L-02-037, March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 2

From kanterella
(Redirected from L-02-037)
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 2
ML021130240
Person / Time
Site: Beaver Valley
Issue date: 04/05/2002
From: Myers L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-02-037
Download: ML021130240 (6)


Text

FENOC Beaver Valley Power Station P. O. Box 4 Shippingport,PA 15077 L-02-037 April 5, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of March 2002.

Respectfully, Lew W. Myers Senior Vice-President - Nuclear DTJ/caj Enclosures cc: NRC Regional Office King of Prussia, PA

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE April 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: March 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIMID) F: Forced (Hours) (1) Shutting S: Scheduled I Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3- Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output until 1606 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.11083e-4 months <br /> on 3/29/02 when a load reduction to approximately 93% output was begun. The load reduction was being done in order to remove the "A"Main Feedwater Pump from service due to high motor outboard bearing temperatures exceeding operating limits. In parallel with the load reduction, additional ventilation had been put in place to aid in cooling the motor outboard bearing. The load reduction was halted at approximately 93% output at 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> on 3/29/02, when motor outboard bearing temperatures decreased below operating limits. Once motor outboard bearing temperatures had stabilized at acceptable levels, the Unit increased output slightly to approximately 95% at 0504 hours0.00583 days <br />0.14 hours <br />8.333333e-4 weeks <br />1.91772e-4 months <br /> on 3/30/02 in order to counter Xenon burnout and to match Tavg/Tref. The Unit remained operating at approximately 95% output for the remainder of the report period in order to maintain reduced loading on the motor bearing until a power reduction to complete repairs could be started on 4/2/02.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: EVPS UNIT #1 REPORT DATE: 04/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Notes: Rated thermal power at
  • la. REPORTING PERIOD: MARCH 2002
  • BVPS-1 was uprated from 2652 MWt*
  • to 2689 MWt on 10/20/01. Net *
1. DESIGN ELECTRICAL RATING (Net MWe): 835 MDC was also uprated from *
  • 810 MWe to 821 MWe. *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 821 THIS MONTH YEAR TO DATE CUMULATIVE 744.0 2160.0 227184.0 3a. HOURS IN REPORTING PERIOD:

744.0 2160.0 154241.5

3. NO. OF HRS. REACTOR WAS CRITICAL:

744.0 2160.0 151781.9

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

620560.0 1800360.0 113466503.0

6. NET ELECTRICAL ENERGY GEN. (MWH):

656180.0 1904610.0 121171396.0

7. GROSS ELECT. ENERGY GEN. (MWH):

(MWH): 1989618.0 5781624.0 373416429.5

8. GROSS THERMAL ENERGY GEN.

100.0 100.0 68.3

9. UNIT AVAILABILITY FACTOR (M):

101.6 101.5 63.6

10. UNIT CAPACITY FACTOR (MDC) (M):

0.0 0.0 16.2

11. UNIT FORCED OUTAGE RATE (M):

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE April 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: March 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4- Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The report period began with the Unit operating at approximately 39% output while power ascension continued for fuel preconditioning following completion of the ninth refueling outage. Power ascension was halted at approximately 70% output at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> on 3/1/02 to verify Technical Specification power distribution limits. Following completion of a flux map at approximately 70%

output, the Unit commenced to increase power at 1001 hours0.0116 days <br />0.278 hours <br />0.00166 weeks <br />3.808805e-4 months <br /> on 3/3/02 for fuel preconditioning.

Power ascension was halted at approximately 86% output at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on 3/3/02 for calibration of nuclear instrumentation. Following completion of calibration of nuclear instrumentation, the Unit commenced to increase power at 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> on 3/4/02. Power ascension was halted at approximately 97% output at 1130 hours on 3/4/02 to perform a heat balance and to perform calibration of Delta-T/Tavg instrumentation. Following completion of calibration of Delta-T/Tavg instrumentation, the Unit commenced to increase output to full power at 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> on 3/4/02. A nominal value of 100% output was achieved at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on 3/5/02.

