JPN-92-077, Forwards Action Plan Relay Room CO2 Suppression Sys

From kanterella
(Redirected from JPN-92-077)
Jump to navigation Jump to search
Forwards Action Plan Relay Room CO2 Suppression Sys
ML20126F734
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/24/1992
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JPN-92-077, JPN-92-77, NUDOCS 9212310093
Download: ML20126F734 (7)


Text

- _ _ _ _ .. - . . . _. .....m _

123 Main Street White Plains. New York 10001 914 601 6846 J

A NewYorkPower n.i,s e. ... .

4# Authority lL;;m=";t*"'

December 24,1992 i

JPN-92 077 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

, Mail Station P1-137

j. Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Relav Room CO, Sunoresalon System

Dear Sir:

4 The Authority completed a discharge test of the CO, System in the Relay >

Room. This system was declared inoperable because the concentration of CO, _

in the Relay Room did not reach the required concentration during the test. This -

was due to inadequate venting of the Relay Room.

An action plan was developed which describes the various tasks that will be performed in order to restore the system to operable status, it includes the e information which the Authority is required to submit by Technical Specification

3.12.C.2. This action plan is provided as Attachment 1.

l If you have any questions, please contact Mr. J. A. Gray, Jr.

Very truly yours,

! k^ $

Ralph E. Beedle.

LO( ~Nm I

cc: see next page 310014 00

+

9212310093 921224 PDR ADOCK 05000333 b

I Y\

P ,PDR

A cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 4

Mr. Brian C. McCabe Project Directorate 1-1 Division of Reactor Projects I/II U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 i

.b

._. ,. , . _ y . - ,

i *-

ATTACHMENT l to JPN-92-077 4

I RELAY ROOM CO, SUPPRESSION SYSTEM -

ACTION PLAN 3

i J

i 4

i 4-3 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59

. - 2 .- . _ . - ._ __ _ ,- _ _;_...-____ _ _ _

. JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

CO

-z VENTING IN RELAY ROOM AND HVAC CONTROL LOGIC '

ACTION PLAN -

-December 16, 1992 i

. ]

1 G..Caccavale - CJerall Lead-N. Abramski - Pre-Startup Issues Lead- L t

r-

"rm::h',;iM: !?tnuti::'tri*it: 13: wn ;;;;df;;1:: n an:..:,.. .,,,,,,,.. . >-.s.-a. ..un . . .n ..d..,,,-...._,..,-......

tR:n'ainnitf;;'i:: MM D:IT E' 7. - - -. -w , ,,IMI r : nu' mi e.

.gg; e^?4 4n;dm.gg;t gg,,c;; C:

'O?n73:.n:;f*t,Wj{LO'OteDuf 0 m yg,q. g g pg ggggggy;;p.I,;:CIC;'.,*.;j;Cin.g tM y ; ;, s;;g.aa

.......=.u. g;,D:! *#M' u nI:p,;;ggn;pn.;g;;;q:.,n;gn.;w;p;gggg;;pr.9, m a . . . . .. , w . ~ .+. A w .,. n. .

r,c :!:OCO,n,!4!'g;1lM,1 yet,3.g't: ,..n, _

fep 3 g ,,. .

E t

TASK DESCRIPTION' RESPONSIBLE' STATUS DUE IND. DATE i

l'...-licensine Input ,

  • Exigent Tech Spec Change - J. Gray e Letter sent frem NYPA to t!5fMtc. Docket MD.' 50-333, *?roposed CDWLETE

~

Changes to the Technical Spectfleations General Limited condition for Operation, Revision (JPTS-88-021)" dated Slovember 20,1992. l

- (when approved, will pennit startup with f tre watches in place).

e Approval of amendment application lies been received Pr 6er to ' . j s/s ,

  • ' ' Define Regulatery Requirements. J. Gray /R. Schimpf e Based on receiving the Exigent Tech Spec approval,'a CDNPLETE i- determination has been made that a retest'is not required.
. -(Need for CD, Retest prior to Startup)

Houever, the system casutot be censidered operable due to the (

2 inability to obtain desired CDs concentration. 1-4 8- Dbtain NRC concurrence en Action Plan J. Gray

  • RRC waiting to see final Actfan Plan 12/18/92 4 .

$ t 4

4 l

.t 4 .

i Page 1 of.5 i

JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

CQ, VENTING IN RELAY ROOM AND HVAC CONTROL LOGIC ACTION PLAN -

~

Decetiiber 16, 1992

'v' {'; g ' I sfR$ 7

, 1 c-

'a ,. ;ty, g ; ;.vg;g',::tgig:

.. m _:, f.:m{f';Oj'7,*: 4"' !Sj a .:.

PRE a _,,y;:;3;'.'

4BTARTUPe "*:3.%=m'W' memo

" IMJL'{]yfiF " &;j;qq"  ; y , yr ,y:n'g

- r :".:-T.  :~ .

