Text

@Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP RO. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 SAFEGUARDS INFORMATION August 22, 2005 JAFP-05-0130 T.A. Sullivan Site Vice President -JAF United States Nuclear Regulatory Commission ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 PHYSICAL SECURITY PLAN. REVISION I

Dear Sir:

Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP).

This revision includes a revision to Plan Figure 20.3 to reflect the as built configuration of the outer ring of the vehicle barrier system and implementation of the guidance in Security Frequently Asked Question (SFAQ) 05-03. These changes do not decrease the safeguards effectiveness of the Plan. A description of each change is enclosed in accordance with 10 CFR 50.54(p)(2).

In accordance with 10 CFR 50.4(b)(4), the revised Plan paragraphs, pages and figures are enclosed with this letter (Attachment 1). In addition a CD-ROM containing an electronic copy of the PSP with the changes incorporated is included with this letter as Enclosure 1.

Attachment I contains Safeguards Information as defined in 10 CFR 73.21 (e). Entergy therefore requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr. Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.

If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.

There are no new commitments contained in this letter.

Very truly yours,

-s r

T.A. Sullivan Site Vice President NOTICE: and Enclosure 1 contain "Safeguards Information".

Upon separation of Attachment 1 and Enclosure 1 from this letter, this letter becomes "DECONTROLLED".

Summary of Revision 22 Changes to the Physical Security Plan and copy of revised pages. :

CD-ROM Containing Updated Physical Security Plan cc:

Mr. Samuel Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. John Boska, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Resident Inspector's Office U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 (with Attachment 1)

(without Attachment 1)

(with Attachment I)

NOTICE: and Enclosure 1 contain "Safeguards Information".

Upon separation of Attachment 1 and Enclosure I from this letter, this letter becomes "DECONTROLLED".