IR 07200030/2018401
| ML18158A554 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 05/17/2018 |
| From: | Raymond Mckinley Plant Support Branch 1 |
| To: | Jonathan Brown Maine Yankee Atomic Power Co |
| McKinley R | |
| References | |
| IR 2018401 | |
| Download: ML18158A554 (4) | |
Text
May 17, 2018
SUBJECT:
MAINE YANKEE ATOMIC POWER COMPANY - NRC INDEPENDENT SPENT
FUEL STORAGE SECURITY INSPECTION REPORT NO. 07200030/2018401
Dear Mr. Brown:
On April 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) performed an Independent Spent Fuel Storage Installation (ISFSI) security inspection at the Maine Yankee Atomic Power Company in Wiscasset, Maine. The inspection covered the October 16, 2002, Interim Compensatory Measures for Dry Independent Spent Fuel Storage Installations Order and was conducted using NRC Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations.
The enclosed inspection report documents the inspection results, which were discussed with you, on April 23, 2018.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, the inspector documented one finding of very low security significance (SLIV) involving a violation of NRC requirements in this report. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555 0001; with copies to the Regional Administrator, Region I, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001.
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. J. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security Related Information is necessary to provide an acceptable response, please mark your entire response Security Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety
Enclosure:
Inspection Report No. 07200030/2018401 (CONTAINS ) (OUO-SRI)
cc w/encl; w/OUO-SRI:
J. Lenois, Security Program Manager J. Hyland, P.E., Manager, Department of Health & Human Services, State of Maine
cc w/o encl; w/o OUO-SRI:
B. Rines, Chairman Board of Selectmen P. Dostie, State of Maine Nuclear Safety Inspector
ML18158A554 (Cover letter)
ADAMS ACCESSION NUMBER: ML18158A559 (Cover letter w/enclosure) (OUO/SRI)
Cover Letter X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DNMS RI/DRS
NAME KHussar RPowell RMcKinley
DATE 5/03/18 5/16/18 5/17/18 J. Letter to Mr. J. Stanley Brown from Mr. Raymond R. McKinley dated May 17, 2018.
SUBJECT: MAINE YANKEE ATOMIC POWER COMPANY - NRC INDEPENDENT SPENT FUEL STORAGE SECURITY INSPECTION REPORT NO. 07200030/2018401
Distribution w/o encl; w/o OUO-SRI: (via E-mail)
D. Lew, RA
(R1ORAMAIL RESOURCE)
D. Collins, DRA (R1ORAMAIL RESOURCE)
J. Yerokun, DRS (R1DRSMAIL RESOURCE)
J. Trapp, DNMS (R1DNMSMAIL RESOURCE)
J. Nick, DNMS (R1DNMSMAIL RESOURCE)
D. Screnci, PAO N. Sheehan, PAO J. Greives, SLO D. Tifft, SLO
Distribution w/encl; w/OUO-SRI RPT:
K. Hussar, DRS R. McKinley, DRS R. Powell, DNMS D. Huyck, NSIR N. Simonian, NSIR E. Wharton, NSIR B. Desai, DRS, RII S. Orth, DRS, RIII J. Groom, DRS, RIV