Inspection Manual Change Notice 25-031,

From kanterella
Jump to navigation Jump to search
Inspection Manual Change Notice 25-031
ML25262A184
Person / Time
Issue date: 09/24/2025
From: Madeleine Arel
NRC/NRR/DRO/IRIB
To:
References
CN 25-031
Download: ML25262A184 (1)


Text

Issue Date: 09/24/25 1

25-031 NRC INSPECTION MANUAL IRIB CHANGE NOTICE 25-031 DELETED:

TRANSMITTED:

Number Date Number Date

1.

IMC 0308 Att 6 11/09/20 IMC 0308 Att 6 09/24/25

2.

IMC 0609 App E Part II 01/15/14 IMC 0609 App E Part II 09/24/25 TRAINING:

Inspector implementation training held in May 2025.

REMARKS:

IMC 0308 Attachment 6, "Basis Document for Security Cornerstone of the Reactor Oversight Process." Update to reflect changes in FOF inspection program. Additional updates made to reflect addition of SGI storage verification to IP 71130.02, remove IP 71130.06, add firearms preemption authority to IP 71130.07, update revision history of IP 71130.09, and add IP 92707. Other editorial changes made.

IMC 0609 Appendix E Part II, "Force-on-Force Significance Determination Process." Revised in accordance with SRM-SECY-17-0100 and SRM-COMSECY-19-0006 to reduce the number of NRC-conducted FOF exercises from two to one. This revision was a complete rewrite. This revision included a determination that this IMC is no longer Official Use Only - Security-Related Information.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security-Related Information Please contact: ____

Email: _______

END