IR 07200036/2021001
| ML21187A150 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, 07200036, 07201039 |
| Issue date: | 07/06/2021 |
| From: | Binoy Desai Division of Reactor Safety II |
| To: | Gayheart C Southern Nuclear Operating Co |
| References | |
| IR 2021001 | |
| Download: ML21187A150 (5) | |
Text
July 6, 2021
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT--- OPERATION OF AN INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200036/2021001
Dear Ms. Gayheart:
On May 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant and discussed the results of this inspection with members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA Adam Nielsen Acting for/
Binoy B. Desai, Chief Engineering Branch 3 Division of Reactor Safety
Docket No. 07201039
Enclosure:
As stated
Inspection Report
Docket Number:
07201039
License Number:
Report Number:
07201039/2021001
Enterprise Identifier: I-2021-001-0153
Licensee:
Southern Nuclear Operating Co. Inc.
Facility:
Vogtle Electric Generating Plant
Location:
Waynesboro, GA
Inspection Dates:
May 17, 2021 to May 21, 2021
Inspectors:
P. Cooper, Senior Reactor Inspector
O. Masnyk-Bailey, Health Physicist
Approved By:
Binoy B. Desai, Chief
Engineering Branch 3
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting inspections of activities related to Vogtle Electric Generating Plant,
operational activities of dry cask storage of spent fuel from May 17, 2021 to May 21, 2021. The
NRCs program for overseeing the safe operation of dry storage of spent fuel at an Independent
Spent Fuel Storage Installations (ISFSI) is described in Inspection Manual Chapter 2690,
Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage
Installations and for 10 CFR Part 71 Transportation Packagings.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2690, Inspection Program for Storage of
Spent Reactor Fuel and Reactor-Related Greater-than-Class C Waste at Independent Spent
Fuel Storage Installations (ISFSI) and for 10 CFR Part 71 Transportation Packagings."
60855 - OPERATION OF AN INDEPENDENT SPENT FUEL STORAGE INSTALLATION
Operation of an Independent Spent Fuel Storage Installation
From May 17 through 21, 2021, the inspectors performed a review of the licensees ISFSI
activities to verify compliance with regulatory requirements. During the on-site inspection, the
inspectors observed and reviewed licensee activities in each of the five safety focus areas
including occupational exposure, public exposure, fuel damage, confinement, and impact to
plant operations.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel to assess licensee performance and compliance with Commission rules and
regulations, license conditions, site procedures, and standards. Additionally, the inspectors
performed independent walkdowns of the heavy load lifting equipment and the ISFSI haul path.
The inspector also performed an independent radiation survey of the ISFSI pad.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On May 20, 2021, the inspectors presented the results to Drayton Pitts, Site Vice President and
other members of the licensee staff.