L-07-026, Withdrawal of Proposed Alternatives to ASME Pump Test Requirements (Request Nos. PRR-11 and PRR-12)

From kanterella
(Redirected from L-07-026)
Jump to navigation Jump to search
Withdrawal of Proposed Alternatives to ASME Pump Test Requirements (Request Nos. PRR-11 and PRR-12)
ML070460592
Person / Time
Site: Beaver Valley
Issue date: 02/14/2007
From: Lash J
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-07-026
Download: ML070460592 (1)


Text

FENOC FirstEnergy Nuclear Operating Company James H. Lash Site Vice President 724-682-5234 Fax: 724-643-8069 February 14, 2007 L-07-026 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 1 BV-1 Docket No. 50-334, License No. DPR-66 Withdrawal of Proposed Alternatives to ASME Pump Test Requirements (Request Nos. PRR-11 and PRR-12)

FirstEnergy Nuclear Operating Company (FENOC) hereby withdraws the request for NRC approval of proposed alternatives to American Society of Mechanical Engineers (ASME) Code testing requirements for Beaver Valley Power Station (BVPS) Unit No. 1 recirculation spray and quench spray pumps, as forwarded by letters dated June 14, 2006 (L-06-89) and July 26, 2006 (L-06-90).

Alternative recirculation spray and quench spray pump test requirements will be resubmitted for approval with the next 10-year interval update of the BVPS Unit No. 1 Inservice Test Program (Issue 4) under the 2001 Edition through 2003 Addenda of the ASME OM Code.

There are no regulatory commitments contained in this letter. If there are any questions concerning this matter, please contact Mr. Henry L. Hegrat, Supervisor FENOC Fleet Licensing, at (330) 315-6944.

Sincerely, H. Lash c:

Ms. N. S. Morgan, NRR Project Manager Mr. P. C. Cataldo, NRC Senior Resident Inspector Mr. S. J. Collins, NRC Region I Administrator Mr. D. A. Allard, Director BRP/DEP Mr. L. E. Ryan (BRP/DEP)

ANI

ý-,t7