Insp Rept 50-322/90-02 on 900506-0825.No Violations Noted. Major Areas Inspected:Facility Tours,Open Item Closure, Staffing & Qualification Review,Fuel Movement & Insp, Physical Security & Review of Licensee Repts
ML20059M502
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/20/1990
From: Doerflein L, Norris B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20059M501 List:
References
50-322-90-02, 50-322-90-2, NUDOCS 9010040312
Download: ML20059M502 (103)


Text

'

c

U. S. NUCLEAR REGULATDRY COMh1ISSION i

.

i

REGION I

,

DOCKET / REPORT No.

50 322/90-02 LICENSE No. NPF 82

LICENSEE:

Long Island Lighting Company

)

P. O. Box 618, North Country Road

Wading River, New York 11792 j

FACILITY:

Shoreham Naclear Power tation j

DATES:

May 6 August 25,1990

.-

INSP?CTORS:

S. Brown, Project Manager, NRR E. Conner, Risk Engineer T. Dexter, Physical Security inspector

!

L Doerflein, Section Chief, RPS2B E. Trottier, Project Manager, NRR B. Norris, Project inspector (Shoreham)

J. Nakoski, Reactor Engineer

,

PREPARED BY:

AY

/d/499

'B. S. )(elrris Date'

'

ProjeYt Inspector (Shoreham)

APPROVED BY:

N/

c#v d fo'

L T.

o flein, Chief Date '

~~

Rea or 'rojects Section 2B Division of Reactor Projects

AREAS INSPECTED:

Routine, on site inspection by members of the Region 1 office and NRR staff consisting of facility tours, open item closure, staffing and qualification review, system layup review, maintenance observations, fuel movement and inspection, physical security, and review of licensee reports.

i l

901004031{ % hh 2 pog ADOC PDC 1-

p

e

'

p; V,

(ff p~

2.x f

EXECUTIVE SUMMARY FACILITV STATUS Shoreham Nuclear Power Station is shut down and defueled. The licensee continues to maintain the facility in a manner consistent with the status of the plant. Housekeeping within the plant is' improving. During the month, there:was a specialist inspection of the physical security program at Shoreham; no significant findings were identified. The NRC has approved a revised Emergency Plan and Fitness for Duty program consistent with the current status of Shoreham.

SURVEIII ANCE AND MAINTENANCE Ieng Island Lighting Company (LILCo) reported that two facilities have expressed an interest in purchasing the fuel. Based on that possibility, LILCo conducted an inspection

.

of four fuel bundles. The inspections of the fuel bundles were performed jointly by LILCo and General Electric. The preliminary realts showed the fuel to be in good condition.

LILCo has completed removal of the fuel support, ieces, the control rod blades, and all of thc incore nuclear,nstrumentation. Care was taken during all of the above activities to limit -

the radioactive exposure to personnel during the removal process.

Emergen,y Diesel Generator maintenance and a station battery surveillance were monitored during 'ne inspection period.' All work was conducted in accordance with the appropriate proces.nr s, ed the personnel were experienced and qualified. When necessary, work was e

stopped to allow Quality Control personnel to inspect the work.

LILCo has established a ecmputer system for tracking the Technical Specification Limiting

.

.

Conditions for Operation entered due to the status of the plant. A review of the system-revealed no inconsistencies with the actual plant status.

STAFFING AND OUALIFICATION REVIEW The senior manager on site, Mr. JVilliam E. Steiger, was replaced by Mr. John D. Leonard.

Mr. Leonard had been the senior.nanager prior to Mr. Steiger. Mr. Leonard will maintain his position of the _ Office of Corperste Services in addition io the Office of Nuclear. The position of the Operations Division..lanager was filled by Mr. Joseph Wynne. Additionally, LILCe baformed the NRC that two positions described in the Updated Safety Analysis

. Report had been eliminated from the LILCo organization; the Outage and Modifications Division Manager and the Outage Engineer, i

l

-

-

-

.

,,

-

.._

o'

'

.

,

-

,.

!

.

T The number _of-personnel assigned to tlie Shoreham station is relatively stable, and the

~

' qualifications of the personnel appear to be above average for current plant conditions

.

LILCo has proposed changes to the licensed operator requalification program and to the

.

operators' licenses to reflect the actual status of Shoreham.

