Inspection Manual Change Notice 22-011,
ML22151A315 | |
Person / Time | |
---|---|
Issue date: | 06/01/2022 |
From: | Madeleine Arel NRC/NRR/DRO/IRIB |
To: | |
Madeleine.Arel@nrc.gov | |
Shared Package | |
ML22124A305 | List: |
References | |
CN 22-011 | |
Download: ML22151A315 (1) | |
Text
NRC INSPECTION MANUAL IRIB Change Notice 22-011 DELETED: TRANSMITTED:
Number Date Number Date
- 2. IP 43005 10/08/15 IP 43005 06/01/22 TRAINING: No special training is required for any documents issued with this Change Notice.
REMARKS: IMC 0308 Attachment 4, "Technical Basis for Assessment." Revised to include transition of new plants from construction oversight to the ROP and note the change to the start date for inspection findings IP 43005, "NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements." Updated requirement to address trip report to Director of Reactor Oversight in the Office of Nuclear Reactor Regulation.
Updated lead organization to IQVB.
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
END Issue Date: 06/01/22 1 22-011