L-03-156, September 2003 Monthly Operating Report for Beaver Valley Units 1 and 2
| ML032890076 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 10/08/2003 |
| From: | Pearce L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-03-156 | |
| Download: ML032890076 (5) | |
Text
he FENOC Fni.Ene.'gv M Ope Cr Beaver Valley PowerStation P. O. Box 4 Shippingport,PA 15077 L-03-156 October 8, 2003 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly minathk report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of September, 2003. No regulatory commitments are contained in this submittal.
Respectfully, W. Pearce
-~~~ ~
~~~- -~ ~- - ~~ ~- ~ Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA
.. 'g'-' ... .
jX9 4
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE October 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: September 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E- Operator Training I Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
1I
- 6 OPERATING DATA REPORT DOCKET NO.
- 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 10/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962
- * * ** * * * * *
- C * * * * * *
- Nokes: Rated thermal power at
- la. REPORTING PERIOD: SEPTEMBER 2003
- BVPS-1 was uprated from 2652 MWt*
- to 2689 KWt on 10/20/01. Net *
- 1. DESIGN ELECTRICAL RATING (Net e)W: 835
- MDC was also uprated from *
- 810 XWe to 821 MWe. *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe): 821
-g ** ** *--* * ** * *'*
- C*
THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 240335.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 720.0 5250.5 165842.0
- 4. SERVICE HOURS GENERATOR ON LINE: 720.0 5203.9 163315.9
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWE): 602700.0 4157899.0 122813906.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 637630.0 4413317.0 131082907.0
- 8. GROSS THERMAL ENERGY GEN. (MWE): 1934204.0 13462002.0 403733311.5
- 9. UNIT AVAILABILITY FACTOR (%): 100.0 79.4 69.4
- 10. UNIT CAPACITY FACTOR (MDC) (%): 102.0 77.3 64.9
- 11. UNIT FORCED OUTAGE RATE (%): 0.0 1.1 15.3
UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE October 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: September 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YV/MD) F: Forced (Hours) (1) Shutting S: Scheduled . Down (2) Comments 1 030913 S 432.0 C 1 The Unit was shutdown for its planned 1Oth refueling outage on 9/13/03.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1806 hours0.0209 days <br />0.502 hours <br />0.00299 weeks <br />6.87183e-4 months <br /> on 9/11/03 when a planned reduction to less than 50% output was commenced in order to support Main Steam Safety Valve testing prior to the beginning of the 1 0 th refueling outage. An output of approximately 48% was achieved at 0427 hours0.00494 days <br />0.119 hours <br />7.060185e-4 weeks <br />1.624735e-4 months <br /> on 9/12/03. At 1910 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.26755e-4 months <br /> on 9/12/03, the
-- Unit began 'to shut down for its-planned-1Ot-hrefuellng outage -The- Unit was removed -from service at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on 9/13/03. Mode 2 was entered at 0036 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The Reactor was manually tripped as part of the planned shutdown and Mode 3 was entered at 0043 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> on 9/13/03. The Unit continued to cool down and depressurize, entering Mode 4 at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br /> and Mode 5 at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on 9/13/03. The Unit entered Mode 6 at 0859 hours0.00994 days <br />0.239 hours <br />0.00142 weeks <br />3.268495e-4 months <br /> on 9/17/03, and remained in this refueling mode for the remainder of the report period.
OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT 82 REPORT DATE: 10/01/03 COMPLETED BY: DAVID T. JONES C 4ZTELEPEONE: (724) 682-4962
- * * * * * *
- 0 * * * * * * * *
- REPORTING PERIOD: SEPTEMBER 2003
- Scten: Rated thermal power at
- la.
- BVPS-2 was uprated from 2652 MWt*
- 1. DESIGN ELECTRICAL RATING (Net MWe): 836
- to 2689 Mwt on 10/30/01. Net *
- MDC was also uprated from *
- 2. MAX. DEPENDABLE CAPACITY (Net NWe): 831
- 820 NWe to 831 FWe.
- THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 139118.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 288.6 6119.6 115674.7
- 4. SERVICE HOURS GENERATOR ON LINEs 288.0 6119.0 114945.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWS)t 224608.0 5089493.0 90271896.0
- 7. GROSS ELECT. ENERGY GEN. (KWH)t 238873.0 5354950.0 95386995.0
- 8. GROSS THERMAL ENERGY GEN. (KWH)t 733841.0 16309075.0 290908686.0
- 9. UNIT AVAILABILITY FACTOR (t): 40.0 93.4 82.6
- 10. UNIT CAPACITY FACTOR (MDC) Ct): 37.5 93.5 78.8
- 11. UNIT FORCED OUTAGE RATE (t): 0.0 0.0 9.3
Text
he FENOC Fni.Ene.'gv M Ope Cr Beaver Valley PowerStation P. O. Box 4 Shippingport,PA 15077 L-03-156 October 8, 2003 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly minathk report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of September, 2003. No regulatory commitments are contained in this submittal.
