Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend
ML20196F579
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/22/1999
From: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196F584 List:
References
JPN-99-021, JPN-99-21, NUDOCS 9906290249
Download: ML20196F579 (2)


Text

\

/y~r p 1 123 Man Street

, j Wr;G PWns New York 10601 914 681.6950 914 287.3309 (Fa4 E WSE James Knubel

& Authority June 22,1999 JPN 99-021 QVgPQs nt aM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1 137 Washington, DC 20555

SUBJECT:

Jarms A. Fit? Patrick Nuclear Power Plant Doc et No. 50-333 Proposed Change to the Technical Specifications Regarding Pressure-Temperature Limits (JPTS-99-003)

References:

1. NYPA Letter, J. Knubel to the NRC, " Revised Reactor Pressure Vessel Material Surveillance Program Summary report and Implementation Schedule," (JPN-98-008), dated March 9, 1998
2. General Electric Report, " Plant FitzPatrick RPV Surveillance Materials Testing and Analysis of 120 Capsule at 13.4 EFPY,"

Revision 1, (GE-NE-B1100732-01), dated February 1998

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications (TS) proposes changes to the Pressure-Temperature (P-T) limits.

In compliance with the requirements of 10 CFR 50 Appendix H, a surveillance capsule was removed from the FitzPatrick reactor in November 1996 after 13.4 EFPY, and subsequently tested. The Authority forwarded the reactor vessel material surveillance program summary report and implementation schedule to the NRC (Reference 1). The Refetence 1 letter included a report from General Electric (Reference 2) documenting the surveillance capsule test results. Based on the test results, P-T curves were prepared, based on the new projected fluence levels, for both 24 EFPY and 32 EFPY. The P-T curves and associated <

Limiting Condition for Operation and Bases changes are included in this proposed amendment.

As part of this submittal, the Authority is proposing to add separate bottom head curves Aes and Bas for in-service hydrostatic and leak tests and non-nuclear heatup and cooldown, respectively. The GE Report (Reference 2) provides the basis for the new bottom head curves. In addition, a non-beltline curve (i.e., Aus) for in-service hydrostatic and leak tests is being added. GE has provided Errata and Addenda dated June 1999 which supplements the Reference 2 report. This Efrata and Addenda provides the basis for the non-beltline curve and is included in this submittal as Attachment IV. I o s ~ Ts i 9906290249 990622 / Ul 1; PDR ADOCK 05000333 P PDR [T L J

The cigntd original of the Application for Amendment to the Operating License is enclosed l- for tiling. Attachmsnt I contains tha propossd now TS pages and Attachment ll is the i

Safety Eva'luation for the proposed change. A markup of the affected TS pages is included as Attachment lll.

l A copy of this application and associated attachments is being provided to the designated

!- New York State official in accordance with 10 CFR 50.91, 1

There are no commitments made by the Authority in this letter. If you have any questions, please contact Ms. C. D. Faison. ,

Very truly yours, 3

l J. Knubel )

l Senior Vice President and  !

Chief Nuclear Officer 4

att as stated 1

cc: Regional Administrator .

U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission i P.O. Box 136 Lycoming, NY 13093 Mr. J. Williams, Project Manager j Project Directorate i i Division of Licensing Project Management -

U. S. Nuclear Regulatory Commission Mail Stop 8C2 )

Washington, DC 20555 Mr. F. William Valentino, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399-i l

J