i U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-367/82-01(DETP)
Docket No. 50-367 License No. CPPR-104 Licensco: Northern Indiana Public Service Company NITN:
Mr. Eugene M. Shorb Senior Vice President
.
5265 Hohman Avenue Hammond, IN 46325 Facility Name: Bailly Generating Station, Nuclear-1 Inspection At:
Bailly Site
Inspection Conducted: October 18, 1982
&Y
////82.
l Inspectors:
7. F. Norton v
br&h~
-
i,y,w M. J. Oestmann C'.'C. Williams, Chief If!h
@
W Approved By:
C Plant Systems Section
'
Inspection Summary
.
Inspection on October 18, 1982 (Report No. 50-367/82-01(DETP))
'
'
Areas Inspected: Site restoration activities.
Results:
,
No items of noncompliance or deviations were identified.
l
!
i I
l
!
_.-
8211300067 821112 i
FDR ADOCK 05000367
, - -. _ _ _ _ _ _
._._
.
_ _
_
-
.
.. _ _
_ _. - - _ - -
.
.
-
-
,
DETAILS 1.
Persons Contacted Northern Indiana Public Service Company (NIPSCo)
D. Kuhn, Manager, Bailly Generating Station R. Bohn, Manager, Nuclear Staff U.S. Army Corps of Engineers J. Konik, Permits Section U.S. Coast and Geodetic Survey M. Hardy, Hydrologist U.S. Department of Interior D. Wilcox, Hydrologist, Indiana Dunes National Lakeshore U.S. Nuclear Regulatory Commission M. Lynch, Project Engineer Others W. Eichhorn, Attorney, Eichhorn, Eichhorn and Link R. Vollen, Attorney, Business Men for Public Interes*
C. Read, Save the Dunes Council H. Read, Izaak Walton League 2.
Functional or Program Areas Inspected Site restoration - compliance with Board Order of May 6, 1982.
a.
General NIPSCO elected to backfill the exccvation by filling with approximately 218,000 cubic yards of off-site dredge material, then completing the fill to final grade with on-site native sands. The dredge material comprises about 67 percent of the total fill.
The dredge fill operation began July 5, 1982 and was completed October 6, 1982. On-site fill material is currently being placed by heavy earth moving equipment and densified with a vibratory compactor. The licensee estimates completion grade will be attained about mid November 1982.
. _
_
- _
.__
. -
. _
..
....
~
,
'.
t
'
,
t
'
The recording equipment nas been removed from all ground water-observation wells located outside of the excavation and all l
wells have been capped. Also, the meteorological tower and in-
!
strumentation building have been removed by NIPSCo's Construction Department.
b.
Conclusion
)
Site restoration is being accomplished well within schedule and i
NIPSCo has taken steps to ensure compliance with all requirements of the Board Order.
3.
Exit Meeting
,
No formal exit meeting was convened. Discussion of the site restora-tion project was held amongst all mentioned under " persons contacted" i
during the site tour of the inspection.
,