N (G
.
-
.
- -
'
,
b U. S. ATOMIC ENERGY COFDIISSION DIRECTORATE OF REGULATORY OPERATIONS
.
REGION III
~
Report of Construction I.ispection RO Inspection Report No. 050-329/74-06 RO Inspection Report No. 050-330/74-06 Licensee: Consumers P'ower Company 1945 West Parnall Road Jackson, Michigan 49201 Midland Plant, Units 1 and 2 License No. CPPR-81
-
Midland, Michigan License No. CPPR-82 Category:
A 1'
Type of Facility: PWR (B&W) - Unit 1, 650 }Ne Unit 2, 818 }Me
-
Type of Inspection:
Special, Unannounced Date of Inspection: March 15, 1974 Dates of Previous Inspection: March 6&7, 1974 (Construction)
Principal Inspector:
R. A. Rohrbacher YY2 W (Date)
Accompanying Inspector: None Other Accompanying Personnel:
W. E. Vette W
Reviewed By:
W. E. Vetter, Chief Y
I
-
Reactor Construction Branch (Date)
e o
8006200 M 7
.
g mw_._._..-
_.
g
.-. -...
m
...
-
-
.
.
'
.
.
'
.
-
SUMMARY OF FINDINGS Enforcement Action
-
A.
Violations No violations of AEC requirements were identified during the inspection.
B.
Safety Matters No safety matters were identified during the inspection.
Licensee Action on Previously Identified Enforcement Matters Not applicable to this special inspection.
'
Design changes Not applicable.
' Unusual Occurrences None identified.
'
.,. -
Other Significant Findings A.
Current Findings An inspection at the corporate offices of the Consumerd Power Company (CP) was conducted to review corporate management files.
The intent was to determine whether the subject records indicated situations wherein the licensee may have withheld information which should have been reported to the AEC. No evidence was found which indicated, or suggested, that reportable matter had not been previously reported to the AEC as required.
-
B.
Unresolved Matters
No new unresolved matters were identified during the current inspection.
'
C.
Status of Previously Reported Unresolved Matters No previously reported unresolved matters were involved with this special inspection.
.- 2 --
.
^
.
i
.
.
-
g
.--.
.
_-_s
.
.
-.
,
..
_.. - - _
_.
...
. _ _.. -.
6._
,
-
.
'
'
.i e
,
,
l t
^
<
N'
Management Interview i-
'
A.
The following persons attended the management interview at the conclusion of the inspection:
Consumers Power Company (CP)
S. H. Howell, Vice President j
W. E. Kessler, Project Manager G. S. Keeley, Director of Quality Assurance Services H. W. Slager, Project Quality Assurance Supervisor B.
Matters discussed and comments, on the part of management personnel, were as follows:
The inspectors stated that the following CP corporate office files, relative to the Midland Plant, were reviewed:
(1) general informa-tion, (2) correspondence, (3) Project Quality Assurance Services -
Midland Project, and (4) monthly reports.
The inspectors further
,-
stated that no problems were identified during this review, and the results of the review raised no substantial questions. Licensee personnel acknowledged this information.
J
>
l
'
i l
l
,
.
-3-
.
l
\\
\\_ /
)
i i
.
i
-
_ _. -
-
.. -...
....... -.....
.
-..
.
_
.
-- -.- - - -_--____
_'
.
. _ _. _
.._.. _...._
C
.
'
.
'
.
,
,D
'
REPORT DETAILS
--
Persons Contacted
-
Only the individuals listed under the Management Interview Section of this report were contacted during the inspection.
Results of Inspection The following CP corporate files, relative to the Midland Plant, were reviewed during the current inspection. No problems were identified during this review.
1.
Correspondence and General Files (Chronological) - G. E. Keeley a
Correspondence and other information in the subject file (about 90 items) were reviewed for the period from October 1, 1973, through March 13, 1974.
.
-2.
Monthly Activities Reports - G. S. Keeley (to S. H. Howell)
Reports dated from October 1973 through March 1974 were reviewed.
(
3.
Correspondence and General Files (Chronological) - H. W. Slager Information in this file, from October 1973 to date, was reviewed.
4.
Correpondence and General Files (Chronclogical) - W. E. Kessler Information in this file for 1973 and 1974, to date, was reviewed.
5.
Midland Project Monthly Reports - W. E. Kessler (to S. H. ~lowell)
Information in this file from 1970 to date was reviewed.
6.
Project Quality Assurance Services - Midland Project - File 10.3
,
(Project or Engineering Services Witness Hold Points)
This file was reviewed in its entirety.
,
71 Project Quality Assurance Services - Midland Project - Files 16.6, 16.7, 16.8, and 16.12 (NCR's on Contractor's, Bechtel Audits)
Information in these files were reviewed. Most of the material in these files were dated from October 1973 to March 1974.
~
-4-
-
~sJ
.
en-ee. -
.-m.._4.-
ee e.
_.=e,,
--m.
-
"
"
.. L
-_ -
__.
...
.
a-
...
__,
/
$
UNITED STATES I
,
ATOMIC ENERGY COviMISSION I
,
.,
,
(
DIRECTORATE OF REGULATORY CPERATIONS
- '8Fil ** g REGION lil 799 ROOSEVELT ROAD weg GLEN ELLYN. ILLINOIS 6o137 (312) 858-2660
-
-
-
A.
RO Inspection Report No. 050-329/74-06 and 050-330/74-06 Transmittal Date
- April 15,1974 Distribution:
Distribution:
RO Chief, FS&EB R0 Chief, FS&EB RO:HQ (5)
RO:HQ (4)
,
DR Central Files L:D/D for Fuels & Materials Regulatory Standards (3)
DR Central Files Licensing (13)
B.
RO Inquiry Report No.
Transmittal Date
Distribution:
Distribution:
RO Chief, FS&EB RO Chief, FS&EB RO:HQ (5)
RO:HQ DR Central Files
-
DR Central Files Regulatory Standards (3)
RO Files Licensing (13)
RO Files
'
C.
Incident Notification From:
(Licensee & Docke,t No. (or License No.)
,
c Transmittal Date
Distribution:
Distribution:
RO Chief, FS&EB R0 Chief, FS&EB RO:HQ (4)
RO:HQ (4)
Licensing (4)
L:D/D for Fuels & Materials DR Central Files DR cantral Files RO Files RU Files
)
.
'
\\
.
6!
'
.s.
--
..
_-
-...
.
.
-
.
.
.
-.,
_ e