveillance is performed within the delay period and the ODCM Surveillance is not met, the ODCM CONTROL must immediately be declared not met, and the applicable ODCM ACTION(s) must be entered.

(Page 18 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 18 of 86 ATTACHMENT C Page 4 of 4 ODCM CONTROLS: APPLICABILITY AND SURVEILLANCE REQUIREMENTS 4.0.4 Entry into a MODE or other specified condition in the Applicability of a ODCM CONTROL shall only be made when the ODCM Surveillances have been met within their allowed surveillance interval, except as provided by ODCM Surveillance Requirement 4.0.3. When an ODCM CONTROL is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with ODCM CONTROL 3.0.4. This provision shall not prevent entry into MODES or other specified conditions in the Applicability, that are required to comply with ODCM ACTION requirements or that are part of a shutdown of the unit.

Page 19 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 19 of 86 ATTACHMENT D Page 1 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION CONTROLS: RADIATION MONITORING (HIGH RANGE INSTRUMENTATION) 3.3.3.1 The radiation monitoring instrumentation channels shown in Table 3.3-6 shall be OPERABLE with their alarm/trip setpoints within the specified limits. APPLICABILITY: As shown in Table 3.3-6. ACTION:

a. With a radiation monitoring channel alarm/trip setpoint exceeding the value shown in ODCM Control 3.3.3.1, Table 3.3-6, adjust the setpoint to within the limit within 4 hours or declare the channel inoperable.
b. With one or more radiation monitoring channels inoperable, take the ACTION shown in ODCM Control 3.3.3.1, Table 3.3-6.
c. The provisions of ODCM Control 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.1 Each radiation monitoring instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL OPERATIONAL TEST operations during the modes and at the frequencies shown in ODCM Control 3.3.3.1, Table 4.3-3.

(Page 20 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Controls for RETS and REMP Programs Revision: 8 20 of 86 ATTACHMENT D Page 2 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 3.3-6 BV-1 RADIATION MONITORING INSTRUMENTATION Pri = Primary Instruments, PMM = Preplanned Method of Monitoring(a) MINIMUM NOMINAL CHANNELS APPLICABLE MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT(') RANGE ACTION 4

1. Noble Gas Effluent Monitors - SPINGS( )
a. Reactor Building/SLCRS (CV-1; Also called Elevated Release)

Mid Range Noble Gas (1) 1,2,3, & 4 35 Pri: (RM-1VS-110 Ch 7) < 1660 cpm 1E-3 to 1E+3 uCi/cc(2) lstPMM: (RM-IVS-112 SA-10) 2nd PMM: (RM-1VS-107B, or 110 Ch 5) 3rd PMM: Grab Sampling every 12 hours High Ran2e Noble Gas (1) 1, 2,3, & 4 35 Pri: (RM-IVS-110 Ch 9) NA 1E-1 to 1E+5 uCi/cc(2) 35 IstPMM: (RM-IVS-112 SA-9 2nd PMM: (RM-1VS-107B, or 110 Ch 5) 3rd PMM: Grab Sampling every 12 hours b.Auxiliary Building Ventilation System (VV-1; Also called Ventilation Vent) Mid Range Noble Gas (1) 1, 2,3, & 4 35 Pri: (RM-1VS-109 Ch 7) < 1390 cpm 1E-3 to 1E+3 uCi/cc(2) 1stlPMM: (RM-1VS-Ill SA-10) 2nd PMM: (RM-iVS-101B, or 109 Ch 5) 3rd PMM: Grab Sampling every 12 hours Himh Range Noble Gas (1) 1, 2, 3, & 4 35 Pri: (RM-1VS-109 Ch 9) NA 1E-1 to 1E+5 uCi/cc(2) 1st PMM: (RM-IVS-111 SA-9) 2nd PMM: (RM-iVS-101B, or 109 Ch 5) 3rd PMM: Grab Sampling every 12 hours

c. Gaseous Waste/Process Vent System (PV-1/2)

Mid Range Noble Gas (1) 1, 2, 3, & 4 35 Pri: (RM-1GW-109 Ch 7) NA 1E-3 to IE+3 uCi/cc(31 1stPMM: (RM-1GW-110 SA-10) 2nd PMM: (RM-IGW-108B, or 109 Ch 5) 3rd PMM: Grab Sampling every 12 hours High Range Noble Gas (1) 1, 2, 3, & 4 35 Pri (RM-1GW-109 Ch 9) <1.76E+5 cpm 1E-1 to 1E+5 uCicc;(3) 1stPMM: (RM-1GW-110 SA-9) 2nd PMM: (RM-1GW-108B, or 109 Ch5) 3rd PMM: Grab Sampling every 12

Page 21 of 86) Procedure Number: Beaver Valley Power Station 1/2oODCc3.N3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM. Controls for RETS and RM[P Programs Revision: Page Number: R8 21 of 86 ATTACHMENT D Page 3 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION hours (a) Instruments or actions shown as PMM are the preplanned methods to be used when the primary instrument is inoperable. SINCE the PMM instruments shown are not considered comparable alternate monitoring channels, THEN the ODCM Surveillance Requirements do not apply to the PMM. Therefore, the reporting requirement of Action 35b would still apply when inoperability of the primary instrument exceeds 30 days.

(Page 22 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: Controls for RETS and REMP Programs 8 22 of 86 ATTACHMENT D Page 4 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 3.3-6 (Continued) BV- I RADIATION MONITORING INSTRUMENTATION Pri = Primary Instruments, PMM = Preplanned Method of Monitoring () MINIMNPM NOMINAL CHANNELS APPLICABLE MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT" [) RANGE ACTION

2. Noble Gas Effluent Steam Monitors
a. Atmospheric Steam Dump Valve and Code Safety Relief Valve Discharge Pri: (RM-1MS-100A) (1) 1, 2, 3, & 4 < 50 cpm 1E-1 to 1E+3 uCi/cc 35 PMM: (Form 1/2-HPP-4.02.009.FO1) or (1/2-ENV-05.14.F01)

Pri: (RM-lMS-100B) (1) 1, 2, 3, & 4 *50 cpm 35 1E-1 to 1E+3 uCi/cc PMM: (Form 1/2-HPP-4.02.009.FO1) or (l/2-ENV-05.14.FOI) Pri: (RM-1MS-100C) (1) 1, 2, 3, & 4 _<50 cpm 35 1E-1 to 1E+3 uCi/cc PMM: (Form 1/2-HPP-4.02.009.F01) or (1/2-ENV-05.14.FO0) b.Auxiliary Feedwater Pump Turbine Exhaust Pri: (RM-1MS-101) (1) 1, 2, 3, & 4 < 170 cpm 1E-1 to 1E+3 uCi/cc 35 PMM: (Form 1/2-HPP-4.02.009.F01) or (1/2-ENV-05.14.FO0) (a) Instruments or actions shown as PMM are the preplanned methods to be used when the primary instrument is inoperable. SINCE the PMM instruments shown are not considered comparable alternate monitoring channels, THEN the ODCM Surveillance Requirements do not apply to the PMM. Therefore, the reporting requirement of Action 35b would still apply when inoperability of the primary instrument exceeds 30 days.

(Page 23 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and LEMP Programs ~Revision: Page Number: 8 23 of 86 ATTACHMENT D Page 5 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 3.3-6 (Continued) BV-2 RADIATION MONITORING INSTRUMENTATION Pri = Primary Instruments, PMM = Preplanned Method of Monitoring(a) MINIMUM NOMINAL CHANNELS APPLICABLE MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT(1 ) RANGE ACTION

1. Noble Gas Effluent Monitors
a. SLCRS Filtered Pathway (CV-2; Also called Elevated Release)

Midrange Noble Gas (Xe-133) Pri: (2HVS-RQ109C) (1) 1,2,3, & 4 NA 1E-4 to 1E+2 pCi/cc 35 1st PMM: (2HVS-RQ109D) 2nd PMM: (2HVS-RQ109B) 3rd PMM: Grab Sampling every 12 hours High Range Noble Gas (Xe-133) Pri: (2HVS-RQ109D) (1) 1, 2, 3, & 4 NA 1E-l to IE+5 jiCilcc 35 1st PMM: (2HVS-RQ109C) 2nd PMM: (2HVS-RQ109B) 3rd PMM: Grab Sampling every 12 hours

2. Noble Gas Effluent Steam Monitors
a. Main Steam Discharge (Kr-88)

Pri: (2MSS-RQ1O1A) 1I/SG 1, 2, 3, & 4 < 3.9E-2 jtCi/cc 1E-2 to 1E+3 1tCi/cc 35 PMM: Form 1/2-HPP-4.02.009.F01 or 1/2-ENV-05.14.FO1 Pri: (2MSS-RQ101B) 1/SG 1,2,3,&4 <3.9E-2 [tCi/cc 1E-2 to 1E+3 ptCi/cc 35 PMM: Form 1/2-HPP-4.02.009.FO1 or 1/2-ENV-05.14.FO1 Pri: (2MSS-RQ101C) 1/SG 1, 2, 3, & 4 < 3.9E-2 iLCi/cc 1E-2 to IE+3 ptCi/cc 35 PMM: Form 1/2-HPP-4.02.009.FO0 or I/2-ENV-05.14.FO0 (a) Instruments or actions shown as PMM are the preplanned methods to be used when the primary instrument is inoperable. SINCE the PMM instruments shown are not considered comparable alternate monitoring channels, THEN the ODCM Surveillance Requirements do not apply to the PMM. Therefore, the reporting requirement of Action 35b would still apply when inoperability of the primary instrument exceeds 30 days.

(Page 24 of 86) e VProcedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 24 of 86 ATTACHMENT D Page 6 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 3.3-6 (Continued) TABLE NOTATIONS (1) Above background (2) Nominal range for Ch 7 and Ch 9. The Alarm is set on Ch 7. (3) Nominal range for Ch 7 and Ch 9. The Alarm is set on Ch 9. (4) Other SPING-4 channels are not applicable to this ODCM Control. ACTION STATEMENTS ACTION 35 With the number of OPERABLE channels less than required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel(s) to OPERABLE status within 72 hours, or: a) Initiate the preplanned alternate method of monitoring the appropriate parameter(s), and b) Return the channel to OPERABLE status within 30 days, or, explain in the next Radioactive Effluent Release Report why the inoperability was not corrected in a timely manner.

Page 25 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: D 8 25 of 86 ATTACHMENT D Page 7 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 4.3-3 (Continued) BV-I RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS C-Pri = Primary Instruments, PMM = Preplanned Method of Monitoring(a) 0 0 CHANNEL MODES IN WHICH r1j CHANNEL CHANNEL OPERATIONAL SURVEILLANCE INSTRUMENT CHECK CALIBRATION TEST REQUIRED

1. Noble Gas Effluent Monitors - SPINGS
a. Reactor Building/SLCRS (CV-1; Also called Elevated Release)

Mid Range Noble Gas S R M 1, 2, 3, & 4 Pri: (RM-1VS-110 Ch7) lstPMM: (RM-1VS-112 SA-10) 2nd PMM: (RM-1VS-107B, or VS-110 Ch 5) 3rd PMM0: Grab Sampling every 12 hours High Range Noble Gas S R M 1,2,3, & 4 Pri: (RM-lVS-10OCh9) 1st PMM: (RM-lVS-112 SA-9) 2nd PMM: (RM-1VS-107B, or VS-10 Ch 5) 3rd PMM: Grab Sampling every 12 hours

b. Auxiliary Building Ventilation System (VV-1; Also called Ventilation Vent)

Mid Range Noble Gas S R M 1,2,3, & 4 Pri: (RM-1VS-109 Ch 7) istPMM: (RM-1VS-111 SA-10) 2nd PMM: (RM-1VS-101B, or VS-109 Ch 5) 3rd PMM: Grab Sampling every 12 hours High Range Noble Gas S R M 1,2,3, & 4 Pri: (RM-lVS-109 Ch 9) 1stPMM: (RM-1VS-111 SA-9) 2nd PMM: (RM-1VS-101B,-or VS-109 Ch 5) 3rd PMIM: Grab Sampling every 12 hours

c. Gaseous Waste Process Vent System (PV-1,2)

Mid Range Noble Gas S R M 1, 2,3, & 4 Pri: (RM-1GW-109 Ch 7) 1st PMM: (RM-IGW-l10 SA-10) 2nd PMM: (RM-IGW-108B, or GW-109 Ch 5) 3rd PMM: Grab Sampling every 12 hours High Range Noble Gas S R M 1,2,3, & 4 Pri: RM-lGW-109 Ch 9) 1st PMM: (RM-IGW-110 SA-9) 2nd PMM: (RM-1GW-108B, or GW-109 Ch5) 3rd PMM: Grab Sampling every 12 hours

Page 26 of 86)

Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Controls for RETS and REMP Programs Revision: n8 26 of 86 ATTACHMENT D Page 8 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION (a) Instruments or actions shown as PMM are the preplanned methods to be used when the primary instrument is inoperable. SINCE the PMM instruments shown are not considered comparable alternate monitoring channels, THEN the ODCM Surveillance Requirements do not apply to the PMM. Therefore, the reporting requirement of Action 35b would still apply when inoperability of the primary instrument exceeds 30 days.

