Dave Morey Vice President Farley Project August 12, 2002 Docket Nos.:
50-348 50-364 SOUTHERN COMPANY Energy to Serve Your World NEL-02-0165 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the July 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. July Monthly Operating Report for Plant Farley Unit 1
- 2. July Monthly Operating Report for Plant Farley Unit 2 Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.5131
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit I DATE:
August 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS Reporting Period:
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
JULY 2002 854 833 This Month Year to Date Cumulative
- 4.
Number Of Hours Reactor Was Critical:
- 5.
Hours Generator On-line:
- 6.
Unit Reserve Shutdown Hours:
- 7.
Net Electrical Energy Generated (MWH):
744.0 744.0 0.0 614,347.0 5,056.1 177,302.0 5,040.0 175,008.2 0.0 0.0 4,220,294.0 138,573,240.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-i
- 1.
- 2.
3.
UNIT SHUTDOWNS CON REPORTING PERIOD:
JULY 2002 DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:
August 8, 2002 4PLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
August 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1.
- 2.
3.
Reporting Period:
JULY 2002 Design Electrical Rating (Net MWe):
855 Maximum Dependable Capacity (Net MWe):
842 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
744.0 744.0 0.0 620,323.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
- 4.
- 5.
- 6.
7.
5,087.0 160,572.6 5,087.0 158,632.8 0.0 0.0 4,312,552.0 126,894,631.0
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:
August 8, 2002 COMPLETED BY:
W. L. Marlar JULY 2002 TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/license Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
- - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 0000 on 020720, a ramp down to approximately 92% power was commenced to perform governor valve testing. The testing was completed and the unit was returned to 100% power at 0700 on 020720.
E2-2