|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20210G4481999-07-26026 July 1999 Discusses Arrangements Made for Administration of Operator Licensing Exam at Armed Forces Radiobiological Research Institute Reactor,Scheduled for Wk of 990913 ML20155K2881998-10-13013 October 1998 Informs That Afrri Will Conduct Annual Emergency Drill on 981105.NRC Is Invited to Attend pre-drill Meeting & Drill. Meeting for Controllers & Evaluators Will Be Conducted on 981102 ML20151X9441998-09-13013 September 1998 Forwards Certificates to Wh Baxter,Ma Ortelli,Sd Osborne & Kl Wrisley,All Newly Licensed Individuals.Certificates in Addition to Actual License ML20239A1981998-09-0303 September 1998 Forwards Initial Exam Rept 50-170/OL-98-01 Held During Week of 980810.NRC Administered Initial Exam to Employees of Applying for License to Operate Armed Forces Radiological Research Inst Reactor ML20151U9611998-09-0303 September 1998 Forwards Copy of Results of Operator Initial Exam Conducted at Afrri on 980810-11.Without Encl ML20217K8781998-04-23023 April 1998 Discusses Arrangements Made for Administration of Operator Licensing Exam at Armed Forces Radiobiological Research Inst Reactor for Wk of 980810.Requests That Listed Matls Be Furnished at Least 60 Days Prior to Exam Date ML20197A7841998-03-0303 March 1998 Forwards Insp Rept 50-170/98-201 on 980202-06.No Violations Noted ML20198E9981997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20149L8051996-11-12012 November 1996 Forwards SRO Certificates to Listed Individuals in Recognition of Important Role Licensed Operators Fulfill in Protecting Health & Safety of Public & Achievement Represented by Meeting NRC Requirements ML20134J9681996-11-12012 November 1996 Forwards SRO Certificates to Listed Individuals in Recognition of Important Role Licensed Operators Fulfill in Protecting Health & Safety of Public & Acheivement Represented by Meeting NRC Requirements ML20134F2751996-10-23023 October 1996 Informs That SI Miller Appointed Acting Reactor Facility Director for Armed Forces Radiobiology Research Inst (Afrri) Replacing ML Moore,Effective 961015 ML20128P2561996-10-11011 October 1996 Extends Invitation to Observe Annual Emergency Drill & Attend Functions on 961104 ML20128L5921996-10-10010 October 1996 Forwards Copy of Results of Operator Initial Exam Conducted on 960916-17.W/o Encl ML20128L5961996-10-10010 October 1996 Forwards Copy of Initial Exam Rept 50-170/OL-96-01 Conducted on 960916-17 ML20115J7911996-07-25025 July 1996 Forwards Analysis & Physical Security Plan Contain Dod Unclassified Controlled Nuclear Info.Encl Withheld,Per 10CFR2.790 ML20108A1111996-05-0202 May 1996 Forwards Corrected 1995 Annual Rept of Afrri Triga Reactor ML20096D2891995-12-0707 December 1995 Forwards Comments & Questions Re Review of Draft Application Format,Content Guidance,Review Plan & Acceptance Criteria for non-power Reactors ML20098A9821995-09-20020 September 1995 Informs That Licensee Will Conduct Annual Emergency Drill on 951115 ML20092A1231995-08-31031 August 1995 Informs That Dod Directed That Afrri Be Closed & Nuclear Reactor Be Shutdown in FY97.AFRRI Will Notify NRC & Submit Necessary Requests & Plans for Approval in Accordance W/ Federal Regulations & NRC Guidelines ML20095D3491995-02-23023 February 1995 Comments on Introduction & Chapters 1,6,8 & 9 of Draft, Format & Content for Applications for Licensing of Nonpower Reactors, & Draft, Safety Analysis Rept Review Plan & Acceptance Criteria for Nonpower Reactors ML20078E2831995-01-19019 January 1995 Informs That Captain Ee Kearsley Msc,Usn Assumed Position of Acting Director of Armed Forces Radiobiology Research Inst, Replacing Captain Rl Bumgarner,Mc,Usn ML20078C1781994-10-11011 October 1994 Informs That Licensee Will Conduct Annual Emergency Drill on 941109 ML20070R6661994-05-19019 May 1994 Forwards Armed Forces Radiobiology Research Institute & Afrri Reactor Facility Emergency Plan. List of Changes Also Encl ML20067B0871994-02-22022 February 1994 Forwards Rev 2 to Physical Security Plan,Adding Section 4.a.(6) on Page 3 to Allow Visitors Such as Tours Into Controlled Access Area & Correcting Section 5.e(7) on Page 8 to State That UPS Located in RCA Not Caa.Encl Withheld ML20059F9501994-01-12012 January 1994 Approves Return of Slightly Contaminated Soil to Original Location Since Action Does Not Constitute Disposal of Radioactive Matl Per 10CFR20.302 ML20078C0971993-12-27027 December 1993 Submits Request for Approval of Slightly Radioactive Matl Disposal Procedures.Attachment Describes Site,Counting Data, Principal Exposure Pathways & Calculations of Estimated Dose to Maximally Exposed Individual ML20058F0531993-11-24024 November 1993 Informs Nrc,Certification of Responsibility for Reactor Indemnification & Decommissioning Costs Assumed by Defense Nuclear Agency,Ref ,Is Now Assumed by Uniformed Svcs Univ of Health Sciences ML20058F0961993-11-24024 November 1993 Informs Nrc,Certification of Responsibility for Decommissioning Costs Originally Assumed by Dna on Behalf of Dod,Ref ,Are Now Assumed by Uniformed Svcs Univ of Health Sciences Re License 19-08330-02 ML20058F1051993-11-24024 November 1993 Informs NRC of Certification of Responsibility for Decommission Costs Originally Assumed by Dna of Behalf of Dod Are Now Assumed by Uniformed Svcs Univ of Health Sciences Re License 19-08330-03 ML20059G7141993-11-0404 November 1993 Forwards Modified Reactor Operator Requalification Program for Afrri Triga Reactor Facility, Adding Lecture on Plant Protection Sys & Facility Interlocks on Page 2,section VA & New Section Detailing Recovery Program at Top of Page 4 ML20059C1011993-10-29029 October 1993 Informs That Licensee Completed Changes to Improve Emergency Plan W/O Prior Commission Approval as Authorized by 10CFR50.54(q).Changes Made & Approved Under 10CFR50.59. Revised Emergency Plan Encl ML20058N5511993-09-27027 September 1993 Responds to 930804 & 0919 Ltr Re Rev 1 to Afrri Triga Reactor Physical Security Plan.Changes Consistent W/ Provisions of 10CFR50.54(p) & Acceptable ML20056H5951993-09-0909 September 1993 Forwards Rev 1 to Armed Forces Radiobiology Research Inst Reactor Facility Physical Security Plan,Per 10CFR50.54(p)(2).Plan Withheld,Per 10CFR2.790 ML20057A7071993-09-0808 September 1993 Discusses Arrangements Made for Administration of Operator Licensing Exams at Facility During Wk of 940117.Addl Info Encl ML20056E3261993-08-17017 August 1993 Forwards Safety Insp Rept 50-170/93-01 on 930720-22.No Violations Noted ML20056E6231993-08-0606 August 1993 Requests Response to Encl Ref Matl Request for Ro/Sro Licensing Exams Scheduled for 940110.Info on Administration of Written Exams & Rules & Guidelines Also Encl ML20046C4011993-08-0606 August 1993 Requests to Change Approved Reactor Operator Requalification Program for Afrri Triga Reactor Facility,Per 10CFR55.59(c) ML20046B4171993-08-0404 August 1993 Forwards Changes to Reactor Facility Physical Security Plan, Per 10CFR50.54(p)(2).Plan Withheld,Per 10CFR2.790 ML20045H5481993-07-0707 July 1993 Clarifies Resolution of Previously Expressed Concern Re Funding of Major Reactor Facility Repair.Funding Route for Specific Large Budget Repair Items Currently in Use Will Continue to Be Available ML20044E3601993-03-11011 March 1993 Forwards Dod Points of Contact on DOE Reactor Licensing or Certification Matter,Per 930301 Telcon ML20115C6011992-09-30030 September 1992 Forwards Updated TS for Afrri Reactor Facility ML20113H8851992-07-29029 July 1992 Forwards Replacement Pages iii,12,15,25,35,36,37 & 38 to Make Changes Requested in 911227 TS Submittal,Per 920729 Conversation ML20082T9961991-09-10010 September 