The Unit continued to operate at a nominal value of 100% output until 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on 3/15/02, when a load reduction to approximately 43% output was commenced to replace the stub shafts and shaft sleeves and to repack the "B" and "A" Heater Drain Pumps. An output of approximately 43% was achieved at 0134 hours0.00155 days <br />0.0372 hours <br />2.215608e-4 weeks <br />5.0987e-5 months <br /> on 3/16102. Following completion of repairs, the Unit commenced to return to full power at 1156 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.39858e-4 months <br /> on 3/20/02. A nominal value of 100% output was achieved at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on 3/21/02.

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE April 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: March 2002

SUMMARY

(continued):

The Unit continued to operate at a nominal value of 100% output until 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on 3/29/02 when a load reduction to approximately 43% output was commenced to perform a balance move on the "A" Heater Drain Pump in order to reduce high vibrations and to repack the "A" and "B" Heater Drain Pumps due to continued leakage. An output of approximately 43% was achieved at 0213 hours0.00247 days <br />0.0592 hours <br />3.521825e-4 weeks <br />8.10465e-5 months <br /> on 3/30/02. Following completion of repairs, the Unit commenced to return to full power at 0212 hours0.00245 days <br />0.0589 hours <br />3.505291e-4 weeks <br />8.0666e-5 months <br /> on 3/31/02. A nominal value of 100% output was achieved at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on 3/31/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 04/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Notes: Rated thermal power at
  • Ia. REPORTING PERIOD: MARCH 2002
  • BVPS-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • to 2689 Mwt on 10/30/01. Net *
  • MDC was also uprated from *
  • 820 MWe to 831 MWe. *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 2160.0 125967.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 1600.6 102955.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 1586.7 102279.3
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 532627.0 1212371.0 79790463.0
7. GROSS ELECT. ENERGY GEN. (MWH): 563088.0 1283496.0 84358239.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1709979.0 3884538.0 257292119.0
9. UNIT AVAILABILITY FACTOR (96): 100.0 73.5 81.2
10. UNIT CAPACITY FACTOR (MDC) (M6): 86.1 67.5 76.8 Ii. UNIT FORCED OUTAGE RATE (M): 0.0 0.0 10.3

Text

FENOC Beaver Valley Power Station P. O. Box 4 Shippingport,PA 15077 L-02-037 April 5, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of March 2002.

Respectfully, Lew W. Myers Senior Vice-President - Nuclear DTJ/caj Enclosures cc: NRC Regional Office King of Prussia, PA

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE April 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: March 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIMID) F: Forced (Hours) (1) Shutting S: Scheduled I Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3- Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output until 1606 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.11083e-4 months <br /> on 3/29/02 when a load reduction to approximately 93% output was begun. The load reduction was being done in order to remove the "A"Main Feedwater Pump from service due to high motor outboard bearing temperatures exceeding operating limits. In parallel with the load reduction, additional ventilation had been put in place to aid in cooling the motor outboard bearing. The load reduction was halted at approximately 93% output at 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> on 3/29/02, when motor outboard bearing temperatures decreased below operating limits. Once motor outboard bearing temperatures had stabilized at acceptable levels, the Unit increased output slightly to approximately 95% at 0504 hours0.00583 days <br />0.14 hours <br />8.333333e-4 weeks <br />1.91772e-4 months <br /> on 3/30/02 in order to counter Xenon burnout and to match Tavg/Tref. The Unit remained operating at approximately 95% output for the remainder of the report period in order to maintain reduced loading on the motor bearing until a power reduction to complete repairs could be started on 4/2/02.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: EVPS UNIT #1 REPORT DATE: 04/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Notes: Rated thermal power at
  • la. REPORTING PERIOD: MARCH 2002
  • BVPS-1 was uprated from 2652 MWt*
  • to 2689 MWt on 10/20/01. Net *
1. DESIGN ELECTRICAL RATING (Net MWe): 835 MDC was also uprated from *
  • 810 MWe to 821 MWe. *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 821 THIS MONTH YEAR TO DATE CUMULATIVE 744.0 2160.0 227184.0 3a. HOURS IN REPORTING PERIOD:

