JAFP-83-0884, Responds to IE Bulletin 83-03, Check Valve Failures in Raw Water Cooling Sys of Diesel Generators. Emergency Svc Water Pump Discharge Check Valves ESW 1A Had Corroded Threaded Stud.Stud Will Be Replaced
| ML20080F155 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/01/1983 |
| From: | Corbin McNeil POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-SSINS-6820 IEB-83-03, IEB-83-3, JAFP-83-0884, JAFP-83-884, NUDOCS 8309190196 | |
| Download: ML20080F155 (2) | |
Text
James A. FitaPetrick Nuclear Power Plant Po. Box 41 Lycorrwng. New York 13093
- - )
315 342.3840 p
- > NewYo.rkPower i;;;"a*";;'e',
& Authonty September 1, 1983 JAFP 83-0884
/
United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA.
19406 Attention:
Richard C. DeYoung, Director
SUBJECT:
NRC I&E BULLETIN NO. 83-03 CHECK VALVE FAILURES IN RAW WATER COOLING SYSTEMS OF DIESEL GENERATORS Gentlemen:
In accordance with the subject bulletin, the results of the initial valve integrity verification are being submitted.
The two emergency service water pump discharge check valves (ESW lA and 1B) were disassembled and inspected during October 1982.
ESW 1A had a threaded stud (integral w/ disc) that was badly corroded.
The nut associated with the stud was replaced.
The disc will be replaced on receipt of a replacement unit from Velan.
The valve was operable as found and was left in an operable condition.
The other pump discharge check (ESW 1B) and the discharge checks from the emergency diesel generator coolers (ESW 6A and B - inspected July 6, 1983) were fully satis-factory.
The ISI program has been changed in accordance with the bulletin.
The change submittal will be made by October 1, 1983.
ng Very truly yours, S$
g"0 8
03g CORBIN A. McNEILL, JR.
4 Subscribed & Sworn to before me 1
1 08 th is da of S tember, 1983.
Y f&
__ P. A OE
/
Q@e Notary Public JOHN W. AUSTIN, e 4701224 h'
Notary Pubt c - State of New York Appointment in oswego County g My Commission Expires March 30,1!L
United States Nuclear Regulatory Commission September 1, 1983 Attention:
Richard C. DeYoung, Director JAFP 83-0884 Subj ect:
NRC I&E Bulletin No. 83-03 Page Check Valve Failures in Raw Water Cooling Systems of Diesel Generators DISTRIBUTION:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 L. W. Sinclair, NYPA, WPO J. P. Bayne, NYPA, WPO R. A. Burns, NYPA, WPO T. Dougherty, NYPA, WPO G. M. Wilverding, NYPA, WPO J. A. Gray, NYPA, WPO R. J. Converse, NYPA, JAF R. Baker, NYPA, JAF J. Lyons, NYPA, JAF NRC Resident Inspector NRCB 83-03 File Document Control Center
- t l
l
-r w
e e
s-
..---~a v
4,-
v
,> m
, -, - - - -