_QllALITY VERIFICATION I

The Quality Assurata e and Quality Control organizations continue to perform the necessary.

audits and inspections to ensure that activities are being conducted in accordance with

?

approved procedures and the license.

. MANAGEMENT MEETINGS AND PRESENTATIONS

,

Numerous meeting and presentations.have occurred during this reporting period. The meetings included a public meeting where LILCO, the Long Island Power Authority (LIPA)

and the New-York Power Authority (NYPA) briefed NRC senior management as to the

organization, engineering capabilities, end the financial qualifications J LIPA; and a

!

'

workirig mechng between the NRC and LILCo to resolve the NRC staff comments on the

-

proposed Defueled Technical Specifications. In addition, following a teu of the facility,

the responsible Branch Chief and Section Chief were given an informal presentation by

LILCO on the system layup program and the site characterization program, c

  • ?

g-i h

'

L i

u

'

l'

lIl

,

.

!

..

i

I.

ii

.i'

-

,

i

)

. N I.,

4?',t..

_.

.

_1

_

m1

,

t 4n

,

SUMMARY AND CONCLUSIONS i

i

'

o INITIAL ACTIVITIES RELATED ?C LICENSE TRANSFER AND DECOMMISSIONING PLANNING AdE NOW UNDERWAY

>

,

i o A LICENSE TRANSFER APPLICATION is UNDER PREPARATION AND WILL BE SUBMITTED TO NRC IN JUNE 1990

'

o CHANNELS OF COMMUNICATION BETWEEN NRC AND LlPA/NYPA NEED TO BE ESTABLISHED AT THE EXECUTIVE AND WORKING LEVELS o LIPA AND NYPA INTEND TO WORK CLOSELY WITH NRC TO ASSURE THE SAFE MAINTENANCE AND DECOMMISSIONING

OF SHOREHAM,IN ACCORDANCE WITH ALL APPLICABLE REQUIREMENTS, AND WITH THE MUTUAL OBJECTIVES OF

'1 PROTECTING THE ENVIRONMENT AND THE HEALTH AND SAFETY OF THE GENERAL PUBLIC AND PLANT PERSONNEL

.

>

l

'

s l

'

l

\\

. - -

-

- -. -

-

-

- -

.

-.. _ _ _ -.-

-

_

_ _ - -

- - - - - - -

..

,

.

.

..

i a

I i

!

i

i

Attachment 5

,

l LILCo

i t

l Internal Presentation

.

'

>

'

,

,

i

,

. -, -

e.

-.

., _..

-

-

-.. _.

,_.,,,...__..,.,,,,,.__._...._.%.,___-#

,.. _.... _.,,....,..

.,,_.,.,_......._,

._ -. _. - - _ _ - _ -.. _ - -

_ - - - -.

. -

- - -. -

.

.

CHRONOLOGY OF RELATED EVENTS

'

l

'

i M4 5, 1990 LILCO SUBMIT 8 A REQUEST FOR A "DEFUELED OPERATING LiCEN8E'

WITH DEFUELED TECH. SPEC 8.

,

APR.

16, 1990 LILCO SUBMITS A DECOMMISSIONING REPORT PREERED BY Lim IN CONSULTATION WITH NYPA.

JUNE 5, 1990 IN A TELEPHONE CONFERENCE CALL

'

THE NRC ASK8 LILCO IF THEY

'

WOULD OBJECT TO NRC

!

-

!

PROCESSING LILCO'8 JAN. 5, 1990 l

'

REQUEST A8 A REQUEST FOR A POSSESSION ONLY LICENSE.

LILCO l

DOE 8 NOT OBJECT.

JUNE 27,1990 NRC SUBMITS COMMENTS 'ON THE JAN. 5,1990 DEFUELED

TECHNICAL SPECIFICATONS.

'

.

JULY 10,1990 LILCO ACTION PLAN AGREED UPON AT INTERDEPARTMENT MEETING.

,

PLAN (1) IDENTIFY UNACCEPTABLE

,

COMMENTS AND (2) USE DSAR FOR A TECHNICALLY CONVINCING

'

ARGUMENT.

!

JULY 13,1990 NRC LETTER DOCUMENENG TH9

'

i JUNE 5 TELEPHONE CONVER8Ki10N.

