JPN-98-004, Forwards Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads
| ML20202D375 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/06/1998 |
| From: | James Knubel POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20202D381 | List: |
| References | |
| JPN-98-004, JPN-98-4, NUDOCS 9802170068 | |
| Download: ML20202D375 (2) | |
Text
_-
123 Man Street Wh.to Plains. New Ycd 10001 914 681 *t950 e
914 287.3309 (Fax)
NewYorklbwer s me.xn sei 4# Authority s"af%%0e",'"
February 6, 1998 JPN-98-004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, DC 20555
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Regarding the Reactor Protection System (RPS) Normal Supply Electrical Protection Assem*ulv (EPA) Undervoltaae Trio Setooint UrTS97-003)
Dear Sir:
This application for an omendment to the James A. FitzPatrick Technical Specifications revises the Reactor Protection System (RPS) Normal Supply Electrica! Protection Assembly (EPA) Undervoltage Trip setpoint as a result of a reanalysis based on the most limiting minimum voltage requirements of the applied loads. The Authority is also in the process of completing an analysis of the EPA unders altage trip setpoints for the Alternate Supply, The signed original of the Application for Amendment to the Operating License is enclosed for filing. Attachment I is the proposed Technical Specification pages. Attachment ll is the
' Safety Evaluation for the proposed changes. Attachment 111 is i mcrkup of the affected Technical Specification pages.
There are no commitments contained in this submittal.
A copy of this applicatir n and the associated attachments la being provided to the designated New York bate official in accordance with 10 CFR 50.91.
If you have any questions, please contact Ms. C. D. Faison.
Very truly yours,
[
4e 9E02170068 980206 J. Knubel PDR ADOCK 05000333 Senior Vice President and g
P PDR Chief Nuclear Officer c
[kODI I
att:
As stated ll ll llllll llll ll ec:
next page i
-w
i llegional Administrator-
- U. S. Nuclear Regulatory Commission 475 Allendale Road
_ King of Prussia, PA 19406 -
N-Office of the Resident inspector:
U. S. Nuclear Regulatory Commis'slon P.O. Box.136 Lycoming, NY 13093 Mr. Daniel Dormen, Project Manager Project Directorate 11 Division of Reactor Projects-l/ll-U. S. Nuclear Regulatory Commission Mail Stop 14 B2-Washington, DC 20505 I
- Mr. F. William Valentino, President New York. State Energyi Research, and Development Authority Corporate Plaza West 286 Washington Avcaue Extension
- Albany, NY 12203 6399 f
f i
{\\ M O
- W/
"