L-07-024, Emergency Response Data System
ML070440145 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 02/08/2007 |
From: | Lash J FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Security and Incident Response |
References | |
L-07-024 | |
Download: ML070440145 (2) | |
Similar Documents at Beaver Valley | |
---|---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023
[Table view]Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14 Category:Report MONTHYEARL-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023
[Table view]Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-22-154, Pressure and Temperature Limits Report Revision2022-07-0606 July 2022 Pressure and Temperature Limits Report Revision L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-02-10010 February 2022 Steam Generator Inspection Report- Fall 2021 Refueling Outage IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks ML21026A3372021-01-26026 January 2021 Steam Generator Inspection Report Revision - Spring 2020 Refueling Outage L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML21127A1652020-07-17017 July 2020 ODCM: Index, Matrix and History of ODCM Changes L-21-135, ODCM: Liquid Effluents2020-07-17017 July 2020 ODCM: Liquid Effluents ML21127A1482020-07-17017 July 2020 ODCM: Controls for RETS and REMP Programs L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML21127A1562019-07-17017 July 2019 ODCM: Gaseous Effluents ML19051A1092019-02-20020 February 2019 LTR-SDA-18-054-NP, Revision 0 - Technical Justification to Support the Extended Volumetric Examination Interval for Beaver Valley Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.2018-03-15015 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. ML21127A1592018-01-22022 January 2018 ODCM: Radiological Environmental Monitoring Program L-17-277, Pressure and Temperature Limits Reports, Revisions 8 and 92017-10-0404 October 2017 Pressure and Temperature Limits Reports, Revisions 8 and 9 L-17-259, Mitigating Strategies Assessment (MSA) for Flooding2017-09-20020 September 2017 Mitigating Strategies Assessment (MSA) for Flooding ML17213A0162017-05-11011 May 2017 Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1 ML17213A0172017-05-11011 May 2017 Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1 ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16312A3112016-11-0707 November 2016 Spent Fuel Pool Evaluation Supplemental Report. Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Ntif) Review... L-16-327, Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair2016-10-31031 October 2016 Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair L-16-093, Report of Facility Changes, Tests and Experiments2016-06-0303 June 2016 Report of Facility Changes, Tests and Experiments L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22016-04-0606 April 2016 Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information2016-01-20020 January 2016 Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time2016-01-0505 January 2016 Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool..2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool.. ML16277A1142015-10-28028 October 2015 ERS-MPD-93-007, Rev. 11, BVPS-U1 Gaseous Radioactivity Monitor Emergency Action Levels. ML15274A3072015-10-0505 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54 Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2015-09-16016 September 2015 Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML15132A4962015-05-22022 May 2015 Review of the 2014 Steam Generator Tube Inspection Report (TAC No. M4620) ML16277A1222015-04-20020 April 2015 ERS-LMR-14-001, Rev. 1, Liquid Monitor Alert Emergency Action Level (EAL) Set Points. ML15119A1042015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 1 of 4 L-15-091, SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 42015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 4 ML21127A1582015-02-11011 February 2015 ODCM: Bases for ODCM Controls ML16277A1152015-01-30030 January 2015 ERS-HHM-87-014, Rev. 8, Unit 1 / Unit 2 ODCM Gaseous Effluent Monitor Setpoints. ML15027A2352015-01-28028 January 2015 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program (Tac Nos. MF3301 & MF3302) L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-352, Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22014-11-0505 November 2014 Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 ML21127A1442014-10-0707 October 2014 ODCM: Information Related to 40 CFR 190 L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14224A5772014-07-31031 July 2014 SG-SGMP-14-17, Revision 1, Beaver Valley, Unit 2, End-of-Cycle 17 Analysis and Prediction for End-of-Cycle 18 Voltage-Based Repair Criteria 90-Day Report. ML14224A5762014-07-31031 July 2014 SG-CCOE-14-1, Revision 0, Generic Letter 95-05 Tube Intersection Burst Test, Leakage Test, and Morphology Conclusions. ML14224A5752014-06-25025 June 2014 R17 Steam Generator F* (F Star) Report ML14009A0892014-02-10010 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Daiichi Nuclear Power Plant Accident 2023-08-07 Category:Miscellaneous MONTHYEARL-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023
