JAFP-10-0067, Physical Security Plan, Revision 7
| ML101530017 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 05/24/2010 |
| From: | Joseph Pechacek Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| JAFP-10-0067 | |
| Download: ML101530017 (2) | |
Text
SAFEGUARDS INFORMATION vF%0wvEntffgy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager JAFP-10-0067 May 24, 2010 United States Nuclear Regulatory Commission ATTN:
Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Physical Security Plan, Revision 7 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
Dear Sir or Madam:
Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2). This revision is a general re-write of the PSP to implement the new requirements, of 10 CFR 73.55, which became effective on March 31, 2010.
In accordance with 10 CFR 50.4(b)(4), the revised PSP is enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.2. Entergy, therefore, requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.
Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.
If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.
Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page becomes "DECONTROLLED".
C) C-)
ýýq-SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION
-- Entergy JAFP-10-0067 May 24,2010 United States Nuclear Regulatory Commission ATTN: Document Control Desk
. U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Physical Security Plan, Revision 7 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
Dear Sir or Madam:
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR50.54(p)(2). This revision is a general re-write of the PSP to implement the new requirements, of 10 CFR 73.55, which became effective on March 31,2010.
In accordance with 10 CFR 50.4(b)(4), the revised PSP is enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.2. Entergy, therefore, requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.
Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.
If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.
Notice: Attachment 1 contains "Safeguards Information". Upon separation of Attachm!!nt 1 from this letter this page becomes "DECONTROLLED".
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION JAFP-10-0067 Page 2 of 2 There are no new commitments contained in this letter.
Very truly yours, Joseph Pechacek Licensing Manager : JAF Physical Security, Training & Qualification, and Safeguards Contingency Plan, Revision 7, March 30, 2010 cc:
Mr. Samuel Collins (with Attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. Bhalchandra Vaidya, Project Manager (without Attachment)
Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Resident Inspector's Office U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 (without Attachment)
Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page'becomes "DECONTROLLED".
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION There are no rlew commitments contained in this letter.
Very truly yours,
~llJ~
{/'r~
Joseph Pechacek Licensing Manager JAFP-10-0067 Page 2 of 2 : JAF Physical Security, Training & Qualification, and Safeguards Contingency Plan, Revision 7, March 30, 2010 cc:
Mr. Samuel Collins (with Attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. Bhalchandra Vaidya, Project Manager (without Attachment)
Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8-C2 Wash~ington, DC 20555 Resident Inspector's o.ffice (without Attachment)
U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page 'becomes "DE.CONTROLLED".
SAFEGUARDS INFORMATION