IR 05000225/1980003
| ML19310A866 | |
| Person / Time | |
|---|---|
| Site: | Rensselaer Polytechnic Institute |
| Issue date: | 05/13/1980 |
| From: | Devlin J, Hawkins W, Ladun R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19310A862 | List: |
| References | |
| 50-225-80-03, 50-225-80-3, NUDOCS 8006300610 | |
| Download: ML19310A866 (1) | |
Text
{{#Wiki_filter:i O - U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I i , Report No.
50-225/80-03 l Docket No.
50-225 Safeguards Group IIA License No.
CX-22 Priority Category F Licensee: Rensselaer Polytechnic Institute Department of Engineering and Science Troy, New York 12181 Facility Name: Rensselaer Polytechnic Institute Critical Facility Inspection at: Schenectady, New York Type of Inspection: Routine, unannounced Physical Security Inspection conducted: April 29-30, and May 1, 1980 Date of Last Physical Security Visit: February 20-23, 1979 Inspectors: #f#r[Mc.,, /
- 4 2 - 8 c)
R. H. Ladun, Physical Security Inspector Date W. C. Hawkins, Physical Security Specialist Date = - - ^ Date Approved byt fa
- -/d -70 J. JV. Devlin, Chief, Security and Investigation Date Aection, Safeguards Branch Inspection Summary:
Inspection on April 24-30 and May 1, 1980 (Report No. 50-225/80-03) Areas Inspected: Security Plan; Protection of SNM; Security Organization; Access Control; Alarm System"; Keys, Locks and Hardware; Communications; Surveillance; Procedures; Security Program Review; and Protection Against Radiological Sabotage.
This inspection was initiated during non-regular working hours, and involved twenty-four (24) inspector-hours onsite by one NRC regional based inspector and one Head-quarters based inspector; two (2) inspector-hours were accomplished during non-regular working hours.
Results: No items of noncompliance were identified in any of the eleven (11) areas examined.
Region-I Form 166 (August 1979)8006800 [[ ' , }}