1991 Forwards Revised Proposed Changes to Tech Specs for Afrri Facility License R-84 ML20083B4221991-09-0909 September 1991 Requests Withdrawal of Requesting Amend to License R-84.Intent of Request Was to Indicate Change of Command from Gw Irving to Captian Rl Bumgarner on 910830 ML20024H2561991-05-17017 May 1991 Forwards Response to NRC 910501 Request for Addl Info on Proposed Tech Spec Changes for License R-84 ML20024H1371991-05-0202 May 1991 Concludes That Best Answer for Question B-18 of Ro/Sro Licensing Exam Administered at Affri on 910423 Is Response D ML20073D9101991-04-26026 April 1991 Submits Comments on Reactor Operator & Senior Reactor Operator Licensing Exams Administered on 910423.Listed Corrections to Written Exam Answer Key Requested ML20070H0621991-03-0505 March 1991 Forwards TR-90-01, Max Temp Calculation & Operational Characteristics of Fuel Follower Control Rods for Afrri Triga Reactor Facility, Per NRC 910212 Request for Addl Info ML20024H1411991-02-20020 February 1991 Submits Listed Ref Matls in Response to 910130 Request.Ref Matls Include,Sar,Ts,Emergency Plan,Operating Procedures,Ref Packaging Containing Various Ref Equations,Rod Curves & Technical Data.Operator Licensing Exam Encl ML20058H7971990-11-14014 November 1990 Forwards Request for Addl Info Re 900430 Application for Amend to License R-84 1999-07-26
[Table view] Category:NRC TO RESEARCH INSTITUTION/LABORATORY
MONTHYEARML20055J4771990-07-23023 July 1990 Forwards Amend 19 to License R-84 & Safety Evaluation.Amend Approves Installation of Microprocessor Based Instrumentation & Control Sys ML20055G4351990-07-11011 July 1990 Advises That 900417,0501,10,0612 & 26 Changes to Physical Security Plan Meet 10CFR50.54(p) & Acceptable.Plan Withheld ML20055C5971990-05-22022 May 1990 Advises That 900410 Changes to Armed Forces Radiobiology Research Inst Triga Reactor Facility Emergency Plan Decrease Effectiveness of Currently Approved Plan & Therefore Not Acceptable ML20246J9911989-08-28028 August 1989 Requests Addl Info Re 890605 Proposed Reactor Operator Requalification Program within 30 Days of Ltr Date IR 05000170/19880041989-03-22022 March 1989 Discusses Insp Rept 50-170/88-04 on 881026-28 & 1107 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,500 ML20246P4301989-03-22022 March 1989 Notifies of 890418-19 NRC Research & Test Reactor Seminars in King of Prussia,Pa,Initially Proposed in . Agenda & Map of Local Area Encl ML20196A4691988-11-28028 November 1988 Forwards Insp Rept 50-170/88-04 on 881026-28 & 1107. Violation Noted Will Be Discussed During Enforcement Conference ML20151L1561988-07-27027 July 1988 Forwards Safeguards Insp Repts 50-170/88-02 & 30-04545/88-01 on 880629-30.No Violations Noted ML20151B1171988-04-0101 April 1988 Forwards Exam Rept 50-170/88-01OL of Exam Administered on 880224-25 ML20236S8261987-11-24024 November 1987 Informs That Reactor Operator & Senior Reactor Operator Written & Operating Exams Scheduled for Wk of 880222.Encl Ref Matl Requirements for Exams Should Be Submitted by 871222 in Order for NRC to Meet Schedule.Related Info Encl ML20215B0671987-06-11011 June 1987 Informs of Recent Reorganization of Nrc.A Adams Designated as Facility Project Manager IR 05000170/19860011986-10-23023 October 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-170/86-01 ML20132B0051985-06-28028 June 1985 Advises That 850430 Reissue 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20129C7481985-05-15015 May 1985 Forwards Safeguards Insp Rept 50-170/85-02 on 850422.No Violation Noted 1990-07-23
