IR 05000186/2006204
ML062860384 | |
Person / Time | |
---|---|
Site: | University of Missouri-Columbia |
Issue date: | 10/17/2006 |
From: | Johnny Eads NRC/NRR/ADRA/DPR/PRTB |
To: | Rhonda Butler Univ of Missouri - Columbia |
Voth M, NRR/ADRA/DPR/PRT, 415-1210 | |
References | |
IR-06-204 | |
Download: ML062860384 (18) | |
Similar Documents at University of Missouri-Columbia | |
---|---|
Category:Inspection Report
MONTHYEARIR 05000186/20242012024-05-29029 May 2024
[Table view]The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 IR 05000186/20232022023-12-12012 December 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 IR 05000186/20232012023-07-31031 July 2023 The Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 IR 05000186/20222022023-02-23023 February 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure IR 05000186/20222012022-06-14014 June 2022 The Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 IR 05000186/20212032022-03-0202 March 2022 The Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 IR 05000186/20212022021-05-28028 May 2021 the Curators of the University of Missouri - U.S. Nuclear Commission Routine Inspection Report No. 05000186/2021202 IR 05000186/20212012021-05-27027 May 2021 University of Missouri-Columbia U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000186/2021201 - Non-OUO-Sri Cover Letter IR 05000186/20202022021-03-12012 March 2021 University of Missouri - Columbia - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2020202 - Cover Letter and Enclosure IR 05000186/20202012020-07-10010 July 2020 University of Missouri-Columbia - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2020-201 - Cover Letter and Enclosure IR 05000186/20192012019-06-25025 June 2019 University of Missouri-Columbia - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2019-201 IR 05000186/20194112019-06-25025 June 2019 University of Missouri-Columbia-U.S. Nuclear Regulatory Commission Security Related Inspection Report No. 05000186/2019-411 (Cover Letter Only) - Public IR 05000186/20194102019-03-14014 March 2019 University of Missouri-Columbia - U.S. Nuclear Regulatory Commission Security Related Inspection Report 05000186/2019410 IR 05000186/20182022018-11-14014 November 2018 University of Missouri-Columbia - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2018202 IR 05000186/20182012018-08-30030 August 2018 University of Missouri - Columbia Research Reactor - NRC Routine Inspection Report 05000186/2018201 IR 05000186/20172032018-05-0303 May 2018 University of Missouri, Columbia - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-186/2017-203 IR 05000186/20172022017-07-27027 July 2017 University of Missouri Columbia Research Reactor U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-186/2017-202 and Notice of Violation IR 05000186/20172012017-05-0404 May 2017 University of Missouri, Columbia - NRC Security Related Inspection Report 05000186/2017201 IR 05000186/20170022017-03-28028 March 2017 Examination Confirmation Letter No. 50-186-17-02, University of Missouri - Columbia IR 05000086/20162032016-11-0909 November 2016 University of Missouri - Columbia - U.S. Nuclear Regulatory Commission Routine Inspection Report 0500086/2016203 IR 05000186/20162022016-04-21021 April 2016 University of Missouri Columbia Research Reactor U. S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2016202 and Notice of Violation, March 22-24, 2016 IR 05000186/20162012016-02-0505 February 2016 University of Missouri-Columbia - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-186/2016-201 IR 05000186/20132032013-12-0505 December 2013 IR 05000186-13-203 ;11/04/2013 - 11/07/2013; University of Missouri - Columbia - University of Missouri Research Reactor, NRC Routine Inspection Report IR 05000186/20132022013-08-0606 August 2013 IR 05000186-13-202, on July 8-11, 2013, University of Missouri, Columbia Letter for NRC Security - Related Inspection Report No. 50-186-13-202 IR 05000186/20132012013-04-15015 April 2013 IR 05000186-13-201 on 03/18/2013 - 03/21/2013, University of Missouri - Columbia Research Reactor, Routine Inspection Report IR 05000186/20122022012-06-29029 June 2012 IR 05000186/12-202 on June 4-6, 2012, at the University of Missouri - Columbia Research Reactor - Transmittal Letter for NRC Security-Related Inspection Report No. 50-186/2012-202 IR 05000186/20120012012-05-29029 May 2012 Letter Corporate Notification Letter, No. 0500186-12-001 University of Missouri Research Reactor IR 05000186/20112032011-11-17017 November 2011 IR 05000186-11-203 on October 17-20, 2011 at the University of Missouri, Columbia Research Reactor - NRC Routine Inspection Report No. 50-186/2011-203 IR 05000186/20080022008-06-17017 June 2008 Er 05000186-08-002, on 05/19-20/2008, University of Missouri - Columbia, Initial Examination Report IR 05000186/20072032007-10-16016 October 2007 NRC Inspection Report No. 50-186/2007-203 IR 05000186/20072012007-03-29029 March 2007 IR 05000186-07-201, on 03/19-22/2007, University of Missouri - Columbia IR 05000186/20062052007-01-31031 January 2007 IR 05000186-06-205, on 12/18-21/2006, University of Missouri - Columbia Research Reactor Facility IR 05000186/20062042006-10-17017 October 2006 IR 05000186-06-204, 09/25-28/2006, University of Missouri Research Reactor Facility IR 05000186/20062022006-09-22022 September 2006 IR 05000186-06-202, on 06/19-22/2006, University of Missouri IR 05000186/20062032006-08-23023 August 2006 NRC Inspection Report No. 50-186/2006-203. Cover Letter IR 05000186/20062012006-02-22022 February 2006 IR 05000186-06-201, on 01/09-18/06, Univ of Missouri-Columbia IR 05000186/20052012005-05-13013 May 2005 NRC Inspection Report No. 05000186-05-201, University of Missouri-Columbia, April 11-14, 2005 IR 05000186/19992011999-07-0101 July 1999 Insp Rept 50-186/99-201 on 990607-11.Violations Noted.Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program,Fuel Handling Program & Experimental Program IR 05000186/19982021998-12-21021 December 1998 Insp Rept 50-186/98-202 on 981116-20.No Violations Noted. Major Areas Inspected:Rp,Environ Monitoring,Transportation Activities,Physical Security,Matl Control & Accountability, Inspector Identified Violation Follow Up & Event Repts IR 05000186/19982011998-02-0202 February 1998 Insp Rept 50-186/98-201 on 980112-15.Violations Noted.Major Areas Inspected:Aspects of Organization,Operations & Maint Activities IR 05000186/19972011997-12-11011 December 1997 Safety Insp Rept 50-186/97-201 on 971103-07.Violations Noted.Major Areas Inspected:Transportation Activities, Radiation Protection,Environmental Monitoring & Inspector Identified Follow Up Items IR 05000186/19960011996-12-0606 December 1996 Insp Rept 30-32695/96-02 & 50-186/96-01 on 961104-08.No Violations Noted.Major Areas Inspected:Aspects of Organization,Periodic & Special Repts & Operations & Maint IR 05000183/19930041993-11-24024 November 1993 Forwards Insp Rept 50-183/93-04 on 931101-05.No Violations Noted IR 05000186/19930041993-11-24024 November 1993 Insp Rept 50-186/93-04 on 931101-05.No Violations Noted. Major Areas Inspected:Organization,Logs,Records,Review & Audit,Surveillance,Procedures,Experiments,Requalification Training,Fuel Handling Activities & Emergency Planning IR 05000186/19920021992-12-0202 December 1992 Discusses Insp Rept 50-186/92-02 on 920903-04 & Forwards Notice of Violation,Proposed Imposition of Civil Penalty & Demand for Info.Review of Circumstances Surrounding Inadvertent Switching of Two Aliquots Discussed IR 05000186/19920041992-11-25025 November 1992 Insp Rept 50-186/92-04 on 921102-05.No Violations Noted. Major Areas Inspected:Organization,Logs,Review & Audit Functions,Requalification Training,Procedures,Surveillance, Experiments & Emergency Planning IR 05000186/19900011990-10-0505 October 1990 Insp Rept 50-186/90-01 on 900815-1001.No Violations Noted. Major Areas Inspected:Records,Logs,Review & Audit Functions, Surveillance,Followup of LERs & Silicon Irradiation Program IR 05000186/19890011989-05-0404 May 1989 Insp Rept 50-186/89-01 on 890306-10.Violation Noted.Major Areas Inspected:Operational Safety Verification,Maint/ Surveillance Programs,Mods/Design Changes,Reactor Svcs - Irradiation of Samples & Products & Radiological Protection IR 05000186/19880031989-02-23023 February 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-186/88-03.Encl Evaluation of Severity Level Violation Designation Withheld (Ref 10CFR73.21) IR 05000186/19880041988-11-15015 November 1988 Partially Withheld Matl Control & Accounting Insp Rept 50-186/88-04 on 881027-28 & 31 (Ref 10CFR2.790).Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Control,Shipping & Receiving & Records & Repts 2024-05-29 Category:Letter MONTHYEAR05000186/LER-2024-003, University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.212024-10-25025 October 2024
[Table view]University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.21 ML24281A1322024-10-0404 October 2024 University of Missouri - Notification of NIST Award 60NANB23D160 NEPA Catex ML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 The Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 05000186/LER-2023-003, University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b2023-06-0606 June 2023 University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 The Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 The Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia 05000186/LER-2021-004, University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.102021-11-23023 November 2021 University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.10 ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel 2024-08-27 |
Inspection Report - University of Missouri-Columbia - 2006204 (Security) | |
---|---|
Assessments
|
Text
ber 17, 2006
SUBJECT:
NRC INSPECTION REPORT NO. 50-186/2006-204
Dear Mr. Butler:
This letter refers to the inspection conducted on September 25 - 28, 2006, at the University of Missouri Research Reactor facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of this inspection.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress. Based on the results of this inspection, no significant safety concerns or noncompliances of NRC requirements were identified. No response to this letter is required.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this inspection, please contact Craig Bassett at 404-358-6515.
Sincerely,
/RA/
Johnny H. Eads, Branch Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-186 License No. R-103 Enclosure: NRC Inspection Report No. 50-186/2006-204 cc w/enclosure: Please see next page
University of Missouri-Columbia Docket No. 50-186 cc:
University of Missouri Associate Director Research Reactor Facility Columbia, MO 65201 A-95 Coordinator Division of Planning Office of Administration P.O. Box 809, State Capitol Building Jefferson City, MO 65101 Mr. Ron Kucera, Director Intergovernmental Cooperation and Special Projects Missouri Department of Natural Resources P.O. Box 176 ber 17, 2006
SUBJECT:
NRC INSPECTION REPORT NO. 50-186/2006-204
Dear M