TASK DESCRIPTION RESPONSIBLE STATUS DdE IND. DATE

2. Compensatory Actice Due to the fact that the CD, discharge test la RR did not reach the retpired concentratten levels, the following canpensatory actions are being taken. Note that the CO2 system in this trea is a designed manual systes.

O Fire Watch A.11eath/C. Alaum e Continuous Fire Watch exists In tie Relay Room since tie systes COMPLETE was declared inoperable. This Fire Vatch will remain is place unt ti the CD, System in the Relay Room is declared operable.

O Alternate Suppression A. lienth e Alternate Suppression is ave 11able in the area in the fons ef: COMPLETE 100 lbs. gertable CD, Extingstshers.15 lbs. portable CD, extlexystshers and water post stations.

O Installed Heat Detection / fire Brigade A. lieath e Installed test detectles in the Relay Room remains operable and COMPLETE will alarm in the Control Roce en the Fire Protection Panel. The Fire Brigade is avallable and will be utfitzed as needed.

O Procedsre Changes (0P-558, 56.- ARP-fPP-C) J. Balla/W. fiendrick e GP-55B. " Control Room Ventilation and Cool!ng" will be updated to 12/18/92 provide direction to operators for tie isolation of the Control Roan Ventilation System. Specifically. (A) The kOTE uruler Control Rooss Ventilation isolatica Section ist11 read: The Relay Roon ventilatton shall be isolated whenever Control Rotzs vent 11atten is 1solated. 150 wever, when the CDr System in the Relay Room discharges, the Relay Roca ventilation system shall not be lselated". (B) The normal positten for the Primary Air Service Energency Supply Fans isol Valve 70CRV-Di and the Secondary Air Source Erergency Supply Fans 1 sol Valve TOCRV-c2 will le changed to " CLOSED" and "0 Pear

  • respectively.

e DP-55. " Relay Room Ventilation and Cooling" will be updated to 12/14/92 better describe systes configuration dsring CD, discharge.

Specifically, the following will be added to the System Description Section. When tie CD, Systes la the Relay Roon is actuated the Ventilation System is aetomatically secured. Air Hand 1tng linits Anti-12A, A_5fJ-lZB and Exhaust ran FM-3A are secured and tielt associated daepers close (70MDD-1014. FDHCD-IDIB and 7DMDD-102A respectively). Exhaust Fan FR-138 Is also secured but its associated damper (70MDD-1028) remains energfred (OPEN) maintaining a vent path.

Page 2 of 5

JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

CD VENTING IN RELAY ROOM AND HVAC CONTROL LOGIC

-i .

ACTION PLAN .

December 16, 1992 1;;; '..a;;"::;nn O;;;;;;;;m'.1:;

BE6EE;:lliNilisJT;ii4 ';;t;;"'7;'J:">.L'" ,'n';b; . ::m:'%m;;;^n::::mh::!riti;:2 di!r)T;i'?liiNii/i!iflMdfdiiiii?3EEElb!!iPRE ';t'.;;O : W ' ';d!Oig" lit" lit!!9iliti G9fN d W: BTAETiJPiiiMES!?$5hia

                                                                                       %                                                                       .:4;;t:ett;m;Odt; D 4 MFfm50P' TASK DESCRIPTION                               RESPellSIBLE                                          STATUS                                       DUE IMD.                                                                                         DATE 4
2. Comoensatory Action (continued) 8 Alars Response PrMie (ARP) changes in progress. The changes 12/14/SZ will ensure that prior to initiation of the samtal discharge of the CD, system, the Control Room ifrAC systesi is placed in isolation, non-essential personnel will be evactrated from the Control Rcom, RR fire watch and other personnel in RR have evacuated, direct Control Room personnel dan breathing apparatus  ;

and instrarct not to reseve until Control Room habitability is i established. 8 Operator Afd Changes J. BallaN. fiendrld 8 Existing Dperator Aid OP-577 " Initiation of CD, into the Relay 12/14/92 ' Room". located on the Fire Protection Panel (FFP) la the Control Rcom shall be enhanced to agree with ARP-FPP-C as above. e Establish Fire idatch for RR and post R. LocY 9 Casplete - Post 15 was previously established. CDNPLETE lastructions-4 Install Dperator Aid on Remote Station R. Locy/J. Ballal

  • A Special Condition Tag exists which requires 55 permission prior CINFLEIE W. &ndrick to CD, initiation. Condition shall remain in place until post startige riodifications are complete.

6 Compensatory Instructions of CD, System R. Locy Initiation e An operator aid is on the fire protection panel to instruct .COMPLE1E operators to dos breathing apparatus prior to CD, initiation. r Page 3 of 5

                                                                                                                                                                                                            ~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT . CQ. VENTING IN RELAY ROON AND HVAC CONTROL LOGIC '~ ACTION PLAN . December 16, 1992 m - y. . . . . . . . . .