,

OsTTS.1 i

i

,$

, _ _

... _.... - _. _..,,,

._._._,..._,,.,.,,......,_.._,.._._,_,._,..,,.-,,..,.______._,__...7

, --

._

- _ - - - - - _ - _ _ _ _ _ _ _ _ _ _ _ _.

_

..

,

'

CHRONOLOGY OF RELATED EVENTS

'

,

,

JULY 19,1990 LILCO CATEGORIZE 8 NRC COMMENT 8;

!

DISCUSS AND ASSIGN RESPONSIBILITY POR RESOLUTION OF UNACCEPTABLE

.

'

'

COMMENTS.

,

JULY 26,1990 RESPONSIBLE PARTIES PRESENT AND DISCUSS ARGUMENT 8 WHICH WILL BE USED TO CONVINCE NRC STAPP TO

>

ACCEPT THE ORIGINAL JAN. 6,1990 SUBMITTAL.

JULY 27,1990 COMMUNICATE TO NRC LILCO'8 IDEA 8, COMMENTS ETC. ON MARKED UP

.'

TECH. SPEC.

AUG. 2,1990 MEETING WITH NRC-ROCKVILLE, MD.

LILCO'S UNDERSTANDING OF THE APPLICABILITY-

<

)

'

OF THESE 'DEPUELED TECH. SPECIPICATION8

'

i

  • WILL BE ISSUED WITH OR BEFORE THE POL TO LILCO e WILL BE IN EPPECT UNTIL EITHER 1. LICENSE TRANSPER OR

-

2. PUEL 18 REMOVEO FROM THE REACTOR BUILDING (EXCEOT F R SEALED 80VHCES AND LIQUID HOLDlli TANKS).

DEFTS t

_

u

.

... --.,-. _,,,-__-_._.-. _. _ -..- _._ _...... -.. _ -. _ _. _ -. _ _ _. _ _.

.

..--..

.

_.

. _ _ _ -

. -. -

- -

. -. - -... - -. _.

..-

.

.

i

'h'

f

.

_

'

.

CHRONOLOGY OF'RELATED EVENTS a

g-i LILCO'8 UNDERSTANDING OF THE POL i

POL WILf, iAOK LIKE THE-DOL SUBMITTED

'

JAN. 5, ii,90.

l.

.

POL WlLL NOT CONTAIN LICENSE CONDITIONS

PERTAINING. TO TDI DIESEL GENERATOR 8 OR i

EMERGENCY PLANNING.

>

POL MAY BE ISSUED AFTER-THE DEPUELED

+:

TECH. SPECS.

.

g'6

- DEFT 8.6

...

.

,

. _

_

~

.

.

..

..

..

..

.

-

..

.

'

SIGNIFICANT NRC COMMENTS:ON DEFUELED TECH. SPECS.

-

,

'

ALL COMMENTS ARE NEGOTIABLE ADDED TWO NEW DEFINITIONS

  • DEFUELED MODE
  • FUEL HANDLING OPERATIONS i

,

APPLICABILITY SECTION 3/4.0

  • DELETED 25% MARGIN FOR SURVEILLANCE

,

  • ADDED STANDARD 181/18T SURVElLLANCE

'

PARAGRAPH -

"

ADMINISTRATIVE MATTER 8

  • ADDED WiCH ENGINEER. BACK INTO.

j ADMIN. SECTION (SHIFT COMPOSITION)

  • ADDED

'V. bv0AD * LICENSED" OPERATOR I'

  • ADDED.

HE ' _TH PHYSICS TECH TO ON-SHIFT Ju.f.'JS1 TION

,

L e' REMOVED Ai.L REFERENCES TO THE D8AR l

SUB8TITUEO AN8! N18.1

-

1971 5 noennee_,

L

~

-

..

.

.

.. - -

..

.

-_

_

. _ - _ - _ _ _

- _ - _ -

- - - - -.. -. _. - - -

.. ~

. _. -

-

L:.

.-

o

.

SIGNIFICANT NRC COMMENTSLON

p DEFUELED TECH. SPECS.

l

!

'

INCREASED APPLICABILITY FOR SOME LIMITING CONDITIONS BEYOND JUST r

"WHEN MANQl.iNG IRRADIATED. FUEL..."