Page 27 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: C 8 27 of 86 ATTACHMENT D Page 9 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 4.3-3 (Continued) BV- I RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, PMM = Preplanned Method of Monitoring(a) CHANNEL MODES IN WHICH CHANNEL CHANNEL OPERATIONAL SURVEILLANCE INSTRUMENT CHECK CALIBRATION TEST REQUIRED

2. Noble Gas Effluent Steam Monitors
a. Atmospheric Steam Dump Valve and Code Safety Relief Valve Discharge Pri: (RM-1MS-100A) S R M 1, 2, 3, & 4 PMM: (Form 1/2-I-PP-4.02.009.FO1 or 1/2-ENV-05.14.FO0)

Pri: (RM-1MS-100B) S R M 1, 2, 3, & 4 PMM: (Form 1/2-HPP-4.02.009.FO1 or 1/2-ENV-05.14.FO1) Pri: (RM-1MS-100C) S R M 1, 2,3, & 4 PMM: (Form 1/2-HPP-4.02.009.FO1 or 1/2-ENV-05.14.FO1)

b. Auxiliary Feedwater Pump Turbine Exhaust Pri: (RM-1MS-101) S R M 1, 2, 3, & 4 PMM: (Form 1/2-HPP-4.02.009.FO1 or 1/2-ENV-05.14.FO I)

(a) Instruments or actions shown as PMM are the preplanned methods to be used when the primary instrument is inoperable. SINCE the PMM instruments shown are not considered comparable alternate monitoring channels, THEN the ODCM Surveillance Requirements do not apply to the PMM. Therefore, the reporting requirement of Action 35b would still apply when inoperability of the primary instrument exceeds 30 days.

.Page 28 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 28 of 86 ATTACHMENT D Page 10 of 10 ODCM CONTROLS: RADIATION MONITORING INSTRUMENTATION TABLE 4.3-3 (Continued) BV-2 RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, PMM = Preplanned Method of Monitoring(a) CHANNEL MODES IN WHICH CHANNEL CHECK CHANNEL OPERATIONAL SURVEILLANCE INSTRUMENT CALIBRATION TEST REQUIRED

1. Noble Gas Effluent Monitors
a. SLCRS Unfiltered Pathway (CV-2; Also called Elevated Release)

Mid Ranpe Noble Gas S R M 1, 2,3, & 4 Pri: (2HVS-RQ109C) 1st PMM: (2HVS-RQ109D) 2nd PMM: (2HVS-RQ109B) 3rd PMM: Grab Sampling every 12 hours High Range Noble Gas S R M 1, 2, 3, & 4 Pri: (2HVS-RQ109D) 1st PMM: (2HVS-RQ109C) 2nd PMM: (2HVS-RQ109B) 3rd PMM: Grab Sampling every 12 hours

2. Noble Gas Effluent Steam Monitors
a. Main Steam Discharge (Kr-88)

Pri: (2MSS-RQIO0A) S R M 1, 2, 3, & 4 PMM: (Form 1/2-HPP-4.02.009.FO0 or 1/2-ENV-05.14.FO1) Pri: (2MSS-RQ101B) S R M 1, 2, 3, & 4 PMM: (Form 1/2-HPP-4.02.009.FO1 or 1/2-ENV-05.14.FO1) Pri: (2MSS-RQ101C) S R M 1, 2, 3, & 4 PMM: (Form 1/2-IPP-4.02.009.FO1 or 1/2-ENV-05.14.FO1) (a) Instruments or actions shown as PMM are the preplanned methods to be used when the primary instrument is inoperable. SINCE the PMM instruments shown are not considered comparable alternate monitoring channels, THEN the ODCM Surveillance Requirements do not apply to the PMM. Therefore, the reporting requirement of Action 35b would still apply when inoperability of the primary instrument exceeds 30 days.

(Page 29 of 86) Beaver Valley Power Station rocdureNuober: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: P8 Page Number: 29 of 86 ATTACHMENT E Page 1 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS CONTROLS: RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION 3.3.3.9 In accordance with T. S. 5.5.2. a, the radioactive liquid effluent monitoring instrumentation channels shown in ODCM Control 3.3.3.9, Table 3.3-12 shall be OPERABLE with their alarm/trip setpoints set to ensure that the limits of ODCM CONTROL 3.11.1.1 are not exceeded. The alarm/trip setpoints of the radiation monitoring channels shall be determined in accordance with 1/2-ODC-2.01. Applicability - During Releases Through the Flow Path:

a. For all Gross Activity (e.g.; Beta or Gamma) Radioactivity Monitors
b. For all Flow Rate Measurement Devices Applicability - During Liquid Additions to the Tank:
a. For all Tank Level Indicating Devices Action:
a. With a radioactive liquid effluent monitoring instrumentation channel alarm/trip setpoint less conservative than required by the above specification, immediately suspend the release of radioactive liquid effluents monitored by the affected channel or correct the alarm/trip setpoint.
b. With one or more radioactive liquid effluent monitoring instrumentation channels inoperable, take the ACTION shown in ODCM Control 3.3.3.9, Table 3.3-12 or conservatively reduce the alarm setpoint. Exert a best effort to return the channel to operable status within 30 days, and if unsuccessful, explain in the next Radioactive Effluent Release Report why the inoperability was not corrected in a timely manner.
c. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.9 Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated operable by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION, and CHANNEL OPERATIONAL TEST operations at the frequencies shown in ODCM Control 3.3.3.9, Table 4.3-12.

Page 30 of 86)

Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 30 of 86 ATTACHMENT E Page 2 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 3.3-12 BV- I RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION Pri = Primary Instruments, Alt = Alternate Instruments M[N]M-UM CHANNELS INSTRUMENT OPERABLE ACTION

1. Gross Activity Monitors Providing Automatic Termination Of Release
a. Liquid Waste Effluents Monitor (1) 23 Pri: (RM-1LW-104)
b. Liquid Waste Contaminated Drain Monitor (1) 23 Pri: (RM-ILW-116)
c. Auxiliary Feed Pump Bay Drain Monitor (1) 24 Pri: (RM-1DA-100)
2. Gross Activity Monitors Not Providing Termination Of Release
a. Component Cooling-Recirculation Spray Heat (1) 24 Exchangers River Water Monitor Pri: (RM-1RW-100)
3. Flow Rate Measurement Devices a- Liquid Radwasteffut Line (1) 25 Pri (FR-LW-104) for (RM-1LW-104)
b. Liquid Waste Contaminated Drain Line (1) 25 Pri: (FR-1LW-103) for (RM- 1LW- 116)
c. Cooling Tower Blowdown Line (1) 25A Pri: (FT-ICW-101-1) or Alt: (FT-1CW-101) and (2CWS-FT101)
4. Tank Level Indicating Devices (for tanks outside plant building)
a. Primary Water Storage Tank (1) 26 Pri: (LI-1PG-115A) for (1BR-TK-6A)
b. Primary Water Storage Tank (1) 26 Pri: (LI-1PG-115B) for (1BR-TK-6B)
c. Steam Generator Drain Tank (1) 26 Pri: (LI-1LW-1 10) for (1LW-TK-7A)
d. Steam Generator Drain Tank (1) 26 Pri: (LI-ILW-1 11) for (1LW-TK-7B)
Page 31 of 86)

Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: E8 Page Number: 31 of 86 ATTACHMENT E Page 3 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 3.3-12 (continued) BV-2 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION Pri = Primary Instruments, Alt = Alternate Instruments MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION

1. Gross Radioactivity Monitor Providing Alarm, And Automatic Termination Of Release
a. Liquid Waste Process Effluent Monitor (1) 23 Pri: (2SGC-RQ100)
2. Gross Radioactivity Monitors Providing Alarm, But Not Providing Termination Of Release
a. None Required
3. Flow Rate Measurement Devices
a. Liquid Radwaste Effluent (1) 25 Pri: (2SGC-FS100)
b. Cooling Tower Blowdown Line (1) 25A Pri: (FT-1CW-101-1) or Alt: (FT-1CW-101) and (2CWS-FT101)
4. Tank Level Indicating Devices (for tanks outside plant buildings)
a. None Required

Page 32 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 32 of 86 ATTACHMENT E Page 4 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 3.3-12 (continued) ACTION STATEMENTS Action 23 With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases may be initiated (or resumed) provided that prior to release:

1. At least two independent samples are analyzed in accordance with ODCM SURVEILLANCE REQUIREMENT 4.11.1.1.1, and at least two technically qualified members of the Facility Staff independently verify the release rate calculations(1 ) and discharge valving, or
2. Initiate monitoring with the comparable alternate monitoring channel. ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM CONTROL requirement.

Otherwise, suspend release of radioactive effluents via this pathway. Action 24 With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided:

1. That at least once per 12 hours grab samples are analyzed for gross radioactivity (beta or gamma) at a Lower Limit of Detection (LLD) of at least 1E-7 uCi/ml, or
2. Initiate monitoring with the comparable alternate monitoring channel. ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM CONTROL requirement.

(1) Since the computer software used for discharge permit generation automatically performs the release rate calculations, then the independent signatures on the discharge permit for "preparer" and "reviewer" satisfy the requirement for "...two technically qualified members of the Facility Staff independently verify the release rate calculations..."

(Page 33 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls 11 for RETS and REMP Programs Revision: Page Number: 8 33 of 86 ATTACHMENT E Page 5 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS Table 3.3-12 (continued) ACTION STATEMENTS Action 25 With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided:

1. The flow rate is estimated at least once per 4 hours during actual releases. (Pump curves may be used to estimate flow), or
2. Initiate monitoring with the comparable alternate monitoring channel. ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM CONTROL requirement.

Action 25A With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided:

1. The dilution flow rate is calculated at least once per 4 hours during actual releases using the methods described in procedure (1MSP-31.06-I), or
2. Initiate monitoring with the comparable alternate monitoring channel. ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM CONTROL requirement.

Action 26 With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, liquid additions to this tank may continue provided:

1. The tank liquid level is estimated during all liquid additions to the tank, or
2. Initiate monitoring with the comparable alternate monitoring channel. ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM CONTROL requirement.

(Page 34 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REM Programs Revision: Page Number: M 8 34 of 86 ATTACHMENT E Page 6 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 4.3-12 BV- I RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, Alt = Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

1. Gross Beta or Gamma Radioactivity Monitors Providing Alarm And Automatic Termination Of Release
a. Liquid Radwaste Effluent Line D p(5) R(3) Q0)

Pri: (RM-1LW-104)

b. Liquid Waste Contaminated D p(5) k(3) Q)

Drain Line Pri: (RM-1LW-116)

c. Auxiliary Feed Pump Bay D D R(3) Q(l)

Drain Monitor Pri: (RM-lDA-100)

2. Gross Beta Or Gamma Radioactivity Monitors Providing Alarm But Not Providing Automatic Termination Of Release
a. Component Cooling - Recirculation Spray D M(5) R(3) Q(2)

Heat Exchangers River Water Monitor Pri: (RM-1RW-100)

3. Flow Rate Monitors
a. Liquid Radwaste Effluent Lines D(4) NA R Q Pri: (FR-1LW-104) for (RM-1LW-104)
b. Liquid Waste Contaminated Drain Line D(4) NA R Q Pri: (FR-1LW-103) for (RM-lLW-116)
c. Cooling Tower Blowdown Line D(4) NA R Q Pri: (FT-1CW-101-1) or Alt: (FT-ICW-101) and (2CWS-FT101

(Page 35 of 86) Procedure Number: Beaver Valley Power StationPrcdeNub: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: P8 35 of 86 ATTACHMENT E Page 7 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 4.3-12 (continued) BV-I RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, Alt Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

4. Tank Level Indicating Devices (for tanks outside plant buildings)
a. Primary Water Storage Tank D* NA R Q Pri: (LI-1PG-115A) for (lBR-TK-6A)
b. Primary Water Storage Tank D* NA R Q Pri: (LI -IPG-115B) for (IBR-TK-6B)
c. Steam Generator Drain Tank D* NA R Q Pri: (LI-1LW-1 10) for (1LW-TK-7A)
d. Steam Generator Drain Tank D* NA R Q Pri: (LI-1LW-111) for (1LW-TK-7B)
              *During liquid additions to the tank.

(Page 36 of 86) Procedure Number: Beaver Valley Power Station 1/2ouDC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs CRevision: 8 Page Number: 36 of 86 ATTACHMENT E Page 8 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 4.3-12 (continued) BV-2 RADIOACTIVE LIOUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, Alt = Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

1. Gross Radioactivity Monitor Providing Alarm And Automatic Termination Of Release
a. Liquid Waste Process Effluent D p(5) R(7)(3) 6 Q( )

Pri: (2SGC-RQlOO)

2. Flow Rate Measurement Devices
a. Liquid Radwaste Effluent NA R Q Pri: (2SGC-FS100)
b. Cooling Tower Blowdown Line NA R Q Pri: (FT-lCW-101-1) or Alt: (FT-1CW-101) and (2CWS-FT101)
3. Tank Level Indicating Devices (for tanks outside plant buildings)
a. None Required

(Page 37 of 86) r Procedure Number': I1

Title:

General Skill Reference Page Number: ODCM: Controls for RETS and REMP Programs I ATTACHMENT E Page 9 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 4.3-12 (continued) TABLE NOTATION (U) The CHANNEL OPERATIONAL TEST shall also demonstrate that automatic isolation of this pathway and Control Room Alarm Annunciation occurs if any of the following conditions exist:

1. Instrument indicates measured levels above the alarm/trip setpoint.
2. Downscale failure.
3. Instrument controls not set in operate mode.

