IR 05000186/2012201
| ML121150004 | |
| Person / Time | |
|---|---|
| Site: | University of Missouri-Columbia |
| Issue date: | 04/26/2012 |
| From: | Johnny Eads Research and Test Reactors Branch B |
| To: | Rhonda Butler Univ of Missouri - Columbia |
| Bassett C, NRR/DRP/PRTB, 404-562-4899 | |
| References | |
| IR-12-201 | |
| Download: ML121150004 (32) | |
Text
April 26, 2012
SUBJECT:
UNIVERSITY OF MISSOURI - COLUMBIA RESEARCH REACTOR - NRC ROUTINE INSPECTION REPORT NO. 50-186/2012-201
Dear Mr. Butler:
On April 9-12, 2012, the U.S. Nuclear Regulatory Commission (NRC, the Commission)
completed an inspection at the University of Missouri - Columbia Research Reactor (Inspection Report No. 50-186/2012-201). The enclosed report documents the inspection results, which were discussed on April 12, 2012, with members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed of activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.
No response to this letter is required.
Based on the results of this inspection, the NRC has determined that one Severity Level IV violation of NRC requirements has occurred. The violation is being treated as a Non-Cited Violation (NCV), consistent with Section 2.3.2.b of the Enforcement Policy. The NCV is described in the subject inspection report. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, please contact Craig Bassett at 301-466-4495 or by electronic mail at Craig.Bassett@nrc.gov.
Sincerely,
/RA/
Johnny H. Eads, Jr., Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Docket No. 50-186 License No. R-103
Enclosure: NRC Inspection Report No. 50-186/2012-201 cc w/encl: See next page
University of Missouri - Columbia Research Reactor Docket No. 50-186
cc:
University of Missouri Associate Director Research Reactor Facility Columbia, MO 65201
Homeland Security Coordinator Missouri Office of Homeland Security P.O. Box 749 Jefferson City, MO 65102
Planner, Dept of Health and Senior Services Section for Environmental Public Health 930 Wildwood Drive, P.O. Box 570 Jefferson City, MO 65102-0570
Deputy Director for Policy Department of Natural Resources 1101 Riverside Drive Fourth Floor East Jefferson City, MO 65101
A-95 Coordinator Division of Planning Office of Administration P.O. Box 809, State Capitol Building Jefferson City, MO 65101
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611