IE Insp Rept 50-514/80-01 on 801118-19.No Noncompliance Noted.Major Areas Inspected:Storage Conditions,Records of Components & Equipment & 1979 & 1980 QA Audits
ML19345F706
Person / Time
Site: 05000514
Issue date: 01/09/1981
From: Dodds R, Eckhardt J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19345F700 List:
References
50-514-80-01, 50-514-80-1, NUDOCS 8102190083
Download: ML19345F706 (3)


Text

.

.

~~.

"'" * * TC F.' cC".!: sC ID:t

'

.

-

- ~ ~ -

-)
rg 7 c g;,r,.--

"

,

,

Report ?o.

eC-514/En.n1 f

'. _ "/ L J a;e, u a rd *: G ro :n _

_ 0 514_ _ _ _ _ _ __ _

Docket ? o.

...

I.icenue:

Prthnd_GeneraLE1?ctric_ Company __ _ _

12LL.L. 5almon Street Portland. Cregon 97204 Facility ':a e:

Pebble Scrinos Unit No.1 I r.s p a c : 1:n at:

Tren Starace Site and Corocrate Headouarters fop roer 18-19, 1980 l

Inspecti:n conauctec:

-.

Inspectora: c/C'.5 5 7. M

//d /N/

.;n :.unec v/ H. ic?.narat, xeactor inspector

'

./

~;c d i;;neu

___.

_

._ _

_ _. _ _

c.: e s ignea

-

.

~

~

-$l Approved,y:

'

'

?. T. f5033, Ch1Ei,~ Engineering Support $ecticn

cite s igned

,

Teactor (custructica and Engineering Support Branch Suc=wy:

Invectica :a Jave cer 12-1.', _ 50 (Recort No. 50-514/80-01)

Areas Irscacted:

?cutine, anncunced inspection of storage conditions and records of Pebole Springs U.iit 1 ccmponents cnd equipment, and PGE QA audits of 1979 cnd 1930. The inspection involved nine inspector-hours by one NRC inspector.

Results:

o deviaticns frcm ccamitments to the !:RC were identified.

RV Form 219 (2)

8102190 0Tf3

-

..

.

__

.

.

yETAILS 1.

Persons Centacted a.

Portinnd General Electric Ccmoany (PGE)

F. C. Gaidos, Nuclear Projects OA Manager J. G. Schweitzer, CA Engineering Supervisor D. '.. Swanson, Project Licensino Supervisor J. :'. Aldersebas, Resident Engineer F. ?nsel, Construction Coordinator K. Johnson, QC Coordinator 2.

Proiect Status Discu:sion with PGE corsonnel inoicated that Bechtel (the AE) is reducing ef#crt on the Pebble Sorings oroject from 10 to 20 cersons to 15 persons by early 1981.

The original site at Arlington, Oregon is in question due to recent anti nuclear legislation in the State of Oregon. PGE does not nave an active enalneering review for Inis oroject and is following the TPI mocifications in conjunction with the B&W owners group.

3.

Audits _

Selected aucit reports of audits performed by PGE Quality Assurance during 1979 ano 19a0 were reviewed to ascertain compliance with ANSI H45.2.12,

"U.ecuirecents ior Auditing of QA Programs for Huclear Power Plants."

-

The following audic reports were reviewed:

c'rcanizatien Auuitec Audit Date 22catei (SF)

Darcn 5-7, 1979 Saotemoer 27-28, 1979 Septemoer 29-Cetober 2,1980 E'W(Lyncaturg)

May 8-11, 1979 i

i!ovember 1-2, TJ79 l

July 8-10, 1980 USSS Equipment Transitory January 16-17, 1979 Storaga (Trojan)

January 15-18, 1980 No deviations from audit requirenents were identified.

l

l s.

.

.

.

-2-4.

Ecuicrent Storaoe Storage conditions of the following Febble Strings equipment (stored at the Trojan site) were examined to ascertain coroliance with ANSI N.45.2.2,

" Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants," and the B&W soecification for "Long Term Storage Requirements for EPV and Accessory Items:" reactor vessel, reactor vessel head,

>

cara basket, core support cylinder, plenum assembly, reactor coolant piping (12 pieces), boren chemical addition tanks, pressurizer, and steam generators (two). This equipment was either in covered buildings, water tight tarps, or metal silos. All of the equipment contained dessicant and procer humidity indicators. The inspector noted that the indicators fcr the core basket, core succort cylincer, and olenum assembly indicated cut of stec hicn. Also, there was water on the floors of the metal siics containing tne care casket anc olenum assemoly. These conditions hac been noted by PGE during the Novemoer ma1ntenance inspections and were indicatea on the maintenance recorcs. Correction of these conditions was scncculea.

Paintenance recoros for 1979 and 1980 were reviewed. The inspector noted that the maintenance cnecks for May ana June, 1980 were not performed.

This ac; eared to oe due to cnange in inspection personnel ouring this cariod.

The July inspection records indicated all conditions were satisfactory.

The inspector had no further questions in Inis area.

!n acdition, the level A storage warehouse at the Trojan site was examined.

This area contained electrical cabinets and instruments for Pebble Springs.

No deviations from storage requirements were identified.

5.

Exit intervica At the conclusion of the inspection, the inspector met with J. K. Aldersebaes and sumcarized the scope and findings of the inspection as noted in this report.

..