(2) The CHANNEL OPERATIONAL TEST shall also demonstrate that Control Room Alarm Annunciation occurs if any of the following conditions exist:

1. Instrument indicates measured levels above the alarm/trip setpoint.
2. Downscale failure.
3. Instrument controls are not set in operate mode.

(3) The initial CHANNEL CALIBRATION for radioactivity measurement instrumentation shall be performed using one or more of the reference standards certified by the National Bureau of (Standards/NIST) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS/NIST. These standards should permit calibrating the system over its intended range of energy and rate capabilities. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration should be used, at intervals of at least once per 18 months. This can normally be accomplished during refueling outages. (Existing plants may substitute previously established calibration procedures for this requirement). (4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be made at least once daily on any day on which continuous, periodic, or batch releases are made. (5) A SOURCE CHECK may be performed utilizing the installed means or flashing the detector with a portable source to obtain an upscale increase in the existing count rate to verify channel response.

(Page 38 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference Revision: Page Number: ODCM: Controls for RETS and REMP Programs 8 38 of 86 ATTACHMENT E Page 10 of 10 ODCM CONTROLS: RETS INSTRUMENTATION FOR LIQUID EFFLUENTS TABLE 4.3-12 (continued)

                                        "              TABLE NOTATION (6)   The CHANNEL CALIBRATION shall also demonstrate that automatic isolation of this pathway and Control Room Alarm Annunciation occurs if the instrument indicates measured levels above the alarm/trip setpoint.

(7) The CHANNEL CALIBRATION shall also demonstrate that Control Room Alarm Annunciation occurs if either of the following conditions exist:

1. Downscale failure.
2. Instrument controls are not set in operate mode.

Page 39 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODCo3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 39 of 86 ATTACHMENT F Page 1 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES CONTROLS: RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 3.3.3.10 In accordance with T.S. 5.5.2.a, the radioactive gaseous effluent monitoring instrumentation channels shown in ODCM Control 3.3.3.10, Table 3.3-13 shall be operable with their alarm/trip setpoints set to ensure that the limits of ODCM CONTROL 3.11.2.1 are not exceeded. The alarm/trip setpoints of the radiation monitoring channels shall be determined in accordance with 1/2-ODC-2.02. Applicability: During releases through the flow path. Action:

a. With a radioactive gaseous process or effluent monitoring instrumentation channel alarm/trip setpoint less conservative than a value which will ensure that the limits of ODCM CONTROL 3.11.2.1 are met, immediately suspend the release of radioactive gaseous effluents monitored by the affected channel or correct the alarm/trip setpoint.
b. With one or more radioactive gaseous effluent monitoring instrumentation channels inoperable, take the ACTION shown in ODCM Control 3.3.3.10, Table 3.3-13 or conservatively reduce the alarm setpoint. Exert a best effort to return the channel to operable status within 30 days, and if unsuccessful, explain in the next Radioactive Effluent Release Report why the inoperability was not corrected in a timely manner.
c. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.10 Each radioactive gaseous effluent monitoring instrumentation channel shall be demonstrated operable by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION, and CHANNEL OPERATIONAL TEST operations at the frequencies shown in ODCM Control 3.3.3.10, Table 4.3-13.

(Page 40 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and RENM Programs Revision: Page Number: n8 40 of 86 ATTACHMENT F Page 2 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 BV-1 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION Pri = Primary Instruments, Alt = Alternate Instruments MINIMUM CHANNELS INSTRUMENT OPERABLE APPLICABIIT1Y ACTION

1. Gaseous Waste/Process Vent System (PV-1/2)
a. Noble Gas Activity Monitor (1)
  • 27,29,30A,30B Pri: (RM-1GW-108B) or Alt For Continuous Release: (RM-1GW-109 Ch 5) may only be used as the comparable alternate monitoring channel for continuous releases via this pathway.

NO Alt For Batch Releases: For information, (RM-1GW-109 Ch 5) SHALL NOT be used as the comparable alternate monitoring channel for batch releases of the BV- 1 GWDT's or the BV-2 GWST's. Specifically, SINCE this channel does not perform the same automatic isolation function as the primary channel, THEN ACTION 27 shall be followed for batch releases of the BV-1 GWDT's or the BV-2 GWST's via this pathway.

b. Particulate and Iodine Sampler (1) 32 Pri: (Filter Paper & Charcoal Cartridge for RM-IGW-109) or 1st Alt: (Filter Paper & Charcoal Cartridge for RM-1GW-1 10) or 2nd Alt: (Continuous collection via RASP Pump) or 3rd Alt: (Grab samples every 12 hours)
c. System Effluent Flow Rate Measuring Device (1) 28A Pri: (FR-1GW-108) or Alt: (RM-1GW-109 Ch 10)
d. Sampler Flow Rate Measuring Device Used for (1) 28B Particulate and Iodine Sample Collection (see 1.b)

Pri: (RM-IGW-109 Ch 15) or Alt: (Rotometer: FM-1GW-101, and Vacuum Gauge: PI-1GW-135)

2. Auxiliary BuildingVentilation System (VV-1; Also called Ventilation Vent)
a. Noble Gas Activity Monitor (1) 29,30A Pri: (RM-1VS-101B) or Alt: (RM-1VS-109 Ch 5)
b. Particulate and Iodine Sampler (1) 32 Pri: (Filter Paper & Charcoal Cartridge for RM-1VS-109) or 1st Alt: (Filter Paper & Charcoal Cartridge for RM-IVS-1 11) or 2nd Alt: (Continuous collection via RASP Pump) or 3rd Alt: (Grab samples every 12 hours)
c. System Effluent Flow Rate Measuring Device (1) 28A Pri: (FR-lVS-101) or Alt: (RM-lVS-109 Ch 10)
d. Sampler Flow Rate Measuring Device Used for (1) 28B Particulate and Iodine Sample Collection (see 2.b)

Pri: (RM-1VS-109 Ch 15) or Alt: (Rotometer: FM-1VS-102, and Vacuum Gauge: PI-1VS-659)

(Page 41 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03 Titleý Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 1 41 of 86 ATTACHMENT F Page 3 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES

              *During Releases via this pathway.

(Page 42 of 86) Procedure Number: Beaver Valley Power Station o /2-oDC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: O 8 42 of 86 ATTACHMENT F Page 4 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 (continued) BV- I RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION Pri = Primary Instruments, Alt = Alternate Instruments MINMUM CHANNELS INSTRUMENT OPERABLE APPLICABILHY ACTION

3. Reactor Building/SLCRS (CV-1; Also called Elevated Release)
a. Noble Gas Activity Monitor (1) 29,30A Pri: (RM-1VS-107B) or Alt: (RM-1VS-110 Ch 5)
b. Particulate and Iodine Sampler (1)
  • 32 Pri: (Filter Paper & Charcoal Cartridge for RM-LVS-1 10) or 1st Alt: (Filter Paper & Charcoal Cartridge for RM-1VS- 112) or 2nd Alt: (Continuous collection via RASP Pump) or 3rd Alt: (Grab samples every 12 hours)
c. System Effluent Flow Rate Measuring Device (1) 28A.

Pri: (FR-1VS-112) or Alt: (RM-1VS-110 Ch 10)

d. Sampler Flow Rate Measuring Device Used for (1) 28B Particulate and Iodine Sample Collection (see 3.b)

Pri: (RM-1VS-110 Ch 15) or Alt: (Rotometer: FM-1VS-103, and Vacuum Gauge: PI-1VS-660)

              *During Releases via this pathway.

(Page 43 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: D 8 Page Number: 43 of 86 ATTACHMENT F Page 5 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 (continued) BV-2 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION Pri = Primary Instruments, Alt = Alternate Instruments MINIMUM CHANNELS INSTRUMENT OPERABLE APPLICABIIIY ACIION

1. SLCRS Unfiltered Pathway (VV-2; Also called Ventilation Vent)
a. Noble Gas Activity Monitor (1)
  • 29, 30B Pri: (2HVS-RQ1O1B)
b. Particulate and Iodine Sampler (1)
  • 32 Pri: (Filter Paper & Charcoal Cartridge for 2HVS-RQ101) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor (1)
  • 28A Pri: (Monitor Item 29 for 2HVS-VP1O1)
d. Sampler Flow Rate Monitor Used for Particulate (1)
  • 28B and Iodine Sample Collection (see 1.b)

Pri: (2HVS-FIT1O1-1)

2. SLCRS Filtered Pathway (CV-2; Also called Elevated Release)
a. Noble Gas Activity Monitor (1)
  • 29, 30B Pri: (2HVS-RQ109B)
b. Particulate and Iodine Sampler (1)
  • 32 Pri: (Filter Paper & Charcoal Cartridge for 2HVS-RQ109 High Flow Path) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor (1) 28A Pri: (Monitor Item 29 for 21HVS-FR22) or 1st Alt: (2HVS-FI22A and F122C) or 2nd Alt: (2HVS-FI22B and F122D)
d. Sampler Flow Rate Monitor Used for Particulate (1) 28B and Iodine Sample Collection (see 2.b)

Pri: (Monitor Items 28 and 72 for 2HVS-DAU109B)

3. Decontamination Building Vent (DV-2)
a. Noble Gas Activity Monitor (1) 29 Pri: (2RMQ-RQ301B)
b. Particulate and Iodine Sampler (1) 32 Pri: (Filter Paper & Charcoal Cartridge for 2RMQ-RQ30 1) or 1st Alt: (Continuous collection via RASP Pump) 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor None None None

'Page 44 of 86) Beavr ValeyProcedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs CM Revision: 8 Page Number: 44 of 86 ATTACHMENT F Page 6 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES

d. Sampler Flow Rate Monitor Used for Particulate (1) 28B and Iodine Sample Collection (see 3.b)

Pri: (2RMQ-FIT301-1)

              *Durting Releases via this pathway.

Page 45 of 86) Beaver Valley Power Station Procedure Number: . 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs MRevision: 8 Page Number: 45 of 86 ATTACHMENT F Page 7 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 (continued) BV-2 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION Pri = Primary Instruments, Alt = Alternate Instruments MN1MUM CHANNELS INSTRUMENT OPERABLE APPLICABILITY ACTION

4. Condensate Polishing Building Vent (CB-2)
a. Noble Gas Activity Monitor (1)
  • 29 Pri: (2HVL-RQ112B)
b. Particulate and Iodine Sampler (1)
  • 32 Pri: (Filter Paper & Charcoal Cartridge for 2HVL-RQ 112) 1st Alt: (Continuous collection via RASP Pump) 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor None None None
d. Sampler Flow Rate Monitor Used for Particulate (1)
  • 28B and Iodine Sample Collection (see 4.b)

Pri: (2HVL-FIT112-1)

5. Waste Gas Storage Vault Vent (WV-2)
a. Noble Gas Activity Monitor (1)
  • 29 Pri: (2RMQ-RQ303B)
b. Particulate and Iodine Sampler (1)
  • 32 Pri: (Filter Paper & Charcoal Cartridge for 2RMQ-RQ303) 1st Alt: (Continuous collection via RASP Pump) 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor None None None
d. Sampler Flow Rate Monitor Used for Particulate (1)
  • 28B and Iodine Sample Collection (see 5.b)

Pri: (2RMQ-FIT303-1)

              *During Releases via this pathway.

(Page 46 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Number: DRevision: 8 Page 46 of 86 ATTACHMENT F Page 8 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 (continued) ACTION STATEMENTS Action 27 APPLICABLE FOR BATCH RELEASES OF BV-I GASEOUS WASTE DECAY TANKS OR BV-2 GASEOUS WASTE STORAGE TANKS With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the Unit 1 Gaseous Waste Decay Tanks (GWDT's) or the Unit 2 Gaseous Waste Storage Tanks (GWST's) may be released to the environment provided that prior to initiating (or resuming) the release: I. At least two independent samples of the tank's content are analyzed and at least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge valve lineup, or

2. Initiate continuous monitoring with the comparable alternate monitoring channel.

ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM Control requirement. Otherwise, suspend releases of radioactive effluents via this pathway. Action 28A APPLICABLE FOR BV-I SYSTEM EFFLUENT FLOW RATE MEASURING DEVICES OR BV-2 PROCESS FLOWRATE MONITORS With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided:

1. The system/process flow rate is estimated at least once per 4 hours (or assumed to be at the ODCM design value(i)), or
2. Initiate continuous monitoring with the comparable alternate monitoring channel.

ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM Control requirement. (1) In lieu of estimating the system/process flow rate at least once per 4 hours, the system/process flow rate can be assumed to be at the following ODCM design values: 1,450 cfm = BV-1 Gaseous Waste/Process Vent System (PV-1,2) 62,000 cfm = BV- 1 Auxiliary Building Ventilation System (VV- 1) 49,300 cfm = BV-1 Reactor Building/SLCRS (CV-1) 23,700 cfm = BV-2 SLCRS Unfiltered Pathway (VV-2) 59,000 cfm = BV-2 SLCRS Filtered Pathway (CV-2)

(Page 47 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 47 of 86 ATTACHMENT F Page 9 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 (continued) ACTION STATEMENTS Action 28B APPLICABLE FOR BV-I SAMPLER FLOW RATE MEASURING DEVICES OR BV-2 SAMPLER FLOWRATE MONITORS With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided:

1. The sampler flow rate is estimated at least once per 4 hours, or
2. Initiate continuous monitoring with the comparable alternate monitoring channel.

ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM Control requirement. Action 29 APPLICABLE FOR CONTINUOUS RELEASES With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided:

1. Grab samples (or local monitor readings)(') are taken at least once per 12 hours. If grab samples are taken, these samples are to be analyzed for gross activity within 24 hours, or
2. Initiate continuous monitoring with the comparable alternate monitoring channel.

ODCM Surveillance requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this ODCM CONTROL requirement. I) For BV-2, there are situations where the local monitor (e.g.; the RM-80) is capable of performing the intended monitoring function, but the communications are lost to the Control Room. In this case, the local monitor can be read at least once per 12 hours in-lieu of obtaining grab samples at least once per 12 hours.

(Page -48 of 86) Beaver Valley Power Station -Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs MRevision: 8 Page Number: 48 of 86 ATTACHMENT F Page 10 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 3.3-13 (continued) ACTION STATEMENTS Action 30A APPLICABLE FOR THE INITIAL BATCH PURGE OF THE BV-I REACTOR CONTAINMENT With the number of channels OPERABLE less than required by minimum Channels OPERABLE requirement, immediately suspend PURGING of Reactor Containment via this pathway if both RM-1 VS-104A and B are not OPERABLE with the purge/exhaust system in service. The following should also be noted:

1. As stated, this Action is applicable for INOPERABLE monitors only when performing the initial batch purge of the reactor containment atmosphere (i.e.;

immediately after reactor containment atmosphere equalization).

2. Since all other releases of reactor containment atmosphere (i.e.; after the initial batch purge) are considered continuous releases, then this Action is not applicable.

Therefore, Action 29 is applicable for INOPERABLE monitors when performing a continuous release of the reactor containment atmosphere. Action 30B APPLICABLE FOR THE INITIAL BATCH PURGE OF THE BV-2 REACTOR CONTAINMENT With the number of channels OPERABLE less than required by Minimum Channels OPERABLE requirement, immediately suspend PURGING of Reactor Containment via this pathway if both 2HVR-RQ104A and 104B are not OPERABLE with the purge/exhaust system in service. The following should also be noted:

1. As stated, this Action is applicable for INOPERABLE monitors only when performing the initial batch purge of the reactor containment atmosphere (i.e.;

immediately after reactor containment atmosphere equalization).

2. Since all other releases of reactor containment atmosphere (i.e.; after the initial batch purge) are considered continuous releases, then this Action is not applicable.

Therefore, Action 29 is applicable for INOPERABLE monitors when performing a continuous release of the reactor containment atmosphere. Action 32 APPLICABLE FOR CONTINUOUS RELEASES With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided samples are continuously collected with auxiliary sampling equipment as required in ODCM Control 3.11.2.1, Table 4.11-2, or sampled and analyzed once every 12 hours.

(Page 49 of 86) Procedure Number: Beaver Valley Power Station 1o20uDCo3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REND Programs Revision: 8 Page Number: 49 of 86 ATTACHMENT F Page 11 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 4.3-13 BV-1 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, Alt = Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

1. Gaseous Waste/Process Vent System (PV-1/2)
a. Noble Gas Activity Monitor p p(4) R(3) Q()

Pri: (RM-IGW-108B) Alt For Continuous Release: (RM-1GW-109 Ch 5) This channel may only be used as the comparable alternate monitoring channel for continuous releases via this pathway. Alt For Batch Releases: (See Action 27): RM-IGW-109 Ch 5 SHALL NOT be used as the comparable alternate monitoring channel for batch releases of the BV-1 GWDT's or the BV-2 GWSTs. Specifically, SINCE this channel does not perform the same automatic isolation function as the primary channel, THEN ACTION 27 shall be followed for batch releases of the BV-1 GWDT's or the BV-2 GWSTs via this pathway

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for RM-lGW-109) or 1st Alt: (Filter Paper & Charcoal Cartridge for RM-1GW-1 10) or 2nd Alt: (Continuous collection via RASP Pump) or 3rd Alt: (Grab samples every 12 hours)
c. System Effluent Flow Rate Measuring Device P NA R Q Pri: (FR-1GW-108) or Alt: (RM-lGW-109 Ch 10)
d. Sampler Flow Rate Measuring Device Used for D* NA R Q Particulate and Iodine Sample Collection (see Lb)

Pri: (RM-1GW-109 Ch 15) or Alt: (Rotometer: FM-1GW-101, and Vacuum Gauge: PI-lGW-135)

2. Auxiliary Building Ventilation System (VV-1; Also called Ventilation Vent)
a. Noble Gas Activity Monitor D M(4), R(3) Q(2)

Pri: (RM-I VS-101B) or p(4)*** Alt: (RM-IVS-109 Ch 5)

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for RM-IVS-109) or Ist Alt: (Filter Paper & Charcoal Cartridge for RM-i VS- 11l) or 2nd Alt: (Continuous collection via RASP Pump) or 3rd Alt: (Grab samples every 12 hours)
c. System Effluent Flow Rate Measurement Device D NA R Q Pri: (FR-1VS-101) or Alt: (RM-lVS-109 Ch 10)
d. Sampler Flow Rate Measuring Device Used for D NA R Q Particulate and Iodine Sample Collection (see 2.b)

Pri: (RM-1VS-109 Ch 15) or Alt: (Rotometer: FM-iVS-102, and Vacuum Gauge: PI-1VS-659)

  • During Releases via this pathway.
               *** During purging of Reactor Containment via this pathway.

(Page 50 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference Page Number: ODCM: Controls for RETS and REMP Programs Revision: 8 50 of 86 ATTACHMENT F Page 12 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 4.3-13 BV-1 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, Alt = Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

3. Reactor BuildingfSLCRS (CV-1; Also called Elevated Release) 2
a. Noble Gas Activity Monitor D M(4), R(3) Q( )

p(4)*** Pri: (RM-1VS-107B)or Alt: (RM-1VS-110 Ch 5)

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for RM-1VS-1 10) or 1st Alt: (Filter Paper & Charcoal Cartridge for RM-1VS-112) or 2nd Alt: (Continuous collection via RASP Pump) or 3rd Alt: (Grab samples every 12 hours)
c. System Effluent Flow Rate D NA R Q Measuring Device Pri: (FR-1VS-112) or Alt: (RM-1VS-110 Ch 10)
d. Sampler Flow Rate Measuring Device Used for D NA R Q Particulate and Iodine Sample Collection (see 3.b)

Pri: (RM-LVS-110 Ch 15) or Alt: (Rotometer: FM-1VS-103, and Vacuum Gauge: PI-1VS-660)

             *During releases via this pathway.
             ***During purging of Reactor Containment via this pathway.

(Page 51 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: R8 Page Number: 51 of 86 ATTACHMENT F Page 13 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 4.3-13 (continued) BV-2 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri = Primary Instruments, Alt = Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

1. SLCRS Unfiltered Pathway (VV-2; Also called Ventilation Vent)
a. Noble Gas Activity Monitor D M(4), W3)(6) Q(5)

Pri: (2HVS-RQ101B) p(4)***

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for 2HVS-RQ101) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor D NA R Q Pri: (Monitor Item 29 for 2HVS-VP1O1)
d. Sampler Flow Rate Monitor Used for Particulate D NA R Q and Iodine Sample Collection (see 1.b)

Pri: (2HJVS-FITO01-1)

2. SLCRS Filtered Pathway (CV-2; Also called Elevated Release)
a. Noble Gas Activity Monitor D M(4), R( 3X6) Q(S)

Pri: (2HVS-RQ109B) p(4)*

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for 2HVS-RQ109 High Flow Path) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor D NA R Q Pri: (Monitor Item 29 for 2HVS-FR22) or 1st Alt: (2HVS-FI22A and F122C) or 2nd Alt: (2HVS-FI22B and F122D)
d. Sampler Flow Rate Monitor Used for Particulate D NA R Q and Iodine Sample Collection (see 2.b)

Pri: (Monitor Items 28 and 72 for 2HVS-DAU109B)

3. Decontamination Building Vent (DV-2)
a. Noble Gas Activity Monitor D M4) W3)(6) Q(S)

Pri: (2RMQ-RQ301B)

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for 2RMQ-RQ301) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor NA NA NA NA
d. Sampler Flow Rate Monitor Used for Particulate D NA R Q and Iodine Sample Collection (see 3.b)

Pri: (2RMQ-FIT301-1)

Page 52 of 86)

Title:

Beaver Valley Power Station I1/2-ODC-3.03 Procedure Number: Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 52 of 86 ATTACHMENT F Page 14 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 4.3-13 (continued) BV-2 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Pri - Primary Instruments, Alt = Alternate Instruments CHANNEL CHANNEL SOURCE CHANNEL OPERATIONAL INSTRUMENT CHECK CHECK CALIBRATION TEST

4. Condensate Polishing Building Vent (CB-2)
a. Noble Gas Activity Monitor D NM(4) R(3X6) Q(5)

Pri: (21HVL-RQ 112B)

b. Particulate and Iodine Sampler W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for 2HVL-RQ 112) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor NA NA NA NA
d. Sampler Flow Rate Monitor Used for Particulate D NA R Q and Iodine Sample Collection (see 4.b)

Pri: (2ffVL-FIT112-1)

5. Waste Gas Storage Vault Vent (WV-2)
a. Noble Gas Activity Monitor D N(4) R(3)(6) Q(S)

Pri: (2RMQ-RQ303B)

b. Particulate and Iodine Samples W NA NA NA Pri: (Filter Paper & Charcoal Cartridge for 2RMQ-RQ303) or 1st Alt: (Continuous collection via RASP Pump) or 2nd Alt: (Grab samples every 12 hours)
c. Process Flow Rate Monitor NA NA NA NA
d. Sampler Flow Rate Monitor Used for Particulate D NA R Q and Iodine Sample Collection (see 5.b)

Pri: (2RMQ-FIT303-1)

(Page 53 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 53 of 86 ATTACHMENT F Page 15 of 15 ODCM CONTROLS: RETS INSTRUMENT FOR GASEOUS RELEASES TABLE 4.3-13 (continued) TABLE NOTATION (t) The CHANNEL OPERATIONAL TEST shall also demonstrate that automatic isolation of this pathway and Control Room Alarm Annunciation occurs if any of the following conditions exist:

a. Instrument indicates measured levels above the alarm/trip setpoint.
b. Downscale failure.
c. Instrument controls not set in operate mode.

(2) The CHANNEL OPERATIONAL TEST shall also demonstrate that Control Room Alarm Annunciation occurs if any of the following conditions exist:

a. Instrument indicates measured levels above the alarm/trip setpoint.
b. Downscale failure.
c. Instrument controls not set in operate mode.

(3) The initial CHANNEL CALIBRATION for radioactivity measurement instrumentation shall be performed using one or more of the reference standards certified be National Bureau of Standards or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards should permit calibrating the system over its intended range of energy and rate capabilities. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration should be used, at intervals of at least once per 18 months. This can normally be accomplished during refueling outages. (4) A SOURCE CHECK may be performed utilizing the installed means or flashing the detector with a portable source to obtain an upscale increase in the existing count rate to verify channel response. (5) The CHANNEL OPERATIONAL TEST shall also demonstrate that Control Room Alarm Annunciation occurs if the instrument indicates measured levels above the alarm/trip setpoint. (6) The CHANNEL CALIBRATION shall also demonstrate that Control Room Alarm Annunciation occurs if either of the following conditions exist:

1. Downscale failure.
2. Instrument controls are not set in operate mode.

(Page 54 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Page Number: ORevision: 8 54 of 86 ATTACHMENT G Page 1 of 5 ODCM CONTROLS: LIQUID EFFLUENT CONCENTRATION CONTROLS: LIQUID EFFLUENT CONCENTRATION 3.11.1.1 In accordance with T.S. 5.5.2.b and T.S. 5.5.2.c, the concentration of radioactive material released at any time from the site (see 1/2-ODC-2.01, Figure 5-1) shall be limited to 10 times the EC's specified in 10 CFR Part 20, Appendix B (20.1001-20.2402), Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases. This is referred to as the ODCM Effluent Concentration Limit (OEC). For dissolved or entrained noble gases, the concentration shall be limited to 2E-4 uCi/ml total activity. Applicability: At all times. Action:

a. With the concentration of radioactive material released from the site to unrestricted areas exceeding the above limits; immediately restore the concentration within the above limits, and
b. Submit a Special Report to the Commission within 30 days in accordance with 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1).
c. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.1.1.1 Radioactive liquid wastes shall be sampled and analyzed according to the sampling and analysis program of ODCM Control 3.11.1.1, Table 4.11-1 *. 4.11.1.1.2 The results of radioactive analysis shall be used in accordance with 1/2-ODC-2.01 to assure that the concentration at the point of release are maintained within the limits of ODCM CONTROL 3.11. 1.1. 4.11.1.1.3 When BV-I primary to secondary leakage exceeds 0.1 gpm (142 gpd), samples of the Turbine Building Sump shall be obtained every 8 hours to ensure that the Turbine Building Sump concentration does not exceed 1 OEC. Once it is determined that an OEC is reached, the Turbine Building Sump shall be routed to the Chemical Waste Sump.

