JAFP-15-0075, Flood Hazard Reevaluation Requested Files for James A. Fitzpatrick

From kanterella
Jump to navigation Jump to search
Flood Hazard Reevaluation Requested Files for James A. Fitzpatrick
ML15187A226
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/16/2015
From: Adner C
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AFP-15-0075, JAFP-15-0075
Download: ML15187A226 (4)


Text

Entergy Nuclear Northeast I Entergy Nuclear operations,'nc.

- -t' NI, James A. -itz*-au, ,

P.O. Box 110 SEntergy Lycoming, NY 13093 Tel 315-342-3840 Chris M. Adner Regulatory Assurance Manager JAFP-15-0075 June 16, 2015 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001

Subject:

Flood Hazard Reevaluation Requested Files for James A. FitzPatrick James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59

Dear Sir or Madam:

James A. FitzPatrick Nuclear Power Plant is submitting the files related to the Flood Hazard Reevaluation on hard drive. The list of files is contained in the Attachment. The files identified in the first column (with its title listed in the second column) are in pdf format. The third column contains the input/output files.

File formats include spreadsheets in Excel format. The remaining file format is listed in the file name. As an example LIP FLO2D is in FLO2D and requires FLO2D program (COTS) to access the input/output files.

There are no commitments contained in this letter.

Should you have any questions, please contact Mr. Chris M. Adner, Regulatory Assurance Manager, at (315) 349-6766.

Very truly yours, Chris M. Adner Regulatory Assurance Manager CA/mh

Attachment:

List of Files

Enclosure:

. Hard drive jY~

JAFP-1 5-0075 Attachment List of Files (1 Page)

N.

JAFP-15-0075 Attachment List of Files File Name Title Input/Output Files LIP FLO2D Input/Output James A. FitzPatrick Flooding PMF FLO2D Input/Output 32-9227045-000 LIP.pdf Hazard Re-Evaluation - Local HEC-HMS Input/Output Intense Precipitation Supporting Spreadsheets James A. FitzPatrick Flooding BOSS HMR52 Output 32-9227050-000.pdf Hazard Re-Evaluation -Probable HEC-HMS Input/Output Maximum Flood on Streams Supporting Spreadsheets James A. FitzPatrick Flooding MATLAB Input/Output Hazard Re-Evaluation - Probable Supporting Spreadsheets 32-9227053-000.pdf Maximum Wind Storm - Lake Ontario James A. FitzPatrick Flooding SSPP Input/Output Hazard Re-Evaluation - Probable Supporting Spreadsheets 32-9227056-000.pdf Maximum Storm Surge -

Lake Ontario James A. FitzPatrick Flooding MATLAB Input/Output 32-9227059-000.pdf Hazard Re-Evaluation - Probable Supporting Spreadsheets Maximum Seiche - Lake Ontario James A. FitzPatrick Flooding SWAN Input/Output 32-9227062-000.pdf Hazard Re-Evaluation - Ppon Spreadsheet Combined Events Supporting Spreadsheets James A. FitzPatrick Flooding No files associated with these reports Hazard Re-Evaluation -

51-9226881-000.pdf Screening for Dam Failure, Tsunami, Ice-Induced Flooding, and Channel Migration James A. FitzPatrick Topographic AREVA JAF 2D Plan.dwg 38-9227043-000.pdf Jamey Fiverables AREVAJAFContours RevAug2014.dwg Survey Deliverables AREVA JAF DTM RevAug20l4.dwg

JAFP-1 5-0075 Enclosure Hard Drive (WD Elements 500GB Hard Drive)