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20210G4481999-07-26026 July 1999 Discusses Arrangements Made for Administration of Operator Licensing Exam at Armed Forces Radiobiological Research Institute Reactor,Scheduled for Wk of 990913 ML20151X9441998-09-13013 September 1998 Forwards Certificates to Wh Baxter,Ma Ortelli,Sd Osborne & Kl Wrisley,All Newly Licensed Individuals.Certificates in Addition to Actual License ML20239A1981998-09-0303 September 1998 Forwards Initial Exam Rept 50-170/OL-98-01 Held During Week of 980810.NRC Administered Initial Exam to Employees of Applying for License to Operate Armed Forces Radiological Research Inst Reactor ML20151U9611998-09-0303 September 1998 Forwards Copy of Results of Operator Initial Exam Conducted at Afrri on 980810-11.Without Encl ML20217K8781998-04-23023 April 1998 Discusses Arrangements Made for Administration of Operator Licensing Exam at Armed Forces Radiobiological Research Inst Reactor for Wk of 980810.Requests That Listed Matls Be Furnished at Least 60 Days Prior to Exam Date ML20197A7841998-03-0303 March 1998 Forwards Insp Rept 50-170/98-201 on 980202-06.No Violations Noted ML20198E9981997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20149L8051996-11-12012 November 1996 Forwards SRO Certificates to Listed Individuals in Recognition of Important Role Licensed Operators Fulfill in Protecting Health & Safety of Public & Achievement Represented by Meeting NRC Requirements ML20134J9681996-11-12012 November 1996 Forwards SRO Certificates to Listed Individuals in Recognition of Important Role Licensed Operators Fulfill in Protecting Health & Safety of Public & Acheivement Represented by Meeting NRC Requirements ML20128L5921996-10-10010 October 1996 Forwards Copy of Results of Operator Initial Exam Conducted on 960916-17.W/o Encl ML20128L5961996-10-10010 October 1996 Forwards Copy of Initial Exam Rept 50-170/OL-96-01 Conducted on 960916-17 ML20059F9501994-01-12012 January 1994 Approves Return of Slightly Contaminated Soil to Original Location Since Action Does Not Constitute Disposal of Radioactive Matl Per 10CFR20.302 ML20058N5511993-09-27027 September 1993 Responds to 930804 & 0919 Ltr Re Rev 1 to Afrri Triga Reactor Physical Security Plan.Changes Consistent W/ Provisions of 10CFR50.54(p) & Acceptable ML20057A7071993-09-0808 September 1993 Discusses Arrangements Made for Administration of Operator Licensing Exams at Facility During Wk of 940117.Addl Info Encl ML20056E3261993-08-17017 August 1993 Forwards Safety Insp Rept 50-170/93-01 on 930720-22.No Violations Noted ML20056E6231993-08-0606 August 1993 Requests Response to Encl Ref Matl Request for Ro/Sro Licensing Exams Scheduled for 940110.Info on Administration of Written Exams & Rules & Guidelines Also Encl ML20058H7971990-11-14014 November 1990 Forwards Request for Addl Info Re 900430 Application for Amend to License R-84 ML20059M7941990-09-27027 September 1990 Advises That Changes to Emergency Plan,Submitted on 900620, in Compliance w/10CFR50.44(q) & 10CFR50,App E ML20055J4771990-07-23023 July 1990 Forwards Amend 19 to License R-84 & Safety Evaluation.Amend Approves Installation of Microprocessor Based Instrumentation & Control Sys ML20055G4351990-07-11011 July 1990 Advises That 900417,0501,10,0612 & 26 Changes to Physical Security Plan Meet 10CFR50.54(p) & Acceptable.Plan Withheld ML20055C5971990-05-22022 May 1990 Advises That 900410 Changes to Armed Forces Radiobiology Research Inst Triga Reactor Facility Emergency Plan Decrease Effectiveness of Currently Approved Plan & Therefore Not Acceptable ML20246J9911989-08-28028 August 1989 Requests Addl Info Re 890605 Proposed Reactor Operator Requalification Program within 30 Days of Ltr Date ML20246G3281989-08-22022 August 1989 Forwards Order Imposing Civil Monetary Penalty in Amount of $2,500 for 880726 & 0801 Malfunction of Gas Stack Monitor & Failure to Record 870603 Malfunction of Gas Stack Monitor in Malfunction Log Book ML20245G2491989-04-21021 April 1989 Notifies That 2-wk Extension of Time in Which to Respond to Enforcement Action EA-88-269 Granted,Per 890322 