(Page 55 of 86) Beaver Valley P wrSainPoououbr Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use:

                                                                                                    '1/2       General Skill Reference ODCM: Controls for RETS and REMIP Programs                                          Revision:      Page Number:

_8 55 of 86 ATTACHMENT G Page 2 of 5 ODCM CONTROLS: LIQUID EFFLUENT CONCENTRATION SURVEILLANCE REQUIREMENTS (continued) 4.11.1.1.4 When BV-2 primary to secondary leakage exceeds 0.1 gpm (142 gpd), samples of the Turbine Building Sump shall be obtained every 8 hours to ensure that the Turbine Building Sump concentration does not exceed 1 OEC. Once it is determined that an OEC is reached, the Turbine Building Sump shall be routed to Steam Generator blowdown hold tank (2SGC-TK21A or 2SGC-TK21B). 4.11.1.1.5 Prior to the BV-2 Recirculation Drain Pump(s) (2DAS-P215A1215B) discharging to catch basin 16, a grab sample will be taken. The samples will be analyzed for gross activity at a sensitivity of at least 1E-7 uCi/ml. Water volume discharged shall be estimated from the number of pump operations unless alternate flow or volume instrumentation is provided.

  • Radioactive liquid discharges are normally via batch modes. BV-I and BV-2 Turbine Building Drains shall be monitored as specified in ODCM SURVEILLANCE REQUIREMENT 4.11.1.1.3 and 4.11.1.1.4. The BV-2 Recirculation drain pump discharge shall be monitored as specified in ODCM SURVEILLANCE REQUIREMENT 4.11.1.1.5, respectively.

(Page 56 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 56 of 86 ATTACHMENT G Page 3 of 5 ODCM-CONTROLS: LIQUID EFFLUENT CONCENTRATION TABLE 4.11-1 RADIOACTIVE LIQUID WASTE SAMPLING AND ANALYSIS PROGRAM LOWER MINIMUM TYPE OF LIMIT OF LIQUID SAMPLING ANALYSIS ACTIVITY DETECTION RELEASE TYPE FREQUENCY FREQUENCY ANALYSIS (LLD) (uCi/ml)(a) A. Batch Waste P P Principal Gamma 5E-7 Release Tanks(d) Each Batch() Each Batch(h) Emitters(f) 1-131 1E-6 P M Dissolved And 1E-5 One Batch/M[h) Entrained Gases (Gamma Emitters) P M H-3 1E-5 Each Batch(") Composite(b) Gross Alpha 1E-7 P Q Sr-89, Sr-90 5E-8 Each Batch0h) Composite(b) Fe-55 1E-6 B. Continuous Grab SampleWg) W Principal Gamma 5E-7 Releases(eXg) Composite(c) Emitters(f) 1-131 1E-6 Grab Sample(') M Dissolved And 1E-5 Entrained Gases (Gamma Emitters) Grab Sample(g) M H-3 IE-5 Composite(c) Gross Alpha 1E-7 Grab Sample(g) Q Sr-89, Sr-90 5E-8 Composite(c) Fe-55 1E-6

(Page 57 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 57 of 86 ATTACHMENT G Page 4 of 5 ODCM CONTROLS: LIQUID EFFLUENT CONCENTRATION TABLE 4.11-1 (continued) TABLE NOTATION (a) The LLD is the smallest concentration of radioactive material in a sample that will be detected with 95% probability with 5% probability of falsely concluding that a blank observation represents a "real" signal. For a particular measurement system (which may include radiochemical separation): LLD= 4.66 Sb (E)(V)(2.22)(Y) exp(-XAT) where: LLD is the lower limit of detection as defined above (as pCi per unit mass or volume); Sb is the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute); E is the counting efficiency (as counts per transformation); V is the sample size (in units of mass or volume); 2.22 is the number of transformations per minute per picocurie; Y is the fractional radiochemical yield (when applicable); X is the radioactive decay constant for the particular radionuclide; AT is the elapsed time between sample collection (or end of the sample collection period) and time of counting (for environmental samples, not plant effluent samples). The value of Sb used in the calculation of the LLD for a detection system shall be based on the actual observed variance of the background counting rate or of the counting rate of the blank samples (as appropriate) rather than on an unverified theoretically predicted variance. Typical values of E, V, Y and AT should be used in the calculations. The LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as a posteriori (after the fact) limit for a particular measurement.

'Page 58 of 86) Beaver Valley Power Station - Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 58 of 86 ATTACHMENT G Page 5 of 5 ODCM CONTROLS: LIQUID EFFLUENT CONCENTRATION TABLE 4.11-1 (continued) TABLE NOTATION (b) A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of sampling employed results in a specimen which is representative of the liquids released. (c) To be representative of the quantities and concentrations of radioactive materials in liquid effluents, samples shall be collected, continuously in proportion to the rate of flow of the effluent stream. Prior to analyses, all samples taken for the composite shall be thoroughly mixed in order for the composite sample to be representative of the effluent release. (d) A batch release exists when the discharge of liquid wastes is from a discrete volume. Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling. (e) A continuous release exists when the discharge of liquid wastes is from a non-discrete volume; e.g., from a volume of a system having an input flow during the continuous release. Releases from the Turbine Building Drains and the AFW Pump Bay Drain System and Chemical Waste Sump are considered continuous when the primary to secondary leak rate exceeds 0.1 gpm ,(142 gpd). The principal gamma emitters for which the LLD specification will apply are exclusively the following radionuclides: Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144. This list does not mean that only these nuclides are to be detected and reported. Other peaks which are measurable and identifiable, together with the above nuclides, shall also be identified and reported. Nuclides which are below the LLD for the analyses should be reported as "less than" the nuclide's LLD, and should not be reported as being present at the LLD level for that nuclide. The "less than" values should not be used in the required dose calculations. When unusual circumstances result in LLD's higher than required, the reasons shall be documented in the Radioactive Effluent Release Report. 0 (g) When radioactivity is identified in the secondary system, a RWDA-L should be prepared on a monthly basis to account for the radioactivity that will eventually be discharged to the Ohio River. (h) Whenever the BV-2 Recirculation Drain Pump(s) are discharging to catch basin 16, sampling will be performed by means of a grab sample taken every 4 hours during pump operation.

(Page 59 of 86) Beaver Valley Power Station Procedure Num DC 3 3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 1 8 59 of 86 ATTACHMENT H Page 1 of I ODCM CONTROLS: LIQUID EFFLUENT DOSE CONTROLS: LIQUID EFFLUENT DOSE 3.11.1.2 In accordance with T.S.5.5.2.d and T.S. 5.5.2.c, the dose or dose commitment to MEMBER(S) OF THE PUBLIC from radioactive materials in liquid effluents released from the reactor unit (see 1/2-ODC-2.01 Figure 5-1) shall be limited:

a. During any calendar quarter to less than or equal to 1.5 mrem to the total body and to less than or equal to 5 mrem to any organ, and
b. During any calendar year to less than or equal to 3 mrem to the total body and to less than or equal to 10 mrem to any organ.

Appic~ bility: At all times. Action a.

a. With the calculated dose from the release of radioactive materials in liquid effluents exceeding any of the above limits, prepare and submit to the Commission within 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report which identifies the cause(s) for exceeding the limit(s) and defines the corrective actions to be taken to reduce the releases, and the proposed corrective actions to be taken to assure the subsequent releases will be within the above limits. (This Special Report shall also include (1) the results of radiological analyses of the drinking water source and (2) the radiological impact on finished drinking water supplies with regard to the requirements of 40 CFR 141, Safe Drinking Water Act).*
b. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.1.2.1 Dose Calculations. Cumulative dose contributions from liquid effluents shall be determined in accordance with 1/2-ODC-2.01 at least once per 31 days.

  • Applicable only if drinking water supply is taken from the receiving water body within three miles of the plant discharge (three miles downstream only).

(Page 60 of 86) Procedure Number: SBeaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 60 of 86 ATTACHMENT I Page 1 of 1 ODCM CONTROLS: LIQUID RADWASTE TREATMENT SYSTEM CONTROLS: LIQUID RADWASTE TREATMENT SYSTEM 3.11.1.3 In accordance with T. S.5.5.2. f, the Liquid Radwaste Treatment System shall be used to reduce the radioactive materials in each liquid waste batch prior to its discharge when the projected doses due to liquid effluent releases from the reactor unit (see 1/2-ODC-2.01 Figure 5-1) when averaged over 31 days would exceed 0.06 mrem to the total body or 0.2 mrem to any organ. Applicability: At all times. Action:

a. With liquid waste being discharged without treatment and exceeding the limits specified, prepare and submit to the Commission within 30 days pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1) a Special Report which includes the following information:
1. Identification of the inoperable equipment or subsystems and the reason for inoperability.
2. Action(s) taken to restore the inoperable equipment to operational status, and
3. Summary description of action(s) taken to prevent a recurrence.
b. The provisions of ODCM. CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.1.3.1 Doses due to liquid releases shall be projected at least once per 31 days, in accordance with 1/2-ODC-2.01.

CPage 61 of 86) Beaver Valy Power Station Procedure Number: ar ey P1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference 0DCM: Controls for RETS and REM Programs Revision: 8 Page Number: 61 of 86 ATTACHMENT J Page 1 of 1 ODCM CONTROLS: LIQUID HOLDUP TANKS CONTROLS: LIQUID HOLDUP TANKS 3.11.1.4 In accordance with T. S. 5.5.8, the quantity of radioactive material contained in each of the following tanks shall be limited to the values listed below, excluding tritium and dissolved or entrained noble gases.

a. < 18 Curies: 1BR-TK-6A (Unit 1 Primary Water Storage Tank)
b. < 18 Curies: 1BR-TK-6B (Unit I Primary Water Storage Tank)
c. < 7 Curies: 1LW-TK-7A (Unit 1 Steam Generator Drain Tank)
d. < 7 Curies: 1LW-TK-7B (Unit 1 Steam Generator Drain Tank)
e. < 6 Curies: 1QS-TK-1 (Unit 1 Refueling Water Storage Tank-RWST)
f. < 62 Curies: 2QSS-TK21 (Unit 2 Refueling Water Storage Tank-RWST)
g. < 10 Curies: Unit I and 2 miscellaneous temporary outside radioactive liquid storage tanks.

APPLICABILITY: At all times. ACTION:

a. With the quantity of radioactive material in the tank exceeding the limit, perform calculations to determine compliance to the limits of 10 CFR Part 20, Appendix B, Table 2, Column 2. These calculations shall be performed at the nearest potable water supply, and the nearest surface water supply in the unrestricted area (i.e.; at the entrance to the Midland Water Treatment Facility). IF the limits of 10 CFR Part 20 are determined to be exceeded, THEN immediately suspend all additions of radioactive material to the tank and within 48 hours reduce the tank contents to within the limits set forth in 10 CFR Part 20, and
b. Submit a Special Report in accordance with 10 CFR 50.4 (b) (1) within 30 days and include a schedule and a description of activities planned and/or taken to reduce the contents to within the limits set forth in 10 CFR Part 20.
c. The provisions ODCM Control 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.1.4.1 The quantity of radioactive material contained in each of the above listed tanks (except the Unit 1 and 2 RWST's) shall be determined to be within the above limit by analyzing a representative sample of the tank's contents at least once per 7 days when radioactive materials are being added to the tank. 4.11.1.4.2 SINCE additions of radioactive material to the Unit I and 2 RWST's are normally made at the end of a refueling outage (i.e.; drain down of the reactor cavity back to the RWST), THEN compliance to this limit shall be performed as follows: The quantity of radioactive material contained in the Unit 1 and 2 RWST's shall be determined to be within the above limit by analyzing a representative sample of the tank's contents within 7 days after transfer of reactor cavity water to the respective Unit's RWST.

(Page 62 of 86) Beaver Valley Power Station Procedure Nu ODC 3 3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for PETS and REMP Programs Revision: 8 Page Number: 62 of 86 ATTACHMENT K Page 1 of 5 ODCM CONTROLS: GASEOUS EFFLUENT DOSE RATE CONTROLS: GASEOUS EFFLUENT DOSE RATE 3.11,2.1 In accordance with T. S.5.5.2. c and T. S. 5.5.2.g, the dose rate in the unrestricted areas (see 1/2-ODC-2.02 Figure 5-1) due to radioactive materials released in gaseous effluents from the site shall be limited to the following values:

a. The dose rate limit for noble gases shall be _*500 mrem/yr to the total body and _

3000 mrem/yr to the skin*, and

b. The dose rate limit, inhalation pathway only, for 1-131, tritium and all radionuclides in particulate form (excluding C-14) with half-lives greater than eight days shall be
  • 1500 mrem/yr to any organ.

