Grants Permission to Restart Geological Survey Triga Reactor Based on Results of Insp Rept 50-274/88-01 on 881110
ML20206H047
Person / Time
Site: U.S. Geological Survey
Issue date: 11/17/1988
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millard H
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
References
NUDOCS 8811230072
Download: ML20206H047 (1)


Text

._ _ - -_ _ -_____ _ __

p

, , c. ,

,

'

.

'

-

NOV I 7 1988 In Reply Refer To:

Docket: 50-274/88-01

.

U.S. Department of Interior Geological Survey .

ATTN: Dr. Hugh T. Millard, Jr.

Reactor Administrator P.O. Box 25046.- Mail Stop 424 Denver Federal Center Denver, Colorado 80225 Gentlemen:

This refers to your October 25, 1988, letter and our November 10, 1988, letter regarding restart of the Geological Survey TRIGA reactor. Based on the results of our inspection ronducted on November 10, 1938, we find that your program is in a proper state to allow restart of the reactor. Accordingly, permission is granted to restart the reactor.

As discussed during the inspection exit briefing on November 10, 1988, you are to inform this office af ter the fit st week of reactor operation concerning:

(1) radiation levels present near the top of the annulus between the old and new liners, and (2) any increase in pool water temperature that resulted from installation of the smaller new liner.

If you have any questions, please contact us.

51ncen1y,

,, , , , , , , , , ,

delginal n!@ 53 3ehn K & ats*=ery, insberLn M r. tin Regional Administrator bec to DMB (IE01)

bec:

R. Martin Inspector (s)

C:RPSB-DRSS A. Adams, NRR Project Manager ORP Lisa Shea, RM/ALF RIV File MIS Coordinator RSTS Operator DRS

R. L. Bangart, ORSS C:FRPS R. Hall-DRSS RP3-0RSS B. Murray

'

RIV:RFB V D: C:0LS R$y BMurray/ sir fRBah rt JPeletM PX/r)1 n

/88 $/%/88 11 / l / 8 8 ll /g /88

%

[ $OOck b! C

_

_ .__ . _ - - _ _ _ - _ _ _ - _ _ - - -

(

f . .

I i' NOV I O 1988

.

} In Reply Refer To:

Docket: 50-274

.

U.S. Department of Interior Geological Survey ATTN: Dr. Hugh T. Millard, Jr.

Reactor Administrator P.O. Box 25046 - Mail Stop 424 Denver Federal Center Denvec, Colorado 80225 Gentlemen:

This refers to youe October 25, 1988, letter requesting permission to restart the geological survey TRIGA reactor. As you know, we plan to be at your facility on November 10, 1988, to review your pre-startup program following the replacement of the reactor vessel liner. Based on our inspect %n findings, a decision will be made concerning restart of the reactor. If no significant problems are identified, we anticipate that perrrission *o ope-ste the reactor could be granted on or soon after November 16, 1988.

If you have anv questions, please antact us.

Sincerely, Or!Ginal signed byn Robert D. Martin Robert D. Martin Regional Administrator bec to DMB (IE01)

bec:

R. Martin D. Chaney C:RPSB-DRSS A. Adams, NRR Project Manager

> DRP Lisa Shea, RM/ALF

'RIV File ' MIS Coordinator

'RSTS Operator 'DRS R. L. Bangart, DRSS C:FRPS

'R. Hall-DRSS RPB-DRSS RIV:FRPS: FRPS:RP C:RPB RA DChaney/ sir RBaer BMurra) t t RMar in g/0(/88 W/p/88 ([ /p /88 ll 4T/88 A/10/88

$Y Og t \ a % lo.'

O N

_ _ _ - _ _ _ _ _ _ _ _ _ _ _

.

g United States Department of thd Iggggnlygg GEOL (Xi! CAL SURVEY ,

", j i

. nox 25ao ns. 424 l

'

DENVER FEDERAL CENTER i! OCT 2 81988 DENVER. COLORADO 80225 0(H6 !' ! ,

n ee rn ..... ni

...

October 25, 1988 Docket No. 50-274 License No. R-ll3 Robert D. Martin Regional Adininistrator U.S. Nuclear Regulatory Cossaission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Dear Sir Subject: Restart of the Geological Survey TRIGA Mark I reactor (GSTR) .

Reassembly of the GSTR is progressing well and we expect to be ready for the initial startup operation on November 7, 1988. This letter is to formally request permission for resuming operation of the GSTR. If you desire to inspect the facility, we ask that you be prepared to do so by Mr 7. Wis would result in mini.nal delay in our operations. It also seems likely at this time that the installation of the new control console will be delayed beyond November, 1988.

Sincerely, 1 1 % . }/

Vi7//////dl Qf'

Hugh T. Millard, Jr.

Reactot Adininit.trator copy to:

Mr. Blaine Murray, Region IV, U.S.N.R.C.

Mr. Russell Wise, Region IV, U.S.N.P.C.

Mr. Alexander Adams, NRR, U.S.N.R.C.

i

.

i pH p. 2 cote

_ - - __ -__

. _- __ - -