BY ADDING 'DrsFUELED MODE, WHEN..."

ADDED THE' REQUIREMENT FOR ONE DIESEL GENERATOR DURING FUEL HANDLING

OPERATIONS. REQUEST THAT WE SUBMIT A. SURVEILLANCE REQUIREMENT -FOR REVIEW & APPROVAL I

,

ADDED D.C. SOURCES e

FIRE : PROTECTION ELEMENTS

(DETECTOR 8, YARD HYDRANTS)

RETS

R.

_B. AUTOMATIC 180LATION WLVES

R. B. 8. V. 8.

  • CHEMISTRY

q AREA TEMP MONITORING

neenasa_n-

.

-.

--

.. -

.

A

~

-.

-

..

'

.

15tOS OF M JtLY 19,1990 EETING-

-

Category 1: Accept As-Is'

Cittan y 2: Accept As Modified.

Ceix9ury 3: lTimu.tvidste

-

Omment ID No.

T.S. Page T.S. Section Agreed lban Category Primry Respui61bility-1.

1-1 1.1

NDSD

2.

1-1 1.5 (new)

NOSD 3.

1-2 1.6 (new)

Plant Staff 4.

3/4 0-1 3.0.1

5.

3.0.2

"

6.

3.0.3

Plant Staff

"

7.

4.0.1

"

8.

4.0.2

Plant Staf7

"

9.

4.0.3

"

10.

4.0.4

Plant Staff-

"

11.

4.0.5 (new)

POSD

"

l 12.

3/4 1-1 3.1.1.2

l 13.

3/4 1-2 T3.1.1.2-1

NOSD l

j-14.

3/4 1-4 T3.1.1.2-1

Plant Staff 15.

3/4 1-5-T4.1.1.2-1 2.

Plant Staff

&

a

_

z.

'

.. _..,

. ~

..

._,

.,

.. -

.

_

.....

,

. _. -..

.

..

...

.

... _

^

~

ESILTS T TIE JlLY 19,1990 EETIE

_

Gh:9ury 1: Accet As.Is Caireury 2: Accet As Modified Cah:sury 3: thaccetable O ment

.-

Agreed lban Category Prinety Rt=surc,1bility ID No.

T.S. Page T.S. Sectim 16.

3/4 1-6 3.1.1.3

17.

3/4 1-9 3.1.1.4

18.

3/4 2-1 3.2.1.1

ED

,

h 19.

3/4 3-1 3.3.1

Plmt Staff 20.

3/4 3-3 3.3.2.1

  • 21.

3/4 3-4 3.3.2.2

22.

3/4 3-5 3.3.2.3 1.

23.

3/4 4-1 3.4.1 & 4.4.1

ED 24.

3/4 4-2 3.4.2

Plant Staff 25.

3/4 8-13 3.8.2.2 (Added)

ED

,

26, 3/4 5-1 3.5.1

Plant Staff

'

27.

3/4 5-2 3.5.2

PlantStaff 28.

3/4 5-4 3.5.3

29.

3/4 5-5 3.5.4

30.

3/4 3-81 thru 3-93 Fire Det. & ETS(Added)

NOSD

.

I

- - - -,.

g 9%

~

.w m.e-3p y m g ~

~~

.

ESltIS (F TE JLY 19,1990 EETIIG Category 1: Accept As Is :

Caiss e 2: Accet As Modified Category 3: timar.tvidste ~

o Connent ID No.

T.S. Page T.S.'Section.

Agreed (bon Category _Prinary Responsibility

,

31.

3/4 4-13 thru 4-15-Onnistry (Added)'

Plant Staff 32.

3/4 6-38 8 39 R.B. Auto Iso. Valves.(Added)

ED

,

33.

3/4 6-40 thru 6-42 RBSVS (Added)

ED

.

34.

3/4 7-22 thru 7-24 Fire Protection-(Added)

NOSD 3/4 7-32 thru 7-34 35.

3/4 7-36 8 37 Area Teno Monitoring (Added)

Plant Staff

36.

3/4 11-1 thru ETS (Added)

NDSD 3/4 12-11'

37.

6-1 6.1.1

.,

38.

6-1 6.1.2

Plant Staff 39.

6-1 6.2.1 2.

NOSD 40.