Applicability: At all times. Action:

a. With the dose rate(s) exceeding the above limits, immediately decrease the release rate to comply with the above limits(s), and
b. Submit a Special Report to the Commission within 30 days pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1).
c. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.1.1 The dose rate due to noble gaseous effluents shall be determined to be within the above limits in accordance with 1/2-ODC-2.02. 4.11.2.1.2 The dose rate, inhalation pathway only, for 1-13 1, tritium and all radionuclides in particulate form (excluding C-14) with half-lives greater than eight days in gaseous effluents, shall be determined to be within the above limits in accordance with the methods and procedures of the ODCM by obtaining representative samples and performing analyses in accordance with the sampling and analysis program specified in ODCM Control 3.11.2.1, Table 4.11-2.

              *During containment purge the dose rate may be averaged over 960 minutes.
Page 63 of 86)

Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 63 of 86 ATTACHMENT K Page 2 of 5 ODCM CONTROLS: GASEOUS EFFLUENT DOSE RATE TABLE 4.11-2 RADIOACTIVE GASEOUS WASTE SAMPLING AND ANALYSIS PROGRAM MINIMUM TYPE LOWER LIMIT OF GASEOUS SAMPLING ANALYSIS OF DETECTION RELEASE FREQUENCY FREQUENCY ACTIVITY . (LLD) TYPE ANALYSIS (UCi/Hl)(a) A. Waste Gas Storage P P Principal 1E-4 Tank Each Tank Each Tank Gamma Grab Sample Emitters(g) Each Tank* Each Tank* H-3* 1E-6 Grab Sample B. Containment Purge P P Principal Gamma 1E-4 Each Purge(b) Each Purge(b) Emitters(g) Grab Sample H-3 1E-6 C. Ventilation M~b)(e)(e) M(b) Principal Gamma 1E-4 Systems(h) Grab Sample Emitters(g) VV-1 (U1 PAB/Ventilation Vent) H-3 1E-6 CV-1 (U1 Rx ContJSLCRS Vent) PV-1/2 (U11/2 GW/Process Vent) VV-2 (U2 SLCRS Unfiltered Path) CV-2 (1U2 SLCRS Filtered Path) DV-2 (U2 Decon Bldg Vent) WV-2 (U2 Waste Gas Vault Vent) CB-2 (U2 Cond Pol Bldg Vent)

  • The H-3 concentration shall be estimated prior to release and followed up with an H-3 grab sample from the Ventilation System during release.

(Page 64 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 64 of 86 ATTACHMENT K Page 3 of 5 ODCM CONTROLS: GASEOUS EFFLUENT DOSE RATE TABLE 4.11-2 (continued) RADIOACTIVE GASEOUS WASTE SAMPLING AND ANALYSIS PROGRAM MINIMUM TYPE LOWER LIMIT OF GASEOUS SAMPLING ANALYSIS OF DETECTION RELEASE FREQUENCY FREQUENCY ACTIVITY (LLD) TYPE ANALYSIS (uCi/ml)(a) D. All Ventilation Continuous(f W(") 1-131 IE-12 Systems Listed Charcoal 1-133 IE-10 Above (in C.) Sample Which Produce Continuous Continuous(f W(d) Principal Gamma 1E-1 1 Release Particulate Emitters W) Sample (-131, Others) Continuous(f M Gross Alpha 1E- 1I Composite Particulate Sample Continuous(f Q Sr-89, Sr-90 1E-1 1 Composite Particulate Sample Continuous(D Noble Gas Noble Gases 1E-6 Monitor Gross Beta And Gamma

(Page 65 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs DRevision: 8 Page Number: 65 of 86 ATTACHMENT K Page 4 of 5 ODCM CONTROLS: GASEOUS EFFLUENT DOSE RATE TABLE 4.11-2 (continued) TABLE NOTATION (a) The Lower Limit of Detection (LLD) is defined in Table Notation (a) of ODCM Control 3.11 .1.1, Table 4.11-1 for ODCM Surveillance Requirement 4.11.1.1. (b) Samples (grab particulate, iodine & noble gas) and analysis shall also be perforned following SHUTDOWN, STARTUP, or a THERMAL POWER change exceeding 15% of RATED THERMAL POWER within a 1 hour period. This requirement does not apply if (1) analysis shows that the Dose Equivalent 1-131 concentration mn the primary coolant has not increased more than a factor of 3; and (2) the noble gas monitor shows that effluent activity has not increased more than a factor of 3. Clarification: All samples shall be obtained within 24 hours of reaching the intended steady state power level, and analyzed within 48 hours of reaching the intended steady state power level. Applicability: Unit 1 Ventilation Systems (VV-1, CV-I and/or PV-1/2), or Unit 2 Ventilation Systems (VV-2, CV-2 and/or PV-1/2), as appropriate. Specifically, sample the ventilation release path(s) that show a factor of 3 increase on the noble gas effluent monitor. (3.1.16) (3.1.18) (c) Tritium grab samples shall be taken at least once per 24 hours (from the appropriate ventilation release path of the refueling canal area) when the containment refueling canal is flooded. Sampling may be terminated after completion of vessel defueling. Sampling shall resume upon commencement of vessel refueling. Applicability - (MODE 6): Unit 1 Ventilation System (VV-I or CV-1), or Unit 2 Ventilation System (VV-2 or CV-2), that is aligned to the Reactor Containment Building atmosphere. In lieu of sampling the ventilation release path, samples may be obtained from the Reactor Containment Building atmosphere. (3.1.11) (3.1.19) (d) Part 1: Samples (continuous particulate & iodine) shall be changed at least once per 7 days and analyses shall be completed within 48 hours after changing, or after removal from sampler. Applicability for Part 1: Unit 1 and Unit 2 Ventilation Systems (VV-1, CV-1, PV-1/2, VV-2, CV-2, DV-2, WV-2 & CB-2). Part 2: Samples (continuous particulate & iodine) shall also be changed at least once per 24 hours for at least 7 days following each SHUTDOWN, STARTUP, or THERMAL POWER change exceeding 15% of RATED THERMAL POWER within a 1 hour period and analyses shall be completed within 48 hours of changing. When samples collected for 24 hours are analyzed, the corresponding LLDs may be increased by a factor of 10. This requirement does not apply if: (1) analysis shows that the DOSE EQUIVALENT 1-131 concentration in the reactor coolant has not increased more than a factor of 3; and (2) the noble gas monitor shows that effluent activity has not increased more than a factor of 3. Clarification: All samples shall be changed within 24 hours of reaching the intended steady state power level, and analyzed within 48 hours of reaching the intended steady state power level. Applicability for Part 2: Unit 1 Ventilation Systems (VV-1, CV-1 and/or PV-1/2), or Unit 2 Ventilation Systems (VV-2, CV-2 and/or PV-1/2), as appropriate. Specifically, change out the continuous particulate, iodine samples for the ventilation release path(s) that show a factor of 3 increase on the noble gas effluent monitor. (3.1.16) (3.1.18)

(Page 66 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS'and REMP Programs Revision: Page Number: 8 66 of 86 ATTACHMENT K Page 5 of 5 ODCM CONTROLS: GASEOUS EFFLUENT DOSE RATE (e) Tritium grab samples shall be taken at least once per 7 days (from the appropriate ventilation release path of the spent fuel pool area) whenever spent fuel is in the spent fuel pool. Applicability: Unit 1 Ventilation System (CV-1), or Unit 2 Ventilation System (CV-2) that is aligned to the Fuel Handling Building atmosphere. In lieu of sampling the ventilation release path, samples may be obtained from the Fuel Handling Building atmosphere. (3.1.11) (3.1.19) (f) The average ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with ODCM CONTROLS 3.11.2.1, 3.11.2.2, and 3.11.2.3. Clarification: The average ratio of the sample flow rate to the sampled stream flow rate can be determined, but it must not be used in dose and dose rate calculation. Specifically, use of this ratio would provide non-conservative dose calculations, and would compromise licensee response to NRC Unresolved Item 50-334/83-30-05. For information, a comprehensive three-year Radiation Monitor Particle Study was performed in response to the unresolved item's concern that the effluent monitors were not collecting representative samples per ANSI N 13.1. The results of that study concluded that a correction factor (minimum CF of 2) must be applied to particulate sample volume calculations and subsequent dose and dose rate calculations. Specifically, the minimum CF of 2 must be utilized in-lieu of actual ratios of sample flow rate to the sampled stream flow rate. In summary, the minimum CF of 2 provides adequate compensation for any negative bias inparticulate sample collection. (3.213) Applicability: Unit 1 Ventilation Systems (VV-1, CV-1 & PV-1/2), and Unit 2 Ventilation Systems (VV-2 & CV-2). (g) The principal gamma emitters for which the LLD specification will apply are exclusively the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, and Xe-138 for gaseous emissions and Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144 for particulate emissions. This list does not mean that only these nuclides are to be detected and reported. Other peaks which are measurable and identifiable, together with the above nuclides, shall also be identified and reported. Nuclides which are below the LLD for the analyses should not be reported as being present at the LLD level for that nuclide. When unusual circumstances result in LLD's higher than required, the reasons shall be documented in the Annual Radioactive Effluent Release Report. (h) Only when this release path is in use. Applicability: Unit 1 and Unit 2 Ventilation Systems (VV-1, CV-1, PV-1/2, VV-2, CV-2, DV-2, WV-2 & CB-2).

(Page 67 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM:. Controls for RETS and REMP Programs Revision: Page Number: R8 67 of 86 ATTACHMENT L Page 1 of 1 ODCM CONTROLS: DOSE- NOBLE GASES CONTROLS: DOSE-NOBLE GASES 3.11.2.2 In accordance with T.S. 5.5.2.e and T.S. 5.5.2.h,, the air dose from the reactor unit in unrestricted areas (see 1/2-ODC-2.02 Figure 5-1) due to noble gases released in gaseous effluents shall be limited to the following:

a. During any calendar quarter, to < 5 mrad for gamma radiation and < 10 mrad for beta radiation.
b. During any calendar year, to < 10 mrad for gamma radiation and < 20 mrad for beta radiation.

Applicability: At all times. Action:

a. With the calculated air dose from radioactive noble gases in gaseous effluents exceeding any of the above limits, prepare and submit to the Commission with in 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report which identifies the cause(s) for exceeding the limit(s) and defines the corrective actions taken to reduce the releases and the proposed corrective actions to be taken to assure the subsequent releases will be within the above limits.
b. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.2.1 Dose Calculations. Cumulative dose contributions shall be determined in accordance with 1/2-ODC-2.02 at least once every 31 days.

(Page 68 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

/ Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: 8 Page Number: 68 of 86 ATTACHMENT M Page 1 of 1 ODCM CONTROLS: DOSE - RADIOIODTNES AND PARTICULATES CONTROLS: DOSE-RADIOIODINES, RADIOACTIVE MATERIAL IN PARTICULATE FORM, AND RADIONUCLIDES OTHER THAN NOBLE GASES 3.11.2.3 In accordance with T.S. 5.5.2.e and T.S. 5.5.2.i, the dose to MEMBER(S) OF THE PUBLIC from radioiodines and radioactive materials in particular form (excluding C-14), and radionuclides (other than noble gases) with half-lives greater than eight days in gaseous effluents releases from the reactor unit (see 1/2-ODC-2.02 Figure 5-1) shall be limited to the following:

a. During any calendar quarter to _ 7.5 mrem to any organ, and
b. During any calendar year to _<15 mrem to any organ.

Applicability: At all times. Action:

a. With the calculated dose from the release of radioiodines, radioactive materials in particulate form, (excluding C-14), and radionuclides (other than noble gases) with half-lives greater than eight days, in gaseous effluents exceeding any of the above limits, prepare and submit to the Commission within 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report, which identifies the cause(s) for exceeding the limit and defines the corrective actions taken to reduce the releases and the proposed corrective actions to be taken to assure the subsequent releases will be within the above limits.
b. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.3.1 Dose Calculations. Cumulative dose contributions shall be determined in accordance with 1/2-ODC-2.02 at least once every 31 days.

(Page 69 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.r3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: D 8 69 of 86 ATTACHMENT N Page 1 of 1 ODCM CONTROLS: GASEOUS RADWASTE TREATMENT SYSTEM CONTROLS: GASEOUS RADWASTE TREATMENT SYSTEM 3.11.2.4 In accordance with T.S. 5.5.21, Item 6, the Gaseous Radwaste Treatment System and the Ventilation Exhaust Treatment System shall be used to reduce radioactive materials in gaseous waste prior to their discharge when the projected gaseous effluent air doses due to gaseous effluent releases from the reactor unit (see 1/2-ODC-2.02 Figure 5-1), when averaged over 31 days, would exceed 0.2 mrad for gamma radiation and 0.4 mrad for beta radiation. The appropriate portions of the Ventilation Exhaust Treatment System shall be used to reduce radioactive materials in gaseous waste prior to their discharge when the projected doses due to gaseous effluent releases from the reactor unit (see 1/2-ODC-2.02 Figure 5-1) when averaged over 31 days would exceed 0.3 mrem to any organ. Applicability: At all times. Action:

a. With gaseous waste being discharged without treatment and in excess of the above limits, prepare and submit to the Commission within 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report which includes the following information.
1. Identification of the inoperable equipment or subsystems and the reason for inoperability,
2. Action(s) taken to restore the inoperable equipment to operational status, and
3. Summary description of action(s) taken to prevent a recurrence.
b. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.4.1 Doses due to gaseous releases from the site shall be projected at least once per 31 days, in accordance with 1/2-ODC-2.02.

