Text
SAFEGUARDS INFORMATION
-L-Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP P.O. Box 10 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager JAFP-1 1-0060 May 12, 2011 United States Nuclear Regulatory Commission ATTN:
Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Physical Security Plan, Revision 10 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
Dear Sir or Madam:
Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2). Revision 9 was made effective on March 25, 2011. That revision 1) revised the number of armed responders and armed security officers; and 2) added an armored vehicle patrol to the middle defense.
Revision 10 was made effective on April 18, 2011. This revision 1) added a Security Owner Controlled Area description and functions; and 2) added a vibration detection system as an element of the intrusion detection system. Since Revision 10 was made effective within the 60-day notification period described in 10 CFR 50.54(p)(2) this transmittal summarizes changes made in both revisions 9 and 10.
In accordance with 10 CFR 50.4(b)(4), the revised PSP (Revision 10) is enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.2. Entergy, therefore, requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.
Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.
Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page becomes "DECONTROLLED".
SAFEGUARDS INFORMATION s oc)l vwz.t
SAFEGUARDS INFORMATION JAFP-1 1-0060 Page 2 of 2 If you have any questions or require additional information, please contact Mr. Jonathan LaPlante, Security Manager, at (315) 349-6406.
There are no new commitments contained in this letter.
Very truly yours, Eugene Dorman Acting Licensing Manager : JAF Physical Security, Training & Qualification, and Safeguards Contingency Plan, Revision 10, April 18, 2011 cc:
Mr. William Dean (with Attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Bhalchandra Vaidya, Project Manager (without Attachment)
Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Resident Inspector's Office U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 (without Attachment)
Notice: Attachment I contains "Safeguards Information". Upon separation of Attachment I from this letter this page becomes "DECONTROLLED".
SAFEGUARDS INFORMATION