JAFP-91-0454, Forwards Engineering Assessment,Battery Room Corridor,Ja Fitzpatrick Nuclear Power Plant, to Support 10CFR50,App R Exemption for area-wide Suppression in Battery Room Corridor

From kanterella
(Redirected from JAFP-91-0454)
Jump to navigation Jump to search
Forwards Engineering Assessment,Battery Room Corridor,Ja Fitzpatrick Nuclear Power Plant, to Support 10CFR50,App R Exemption for area-wide Suppression in Battery Room Corridor
ML20091C252
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/31/1991
From: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091C255 List:
References
JAFP-91-0454, JAFP-91-454, NUDOCS 9108060107
Download: ML20091C252 (2)


Text

-

s Jarnes A. Fit:Patrkk Nuclear Power Plant

P o 00 41 Lyco%ng New Yom 13393 l
m waw>

i

  1. > NewYo.rkPower Radford J. Converse tv Authonty ne m -

July 31, 1991 JAFP-91-0454 United States Nuclear Regulatory Commission Document Control Desk Mail Station Pl-137 Washington, D.C. 20555

Subject:

JAMES A. FIT 2, PATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 APPENDIX R TO 10 CFR 50 EXEMPTION REQUEST FOR AREA WIDE SUPPRESSION IN THE BATTERY ROOM (QRRIDOR __

Dear Sirs:

In accordance with the provisions of 10 CFR 50.12, the New York Power Authority requests exemption from the requ.irements of Sections III.G.3 of Appendix R to 10 CPR 50 as they apply to the James A. FitzPatrick Nuclear Power Plant. The exemption request concerns fire suppression in the Battery Room Corridor.

Battery Room Corridgr (Fire Zone BR-5)

Section III.G.3.b of Appendix R to 10 CPR 50 requires " fire detection and a fixed fire suppression system ... in the area, room, or zone under consideration" where electrical circuits

" associated" with alternative or dedicated shutdown could prevent operation of equipment required for hot shutdown.

The Authority has recently determined that the FitzPatrick Battery Room Corridor contains redundant cables required for safe shutdown. Section III.G.3 requires that alternate shutdown capability be provided in this case. Modifications installed to assure alternate shutdown capability for the B train battery room (fire zone BR-4) also ensure alternate shutdown capability in the event of a fire in the battery room corridor (fire zone BR-5).

However, a fixed fire suppression system is not installed "in the area, room or zone under consideration".

As an interim compensatory measure, the Authority will post a continuous fire watch in the area. Individuals standing fire watch will be trained how to use a portable fire extinguisher.

The Authority requests exemption from the requirements of Section III.G.3 of Appendix R to 10 CFR 50 to the extent that a fixed fire suppression system is required within the FitzPatrick Battery Room Corridor.

{

O 910731 _

9 ,108060107n a w0 m"'"

f,F 4

  • F t

UNITED STATES NUCLEAR REGULATORY COMMISSION July 31, 1991 Document Control Desk JAFP-91-0454 Docket No. 50-333 Page 2 of 2 A detailed description, engineering assessment and technical L justification for this exemption request is included in  ;

Attachment I.

If you'have any questions, regarding either of these exemption requests, contact Mr. J. A. Gray, Jr.

Verytrbifhours, I l j! h YC/h "'

RADFORD J. CONVERSE RESIDENT MANAGER

]

RJC:JE:mac Attachment cc: U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Office of Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Brian C. McCabe Project Directorate I-1 l Director of Reactor Projects - I/II U.S. Nuclear Regulatory Commission Mail Stop 14 B2 l Washington,- D.C. 20555 l