Page 70 of 86)

Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REND Programs Revision: Page Number: 8 70 of 86 ATTACHMENT 0 Page 1 of 1 ODCM CONTROLS: GAS STORAGE TANKS CONTROLS: GAS STORAGE TANKS 3.11.2.5 In accordance with T.S. 5.5.8, the quantity of radioactivity contained in the following gas storage tanks(s) shall be limited to the noble gas values listed below (considered as Xe-133).

a. <52,000 Curies: Each BV-1 Waste Gas Decay Tank (1GW-TK-IA, or 1GW-TK-1B, or 1GW-TK-1C)
b. <19,000 Curies: Any connected group of BV-2 Gaseous Waste Storage Tanks (2GWS-TK25A thru 2GWS-TK25G)

APPLICABILITY: At all times. ACTION:

a. With the quantity of radioactive material in any gas storage tank exceeding the above limit, immediately suspend all additions of radioactive material to the tank and within 48 hours reduce the tank contents to within the limit, and
b. Submit a Special Report in accordance with 10 CFR 50.4 (b)(1) within 30 days and include a schedule and a description of activities planned and/or taken to reduce the contents to within the specified limits.
c. The provisions of ODCM Control 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.5.1 For BV-I Waste Gas Decay Tanks: The quantity of radioactive material contained in each BV-1 Waste Gas Decay Tank shall be determined to be within the above limit at least once per 24 hours when radioactive materials are being added to the tank. Performance of this surveillance is required when the gross concentration of the primary coolant is greater than 100 uCi/ml. For BV-2 Gaseous Waste Storage Tanks: The quantity of radioactive material contained in any connected group of BV-2 Gaseous Waste Storage Tanks shall be determined to be within the above limit at least once per 24 hours when radioactive materials are being added to the tanks.

(Page 71 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REPV Programs Revision: M8 Page Number: 71 of 86 ATTACHMENT P Page 1 of 1 ODCM CONTROLS: TOTAL DOSE CONTROLS: TOTAL DOSE 3.11.4.1 In accordance with T.S. 5.5.2.j, the annual (calendar year) dose or dose commitment to any MEMBER OF THE PUBLIC due to releases of radioactivity and to radiation from uranium fuel cycle sources shall be limited to _<25 mrems to the whole body or any organ, except the thyroid, which shall be limited to < 75 mrems. Applicability: At all times. Action:

a. With the calculated doses from the release of radioactive materials in liquid or gaseous effluents exceeding twice the limits of ODCM CONTROL 3.11.1.2a, 3.11.1.2b, 3.11.2.2a, 3.11.2.2b, 3.11.2.3a, or 3.11.2.3b, calculations shall be made including direct radiation contributions from the units (including outside storage tanks, etc.) to determine whether the above limits of ODCM CONTROL 3.11.4.1 have been exceeded. If such is the case, prepare and submit to the Commission within 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report that defines the corrective action to be taken to reduce subsequent releases to prevent recurrence of exceeding the above limits and includes the schedule for achieving conformance with the above limits. This Special Report, as defined in 10 CFR 20.405(c), shall include an analysis that estimates the radiation exposure (dose) to a MEMBER OF THE PUBLIC from uranium fuel cycle sources, including all effluent pathways and direct radiation, for the calendar year that includes the release(s) covered by this report. It shall also describe levels of radiation and concentrations of radioactive material involved, and the cause of the exposure levels or concentrations. If the estimated dose(s) exceeds the above limits, and if the release condition resulting in violation of 40 CFR Part 190 has not already been corrected, the Special Report shall include a request for a variance in accordance with the provisions of 40 CFR Part 190. Submittal of the report is considered a timely request, and a variance is granted until staff action on the request is complete.
b. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.4.1,1 Cumulative dose contributions from liquid and gaseous effluents shall be determined in accordance with ODCM SURVEILLANCE REQUIREMENTS 4.11.1.2.1, 4.11.2.2.1, and 4.11.2.3.1. 4.11.4.1.2 Cumulative dose contributions from direct radiation from the units (including outside storage tanks, etc.) shall be determined in accordance with 1/2-ODC-2.04. This requirement is applicable only under conditions set forth in Action a. of ODCM CONTROL 3.11.4.1.

(Page 72 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 72 of 86 ATTACHMENT Q Page 1 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS CONTROLS: RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. The program shall provide (1) representative measurements of radioactivity in the highest potential exposure pathways, and (2) verification of the accuracy of the effluent monitoring program and modeling of environmental exposure pathways. The program shall (1) be contained in the ODCM (2) conform to the guidance of the Appendix I to 10 CFR Part 50, and (3) include the following:

1. Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters in the ODCM,
2. A Land Use Census to ensure that changes in the use of areas at and beyond the site boundary are identified and that modifications to the monitoring program are made if required by the results of the census, and
3. Participation in an Interlaboratory Comparison Program to ensure that independent checks on the precision and accuracy of the measurements of radioactive materials in the environmental sample matrices are performed as part of the quality assurance program for environmental monitoring.

3.12.1 The radiological environmental monitoring program shall be conducted as specified in ODCM Control 3.12.1, Table 3.12-1. Applicability: At all times. Action:

a. With the radiological environmental monitoring program not being conducted as specified in ODCM Control 3.12.1, Table 3.12-1, prepare and submit to the Commission, in the Annual Radiological Environmental Report, a description of the reasons for not conducting the program as required and the plans for preventing a recurrence. Deviations are permitted from the required sampling schedule if specimens are unobtainable due to hazardous conditions, seasonal unavailability, malfunction of automatic sampling equipment and other legitimate reasons. If specimens are unobtainable due to sampling equipment malfunction, every effort shall be made to complete corrective action prior to the end of the next sampling period.
b. With the level of radioactivity in an environmental sampling medium at one or more of the locations specified in ODCM Control 3.12.1, Table 3.12.1 exceeding the limits of ODCM Control 3.12.1, Table 3.12-2 when averaged over any calendar quarter, prepare and submit to the Commission within 30 days from the end of affected calendar quarter a Special Report pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1) which includes an evaluation of any release conditions, environmental factors or other aspects which caused the limits of ODCM Control 3.12.1, Table 3.12-2 to be exceeded. This report is not required if the measured level of radioactive was not the result of plant effluents; however, in such an event, the condition shall be reported and described in the Annual Radiological Environmental Report.

(Page 73 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs DRevision: 8 Page Number: 73 of 86 ATTACHMENT Q Page 2 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS When more than one of the radionuclides in ODCM Control 3.12.1, Table 3.12-2 are detected in the sampling medium, this report shall be submitted if: Concentration (1) Concentration (2) Limit Level (1) + Limit Level (2) + ... >1.0

c. With milk or fresh leafy vegetable samples unavailable from the required number of locations selected in accordance with ODCM CONTROL 3.12.2 and listed in the ODCM, obtain replacement samples. The locations from which samples were unavailable may then be deleted from those required by ODCM Control 3.12.1, Table 3.12-1 and the ODCM provided the locations from which the replacement samples were obtained are added to the environmental monitoring program as replacement locations, if available.
d. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.12.1.1 The radiological environmental monitoring samples shall be collected pursuant to ODCM Control 3.12.1, Table 3.12-1 from the locations given in the ODCM and shall be analyzed pursuant to be requirements of ODCM Control 3.12.1, Tables 3.12-1 and 4.12-1.

(Page 74 of 86) Beaver Valley Power Station Procedure N1 ODC 3 3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: O Controls C for RETS and REMP Programs Revision: 8 Page Number: 74 of 86 ATTACHMENT Q Page 3 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS TABLE 3.12-1 RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM EXPOSURE NUMBER OF SAMPLING AND TYPE AND FREQUENCY*a) PATHWAY AND/OR SAMPLES AND COLLECTION OF ANALYSIS SAMPLE LOCATIONS FREQUENCY

1. AIRBORNE
a. Radioiodine And 5 locations Continuous operation Each radioiodmie canister.

Particulates of sampler with sample

1. One sample from a collection at least Analyze for 1-131; control location weekly.

10-20 miles distant Particulate sampler. and in the least Analyze for gross prevalent wind beta weekly (b); direction Perform gamma isotopic

2. One sample from analysis on composite (by vicinity of location) sample at least community having quarterly.

the highest calculated annual average ground level D/Q.

2. DIRECT 40 locations Continuous Gamma dose, quarterly.

RADIATION measurement with

                                           Ž_2 TLDs or a pres-        collection at least surized ion                quarterly.

chamber at each location. (a)Analysis frequency same as sampling frequency unless otherwise specified. (b )Particulate samples are not counted for Ž_ 24 hours after filter change. Perform gamma isotopic analysis on each sample when gross beta is >10 times the yearly mean of control samples.

             **Sample locations are given on figures and tables in 1/2-ODC-2.03.

.ýPage 75 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: T 8 75 of 86 ATTACHMENT Q Page 4 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS TABLE 3.12-1 (continued) RADIOLOGICAL ENVTRONMIENTAL MONITORING PROGRAM EXPOSURE NUMBER OF SAMPLING AND TYPE AND FREQUENCYVa) PATHWAY AND/OR SAMPLES AND COLLECTION OF ANALYSIS SAMPLE LOCATIONS** FREQUENCY

3. WATERBORNE
a. Surface 2 locations. Composite* sample Gamma isotopic analysis of
1. One sample collected over a period composite sample by location upstream. not to exceed 1 month, monthly;
2. One sample Tritium analysis of downstream. composite sample at least quarterly.
b. Drinking 2 locations. Composite* sample 1-131 analysis of each collected over a period composite sample; not to exceed 2 weeks.

Gamma isotopic analysis of composite sample (by location) monthly; Tritium analysis of composite sample quarterly.

c. Groundwater N/A - No wells in lower elevations between plant and river
d. Sediment From 1 location. Semi-annually. Gamma isotopic analysis Shoreline semi-annually.

(')Analysis frequency same as sampling frequency unless otherwise specified.

                *Composite samples shall be collected by collecting an aliquot at intervals not exceeding two hours. For the upstream surface water location, a weekly grab sample, composited each month based on river flow at time of sampling, is also acceptable.
               **Sample locations are given on figures and tables in 1/2-ODC-2.03.

Page 76 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 76 of 86 ATTACHMENT Q Page 5 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS TABLE 3 12-1 (continued) RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM EXPOSURE NUMBER OF SAMPLING AND TYPE AND FREQUENCY'at PATHWAY AND/OR SAMPLES AND COLLECTION OF ANALYSIS SAMPLE LOCATIONS** FREQUENCY

4. INGESTION
a. Milk 4 locations.b) Atleast bi-weekly when Gamma isotopic and 1-131 animals are on pasture; analysis of each sample.
1. Three samples at least monthly at selected on basis of other times.

highest potential thyroid dose using milch census data.

2. One local large dairy.
b. Fish 2 locations. Semi-annual. One Gamma isotopic analysis on sample of available edible portions.

species.

c. Food Products 4 locations. Annually at time of Gamma isotopic analysis and (Leafy harvest. 1-131 analysis on edible Vegetables) 1. Three locations portion.

within 5 miles.

2. One control location.

(a)Analysis frequency same as sampling frequency unless otherwise specified. (b) Other dairies may be included as control station or for historical continuity. These would not be modified on basis of milch animal census.

             **Sample locations are given on figures and tables in 1/2-ODC-2.03.
!?age 77 of 86)

Beaver Valley Power Station [Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: M 8 77 of 86 ATTACHMENT Q Page 6 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS TABLE 3.12-2 REPORTING LEVELS FOR RADIOACTIVITY CONCENTRATIONS IN ENVIRONMENTAL SAMPLES REPORTING LEVELS AIRBORNE BROAD LEAF WATER PARTICULATE OR FISH MILK VEGETABLES ANALYSIS (pCi/1) GASES (pCi/m3) (pCi/kg, WET) (pCi/1 (pCi/kg, WET) H-3 2E+4(a) Mn-54 1E+3 3E+4 Fe-59 4E+2 1E+4 Co-58 1E+3 3E+4 Co-60 3E+2 1E+4 Zn-65 3E+2 2E+4 Zr/Nb-95 4E+2 1-131 2 (b) 0.9 3 1E+2 Cs-134 30 10 1E+3 60 1E+3 Cs-137 50 20 2E+3 70 2E+3 Ba/La- 140 2E+2 3E+2 (a) For drinking water samples. This is a 40 CFR Part 141 value. If no drinking water pathway exists, a value of 3E+4 pCi/I may be used. (b) If no drinking water pathway exists, a value of 20 pCi/I may be used.

