MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] Category:License-Monthly Operating Report
MONTHYEARL-05-125, August 2005 Monthly Operating Report for Beaver Valley Power Station, Units 1 and 22005-09-0909 September 2005 August 2005 Monthly Operating Report for Beaver Valley Power Station, Units 1 and 2 L-05-119, June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 22005-07-0808 July 2005 June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 2 L-05-105, May 2005 Monthly Operating Report for Beaver Valley Power Station2005-06-0707 June 2005 May 2005 Monthly Operating Report for Beaver Valley Power Station L-05-088, April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 22005-05-0606 May 2005 April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-05-064, March 2005 Monthly Operating Report for Beaver Valley Power Station2005-04-0808 April 2005 March 2005 Monthly Operating Report for Beaver Valley Power Station L-05-044, February 2005 Monthly Operating Report for Beaver Valley, Units 1 & 22005-03-0707 March 2005 February 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-05-024, January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 22005-02-0808 February 2005 January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-05-004, December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 22005-01-0707 January 2005 December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 2 L-04-157, November 2004 Monthly Operating Report for Beaver Valley Power Station2004-12-0707 December 2004 November 2004 Monthly Operating Report for Beaver Valley Power Station L-04-137, October, 2004 Monthly Operating Report for Beaver Valley Power Station2004-11-0808 November 2004 October, 2004 Monthly Operating Report for Beaver Valley Power Station L-04-133, September 2004 Monthly Operating Report for Beaver Valley Units 1 and 22004-10-0707 October 2004 September 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 L-04-120, August 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22004-09-0808 September 2004 August 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-04-111, July 2004 Monthly Operating Report for Beaver Valley Units 1 and 22004-08-0606 August 2004 July 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 L-04-096, June 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22004-07-0808 July 2004 June 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-04-079, May 2004 Monthly Operating Report for Beaver Valley Power Station2004-06-0707 June 2004 May 2004 Monthly Operating Report for Beaver Valley Power Station L-04-063, April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-05-0707 May 2004 April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-04-052, March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 22004-04-0707 April 2004 March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-04-031, February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-03-0808 March 2004 February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-04-014, January 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-02-0606 February 2004 January 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-03-201, November 2003 Monthly Operating Report for Beaver Valley Units 1 and 22003-12-0505 December 2003 November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 L-03-184, October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-11-0707 November 2003 October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-156, September 2003 Monthly Operating Report for Beaver Valley Units 1 and 22003-10-0808 October 2003 September 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 L-03-141, August 2003 Monthly Operating Report for Beaver Valley Units 1 & 22003-09-0808 September 2003 August 2003 Monthly Operating Report for Beaver Valley Units 1 & 2 L-03-121, July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-08-0707 August 2003 July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-107, June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-07-0808 July 2003 June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-096, May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-06-0606 June 2003 May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-077, April 2003 Monthly Operating Report for Beaver Valley, Units 1 and 22003-05-0606 May 2003 April 2003 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-03-058, March 2003 Monthly Operating Report for Beaver Valley Power Station2003-04-0707 April 2003 March 2003 Monthly Operating Report for Beaver Valley Power Station L-03-043, February 2003 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22003-03-10010 March 2003 February 2003 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-03-027, January 2003 Monthly Operating Report for Beaver Valley Power Station2003-02-0707 February 2003 January 2003 Monthly Operating Report for Beaver Valley Power Station L-02-116, November 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-12-0606 December 2002 November 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-111, October 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-11-0707 November 2002 October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-104, September 2002 Monthly Operating Report for Beaver Valley2002-10-0707 October 2002 September 2002 Monthly Operating Report for Beaver Valley L-02-096, August 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-09-0606 September 2002 August 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-085, July 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-08-0707 August 2002 July 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-074, June 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-07-0808 July 2002 June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-071, May 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-06-0707 June 2002 May 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-056, April 2002 Monthly Operating Report for Beaver Valley Power Station2002-05-0707 May 2002 April 2002 Monthly Operating Report for Beaver Valley Power Station L-02-037, March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 22002-04-0505 April 2002 March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-02-026, February 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-03-0707 March 2002 February 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 2005-09-09
[Table view] |
Text
FENO C Pt~ y~drO eahgC~pny -
Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-04-137 November 8, 2004 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66
-Unit Dockct No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", -and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of October, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.
Respectfully, Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office . , , . -.- - I . - I . 1, . 1, King of Pruissia, PA ; I . . , .!, . , , 1, -- ; - % . -:, ", , ,! ': ., - " , . - - --, ., . . - . - 1,,.:,
. . . I . . - I . , I .
f..