744.0 2160.0 154241.5

3. NO. OF HRS. REACTOR WAS CRITICAL:

744.0 2160.0 151781.9

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

620560.0 1800360.0 113466503.0

6. NET ELECTRICAL ENERGY GEN. (MWH):

656180.0 1904610.0 121171396.0

7. GROSS ELECT. ENERGY GEN. (MWH):

(MWH): 1989618.0 5781624.0 373416429.5

8. GROSS THERMAL ENERGY GEN.

100.0 100.0 68.3

9. UNIT AVAILABILITY FACTOR (M):

101.6 101.5 63.6

10. UNIT CAPACITY FACTOR (MDC) (M):

0.0 0.0 16.2

11. UNIT FORCED OUTAGE RATE (M):

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE April 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: March 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4- Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The report period began with the Unit operating at approximately 39% output while power ascension continued for fuel preconditioning following completion of the ninth refueling outage. Power ascension was halted at approximately 70% output at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> on 3/1/02 to verify Technical Specification power distribution limits. Following completion of a flux map at approximately 70%

output, the Unit commenced to increase power at 1001 hours0.0116 days <br />0.278 hours <br />0.00166 weeks <br />3.808805e-4 months <br /> on 3/3/02 for fuel preconditioning.

Power ascension was halted at approximately 86% output at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on 3/3/02 for calibration of nuclear instrumentation. Following completion of calibration of nuclear instrumentation, the Unit commenced to increase power at 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> on 3/4/02. Power ascension was halted at approximately 97% output at 1130 hours on 3/4/02 to perform a heat balance and to perform calibration of Delta-T/Tavg instrumentation. Following completion of calibration of Delta-T/Tavg instrumentation, the Unit commenced to increase output to full power at 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> on 3/4/02. A nominal value of 100% output was achieved at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on 3/5/02.

The Unit continued to operate at a nominal value of 100% output until 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on 3/15/02, when a load reduction to approximately 43% output was commenced to replace the stub shafts and shaft sleeves and to repack the "B" and "A" Heater Drain Pumps. An output of approximately 43% was achieved at 0134 hours0.00155 days <br />0.0372 hours <br />2.215608e-4 weeks <br />5.0987e-5 months <br /> on 3/16102. Following completion of repairs, the Unit commenced to return to full power at 1156 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.39858e-4 months <br /> on 3/20/02. A nominal value of 100% output was achieved at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on 3/21/02.

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE April 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: March 2002

SUMMARY

(continued):

The Unit continued to operate at a nominal value of 100% output until 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on 3/29/02 when a load reduction to approximately 43% output was commenced to perform a balance move on the "A" Heater Drain Pump in order to reduce high vibrations and to repack the "A" and "B" Heater Drain Pumps due to continued leakage. An output of approximately 43% was achieved at 0213 hours0.00247 days <br />0.0592 hours <br />3.521825e-4 weeks <br />8.10465e-5 months <br /> on 3/30/02. Following completion of repairs, the Unit commenced to return to full power at 0212 hours0.00245 days <br />0.0589 hours <br />3.505291e-4 weeks <br />8.0666e-5 months <br /> on 3/31/02. A nominal value of 100% output was achieved at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on 3/31/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 04/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Notes: Rated thermal power at
  • Ia. REPORTING PERIOD: MARCH 2002
  • BVPS-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • to 2689 Mwt on 10/30/01. Net *
  • MDC was also uprated from *
  • 820 MWe to 831 MWe. *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 2160.0 125967.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 1600.6 102955.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 1586.7 102279.3
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 532627.0 1212371.0 79790463.0
7. GROSS ELECT. ENERGY GEN. (MWH): 563088.0 1283496.0 84358239.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1709979.0 3884538.0 257292119.0
9. UNIT AVAILABILITY FACTOR (96): 100.0 73.5 81.2
10. UNIT CAPACITY FACTOR (MDC) (M6): 86.1 67.5 76.8 Ii. UNIT FORCED OUTAGE RATE (M): 0.0 0.0 10.3