JPN-91-050, Forwards Schedule for Long Term Fire Protection Actions Concerning Outline Developments,Per

From kanterella
(Redirected from JPN-91-050)
Jump to navigation Jump to search
Forwards Schedule for Long Term Fire Protection Actions Concerning Outline Developments,Per
ML20082U769
Person / Time
Site: FitzPatrick 
Issue date: 09/13/1991
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JPN-91-050, JPN-91-50, NUDOCS 9109200335
Download: ML20082U769 (6)


Text

_ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _. _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

123 Main Steert Whste Plains fsen Park 10(C) 914 081 6846

  1. > NewYorkPower o.,r r.,,,,,,,

& Authority

=;;gg;-

September 13,1991 JPN 91050 i

U.0. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI 137 Washington, D.C. 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Schedule for Long Term Fire Protection Actions

Reference:

NYPA letter, R. E. Boedle to USNRC dated August 16,1991 (JPN-91 043), regarding schedula for short term fire protection itoms.

Dear Sir:

New York Power Authority personnol mot with NRC Staff members on August 2, 1991 at the NRC's Region I offices to outline developments concerning fire protection at the FitzPatrick Nuclear Power Plant. At that meetir,g, the Authority committed to submit a schedule for eech of the short and long torm actions identified in the meeting l

handout.

. Attached is a list of the long term actions items ar.d a schedule ' r completing each of them. A similar list for the short term actions was included with the referenced lettor.

Should you have any quettions, please contact Mr. J. A. Gray, Jr..

Very truly yo rs, Y

Q Ralph E. Boodio

-N Executivo Vice Prosident Nuclear Generation 1

I cc: Next page_

[

~0109200335 910913 l

,DR ADOCK0500g3.

l l

,,-~.,...r.,

,.,-w..--,.,--aJ-.4.-

w

,_w.

-m.,,.,,..w,

,,,.,.n,

.e-

,..ne,,..,-,,.,,,,

e.,. wmn,,.-,

cc:

Offico of the Resident inspoctor U.S. Nucloat Rogulatory Commission Post Offico Box 136 Lycoming, NY 13093 Rogional Administrator U. S. Nuctoar Rogulatory Commission 475 Allendato Road King of Prussia. PA 19406 Mr. Brian C. McCabo Project Directorato 11 Division of Roactor Pro]octs lill U.S. Nuclear Regulatory Commission Mall Stop 14 02 Washington,DC 20555 s

Attachmont I to JPN 91-050 New York Power Authority James A. FitzPatrick Nuclear Power mnt Schodule for Long Term Firo Protoction Actlans New York Power Authoniy personnel mot with NRC Staff rr.ombers on August 2,1991 at tho NRC's Rogion I officos to outlino dovolopments concerning firo protoctic>n at the FitzPatrick Nuclear Power Plant. At that mooting, the Authority committed to submit a schodulo for occh of the long term active identiflod in the mooting handout.

Bolow is a list of the long term fito protoction actions itoms and a scheduto for completing each of them. The completion dates aro identified within brackets.

1. OVERVIEW No long term actions.

II.F APPENDIX A

1. Program li :.

.tomonts, Clarification and Documentation

a. Procedure Revision [ 'uno 1992]
b. Design Basis Reconstitution [ March 1993)
c. Review of Surveillanco Test Program (June 1992)
d. Fire Barrior Roovaluation [30 days after startup from the 1993 r6 fuel outago)
e. Clearly Establish Elomont of a 10 CFR 50.48 Firo Protection Program g

[Marr h 1993)

W

2. Ponotration Qualification Roverification
a. Baso Lino inspection [30 days after startup from the 1993 refuel outage) (800 noto 1.)
b. Qualification Report Review / Approval [30 days after startup from the 1903 refuel outago) (Soo noto 1.)

lli.F FIRE DAMPERS

1. Modification or Upgrado of Operable Damper not installed por an acceptable configuration [30 days after startup from the 1993 rofuct outago)

Page 1

Attachmont I to JPN.91050 IV.F APPENDIX R t

1. _Consolidato the existing clomonts of the fire protoction program into a singlo comptebensive program. [ March 1993) (Part of itom II.F.1.0)

V.F VENTILA110N ISSUES No long term actions.

VI.F BATTERY ROOM AND CORRIDOR No long term actions.

j Vll.G MODIFICATION PROCESS 19791991

1. Consolidate the existing o!oments of the firo protection program into a comprohonsive firo protection referenco manual. [ March 1993) (Part of

)

item II.F.1.0)

2. Posolvo findings. [30 days aftor startup from 1992 mid cyclo maintonance outago)

Vill.F OPEN ITEMS (NON-NRC AUDITS) l

1. Improvo Tralning for design onginoem dealing with fire protection issuos.

[ June 1992]

2. Improve chocking of design documents. (Juno 1992)
3. Addross complianco to NFPA codo or document dovlations. [ March 1993)

XI. JULY 13 MEMO (K.J.V. 91.60) No long term actions.

X.C ACTION PLAN

1. Damper Modifications for operablo dampor not installed por Underwriters Laboratories. [30 days after startup from %3 rofuel outago)
2. Firo Hazards Analysis and Firo Protection Rotorenco Manual Roview and Updato to 1991. [ March 1993)

L

3. Full Barrior Seal inspection [30 days after startup from tho 1993 refuel outago)

(See note 1.)

l'

4. Review and updato the surveillanco tests for doors, dampors and seals.

i L

[ Juno 1992)

5. Reconfigure the design basis of the firo protection system and program.

[ March 1993]

L l:

Pago 2 l

AttachmGnt Ito JPN 91050 6, Identify optimal shutdown equipmont list. [ August 1992) 7, Imptomont newly purchased cable and tacoway managomont software, including Appendix R module. [ August 1992]

l l

Pago 3

..~ -,

Att: chm:nt I to JPN 91050 NOTE 1.

In response to a recent Notico of Violation (Referenco 2), the Authority committod to conduct an engincoring basolino inspection of mechanical and cloctrical ponotration soals during the next firo barrior survoillanc.. This baselino inspection will confirm and document the prosonco of throo hour rated ponotrations in toquitod fire barriors and sorvo as a basis lor futuro inspections. Since those inspections at0 idontical to those nocessary to satisfy long torm actions ll.F.2.a, ll.F.2.b and X.C.3, the Authority is combining those commitmonts and will comploto them in accordanco with tho sci,odulo bolow (e.g. 30 days after startup from the 1993 rofuct outage).

REFC.2NCES 1.

NYPA lettor, R. E. Boodlo to USNRC dated August 16,1991 (JPN 91043), rogarding schedulo for short term firo protection items.

2.

NYPA lotter, W. Fornandoz to USNRC dated Juno 14,1991 (JAFP.910359), regarding rosponso to Notico of Violation, inspection Report 90-09.

Pago 4 l