O
- f OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE November 01, 2004 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO October 2004
- 1. Design Electrical Rating 835.00
- 2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 408.37 6,983.37 175,010.64
- 4. Number of Hours Generator On-line 408.02 6,983.02 172,480.84
55.--Reserve-Shutdown Hours------ - - - - 0.00- - - 0.00 - - 0.00
- 6. Net Electrical Energy Generated (MWHrs) 327,890.00 5,791,750.00 130,433,122.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 10/18/2004 S 337.0 C 1 The Unit was shutdown for its planned 16th refueling outage on 10/18/04 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
I Reason: 2 A Equipment Failure (Explain) Method:
B Maintenance or Test 1 Manual C Refueling 2 Manual Trip/Scram D Regulatory Restriction 3 Automatic Trip/Scram E Operator Training & License Examination 4 Continuation F Administration 5 Other (Explain)
G Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit began the report period operating at a nominal value of 100% output. On 10/16/04 at 1926 hours0.0223 days <br />0.535 hours <br />0.00318 weeks <br />7.32843e-4 months <br />, the Unit began a planned reduction to less than 50%'output in order to support Main Steam Safety Valve testing prior to beginning it's 16th refueling outage. An output of approximately 44% was achieved at 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> on 10/17/04. Following satisfactory completion of Main Steam Safety Valve testing, the Unit began to shutdown for it's planned 16th refueling outage at 1933 hours0.0224 days <br />0.537 hours <br />0.0032 weeks <br />7.355065e-4 months <br /> on 10/17/04. The Unit was taken off-line at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on 10/18/04 to begin it's 16th refueling outage. Mode 2 was entered at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, Mode 3 was entered at 0022 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, Mode 4 was entered at 0333 hours0.00385 days <br />0.0925 hours <br />5.505952e-4 weeks <br />1.267065e-4 months <br />, and Mode 5 (cold shutdown) was entered at 0718 hours0.00831 days <br />0.199 hours <br />0.00119 weeks <br />2.73199e-4 months <br /> on 10/18/04. The Unit remained shutdown in Mode 5 until 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> on 10/22/04, when Mode 6 was entered for refueling. The Unit remained shutdown in Mode 6 for the remainder of the report period.
Page 1 of 1
r OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE November 01 2004 COMPLETED BY David T. Jones . I TELEPHONE 724-682-4962 REPORTING PERIOD: October 2004
- 1. Design Electrical Rating 836.00
- 2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 745.00 7,320.00 124,928.48
- 4. Number of Hours Generator On-line 745.00 7,320.00 124,184.38
- -- 5.--Reserve Shutdown Hours ----- -0.00 - - - - - 0.00 97,8 12.00 _ _
- 6. Net Electrical Energy Generated (MWHrs) 624,297.00 6,077,014.00 97,896,412.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G - Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
Page 1 of 1
Text
FENO C Pt~ y~drO eahgC~pny -
Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-04-137 November 8, 2004 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66
-Unit Dockct No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", -and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of October, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.
Respectfully, Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office . , , . -.- - I . - I . 1, . 1, King of Pruissia, PA ; I . . , .!, . , , 1, -- ; - % . -:, ", , ,! ': ., - " , . - - --, ., . . - . - 1,,.:,
. . . I . . - I . , I .
f..
O
- f OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE November 01, 2004 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO October 2004
- 1. Design Electrical Rating 835.00
- 2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 408.37 6,983.37 175,010.64
- 4. Number of Hours Generator On-line 408.02 6,983.02 172,480.84
55.--Reserve-Shutdown Hours------ - - - - 0.00- - - 0.00 - - 0.00
- 6. Net Electrical Energy Generated (MWHrs) 327,890.00 5,791,750.00 130,433,122.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 10/18/2004 S 337.0 C 1 The Unit was shutdown for its planned 16th refueling outage on 10/18/04 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
I Reason: 2 A Equipment Failure (Explain) Method:
B Maintenance or Test 1 Manual C Refueling 2 Manual Trip/Scram D Regulatory Restriction 3 Automatic Trip/Scram E Operator Training & License Examination 4 Continuation F Administration 5 Other (Explain)
G Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit began the report period operating at a nominal value of 100% output. On 10/16/04 at 1926 hours0.0223 days <br />0.535 hours <br />0.00318 weeks <br />7.32843e-4 months <br />, the Unit began a planned reduction to less than 50%'output in order to support Main Steam Safety Valve testing prior to beginning it's 16th refueling outage. An output of approximately 44% was achieved at 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> on 10/17/04. Following satisfactory completion of Main Steam Safety Valve testing, the Unit began to shutdown for it's planned 16th refueling outage at 1933 hours0.0224 days <br />0.537 hours <br />0.0032 weeks <br />7.355065e-4 months <br /> on 10/17/04. The Unit was taken off-line at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on 10/18/04 to begin it's 16th refueling outage. Mode 2 was entered at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, Mode 3 was entered at 0022 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, Mode 4 was entered at 0333 hours0.00385 days <br />0.0925 hours <br />5.505952e-4 weeks <br />1.267065e-4 months <br />, and Mode 5 (cold shutdown) was entered at 0718 hours0.00831 days <br />0.199 hours <br />0.00119 weeks <br />2.73199e-4 months <br /> on 10/18/04. The Unit remained shutdown in Mode 5 until 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> on 10/22/04, when Mode 6 was entered for refueling. The Unit remained shutdown in Mode 6 for the remainder of the report period.
Page 1 of 1
r OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE November 01 2004 COMPLETED BY David T. Jones . I TELEPHONE 724-682-4962 REPORTING PERIOD: October 2004
- 1. Design Electrical Rating 836.00
- 2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 745.00 7,320.00 124,928.48
- 4. Number of Hours Generator On-line 745.00 7,320.00 124,184.38
- -- 5.--Reserve Shutdown Hours ----- -0.00 - - - - - 0.00 97,8 12.00 _ _
- 6. Net Electrical Energy Generated (MWHrs) 624,297.00 6,077,014.00 97,896,412.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G - Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
Page 1 of 1