FENOC First Energy Nuclear Operating Company SAFEGUARDS INFORMATION Beaver Valley Power Station Route 168 PO. Box 4 Shippingport. PA 15077-0004 L William Pearce Site Vice President 724-682-5234 Far: 724-643-8069 September 30, 2004 L-04-129 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beav*er Valley Power Station (BVPS), Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Revision to Draft BVPS Physical Security Plan On April 28, 2004, the FirstEnergy Nuclear Operating Company (FENOC) provided a proposed draft revision to the BVPS Physical Security Plan (PSP) as required by NRC Order EA-03-086 dated April 29, 2003. A subsequent FENOC submittal (L-04-123) on September 9, 2004 modified that proposed revision to incorporate the resolution of several Requests for Additional Information that had been issued by the NRC.
On September 27, 2004, the NRC issued correspondence regarding security plan provisions for enhanced Owner Controlled Area (OCA) surveillance and response. The proposed revision to the BVPS PSP has now been modified to incorporate these enhanced OCA provisions. Additional PSP changes were also made based on requests made by the NRC staff in telephone conference calls on September 17 and 22, 2004. The pages that have been revised are enclosed with this letter and supercede any versions of those pages previously submitted.
In accordance with 10 CFR 73.21, the enclosure to this document has been determined to contain Safeguards Information, and is thereby exempt from public disclosure.
There are no regulatory commitments contained in this letter. If there are any questions concerning this matter, please contact Mr. Kenneth E. Halliday, Manager Nuclear Security at 724-682-5072.
Sincerely, S{X abt(A L. William Pearce SAFEGUARDS INFORMATION ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED.
I d5lV
-it'
.V
- Beaver Valley Power Station, Unit No. 1 and No. 2 Revision to Draft BVPS Physical Security Plan L-04-1 29 Page 2 SAFEGUARDS INFORMATION
Enclosure:
PSP Table of Contents PSP Chapters 6, 9, 10, 13, 15, 16 PSP Appendix B Table 1 PSP Appendix C Chapter 7 Also enclosed with D. W. Spaulding copy only:
PSP Chapter 1 Figure 1-1 (enlarged copy as requested) c:
Mr. T. G. Colburn, NRR Senior Project Manager (w/o enclosure)
Mr. P. C. Cataldo, NRC Sr. Resident Inspector (w/o enclosure)
Mr. S. J. Collins, NRC Region I Administrator Ms. D. W. Spaulding, NRC Project Manager, Security Plan Review Team (2 copies)
SAFEGUARDS INFORMATION ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED.