FENOC FtEneigy Nuclear Operating CBppany Beaver Valley Power Station Route 168 PO. Box 4 Shippingport, PA 15077-0004 L. William Pearce Site Vice President 724-682-5234 Fax: 724-643-8069 September 29, 2003 L-03-147 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50412, License No. NPF-73 Preparation and Scheduling of Operator Licensing Examinations NRC Regulatory Issue Summary 2003-14 The purpose of this letter is to provide the NRC with the response to NRC Regulatory Issue Summary (RIS) 2003-14 for Beaver Valley Power Station Unit No. 1 and Unit No. 2.

The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide data for scheduling and preparation of operator licensing examinations.

Please find enclosed NRC Form 536 which addresses our proposed operator licensing examination schedule.

No new commitments are contained in this submittal.

If there are any questions concerning this matter, please contact Mr. Larry R. Freeland, Manager, Regulatory Affairs/Performance Improvement at 724-682-5284.

Sincerely, L. William Pearce Attachment c:

Mr. T. G. Colburn, NRR Senior Project Manager Mr. P. C. Cataldo, NRC Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator m~oo-~

S U -..

NRC FORM 536 (5-2003)

U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/3112005 Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Management Branch (T-S E6), U.S. Nuclear Regulatory Commission. Washington. DC 20555-0001, or by Internet e-mail to lnfocoilects~nrc.gov. and to the Desk Officer, Office of Information and Rag ultory Affairs. NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20603.

If a means used to Impose an information colection does not display a currenty vad 0MB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collecton.

FACILITY NRC REGION Beaver Valley Power Station Unit No. 1 and Unit No. 2 Docket No. 50-334/50-412, DPR-66/NPF-73 Exams for 2005 are one each for Beaver Valley Unit 1 and Unit2, scheduled for 2/05, there are no 1

exams scheduled for 2004.

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY2006 CY 2007 ESTIMATED NUMBER OF By-i BV-2 LICENSEE-PREPARED 0

V1 1V2 EXAMINATIONS ESTIMATED NUMBER OF By-1 BV-2 0

0 NRC-PREPARED 0

o 0

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY200s CY2006 CY2007 NUMBER OF REACTOR 0

BV-1 BV-2 0

4 OPERATORS 7

1 NUMBER OF SENIOR REACTOR o

BV-1 BV-2 0

6 OPERATORS - INSTANT 4

8 NUMBER OF SENIOR REACTOR BV-11 BV-2 0

0 OPERATORS - UPGRADE 0

1 0

NUMBER OF SENIOR REACTOR 0

BV-1 BV-2 0

0 OPERATORS - LIMITED 0

0 PROPOSED DATES PRIMARY DATE BV-1 BV-2 021052007 2128/05 2/27/050/527 ALTERNATE DATE 01/22/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2005 CY NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF I10 CANDIDATES NRC FORM 536; (5-2003)

PRINTED ON RECYCLED PAPER