[Table view]Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.2018-03-15015 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16312A3112016-11-0707 November 2016 Spent Fuel Pool Evaluation Supplemental Report. Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Ntif) Review... L-16-093, Report of Facility Changes, Tests and Experiments2016-06-0303 June 2016 Report of Facility Changes, Tests and Experiments L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22016-04-0606 April 2016 Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information2016-01-20020 January 2016 Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time2016-01-0505 January 2016 Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool..2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool.. ML15274A3072015-10-0505 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54 Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2015-09-16016 September 2015 Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML15132A4962015-05-22022 May 2015 Review of the 2014 Steam Generator Tube Inspection Report (TAC No. M4620) ML15027A2352015-01-28028 January 2015 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program (Tac Nos. MF3301 & MF3302) L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-352, Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22014-11-0505 November 2014 Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14009A0892014-02-10010 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Daiichi Nuclear Power Plant Accident ML13284A0242013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix B, Seismic Walkdown Checklists (Swcs), Part 3 of 5 ML13284A0272013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix B, Seismic Walkdown Checklists (Swcs), Continued, Part 4 of 5 ML13284A0262013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix a, Resumes and Qualifications, Part 2 of 5 ML13284A0252013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Part 1 of 5 ML13284A0232013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix a, Resumes and Qualifications, Part 2 of 5 ML13284A0192013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix B Seismic Walkdown Checklists (Swcs), Part 3 of 5 ML13284A0222013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Part 1 of 5 ML13284A0202013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix B Seismic Walkdown Checklists (Swcs) Continued. Part 4 of 5 ML13284A0212013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix C Area Walk-by Checklists (Awcs), Part 5 of 5 L-13-036, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedules2013-05-28028 May 2013 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedules L-13-095, Discharge Monitoring Report (NPDES) Permit No. PA00256152013-02-22022 February 2013 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-12-437, Containment Liner Random and Non-Random Examinations Report2012-12-18018 December 2012 Containment Liner Random and Non-Random Examinations Report L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-27027 November 2012 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML13008A0422012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklits (Swcs), Battery 2N. Pages 1 - 82 ML13008A0412012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report. Cover Through A-40 ML13135A2382012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 1 of 513 Through Sheet 301 of 513 ML13008A0432012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Purge Valve Isolation. Pages 83 - 161 ML13008A0442012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Bus F1, Low Voltage Switchgear. Pages 162 - 240 ML13008A0452012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), SGI Level Switch SP9B6. Pages 241 - 318 ML13008A0462012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Relief Valves SW 3963. Pages 319 - End ML13135A2412012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C - Area Walk-by Checklists (Awcs) and Appendix D - Component List for Anchorage Configuration Check ML13135A2402012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 302 of 513 Through Sheet 513 of 513 ML13135A2362012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report ML13135A2372012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix a - Resumes and Qualifications ML13008A0402012-10-23023 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (Awcs), Prim. Aux. Bldg 735'6. Pages 135 - 191 ML13008A0392012-10-23023 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (Awcs), Emer. Swgr. Room Train A. Pages 66 - 134 2023-08-07 |
Contents
Text
FENOC FirstEnergyNuclear Operating Company James H. Lash 724-682-5234 Site Vice President Fax: 724-643-8069 February 8, 2007 L-07-024 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Emergency Response Data System In accordance with 10 CFR 50, Appendix E, Section VI, changes to the Beaver Valley Power Station Unit No. 2 Data Point Library for the Emergency Response Data System (ERDS) are provided in the Attachment. Data Point identification number T1014A and corresponding NRC ERDS Parameter EXTRA14 were revised to reflect containment temperature detector alarm setpoint changes.
No new regulatory commitments are contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Henry L. Hegrat, Supervisor - FENOC Fleet Licensing, at (330) 315-6944.
Sincerely, ames H. Lash
Attachment:
ERDS Data Point Library Page, NRC ERDS Parameter EXTRA 14 c: Ms. N. S. Morgan, NRR Project Manager (w/o enclosure)
Mr. P. C. Cataldo, NRC Senior Resident Inspector Mr. S. J. Collins, NRC Region I Administrator Mr. D. A. Allard, Director BRP/DEP Mr. L. E. Ryan (BRP/DEP)
L-07-024 Attachment Page I of I BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 1/25/2007 Reactor Unit BV2 PCs Data Feeder NRC ERDS Parameter EXTRA14 Point ID: T1014A Plant Spec Point Desc.: RX CNMT TEMP LMS-TE100-14 GeneridCond Desc.: CONTAINMENT TEMPERATURE Analog/Digital: A Engr Units/Dig States: DEGF Engr Units Conversin LINEAR M/inimum instr Range: 0 Maximum Instr Range: 300 Zero Point
Reference:
N/A Reference Point Notes: N/A PROC or SENS: S Number of Sensors: 1 How Processed: N/A Sensor Location: SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Thp Set Points: HIl ALM @ 93.8 DEGF; LO ALM @ 74.9 DEGF NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: HIGH Temperature Compensation for DP Transmitters: N Level Reference Leg: N/A Unique System Desc. 2LMS-TE100-4 measures Containment temperature outside the Crane Wall-See attached drawing for detector Iocations in Containment 2LMS-TE100-14 senses temperature in Containment at 701' 6"elevation outside the Crane Wall- Ref.10080-TLD-12B-019, RK-14A.