123 Main Street White Plarns. New York 10601 914 681 6200 A NewYorkPower 4# Authority June 6,1994 JPN-94-024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333

$1ation Blackout Rule - Completion of Modification

REFERENCES:

1. NRC letter, R. A. Plasse to R. E. Beedle (TAC M 38546) dated June 9,1992, " Supplemental Safety Evaluation of JAFNPP Responsa to the Station Blackout Rule."
2. NYPA letter, R. E. Beedle to NRC (JPN-93-025) dated April 7,1993,

" Supplemental Response for Station Battery Capacity Calculations, SBO Procedure, EDG Reliability Program and Modifications."

Dear Sir:

The NRC accepted (Reference 1) the Authority's response to the SBO program and requested notification upon completion of program upgrades and modifications. The Authority committed (Reference 2) to complete modifications to the power supplies for both Reactor Core Isolation Cooling (RCIC) encksure fans and the Monitoring Analysis Panel (27 MAP) instrumentation during the April 1994 maintenance outage.

Installation of the power supply modifications for both RCIC enclosure ventilation fans, and the 27 MAP instrumentation, was completed on April 26,1994.

Installation of these two modifications completes all of the actions required by 10 CFR 50.63 " Loss of All Alternating Current Power." If you have any questions, please contact Mr. J. A. Gray, Jr.

Very truly yours,

$S Wiltram

.J iger Acting xecutive Vice President yar Generation r n.. r ".

u v l:

u DI Dj 9406090088 940606

~

PDR ADOCK 05000333 P

PDR l

.~

cc:

Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 j

Office of the Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. John Menning Project Directorate 1-1 Division of Reactor Projects - 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 L

- ~

. -.