JAFP-13-0006, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach
| ML13030A203 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/29/2013 |
| From: | Michael Colomb Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| JAFP-13-0006 | |
| Download: ML13030A203 (4) | |
Text
JAFP-13-0006 January 29, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59
REFERENCES:
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, March 12, 2012 (ADAMS Accession No. ML12053A340).
2.
NRC Interim Staff Guidance JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Revision 0 (ADAMS Accession No. ML12311A214).
3.
NRC Letter, D.L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing and Integrated Assessment and Due Date for Response, December 3, 2012 (ADAMS Accession No. ML12326A912).
Dear Sir or Madam:
On March 12, 2012, the NRC staff issued Reference 1 to request information associated with Near-Term Task Force (NTTF) Recommendation 2.1 for Flooding. Item 2 of Enclosure 2 to Reference 1 requests an Integrated Assessment Report from plant sites whose reevaluated flooding hazard is not bounded by their current design basis. Further, Required Response 1 states: Within 60 days of the date of the NRCs issuance of guidance on implementation details of the Integrated Assessment Report, including criteria for identifying vulnerabilities, submit an approach for developing an Integrated Assessment Report including criteria for identifying vulnerabilities.
The following is Entergy Nuclear Operations, Inc. (Entergy) 60-day response to Required Response 1.
On November 30, 2012, the NRC issued the Reference 2 Interim Staff Guidance. Entergy commits to use the Reference 2 guidance as the approach for developing the NTTF 2.1 flooding Integrated Assessment Report for James A. FitzPatrick if the reevaluated flooding hazard is not bounded by the current design basis flooding evaluation.
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc James A. FitzPatrick NPP PO Box 110 Lycoming, NY 13093 Tel 315-349-6024 Fax 315-349-6480 Michael J. Colomb Site Vice President
JAFP-13-0006 Page 2 of 3 Entergy also commits to use the guidance provided in Reference 3 regarding the trigger conditions and scope of any required Integrated Assessment.
This letter contains two new regulatory commitments, which are identified in the attachment.
Should you have any questions regarding this submittal, please contact Chris M. Adner, Licensing Manager at 315-349-6766.
I declare under penalty of perjury that the foregoing is true and correct; executed on January 29, 2013.
MJC/CA/jo
Attachment:
List of Regulatory Commitments cc:
Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. Mohan Thadani Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission ATTN: Robert J. Fretz Jr.
Mail Stop OWFN/4A15A 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert L. Dennig Mail Stop OWFN/1 OE1 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: G. Edward Miller Mail Stop OWFN/8B1A 11555 Rockville Pike Rockville, MD 20852-2378 Ms. Bridget Frymire New York State Department of Public Service 3 Empire State Plaza, 1 01h Floor Albany, NY 12223 Mr. Francis J. Murray Jr., President New York State Energy and Research Development Authority 17 Columbia Circle Albany, NY 12203-6399
ATTACHMENT JAFP-13-0006 LIST OF REGULATORY COMMITMENTS (1 page)
Attachment to JAFP-13-0006 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
COMMITMENT TYPE (Check One)
SCHEDULED COMPLETION DATE (If Required)
ONE-TIME ACTION CONTINUING COMPLIANCE Entergy commits to use Interim Staff Guidance JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Revision 0 guidance as the approach for developing the NTTF 2.1 flooding Integrated Assessment Report for James A. FitzPatrick if the reevaluated flooding hazard is not bounded by the current design basis flooding evaluation.
March 12, 2017
[Upon submittal of the Integrated Assessment Report, if required, which is two years following submittal of the sites Hazard Reevaluation Report.]
Entergy commits to using the guidance provided in NRC Letter, D.L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing and Integrated Assessment and Due Date for Response, regarding the trigger conditions and scope of any required Integrated Assessment.
March 12, 2017
[Upon submittal of the Integrated Assessment Report, if required, which is two years following submittal of the sites Hazard Reevaluation Report.]