Notice of Violation & Proposed Imposition of Civil Penalty & 890420 Telcon IR 05000170/19880041989-03-22022 March 1989 Discusses Insp Rept 50-170/88-04 on 881026-28 & 1107 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,500 ML20246P4301989-03-22022 March 1989 Notifies of 890418-19 NRC Research & Test Reactor Seminars in King of Prussia,Pa,Initially Proposed in . Agenda & Map of Local Area Encl ML20196A4691988-11-28028 November 1988 Forwards Insp Rept 50-170/88-04 on 881026-28 & 1107. Violation Noted Will Be Discussed During Enforcement Conference ML20155A8361988-09-21021 September 1988 Forwards Exam Rept 50-170/88-03OL Administered on 880721 ML20151L1561988-07-27027 July 1988 Forwards Safeguards Insp Repts 50-170/88-02 & 30-04545/88-01 on 880629-30.No Violations Noted ML20153G5581988-05-0505 May 1988 Requests Listed Info Be Submitted to NRC Prior to 880721 Senior Reactor Operator Licensing Exam.Application Should Be Submitted at Least 30 Days Before Exam Date.Exam Will Be Conducted Per Requirements in Encl 3 ML20151B1171988-04-0101 April 1988 Forwards Exam Rept 50-170/88-01OL of Exam Administered on 880224-25 ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20236S8261987-11-24024 November 1987 Informs That Reactor Operator & Senior Reactor Operator Written & Operating Exams Scheduled for Wk of 880222.Encl Ref Matl Requirements for Exams Should Be Submitted by 871222 in Order for NRC to Meet Schedule.Related Info Encl IR 05000170/19870021987-09-0202 September 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-170/87-02 ML20235Y2141987-07-0909 July 1987 Forwards Safety Insp Rept 50-170/87-02 on 870601-05 & Notice of Violation ML20215B0671987-06-11011 June 1987 Informs of Recent Reorganization of Nrc.A Adams Designated as Facility Project Manager ML20214S1281987-05-27027 May 1987 Informs of Recent Realignment within Region I Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Revised 10CFR50 & 51 Final Rule Re Submitting Written Communication Encl IR 05000170/19860011986-10-23023 October 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-170/86-01 ML20207B0481986-06-30030 June 1986 Advises That Reissue 3 of Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20141A0221986-03-27027 March 1986 Advises of Realignment of Projects within Region I,Effective on 860331.TC Elsasser Will Replace EC Mccabe as Section Chief for Facility.Author Will Retain Responsibility as Branch Chief ML20210J5301986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20199F3721986-03-20020 March 1986 Discusses 860127 Unauthorized Shipment of Spent Fuel at Region 1 Research Reactor Subsequent to 851231 Expiration of License.Info Submitted as Reminder Re Responsibilities for Ensuring Timely Renewal of NRC-approved QA Programs ML20140A7901986-03-0505 March 1986 Forwards Exam Rept 50-170/86-01 Administered During Wk of 860106.Control of Const & Housekeeping Outside Reactor Area Needs Improvement ML20134Q0251985-09-0505 September 1985 Forwards Safety Insp Rept 50-170/85-03 on 850813-14.No Violation Noted ML20132B0051985-06-28028 June 1985 Advises That 850430 Reissue 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20129F3071985-05-23023 May 1985 Forwards Exam Rept 50-170/85-01 of Exam Administered on 850311 ML20129C7481985-05-15015 May 1985 Forwards Safeguards Insp Rept 50-170/85-02 on 850422.No Violation Noted ML20055B5631982-06-29029 June 1982 Forwards IE Safeguards Insp Repts 50-170/82-01 & 30-04545/82-01 on 820513.No Noncompliance Noted ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20062K2211980-09-23023 September 1980 Responds to Re Citizen Concerns About Facility. Armed Forces Radiology Inst Has Submitted Request for Upgrading & Modifying Tech Specs.Facility Application for License Renewal Will Be Announced in Fr W/Intervening Rule 1999-07-26
[Table view] |
Text
..