Respectfully, W. Pearce
-~~~ ~
~~~- -~ ~- - ~~ ~- ~ Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA
.. 'g'-' ... .
jX9 4
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE October 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: September 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E- Operator Training I Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
1I
- 6 OPERATING DATA REPORT DOCKET NO.
- 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 10/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962
- * * ** * * * * *
- C * * * * * *
- Nokes: Rated thermal power at
- la. REPORTING PERIOD: SEPTEMBER 2003
- BVPS-1 was uprated from 2652 MWt*
- to 2689 KWt on 10/20/01. Net *
- 1. DESIGN ELECTRICAL RATING (Net e)W: 835
- MDC was also uprated from *
- 810 XWe to 821 MWe. *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe): 821
-g ** ** *--* * ** * *'*
- C*
THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 240335.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 720.0 5250.5 165842.0
- 4. SERVICE HOURS GENERATOR ON LINE: 720.0 5203.9 163315.9
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWE): 602700.0 4157899.0 122813906.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 637630.0 4413317.0 131082907.0
- 8. GROSS THERMAL ENERGY GEN. (MWE): 1934204.0 13462002.0 403733311.5
- 9. UNIT AVAILABILITY FACTOR (%): 100.0 79.4 69.4
- 10. UNIT CAPACITY FACTOR (MDC) (%): 102.0 77.3 64.9
- 11. UNIT FORCED OUTAGE RATE (%): 0.0 1.1 15.3
UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE October 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: September 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YV/MD) F: Forced (Hours) (1) Shutting S: Scheduled . Down (2) Comments 1 030913 S 432.0 C 1 The Unit was shutdown for its planned 1Oth refueling outage on 9/13/03.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1806 hours0.0209 days <br />0.502 hours <br />0.00299 weeks <br />6.87183e-4 months <br /> on 9/11/03 when a planned reduction to less than 50% output was commenced in order to support Main Steam Safety Valve testing prior to the beginning of the 1 0 th refueling outage. An output of approximately 48% was achieved at 0427 hours0.00494 days <br />0.119 hours <br />7.060185e-4 weeks <br />1.624735e-4 months <br /> on 9/12/03. At 1910 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.26755e-4 months <br /> on 9/12/03, the
-- Unit began 'to shut down for its-planned-1Ot-hrefuellng outage -The- Unit was removed -from service at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on 9/13/03. Mode 2 was entered at 0036 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The Reactor was manually tripped as part of the planned shutdown and Mode 3 was entered at 0043 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> on 9/13/03. The Unit continued to cool down and depressurize, entering Mode 4 at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br /> and Mode 5 at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on 9/13/03. The Unit entered Mode 6 at 0859 hours0.00994 days <br />0.239 hours <br />0.00142 weeks <br />3.268495e-4 months <br /> on 9/17/03, and remained in this refueling mode for the remainder of the report period.
OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT 82 REPORT DATE: 10/01/03 COMPLETED BY: DAVID T. JONES C 4ZTELEPEONE: (724) 682-4962
- * * * * * *
- 0 * * * * * * * *
- REPORTING PERIOD: SEPTEMBER 2003
- Scten: Rated thermal power at
- la.
- BVPS-2 was uprated from 2652 MWt*
- 1. DESIGN ELECTRICAL RATING (Net MWe): 836
- to 2689 Mwt on 10/30/01. Net *
- MDC was also uprated from *
- 2. MAX. DEPENDABLE CAPACITY (Net NWe): 831
- 820 NWe to 831 FWe.
- THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 139118.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 288.6 6119.6 115674.7
- 4. SERVICE HOURS GENERATOR ON LINEs 288.0 6119.0 114945.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWS)t 224608.0 5089493.0 90271896.0
- 7. GROSS ELECT. ENERGY GEN. (KWH)t 238873.0 5354950.0 95386995.0
- 8. GROSS THERMAL ENERGY GEN. (KWH)t 733841.0 16309075.0 290908686.0
- 9. UNIT AVAILABILITY FACTOR (t): 40.0 93.4 82.6
- 10. UNIT CAPACITY FACTOR (MDC) Ct): 37.5 93.5 78.8
- 11. UNIT FORCED OUTAGE RATE (t): 0.0 0.0 9.3