ML022260139
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/12/2002
From: Dennis Morey
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEL-02-0165
Download: ML022260139 (6)


Text

Dave Morey Vice President Farley Project August 12, 2002 Docket Nos.:

50-348 50-364 SOUTHERN COMPANY Energy to Serve Your World NEL-02-0165 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the July 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, Dave Morey RWC:mor

Enclosures:

1. July Monthly Operating Report for Plant Farley Unit 1
2. July Monthly Operating Report for Plant Farley Unit 2 Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.5131

Page 2 U. S. Nuclear Regulatory Commission cc:

Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit I DATE:

August 8, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS Reporting Period:

Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

JULY 2002 854 833 This Month Year to Date Cumulative

4.

Number Of Hours Reactor Was Critical:

5.

Hours Generator On-line:

6.

Unit Reserve Shutdown Hours:

7.

Net Electrical Energy Generated (MWH):

744.0 744.0 0.0 614,347.0 5,056.1 177,302.0 5,040.0 175,008.2 0.0 0.0 4,220,294.0 138,573,240.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-i

1.
2.

3.

UNIT SHUTDOWNS CON REPORTING PERIOD:

JULY 2002 DOCKET NO.:

50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:

August 8, 2002 4PLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

August 8, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS

1.
2.

3.

Reporting Period:

JULY 2002 Design Electrical Rating (Net MWe):

855 Maximum Dependable Capacity (Net MWe):

842 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:

Hours Generator On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWH):

744.0 744.0 0.0 620,323.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

4.
5.
6.

7.

5,087.0 160,572.6 5,087.0 158,632.8 0.0 0.0 4,312,552.0 126,894,631.0

UNIT SHUTDOWNS REPORTING PERIOD:

DOCKET NO.:

50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:

August 8, 2002 COMPLETED BY:

W. L. Marlar JULY 2002 TELEPHONE:

(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/license Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

  • - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 0000 on 020720, a ramp down to approximately 92% power was commenced to perform governor valve testing. The testing was completed and the unit was returned to 100% power at 0700 on 020720.