.-
OCT 2 3 E06
-
Docket No: 50-170 Defense Nuclear Agency Armed Forces Radiobiology Research Institute ,
ATTN: Colonel James Conklin, MC, USAF l Director Bethesda, Maryland 20014 Gentlemen:
Subject: Inspection No. 50-170/86-01(0L)
This refers to your letter dated April 29, 1986 in response to our letter dated March 5, 1986.
Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely, Origina1 Signed Byr Edward C. Wenzinger, Chief Project Branch No. 3 Division of Reactor Projects cc w/ encl:
M. Moore, Reactor Facility Director Public Document Room (PDR)
Nuclear Safety Information Center (NSIC)
State of Maryland (2)
bcc w/ encl:
DRP Section Chief D. Coe OL File 12.0 Region I Docket Room (with concurrences)
0FFICIAL RECORD COPY OL RL DNA - 0001.0.0 10/15/86 _rgro/
e611030053 e61023 0 g\
PDR ADOCK 05000
. . _ - - - . -
.-
.~
.
RI:DRP RI: R P kl.RP RI Dudley/bc Kel Kis".!r Elsasser WpMinger 10//6/86 10/ /86 10/ 0/86 10/3./86 10/ /86 app 0FF:CIAL RECORD COPY OL}HLDNA- 0002.0.0 DJ 10/15/86
.
DEFENSE NUCLEAR AGENCY ARMEo FORCES RADICBIOLOGY RESEARCH INSilfuTE BETHESDA, MARYLAND 20814 DIR 29 April 1986 01004 United States Nuclear Regulatory Commission Mr. Edward C. Wenizinger Project Branch No. 3 King of Prussia, PA 19406
Dear Sir:
Dis letter is in reply to NRC examination report number 60-170/86-01 conducted by Mr. Noel Dudley on 6 January 1986. Mr. Dudley% report contains statements about the facility that do not accurately describe conditions in the facility. Bis letter is the requested reply describing measures taken to assure reactor safety, services, and fire prevention during the pending construction activities. %c Armed Forces Radiobiology Research Institute's comments concerning the NRC report (#50-170/86-01) are discussed beginning with page 3, number 3, " Summary of NRC comments made at exit interview," followed by license examination report, item number 1, " Summary of generic strengths of deficiencies noted on oral examinations"(see enclosure).
For information on matters discussed in this letter, the point of contact is the Reactor Facility Director, Mr. Mark Moore. He can be reached at the letterhead address or on telephone number (301) 295-1290.
Sincerely yours, l
Enclosure:
as stated {#3 MES J. CONKLIN Colonel, USAF, MC Director 3n ,
,
.-- . , , - - , . , . . _ _ - . - - _ - - _ - . . , _ , - , - - . . . - - , -.
.
'
.
.
AFRRI COMMENTS ON NRC REPORT 50-170/86-01
..
'Ihe following are responses to NRC Examination Report No. 50-170/86-01:
1. In item 3, paragraph 2, Mr. Dudley implies that fire extinguishers within the reactor facility had not been checked for 5 months. 'Ihe day fonowing his visit a survey showed that of the extinguishers in the faculty, one was dated Sept 1985, and one dated Nov 1985. All the rest were dated Dec 1985 (the Jan check had not been completed at the time of the operator's exam). In fact, the longest unchecked span noted on the unit tags was 3 months.1he base (NMCNCR) fire department was in the process of having a special hydrostatic testing done (off base) on all units in AFRRI, not just the reactor, and this would require about 6 months to complete as the testing is accomplished there wul be months shown as not being checked on the tags. ToHow-up checking revealed that1he'two units thateter.
Tudley had seen*8 sert returned from the pool of tested imits and had not been back
'long enough for a date in the regular monthly check. All facility units have been ehoeked and are current.