6-1

~6.2.la

,

41.

6-1 6.2.lb

,

F

.

.

_

,

. - -,

. _.;

_c.',_

-.- _ __

_

..,,. _.. _,

_

'

..

.

_

-

....

_.

,

,

.

_ _ _ _. -... _ _ _ _.. _.

,

'

EStA.TS G TE JtA.Y 19,1990 NETIE Category 1: : Accept As Is.-

Cait:9ury 2: Accet As itxlified:

Cairvory 3: tina.uvidsle Camerit

- ID No.

T.S. Page T.S. Section Agreed Ltxxi Ca gory Prinary Re:su61bility w

42.

6-1 6.2.lc

43.

6-2 6.2.2

44.

6-2 6.2.2a

Plant Staff'

45.

6-2 6.2.2b

Plant Staff 46.

6-2 6.2.2c

47.

6-2 6.2.2d (Added)

NDSD

.

48.

6-2 6.3.1

Plant Staff

-

49.

6-3 6.4

Plant Staff 50.

6-4 6.5.1.5

Plant Staff 51.

6-5 6.5.1.8

52, 6-6 6.5.2.3

53.

6-7 6.5.2.7(a)

54.

6-10 6.7.3(b)

Plant Staff

,

.

..a.w

-,. _ _,,._

..._._a_,*

--

-

. - _ -

.-

--.

.. -

.-

.

. _ _ _

.

.

' SUMMARY OF RESULTS

!l

,

ACCEPT A818 21:

.

ACCEPT A8 MODIFIED

l UNACCERTABLE

9 TOTAL

'

,

~

e

-

,

j; i-l-

,

'

L i

l

{:,

'

1; l

'

DEFT 8.6

>

+

g

-

+,,a-s,-..-

w-


,

--

%

-,e

_-

.

...

-. -.._ - -. -

. -. -

-. -

.

. - -.

'

.:

r

.

.

.

.

.

SIGNIFICANT NRC COMMENTS

'

. CATEGORIZED UNACCEPTABLE

  • DELETION OF.THE 25% SURVElLLANCE

'

TEST MARGIN ACTION-PLANT STAFF

.

.

  • - ADDITION OF 181/IST SURVEILLANCE REQUIREMENT ACTION-NOSD

-

'

  • ADDITION OF ONE DIESEL GENERATOR ACTION-NED

,

l l

  • - ADDITION OF D.C. SOURCES

.

i ACTION-NED ADDITION OF FIRE PROTECTION e

PROGRAM ELEMENTS ACTION-NOSD

  • - ADDITION-OF RE18 ACTION-NOSD

+ ADDITION OF R.B. ISOLATION VALVES

,

i ACTION-NED-

  • ADDITION' OF RB8V8 ACTION-NED

'

DEFT 8 d j

,

.

-,.,

.,........

.

.

.

.

..

.... _- -..

-

-

_

.

-

..-_----.

.

..

'

s

>

j-

,

..

>

y ji u

o

,

,

!

'r Attachment 6

'

Licensed Operator L

Requalification Program

.

W us

\\

l ')

f

?

l.

?

I l

i

.t.

.

..

.

.

, _ - - - - - _

-

- -. -

.-

-

.

.

- '

.gg_:.:

.

.-

.

'

-

........

t LILCO PRESENTATION TO NRC

,

.

..

LICENSED OPERATOR REQUAL TRAINING

.,

I

<

.

.. July 31,1990

.

.

I'

.+

..

.

-

c

,

-

!

OBJECTIVE

.

.

-

,

h

=Present License RequallProgram Applicable to. Current

-

Shoreham Plant Status.

.

l t

.;

!

i

-

,

l

,

[

,

.!

!-

l

[

.b

,

f-i

,

!

I

-

!

.

!

._-..:______-_-____-____--_-.____*.___-_--.-_.,,~,.-

.. d

-

-

.

.

.-

-

.

-

-

-

.

-

-

.

-

-

-

_

..

g

'

.:

y

~

g

-

.

.

n

-

,

PRESENT PLANT STATUS

.

!

1)

LILCO has an agreement with New York State not to operate the plant.

.

2)

LILCO ~has committed to the NRC not to move -fuel l

bacik into the reactor.without prior NRC approval.

^

On March 29,1990, the NRC sent LILCO. a

!

!

Confirmatory Order Modifying License to this effect.

.

-

.

I 3)

LILCOlis maintaining all systems require'd'by

_

'

Shoreham. Technical Specifications in an

operable state.

!

-

,

,.

4)

All other-systems are being maintainedLin a

.

protected. state.

.,

__

_-

_

~.

.

b.

.

.

.

-

-

JP

.

.

.

.

,.

g

.

g u

.

n.

.

-

v

..

I GENERAL OVERVIEW

.

..

.

e PRESENT PROGRAM

!

.

Classroom Lectures -

60 Hours Per Year..

..

Simulator. Training

-

-48 Hours Per Year.

Lecture. Exams Given Every 24

-

Hours of Classroom i

'

-

Lectures.

!

l Annual Exam Written

-

Simulator

!

Walkthru l

!

'(New Style in 90)

j

.:

~

l

!

!

-

j l

-

l

,.

=

.._

..

.#..

_

.

.

.

.

..

.

t

.

.

_

.

.

-

.

,,

...

_

,

_~

~

.&

&:

GENERAL PROPOSAL

,

i

~!

Use the recent Reactor Operator and Senior Reactor

-: {

Post Settlement. ' Job' Surveys to guide the Requal Program.

-The results of these surverys are:

I

i Effects on Task List

.

}

-

.

Power : Defueled : Deleted :. Added l

ops

-

RO 417~

196-

226
5

'

.

J SRO

66.
5-
O l

.

i

'

-

~

,

t i

!

'

.

.

_-

__-

. _

. _ _

..

_

_

.. _ _

~__

.

_

_......

...._..

_.. _ _...... _..

.. _............. _ _ _..

g

~

ig.

,

g

-

..

-

.

- _

.

,

~ SPECIFIC PROPOSAL (1)

^

-

l 1) Delete requirement for 10 Annual Reactivity

~

Manipulations.

~

2) LILCO to modify USAR, Licensed Operator lRequalification

~

Program ( 12.014.07): Station Procedure.

.

LILCO to write exemption from'10CFR55.59 control

~ manipulations.

.

(See Attached Markups.) USAR

-

SP12.014.07

-

10CFR55.59

-

,

3)

Basis

~ LILCO has no future plans for any Reactivity.

l

'

Manipulations except in fuel pool. ~LILCO has an

'

agr' ement with NYS not to operate the plant.

LILCO has e

.

l l

the -March 29,1990 NRC. Confirmatory. Order. Modifying l

License which requires LILCO. to get NRC approval prior-to placing fuel in-reactor.

.

'

,

_

m

-

...

~l

.. '

.

.a

.

....

-

-. - - _

-

- - - _ -

-

,

-

j

+

'

.r.

g-

-

g g'

-

SPECIFIC PROPOSAL (2)

'

.

i 1) Reduce the control manipulations-required for.Shoreham License.Requal in accordance. with present RO and SRO Post Settlement Task Lists.

j

'

e

.;

'

2) LILCO to write exemption per attached markup of i

I

a. Licensed Operator Requalification Program (12.014.07)

i

' Appendix 12.2

'

!

t b.

Marked up copy 10CFR55, 59

'

c.

USAR 13.2, 2,1.7

!

i i

Operator Requalification Control Manipulations i

3) Basis - LILCO has no future ~ plans-for the deleted

control manipulations. LILCO has an agreement with NYS j

.

not to operate;the plant. LlLCO. has the March 29,1990 i

NRC Confirmatory Order Modifying: License..which requires

'

l LILCO' to get.NRC' approval prior to placing. fuel in

,

reactor.

.

!

!

_.

.. _

_

~...

.,.

.

.4.-,

.e,

.... ;. _ _...._-~-,.._ _

.......

-.. -

.

... -.

..

...

'

._

_ _ _ _

--

.

.

-

-

+ ;.

y_

q c)

.

,

.

+

.

L SPECIFIC PROPOSAL (3)

1)

Eliminate Simulator Training.

~

2)

LILCO toisubmit revised Licensed Operator Requalification Program (12.014.07) and

.USAR (13.2.2.1.6)

3) Basis - LILCO's reduced task list for Rd and SRO j

positions no. longer-supports Simulator Training.

.

i

.

