JAFP-10-0015, Physical Security Plan, Revision 6
| ML100350407 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/01/2010 |
| From: | Joseph Pechacek Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| JAFP-10-0015 | |
| Download: ML100350407 (2) | |
Text
SAFEGUARDS INFORMATION En tff,4T Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager JAFP-10-0015 February 1,2010 United States Nuclear Regulatory Commission ATTN:
Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Physical Security Plan, Revision 6 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
Dear Sir or Madam:
Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2). The description of the Vehicle-Barrier System (VBS) in Section 6.1.1 has been revised to be consistent with work performed to implement the revised requirements of 10 CFR 73.55 and Figure 20.3, Vehicle Barrier System Layout Plan, was revised to illustrate the changes.
Since changes previously submitted under Revision 5 resulted in repaginating the Physical Security Plan, this submittal provides a complete copy of the repaginated document.
In accordance with 10 CFR 50.4(b)(4), the revised Plan paragraphs and pages are enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.21(e). Entergy therefore requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.
Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.
If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.
SAFEGUARDS INFORMATION Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page becomes "DECONTROLLED".
kQt SAFEGUARDS INFORMATION Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP P.O.Box110 JAFP-1 0-0015 February 1,2010 United States Nuclear Regulatory Commission ATTN:
Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Physical Security Plan, Revision 6 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
Dear Sir or Madam:
Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2). The description of the Vehicle' Barrier System (VBS) in Section 6.1.1 has been revised to be consistent with work performed to implement the revised requirements of 10 CFR 73.55 and Figure 20.3, Vehicle Barrier System Layout Plan, was revised to illustrate the changes.
Since changes previously submitted under Revision 5 resulted in repaginating the Physical Security Plan, this submittal provides a complete copy of the repaginated document.
In accordance with 10 CFR 50.4(b)(4), the revised Plan paragraphs and pages are enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.21 (e). Entergy therefore requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.
Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.
If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.
SAFEGUARDS INFORMATION Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page becomes "DECONTROLLED".
~Dol ljfLl
SAFEGUARDS INFORMATION JAFP-10-0015 Page 2 of 2 There are no new commitments contained in this letter.
V, rtuyors, Josepi Pechacek Licensing Manager : JAF Physical Security, Training & Qualification, and Safeguards Contingency Plan, Revision 6, December 17, 2009, includes: Summary of Changes, Revised Cover Sheet, Revised Physical Security Plan (Pages i through 39) cc:
Mr. Samuel Collins (with Attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. Bhalchandra Vaidya, Project Manager (without Attachment)
Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Resident Inspector's Office (without Attachment)
U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 SAFEGUARDS INFORMATION Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page becomes "DECONTROLLED".
SAFEGUARDS INFORMATION There are no new commitments contained in this letter.
JAFP-1 0-0015 Page 20f 2 : JAF Physical Security, Training & Qualification, and Safeguards Contingency Plan, Revision 6, December 17, 2009, includes: Summary of Changes, Revised Cover Sheet, Revised Physical Security Plan (Pages i through 39) cc:
Mr. Samuel Collins (with Attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. Bhalchandra Vaidya, Project M,anager (without Attachment)
Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8-C2 Washington, DC 20555 Resident Inspector's Office (without Attachment)
U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 SAFEGUARDS INFORMATION Notice: Attachment 1 contains "Safeguards Information". Upon separation of from this letter this page becomes "DECONTROLLED".