JAFP-17-0111, NRC Inspection of Initial Operator License Examinations (U01981)
| ML17321B063 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 11/17/2017 |
| From: | Alexandra Smith Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| JAFP-17-0111 | |
| Download: ML17321B063 (2) | |
Text
Exelon Generation Exelon Generation Company, LLC James A_ FitzPatrick NPP PO. Box110 Lycoming, NY 13093 JAFP-17-0111 November 17, 2017 Tel 315-349-6024 Fax 315-349-6480 Adriene Smith Training Director - JAF U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555
Subject:
References:
Dear Sir or Madam:
James A FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-059 NRC Docket No. 50-333 NRC Inspection of Initial Operator License Examinations (U01981)
NRC letter, James A. FitzPatrick Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations, ML17313A275, dated November 8, 2017 The Reference letter dated November 8, 2017, states that the administration of operator licensing examinations at the James A. FitzPatrick Nuclear Power Plant (JAF) are scheduled during the week of May 21, 2018, with a NRC examination validation visit during the week of April 16, 2018. In addition, the NRC made requests for information in preparation forthe examinations. As discussed with Mr. Brian Fuller, Chief Examiner, this schedule and the requests are acceptable.
This letter contains no new regulatory commitments. Should you have any questions or require further information, please contact me, at (315) 349-6201.
Very truly yours, Ad-_,~~
Adriene Smith Training Director AS/WCD/mh
JAFP-17-0111 Page 2 of 2 cc:
NRC, Regional Administrator NRC, Resident Inspector NRC, NRR Project Manager NRC, Brian Fuller