Partially Withheld Insp Rept 50-160/86-01 on 860422-24 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Nuclear Matl Accounting Procedures
ML20198J211
Person / Time
Site: Neely Research Reactor
Issue date: 05/13/1986
From: Mcalpine E, Son Ninh, Todd G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19292F336 List:
References
50-160-86-01, 50-160-86-1, NUDOCS 8606020331
Download: ML20198J211 (1)


Text

I g?

TTig,gpWATH l

At

[k2 Kf Gg

UNITED STATES o

NUCLEAR REGULATORY COMMISSION

['

REGloN 11 n

g j

-

101 MARIETTA STREET,N.W.

  • '-

t ATL ANTA, GEORGI A 30323

%..... *

MAY 191986 Report No.: 50-160/86-01

-

Licensee: Georgia Institute of Technology 225 North Avenue Atlanta, GA - 30332 Docket No.: 50-160 License No.:

R-97 Facility Name: Georgia Institute of Technology Inspection Conducted: April 22 - 24, 1986 Inspectors:

C iM " 1k,a th,

5[L3/76 kG.A.Todd

'

%

Date Signed ERNYY R0 -

sh /n hS.Q.Ninh N

\\

Date Signed Approved by:

O lW ' R Aotwe 6// 3 /P 6 E. J. McAlpin'e, Chief, Material Control and Date Signed Accountability Section, Nuclear Materials

,

Safety and Safeguards Branch, Division of

'

Radiation Safety and Safeguards SUMMARY Scope: This routine, inspection was conducted by two NRC inspectors in the areas of nuclear material accounting procedures, records and reports, and physical inventory.

Results:

No violations or deviations were identified.

.

%

A I

8606020331 860519 PDR ADOCK 05000160

PDR

$CN $I?.s??N$rQEff7 {,Ewrt;;

E

. _ _

_. _ _ _ _ _

'

--

WTF#fAL TRANSMITTED HEREWITH CoteTAlpes 2.790 itJoRMATeoN FAY 191986 Georgia Institute of Technology ATTN:

Dr. R. A. Karam, Director of Nuclear Research Center-900 Atlantic Drive, N.W.

-

Atlanta, GA 30332 Gentlemen:

SUBJECT: REPORT NO. 50-160/86-01 On April 22 - 24, 1986, NRC inspected activities authorized by NRC Operating License No. R-97 for your Georgia Tech Research Reactor (GTRR) facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosures to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, David M. Verrelli, Chief Projects Branch 2 Division of Reactor Projects Enclosure:

Inspection Report No. 50-160/86-01

'

(Exempt from Disclosure)

cc w/ enc 1:

Dr. T. E. Stelson, Vice President for Research bec: (See page 2)

l