L-08-145, Request for Schedule Change for Advisory Committee on Reactor Safeguards Subcommittee Review, License Renewal Safety Evaluation Report

From kanterella
(Redirected from L-08-145)
Jump to navigation Jump to search
Request for Schedule Change for Advisory Committee on Reactor Safeguards Subcommittee Review, License Renewal Safety Evaluation Report
ML081200596
Person / Time
Site: Beaver Valley
Issue date: 04/25/2008
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-08-145
Download: ML081200596 (2)


Text

FENOC FirstEnergy Nuclear Operating Company Peter P. Sena III 724-682-5234 Site Vice Preside~nt Fax: 724-643-8069 April 25, 2008 L-08-145 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Request for Schedule Change for Advisory Committee on Reactor Safeguards Subcommittee Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Safety Evaluation Report The referenced letter provided the FirstEnergy Nuclear Operating Company (FENOC)

License Renewal Application for the Beaver Valley Power Station (BVPS). A schedule for U.S. Nuclear Regulatory Commission (NRC) review of the BVPS License Renewal Application is provided on the NRC website. The NRC schedule lists December 2008 for the Advisory Committee on Reactor Safeguards (ACRS) License Renewal Subcommittee review of the BVPS License Renewal Safety Evaluation Report (SER).

This letter respectfully requests a schedule change for the ACRS License Renewal Subcommittee review of the BVPS License Renewal SER due to a scheduling conflict.

FENOC requests that the Subcommittee review of the BVPS License Renewal SER be moved to February 2009. With this schedule change, FENOC understands that completion of the NRC review of the BVPS License Renewal Application may be extended up to two months.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.

Sincerely, Peter P. Sena Ill 0 P-9

or Beaver Valley Power Station, Unit Nos. 1 and 2 L-08-145 Page 2

References:

FENOC Letter L-07-113, "License Renewal Application," August 27, 2007.

cc:

Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator Dr. S. S. Lee, NRC DLR Acting Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP