JPN-97-009, Forwards ISI Summary Rept for JAFNPP Which Provides Summary of ISI Exams Conducted During 1996 Refuel Outage & Info Re Operating Status of Feedwater Nozzle Leakage Monitoring Sys & Measured Leakage for Feedwater Nozzles
| ML20136B697 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 03/04/1997 |
| From: | James Knubel POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20136B700 | List: |
| References | |
| JPN-97-009, JPN-97-9, NUDOCS 9703110092 | |
| Download: ML20136B697 (3) | |
Text
.
..__m s'
123 Mair4treet
'=
White Plains, New Ymk 10001
-e-
' 914 681.6200 4
- 5 New%rkPbwer 1
& Authority March 4, 1997 JPN-97-009 a
i U. S. Nuclear Regulatory Commission ATTN: Document Control Desk
. Mail Station P1-137 Washington, DC 20555
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Inservice inspection Summary Report
,1996 Refuel Outage (Reload 12/ Cycle 13)
Reference:
NYPA letter, W. A. Josiger to NRC (JPN-94-031), "NUREG-0619 Inspection Program for Feedwater Nozzles," dated July 19,1994.
Dear Sir:
' This letter submits the Inservice Inspection (ISI) Summary Report for the James A.
FitzPatrick Nuclear Power Plant (Commercial Service Date: July 28,1975) as required by Article IWA-6230 of Section XI of the ASME Boiler and Pressure Vessel Code. The report i
provides a summary of the ISI examinations conducted during the 1996 Refuel Outage (Reload 12/ Cycle 13). The report also provides information regarding the operating status of the feedwater nozzle Leakage Monitoring System, and the measured leakage for the feedwater nozzles, in accordance with the commitments in the referenced letter.
b Application for relief of components that received a limited examination which does not meet the criteria of Code Case N-460 will be submitted in accordance with 10 CFR 4
50.55a(a)(3)(ii) under separate cover.
If you have any questions, please contact Ms. C. D. Faison.
2 Very truly yours, t
J. Knubel 2
i Senior Vice President &
Chief Nuclear Officer
/
I
/
i
Enclosure:
Inservice Inspection Summary Report for Refueling Outage RO12 at James A. FitzPatrick Nuclear Power Plant
]
Attachment:
Ust of Commitments cc: next page 9703110092 970304 I
PDR ADOCK 05000333 G
PDR 110010 mapapppppM
a i
1 cc:
Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Ms. K. Cotton, Acting Project Manager Project Directorate I 1 Division of Reactor Projects-l/II U. S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington,' DC 20555
2 Attachment to JPN-97-009 Ust of Commitments i
d Number Commitment Due Date 4
JPN-97-009-01 Submit app!! cation for relief of components subject June 2,1997 i
to a limited examination which do not meet the j
criteria in Code Case N-460.
1 i
j i'
i 4
t I
k 4
i a
k-