,

,

'

I

.

-

i

i

"

.

,

'

i i

r b '

.

...

.

-

-

.

..

-

-

-

-

- -

,

-

-

-

_

_

.

~

~

+1 - #

~

'

-

.

SPECIFIC PROPOSAL (4)

.

-

1)

Focus Annual Exams.on RO. and SRO Post Settlement j

Task Lists.

'

.

!

2)

LILCO to submit revised Licensed Operator Program

'

l Station Procedure-(12.014.07).to NRC.

3)

Basis - This will focus training program on actual job responsibilities in accordance with 10CFR55.59.

.

o

,i

-

.A aa y

_y

..-

u g

w g

. +

ggi.

_________,__,_3 e*mm

&

l

-

.

-. -

. -

- - -. -

.

-.

-

- _.

.

\\

n v.ii

'

)

,

u

,

m

.

b

7.<

k r

-

,

s i

a-a f

t

'

T

'

L

.

Attachment 7 a

i LILCo Drop-in Visit;

.. '

.

'l i

-

l ll

4,

........

.,

..

... -.....

.

..

- _ _ - - _ - - - - - - - _ _ - -

,,

.;

s Osonq e

$

k UNITED STATES

NUCLEAR REOULATORY COMMISSION 5'

'b

REOiON I 476 ALLENDALE ROAD

' e * * *,o KING OF PRUSSIA. PENNSYLVANIA 19406 Docket No.

50-322

'

Long Island Lighting Company ATTN: Mr.-John Leonard Vice President - Nuclear Operations Post Office Box 618 Shoreham Nuclear Power Station Wading River, New York 11792 Gentlemen:

We appreciated the brief remarks on status and schedules you provided to the Regional-Administrator and me during your drop-in visit at NRC Region I on July 31, 1990.

Enclosed is a summa y of our. discussion - please contact me promptly if you note any errors in-this summary.

Sincerely, Q

e A..Randolph Blough, Chief Reactor Projects Branch No. 2

'

-Division of ReactorLProjects Enclosupe:

As stated cc s/ enc 1:

L. Calone,-Plant Manager R..Gutmann, Manager, Nuclear Operations Support

.

R._Kascasak, Manager, Nuclear Engineering-J. Futter, General Counsel Wi Maloney,. Manager, QA Department Director, Power Division State of New York, Department of Law iShoreham Hearing Service List Public' Document Room (PDR)

local -Public Document Room (LPDR)

' Nuclear Safety Information Center (NSIC)

NRC Resident' Inspector State of New York

= _ - _ -

-

_

T,y.,

._. _.. _ _ _...

9; I

1 s ENCLOSURE Drop-In-Visit from LILCo Vice President.

On July 31, 1990, Messrs. John Leonard (Vice President, Nuclear Operations) and-Len Calone (Shoreham Plant Manager) from LILCo visited NRC Region I on short notice'

They met with Mr. A. R. Blough, Reactor Projects Branch Chief, at

.

9:30 a.m. and with Mr. T. T. Martin, Regional - Administrator, and Mr. Blough from 10:05 to 10:20 a.m. _ Mr. Leonard had wanted to make this courtesy call--

because he is again more involved at Shoreham since.Mr. Steiger's transfer to

,

Engineering. Messrs. Leonard and Calone briefly discussed status and schedules

for the following:

Decon of plant systems - projected to begin in September for nine systems

--

containing about 50 millicuries; Fuel bundle examinations preparing now; plan to keep NRC Project

--

--

inspector informed of progress; Operator Licenses and Training -- meeting with NRC Region I Division of

--

Reactor Safety, July 31, 1:00 p.m.;

Defueled. Tech. Specs -- meeting at NRC Office of Nuclear Reactor Regula-

--

tion, August 2;

License transfer request -- submitted. late June;

--

NUMARC group-on decommissioning of Rancho Seco, Fort St.-Vrain and

--

Shoreham -- LILCo attending August 23 meeting; and, Filling vacant Operations Manager position -- selectee is licensed SRO and

--

tr3nsfers from Training to Operations August 1.

No technical, licensing or unresolved items were discussed. substantively.

,

h

_ - _ _ _. _ _. _. _ _... _. _. _ _. - _ _. _ _ _ _.. _. _ _ -

_m-

-

-