IE Insp Rept 50-367/80-01 on 800310-14.No Noncompliance Noted.Major Areas Inspected:Project Turnover Insp,Plant & Warehouse.Pile Driving Activities & Attended Prehearing Meeting
ML19323B471
Person / Time
Site: Bailly
Issue date: 03/27/1980
From: Barrett P, Gallagher E, Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19323B468 List:
References
50-367-80-01, 50-367-80-1, NUDOCS 8005120410
Download: ML19323B471 (3)


Text

. -

-. - -

= _ -__

-. - _ - _ -.

.. _

.

-

-

.. _ _...

_. _

-

_

8005130 M O

'

O~

.

.

'

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-367/80-01 Docket No. 50-367 License No. CPPR-104 Licensee: Northern Indiana Public Service Company 5256 Hohman Avenue Hammond, IN 46325 i

Facility Name:

Bailly Nuclear Generating Station Inspection At:

Bailly Site, Porter, IN; Champaign, IL; and Valparaiso, IN

Inspection Conducted: March 10 - 14, 1980 Inspectors:

7/ >

.

[8.34 P. A. Barr tt d'27'8#

Ilok

'i Approved By:

R. C. Knop, Chie

,8-J 7-fb Projects Section 1

'

,

!

!

Inspection Summary Inspection on March 10 - 14, 1980 (Report No. 50-367/80-01)

Areas Inspected:

Project Turnover Inspection; plant tour; inspection of warehouses; discussion of pile driving activities; and attendance at pre-hearing. This inspection involved a total of 11 inspector-hours on site by two Region III NRC inspectors.

Results:

No items of noncompliance were identified.

i

!

.

l

. - _

_.

. __

_. _

.

. - _ _

.

_

,

_

____

.

s DETAILS i

Persons Contacted

-

I

.

I Pile Design Meeting - March 10, 1980 NRC Staff 0. Thompson, Geosciences Branch, DSS L. Heller, Geosciences Branch, DSS R. Sause, Geosciences Branch, DSS M. D. Lynch, Project Management E. J. Gallagher, Region III, IE P. A. Barrett, Region III, IE J. Ma, Structural Engineering Branch

'

NRC Consultants M. T. Davisson W. J. Hall U.S. Army Corps of Engineers j

W. Otten, Detroit District

J. Grundstrom, Detroit District i

J. Simpson, North Central Division J. Norton, North Central Division P. Hadala, Water Experiment Station Site and Warehouses Inspections i

Principal Licensee Employees R. J. Bohn, Manager, Nuclear Staff

  • A. Severence, Mechanical-Nuclear Supervisor
  • J. Herr, Electrical Engineer
  • E. Kritzer, QA Engineer C. F. Brann Company
  • D. K. Maxwell, Site QC Supervisor
  • J. Zydel, Materials Supervisor
  • Denotes those present at the exit interview.

,

1.

Meeting on Bailly Pile Foundation Design A meeting was held on March 10, 1980 in Champaign, Illinois to discuss the technical details of the pile foundation design of the i-2-

-

-

-

..

- -

-

.

-.

.-

-

r

-

_ _ _ _ _

_

e Bailly plant structures. The meeting was attended by NRC staff, Corps of Engineers, and NRC Consultants. Details of the meeting included discussion of the pile design criteria, driving criteria, construction requirements, inspection program, and settlement non-itoring program.

,

2.

Pre-Hearing Conference on Bailly Project The RIII NRC inspectors attended the pre-hearing conference held on March 12, 1980 at the U.S. National Guard Armory in Valparaiso, Indiana. The pre-hearing consisted, in part, of discussions con-cerning the scope of a construction permit extension hearing, if held.

3.

Functional or Program Areas Inspected a.

The RIII inspectors toured the plant site and discussed the current status of the driven piles.

b.

The RIII inspector took extensive tours of the reactor pressure vessel, RPV, warehouse, the maintenance and N-1 site warehouses, the Chesterton warehouse, and the B and F-B warehouses at Michigan City.

The inside of the RPV was being maintained at 10 F above ambient temperature in a nonheated warehouse. The RPV head was not locally heated, but was stored inside the RPV ware-house.

All of the other warehouses were well heated and clean. The contained equipment and materials had protective coverings, rodent guards, space heaters energized, and indications of desiccants being used, where applicable.

Controlled access was maintained at all of the warehouses.

'

No items of noncompliance or deviatians were identified.

c.

The licensee was informed that Mr. ?. A. Barrett had taken responsibility as the Region III P';oject Inspector of the Bailly activities, effective February 1, 1980.

Exit Interview The inspector met with site staff representatives (denoted in the Persons Contacted paragraph) at the conclusion of the inspection on March 14, j

1980 at the Michigan City warehouses. The inspector summarized the scope and findings of the inspection. The licensee acknowledged the findings.