                                                                                                        ,.im.. m._,

m:m:emm:n:;an'~bnn::ps::,:::ces.:n:n. m,t:ap:a::. te nn. a gip....~.  :~

                                                                                             .,:p,p.        v-< +" ...g3n. % ,.a.:59 r m q m r
                                                                                                        %..s...

m~'utua.mn,.m...te..: e .mm m c .~=. .c.p.u..m.-- um,ami:a=u

                                                     -    - ~ ~            ..J Huaumt.-         --

edw:m A mmh:n:tmm. tunMRBeBTARTOPi.m,act:'tr..mp=u*pw:,mn:c:a:,un m-e .p:tu

-" itu_;;r:;:m:t,4:=_.;a;r;
                                                                                                                                                                          ,n,1:?en+nnEi:Hii:iEHisE?ri*igi t                 cum I                    TASK DESCRIPTION                                              RESPONSIBt.E                                                      STATUS                                              DUE IND.                                                                                                            DATE        l
3. Intrusion of Co. Into Control Roos 0 Swap [sergency Afr Intake from Primary to R. Locy 4 1his swap will be performed in conjunction with the next ins 11eted 12/14/92 Secondary Supply flee. Refer to CP-558 description ander carpensatery Action section of this Action Plan.

s Test Secondary Air Source to ensure adetysate C. Jones / e Temporary operating Procedure (10P) 92084 has been prepered. The 12/18/92 i ventilation V. Hendrick test has been performed en 12/11/92. The purpose of this TD? es to verify that adequate air flow la provided by the Secondary emergency air source when the Control Roon Ventilation System is ' isolated. Control Room Ventilation Systes la *A!!T0" mode and valve lineups in wba.= with OP-558 as described in the Compensatory Action section of this Action Plan. Test results are currently being evaluated. 8 Determine if door from CR to RR needs to be B. Kyle/ 8 WR was generated and taplemented to bring doors to original COMPLETE

             . addressed                                                              A. Halliday                        destga basis (leak tight). Leak tightness has been achieved and door meets deslys basis.
4. _Svstes Evaltration & Verification e Review System Oescription C. Jones e TS has prepared a systema description based en a review of design COMPLETE docisments.

8 Relay Roar IfVAC control Logic Verificatten C. Jones /D. Kleper.

  • WR 104531 has ben completed by ISC. Pressure switch interlock COMPtETE with went systess was tested. This verified the description of systes eperation deserthed above.

[

5. Serveillance
O IJpdate surveillance test to adequstely test C. Jones /V. Hendrick * . A portion cf ST-TGJ21. " Smoke and Heat Detector Functfenal Tests- 12/23/92 logic Relay Roars", tests the Ventilation /CU, systese logic interlock.

It has become apparent that this test does not adentrately test the logic interlock. Ihe deficiencies have been identifled and 4 the procedure will be updated prior to next perfomance of test. ' 1 Page 4 of 5

JAMES A. FITZPATRICK NUCLEAR POWER PLANT . CD, VENTING IN RELAY ROOM AND HVAC CONTROL LOGIC ' ~ ACTION PLAN . December 16, 1992 t

a ina':::A,J,4 :.:irit:54rss:ImMWWii;Mr ra'::t rtiNF2NHEEiiiEd@9Fis!EM l ':::::.rt: : =ri.:'n::. :J:~::'....aa:::r.:u ';:::::;I
         ' i ;' : ;:: r'1                                                                                                                                           - ~ .-

ry.:a;n:g!'a'p,qlFi:Mili! diti5iiiisi;i;;;::g;:.tri3;g

                          ;gcur$ggp;1:.                            algpg3at;;ii:itpgqwyd:hTARTUP8                                              'T;: ?;9?du;P4    lf /5".I$:m$:WiUP y

TASK DESCRIPTION RESPONSIBLE STATUS DUE

   ,                                                                           IND.                                                                                         DATE i

1.- Modifications e- Co, Concentration (M1-92 377) c. Caccavate/ e An alternate vent path will be provided through the East untL of R. Schig f/ the tetey Room. This etternettve would utitire the existing evtmi door, ahich is currently not in use and covered by a Preto-Power steet U%eed, 29 penetrate the Relay Room and provide the vent path. The venting dset would run from the colling levet down through an opening in the bulk head. A setor operated dag er wo:std be instatted t a open prior to CD, discherge, attowine venting, white the existing system would be isolated. A missile shield and security grate will also be required outside the meter Room at the eset opening.

  • Modiffention Package PORC Approvst 1/31/93
                                                                                            . Installation and testing dsretton - 5 weeks (estlasted).                     ---

Instattation and testing will be performed darIng the next scheduled outage of sufficient esration. l

2. Co. Discheree Test teoufrements R. schimpf Witt be performed ones M192-3TT is instetted durtne the next ---

schedsted outage of suf ficient dsration. 5 1 i Page 5 of 5 __ __}}