Page 78 of 86)

Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 78 of 86 ATTACHMENT Q Page 7 of 9 ODCM CONTROLS: REMIP-PROGRAM REQUIREMENTS TABLE 4.12-1 MAXIMUM VALUES FOR THE LOWER LIM[TS OF DETECTION (LLD)(a)(e) AIRBORNE PARTICULATE FOOD ANALYSIS WATER OR GAS3 FISH MILK PRODUCTS SEDIMENT (pCi/1) (pCi/m ) (pCi/kg, WET) (pCi/1) (pCi/kg, WET) (pCi/kg, DRY) Gross Beta 4 IE-2 H-3 2000(d) Mn-54 15 130 Fe-59 30 260 Co-58,60 15 130 Zn-65 30 260 Zr-95 30(c) Nb-95 15(c) 1-131 1 (b) 7E-2 1 60 Cs-134 15 5E-2 130 15 60 150 Cs-137 18 6E-2 150 18 80 180 Ba-140 60(c) 60 La-140 15(') 15

(Page 79 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 79 of 86 ATTACHMENT Q Page 8 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS TABLE 4.12-1 (continued) TABLE NOTATION (a) The LLD is the smallest concentration of radioactive material in a sample that will be detected with 95% probability with 5% probability of falsely concluding that a blank observation represents a "real" signal. For a particular measurement system (which may include radiochemical separation): LLD= 4.66 Sb (E)(V)(2.22)(Y) exp (-XAT) where: LLD is the lower limit of detection as defined above (as pCi per unit mass or volume); Sb is the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute); E is the counting efficiency (as counts per transformation); V is the sample size (in units of mass or volume); 2.22 is the number of transformations per minute per picocurie; Y is the fractional radiochemical yield (when applicable); X is the radioactive decay constant for the particular radionuclide; AT is the elapsed time between sample collection (or end of the sample collection period) and time of counting (for environmental samples, not plant effluent samples). The value of Sb used in the calculation of the LLD for a detection system shall be based on the actual observed variance of the background counting rate or of the counting rate of the blank samples (as appropriate ) rather than on an unverified theoretically predicted variance. In calculating the LLD for a radionuclide determined by gamma-ray spectrometry, the background shall include the typical contributions of other radionuclides normally present in the samples (e.g., potassium-40 in milk samples). Typical values of E, V, Y and AT should be used in the calculations.

Page 80 of 86)

Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 80 of 86 ATTACHMENT Q Page 9 of 9 ODCM CONTROLS: REMP-PROGRAM REQUIREMENTS TABLE 4.12-1 (continued) TABLE NOTATION The LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as a posteriori (after the fact) limit for a particular measurement. Analyses shall be performed in such a manner that the stated LLD's will be achieved under routine conditions. Occasionally, background fluctuations, unavoidable small sample sizes, the presence of interfering nuclides, or other uncontrollable circumstances may render these LLD's unachievable. In such cases, the contributing factors shall be identified and described in the Annual Radiological Environmental Report. (b) If no drinking water pathway exists, a value of 15 pCi/l may be used. (c) If parent and daughter are totaled, the most restrictive LLD should be applied. (d) If no drinking water pathway exists, a value of 3000 pCi/l may be used. (e) This list does not mean that only these nuclides are to be detected and reported. Other peaks which are measurable and identifiable, together with the above nuclides, shall be identified in the Annual Radiological Environmental Report.

(Page 81 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8' 81 of 86 ATTACHMENT R Page 1 of I ODCM CONTROLS: REMP - LAND USE CENSUS CONTROLS: RADIOLOGICAL ENVIRONMENTAL MONITORING - LAND USE CENSUS 3.12.2 A land use census shall be conducted and shall identify the location of the nearest milk animal, the nearest residence, and the nearest garden of greater than 500 square feet producing broad leaf vegetation in each of the 16 meteorological sectors within a distance of five miles. For elevated releases as defined in Regulatory Guide 1.111, (Rev. 1), July, 1977, the land use census shall also identify the locations of all milk animals and all gardens of greater than 500 square feet producing fresh leafy vegetables in each of the 16 meteorological sectors within a distance of three miles. Applicability: At all times. Action:

a. With a land use census identifying a location(s) which yields a calculated dose or dose commitment greater than the values currently being calculated in ODCM SURVEILLANCE REQUIREMENT 4.11.2.3.1, prepare and submit to the Commission within 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report, which identifies the new location(s).
b. With a land use census identifying a milk animal location(s) which yields a calculated dose or dose commitment (via the same exposure pathway) 20% greater than at a location from which samples are currently being obtained in accordance with ODCM CONTROL 3.12.1 prepare and submit to the Commission within 30 days, pursuant to 10 CFR 20.2203(a)(2)(v) and 10 CFR 50.4(b)(1), a Special Report, which identifies the new location. The new location shall be added to the radiological environmental monitoring program within 30 days, if possible. The milk sampling program shall include samples from the three active milk animal locations, having the highest calculated dose or dose commitment. Any replaced location may be deleted from this monitoring program after October 31 of the year in which this land use census was conducted.
c. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.12.2.1 The land use census shall be conducted at least once per 12 months between the dates of June 1 and October 1 using that information which will provide the best results, such as by a door-to-door survey*, aerial survey, or by consulting local agriculture authorities.

  • Confirmation by telephone is equivalent to door-to-door.

(Page 82 of 86) Procedure Number: Beaver Valley Power Station 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs DRevision: 8 Page Number: 82 of 86 ATTACHMENT S Page 1 of 1 ODCM CONTROLS: REMP - INTERLABORATORY COMPARISON PROGRAM CONTROLS: RADIOLOGICAL ENVIRONMENTAL MONITORING - INTERLABORATORY COMPARISON PROGRAM 3.12.3 Analyses shall be performed on radioactive materials supplied as part of an Interlaboratory Comparison Program. Applicability: At all times. Action:

a. With analyses not being performed as required above, report the corrective actions taken to prevent a recurrence to the Commission in the Annual Radiological Environmental Report.
b. The provisions of ODCM CONTROL 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.12.3.1 The results of analyses performed as part of the above required Interlaboratory Comparison Program shall be included in the Annual Radiological Environmental Report.

ýPage 83 of 86) Beaver Valley Power Station Procedure Number: 1/2-ODC-3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 1 8 83 of 86 ATTACHMENT T Page 1 of 2 ODCM CONTROLS: ANNUAL REMP REPORT CONTROLS: ANNUAL REMP REPORT ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT (3) 6.9.2 In accordance with T.S. 5.6.1, the Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted before May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM) and in 10 CFR Part 50 Appendix I Sections IV.B.2, IV.B.3, and IV.C. The annual radiological environmental reports shall include:

  • Summaries, interpretations, and statistical evaluation of the results of the radiological environmental surveillance activities for the report period, including a comparison with pre-operational studies, operational controls (as appropriate), and previous environmental surveillance reports, and an assessment of the observed impacts of the plant operation on the environment.
  • The results of the land use censuses required by ODCM CONTROL 3.12.2.
                               " If harmful effects or evidence of irreversible damage are detected by the monitoring, the report shall provide an analysis of the problem, and a planned course of action to alleviate the problem.
  • Summarized and tabulated results in the format of ODCM Control 6.9.2, Table 6.9-1 of all radiological environmental samples taken during the report period. In the event that some results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted as soon as possible in a supplementary report.
  • A summary description of the radiological environmental monitoring program.
  • A map of all sampling locations keyed to a table giving distances and directions from one reactor.
  • The results of licensee participation in the Interlaboratory Comparison Program required by ODCM CONTROL 3.12.3.

(3) A single submittal may be made for a multiple unit site. The submittal should combine those sections that are common to all units at the station.

V-0 C) 0 0 r:, TABLE E:6.9-1 ENVIRONMENTAL RADIOLOGICAL MONITORING PROGRAM

SUMMARY

Name Of Facility Docket No. 0 Location Of Facility Reporting Period o (County, State) gH MEDIUM OF TYPE AND LOWER ALL LOCATIONS WITH HIGHEST CONTROL NONROUTINE z PATHWAY SAMPLED TOTAL NUMBER LIMITS OF INDICATOR ANNUAL MEAN LOCATIONS REPORTED (UNIT OF OF ANALYSES DETECTION' LOCATIONS N MEASUREMENTS M[EASUREMENT) PEFRE PERFORMD Jj)NAM[E DISTANCE MEAN(F" ANGb 0 H (LLD) MEAN(F)' AND DIRECTION RANGEb H RANGEb z H H 0. H. ctz W z a Nominal Lower limits of Detection (LLD) as defined in Table Notation

  • of Table 4.12-1 of ODCM CONTROL 3.11.1.1. 0d0 b Mean and range based upon detectable measurement only. Fraction of detectable measurement at specified locations is indicated in parenthesis (f). 0I 0

z

                                                                                                                                                                                  .CD
                                                                                                                                                                             -l 0

(5

ýPage 85 of 86) Beaver Valley Power Station Procedure NurODC 3 3

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs DRevision: 8 Page Number: 85 of 86 ATTACHMENT U Page 1 of 2 ODCM CONTROLS: ANNUAL RETS REPORTS CONTROLS: RETS REPORT RADIOACTIVE EFFLUENT RELEASE REPORT (4) 6.9.3 In accordance with T.S. 5.6.2, the Radioactive Effluent Release Report (RERR) covering the operation of the unit during the previous year shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and Process Control Program (PCP) and in conformance with 10 CFR 50.36a and 10 CFR Part 50, Appendix I Section IV.B. 1. This report is prepared and submitted in accordance with 1/2-ENV-01.05, and at a minimum, shall contain the following: A summary of the quantities of radioactive liquid and gaseous effluent and solid waste released from the unit as outlined in Regulatory Guide 1.21, Revision 1, June, 1974, "Measuring, Evaluating, And Reporting Radioactivity In Solid Wastes And Releases Of Radioactive Materials In Liquid And Gaseous Effluents From Light-Water-Cooled Nuclear Power Plants," with data summarized on a quarterly basis following the format of Appendix B thereof

                             " An assessment of radiation doses from the radioactive liquid and gaseous effluents released from the unit during each calendar quarter as outlined in Regulatory Guide 1.21. In addition, the unrestricted area boundary maximum noble gas gamma air and beta air doses shall be evaluated. The assessment of radiation doses shall be performed in accordance with this manual.
  • Any licensee initiated changes to the ODCM made during the 12 month period.
  • Any radioactive liquid or gaseous effluent monitoring instrumentation channels not returned to OPERABLE status within 30 days, and why the inoperability was not corrected in a timely manner. This applies to the liquid or gaseous effluent monitoring instrumentation channels required to be OPERABLE per ODCM CONTROLS 3.3.3.9 and 3.3.3.10.
  • Any ODCM SURVEILLANCE REQUIREMENT deficiencies. This applies to monitoring, sampling and analysis and dose projection.
  • The reasons when unusual circumstances result in LLD's higher than required by ODCM CONTROL 3.11.1.1, Table 4.11-1 and ODCM CONTROL 3.11.2.1, Table 4.11-2.

(4) A single submittal may be made for a multiple unit site. The submittal should combine those sections that are common to all units at the station; however, for units with separate radwaste systems, the submittal shall specify the releases of radioactive material from each unit.

IPage 86 of 86) i' Procedure Number: Beaver Valley Power Station 1/2-ODC 7 3.03

Title:

Unit: Level Of Use: 1/2 General Skill Reference ODCM: Controls for RETS and REMP Programs Revision: Page Number: 8 86 of 86 ATTACHMENT U Page 2 of 2 ODCM CONTROLS: ANNUAL RETS REPORTS CONTROLS: ANNUAL RETS REPORT (continued) The following information for each type of solid waste shipped offsite during the report period:

                            - container volume
                            - total curie quantity (determined by measurement or estimate)
                            - principal radionuclides (determined by measurement or estimate)
                            - type of waste (e:g., spent resin, compacted dry waste, evaporator bottoms)
                            - type of container"(e.g., LSA, Type A, Type B, Large Quantity)
                            - solidification agent (e.g., cement)
                            --classification and other requirements specified by 10 CFR Part 61
  • An annual summary of hourly meteorological data collected over the previous year.

This annual summary may be either in the form of an hour-by-hour listing of wind speed, wind direction, atmospheric stability, and precipitation (if measured) on magnetic tape, or in the form of joint frequency distributions of wind speed, wind direction, and atmospheric stability. An assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the unit or station during the previous calendar year.

  • An assessment of:the radiation doses from radioactive effluents to MEMBER(S) OF THE PUBLIC due to their activities inside the site boundary see 1/2-ODC-2.01 Figure 5.1 and 1/2-ODC-2.02 Figure 5-1 during the report period. All assumptions used in making these assessments (e.g., specific activity, exposure time, and location) shall be included in these reports. The assessment of radiation doses shall be performed in accordance with"1 /2-ODC-2.04.
  • An assessment of radiation doses to the likely most exposed real individual from reactor releases for the previous calendar year to show conformance with 40 CFR 190, Environmental Radiation Protection Standards For Nuclear Power Operation.

Acceptable methods for calculating the dose contribution from liquid and gaseous effluents are giveri in Regulatory Guide 1.109, Revision 1. The SKYSHINE Code (available from Radiation Shielding Information Center, (ORNL)) is acceptable for calculating the dose contribution from direct radiation due to N-16.

  • If quantities of radioactive materials released during the reporting period are significantly above design objectives, the report must cover this specifically.}}