August 12, 2025

SUBJECT:

IDAHO CLEANUP PROJECT - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200020/2025401

Dear Nicholas Balsmeier:

On July 24, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Idaho Cleanup Project and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse R. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 07200020

Enclosure:

As stated

Inspection Report

Docket Number:

07200020

License Number:

SNM-2508

Report Number:

07200020/2025401

Enterprise Identifier:

I-2025-401-0031

Licensee:

Department of Energy

Facility:

Idaho Cleanup Project

Location:

Idaho Falls, ID

Inspection Dates:

July 21, 2025, to July 24, 2025

Inspectors:

R. Lanfear, Physical Security Inspector

Approved By:

Jesse R. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Security inspection of the TMI2 Independent Spent Fuel Storage Installation (ISFSI) at the Idaho Cleanup Project, in accordance with Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installation.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, independent spent fuel storage installation security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel and Reactor Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packings. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations The inspection TMI2 ISFSI was conducted using Section 02.09 of IP 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, applicable to any licensee issued a specific license for an ISFSI under 10 CFR

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On July 24, 2025, the inspectors presented the independent spent fuel storage installation security inspection results to yourself and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

DR-2025-011, AI

204579, AI

204571, AI

204572, AI

204573, AI

204574

7/28/2025

Drawings

503290

CPP-1674 Space Occupancy Ground Floor Plan

2/19/1998

FRM-7271

TMI-2 Lights out Report

5/18/2025

Miscellaneous

ZOJTM001

TMI-2 On-The-Job Training Guide and Checklist

3/15/2023

LI-11352

Protech Perimeter Intrusion Detection System Preventive

Maintenance and Operability Test

LWP-11301

INL Access Control

MCP-4663

TMI-2 INTEC Security

MCP-4668

TMI-2 Perimeter Performance Testing

MCP-4671

Protection and Control of Safeguards Information

PLN-6519

TMI-2 ISFSI Physical Protection Plan

81311

Procedures

PLN-8523

Insider Mitigation Program Plan

1