J.D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5086 4%
March 11, 2002 SOUTHERN Z.
Docket Nos.:
50-348 COMPANY 50-364 Energy to Serve Your WorldS NEL-02-0057 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the February 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, RWC:mor
Enclosures:
- 1. February Monthly Operating Report for Plant Farley Unit 1
- 2. February Monthly Operating Report for Plant Farley Unit 2
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
bc:
Mr. J. R. Derieux Mr. Z. W. Smith Mr. D. J. Shelton Mr. C. L. Whatley Ms. D. S. Key Mr. A. P. Beattie Mr. G. N. Bass Mr. R. 0. Hutto Ms. Patricia Haught Mr. D. T. Holbrook Mr. K. W. Gannaway Mr. H. J. Jones Mr. W. H. Warren Mr. J. A. Bailey Mr. Mehdi Sheibani Mr. Don Crowe Ms. Barbara Lewis Mr. Steve Tipps Mr. A. E. Jones Ms. C. A. Graham INPO Records Center ANI Library NEL Reading File NEL CTS LC# 13622 SNC Document Management RTYPES A4.54 & G9.03 - Xref: A.2.1
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
March 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
FEBRUARY 2002
- 2.
Design Electrical Rating (Net MWe):
854
- 3. Maximum Dependable Capacity (Net MWe):
833 Year to Date Cumulative
- 4.
Number Of Hours Reactor Was Critical:
- 5. Hours Generator On-line:
- 6.
Unit Reserve Shutdown Hours:
- 7.
Net Electrical Energy Generated (MWH):
672.0 672.0 0.0 571,793.0 1,416.0 173,661.9 1,416.0 171,384.2 0.0 0.0 1,204,474.0 135,557,420.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1 This Month
UNIT SHUTDOWNS REPORTING PERIOD: FEBRUARY 2002 DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:
March 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative
- - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 At 1014 on 020218 a ramp down to approximately 93% power was commenced to repair a EH filter leak on the #1 governor valve. The repair was completed and the unit was returned to 100% power at 1932 on 020218.
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J.M. Farley - Unit 2 DATE:
March 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1.
Reporting Period:
- 2.
Design Electrical Rating (Net MWe):
- 3.
Maximum Dependable Capacity (Net MWe):
FEBRUARY 2002 855 842 This Month
- 4.
- 5.
- 6.
7.
Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
672.0 672.0 0.0 580,505.0 Year to Date Cumulative 1,416.0 156,901.6 1,416.0 154,961.8 0.0 0.0 1,212,023.0 123,794,102.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES E2-1 Date I Tag No.
I Event Description 4
There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
I
UNIT SHUTDOWNS REPORTING PERIOD: FEBRUARY 2002 DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:
March 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.