IR 05000288/1985002
| ML20126F473 | |
| Person / Time | |
|---|---|
| Site: | Reed College |
| Issue date: | 06/10/1985 |
| From: | Norderhaug L, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19344C040 | List: |
| References | |
| 50-288-85-02, 50-288-85-2, NUDOCS 8506170492 | |
| Download: ML20126F473 (1) | |
Text
,
,
,,
'
'
.,n
- .
3, i
\\
~ "A!ERdl IRANT'!TTrp mT~3"m m" 'T
'
Zla0 lidORidAllDa
"'
+
-
.
Thesinformation.on.this page,is considered to be appropriate for public disclosure, pursuant to 10 CFR 2.790.
<
.
'
'
-
-
,
,
,
'
),U.
S.'
NUCLEAR REGULATORY COMMISSION
"
'
REGION V
,
'
,
Report No.: 50-288/85-02 (IE-V-693)
Docket No.: 50-288 i
License No. R-112
,
Licensee: Reed College 3203 S. E. Woodstock Street Fortland, Oregon 97202 Facility Name: Reed College Reactor Facility Inspection at:
Portland, Oregon Inspection Conducted: May 22 and 23, and June 5, 1985 Date of Last Physical Security Inspection Visit: March 23 and 29, 1982 Type of Inspection: Unannounced Physical Security is N'A 7 Inspector:
.4
.
,.a-
L. R. Norderhaug ('j C) ate Signed Sr. Matgrial Control AnalysF MJJ b kf;
[ ~
[ C/M I
Approved by:
M. D. Schuster, Chief Date Signed Safeguards Section Inspection Summary:
Areas Inspected:
Included site orientation and review of Security Plan and Implementing Procedures; Security Organization; Records and Reports; Physical Barriers -- Protected Areas, Material Access Areas and Controlled Access Areas; Lighting; Assessment and Surveillance Aids; Communications.
The inspection involved 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by one NRC inspector. The inspection was begun during an off shift period; one inspection manhour was accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the 7 areas examined, h$f$h j
G
"ATERIAl, IPfM"I!Ti!D NM T~
220 iniORMAlluli
.
-
.
-
-