APPENDIX A NOTICE OF VIOLATION
,
Portland General Electric Company Docket No. 50-344
+
121'S. W. Salmon Street License No. NPF-1 Portland, OR 97204 As a result'of the inspection conducted during the period of August 31 -
October 2, 1985, and in accordance with the'NRC Enforcement Policy, 10 CFR
~Part 2,: Appendix C, the following violation was identified.
'
i 10 CFR 50 Appendix' B, criteria V and the Trojan Nuclear Plant Nuclear Quality Assurance Program, section 5.0, require in part that activities
,
affecting quality.be prescribed:by and accomplished in accordance-with
" documented procedures..
'
Maintanence procedure MP-2-0, " Installed Plant Instrumentation Maintenance," section II.C.I.a requires that all installed instruments
,
Jhave a instrument calibration data sheet which includes the necessary
'
data.
,
.L Contrary to the above, on June 28, 1985, the. instrument calibration data
'
sheets for the pressurizer pressure. transmitters did not include the
-;necessary data.in that the hydrostatic head of water in the instrument
- -
sensing line had not been considered for calibration purposes.
i-This is a Severity Level IV violation.
l In that our inspection indicates corrective action has been! adequately taken and completed for this violation, a written. response is not required.
.
.
i
. Odginal signe*d 69
.
,
'
.
/
D. F. Kirsch (\\'
/
Date R. T. Dodds, Chief
.
Reactor Projects Section-1