2. Item 3, paragraph 3, and item 4, paragraph 1, concern the same issue.1he operator licensing examiner viewed areas peripheral to the reactor area (equipment rooms) that were under construction and undergoing removal and installation of equipment, including the drining of concrete and the unpacking and placement of i electrical components. At no time did the Reactor Director state that he had no control over the areas. On the contrary, it was explained to Mr. Dudley that at
- that time, the equipment rooms were involved in heavy construction work and as i work progressed, debris would be removed consistent with safe work practices. At no time did the area or materials in the area present any safety hazard to personnel or to the reactor systems. The following week, the areas in question were thoroughly cleaned and prepared for the next phase of construction. It should be noted that earlier and later inspections, including an unannounced operational inspection (No. 50-170/85-03) shortly before and a speelal security inspection shortly after (No Report No. to date) the license exam by operational inspectors have found this facility to have excellent housekeeping over the course of many years. Quoting from Report 50-170/85-03 " Facility tour . . . 'Ihe areas were clean, free of debris and well maintained."
Construction on this facility will continue for approximately 6 months. During this time the reester staff win perform housekeeping inspections en a frequent basis to
,
ensure maximum area cleanliness and that construction will not~lmpact the safety ~
' of the reactor or reactor systems.
3. We would like to point out that item 1, paragraph 3 has nothing to do with the exam given to the reactor trainees. Also, it does not indicate generic deficiencies on the part of the trainees. Instead, it is simply an opinion on the part of the examiner.
! 4. Item 3, paragraph 4, and item 4, paragraph 2, again concern the same issue.
l Mr. Dudley has relayed a situation in his report concerning management controls for facility maintenance and modifications that is inaccurate. AB items relating to reactor safety, reactor systems, reactor modifications, and reactor maintenance including records and procedures are current and available in the facility. The examiner, Mr. Dudley, did not ask to see any of these documents. 'Ihe reactor staff has a group of support test equipment, including voltmeters, current meters,
- _-_-- - - _,
- ___.- - -._-___ - - _ - . . _ _ - __
._ _ _ _ _ _ _ _
-
.
.
.
and electrometers, that are used in reactor calibration. His equipment is sent to
,
, an Institute calibration facility and their either calibrated or sent out for calibration. Als is accomplished under Institute procedures, not reactor facility procedures. When the unit is calibrated, it is returned with a calibration sticker in place on the unit. If a unit is out for calibration, a backup unit is always available in the faculty; if the facility does not have a spare unit, one is borrowed from the calibration group. %e records or " tracks" of any reactor system, safety or otherwise, can be readily produced in the faellity, the support equipment records are available in the appropriate area. AFRRI's record of previous inspections both NRC, and independent audit by the Office of the Inspector General, for example 50-170/85-03 Item 5, IG Inspection report, 21 June 1985 and IG Inspection 17 June 1983 TAB G, has shown the maintenance system used in the reactor facility to be more than adequate. his system ensures that the facility maintenance and modifications are performed in a planned manner that guarantees the safety of the reactor and reactor systems.
On the issue of as-built prints available in the facility as referenced in Item 3 paragraph 4, AFRRI contains far more than just a reactor facility. The AFRRI Logistics Department (LOGF) maintairs the building proper and the installed building equipment. Many changes have been made over the last 20 years. These changes are documented on building prints located in the LOGF office. However, because of the large mass of documentation, locating a particular item can
'sometimes be difficult for a newly licensed operator. AFRRI construction,
'
primarily on the facility air and ventilation system, is being conducted in phases.
A complete set of building plans is available as each phase of construction is completed. The scheduled completion date for the reactor area is September 1986.
nis construction was submitted to the NRC as a planned modification in 1983. It was approved in Aug 1984 with the new facility SAR. When complete, these modifications will be shown on a complete set of current as-built drawings. %ey will combine the drawings of the last 20 years, combining the various historical changes and the current modifications into one set of plans. %ese plans will be available in the reactor facility for immediate use by the facility staff as each phase of construction is complete.
AFRRI believes that the management controls for facility maintenance and
,
modifications are adequate to ensure the safety for the reactor and associated ( equipment.
l r 5. As a last point, item 5 indicates changes made to the answer key used in correcting the exam. It may be interesting to note that a significantly greater number of comments were given to the examiner. Most of these were not included on the comment page. Since they represent, from the facility point of view, incon-sistencies in the exam as written, they should be included in the comment section whether used by the examiner or not.
.
--- . . __- _ . _ . . - _ _ . - - - - - - _ - - __ _ _ - _ - ___. - _ _ . - - - _ _ _ _ - _ _ _ _ _ _ _ -