IR 05000160/1985005

From kanterella
Jump to navigation Jump to search
Insp Repts 50-160/85-05 & 50-276/85-05 on 851204.No Noncompliance Noted.Major Areas Inspected:Security Plan & Physical Protection of Snm.Details Withheld (Ref 10CFR2.790 & 73.21)
ML20138P393
Person / Time
Site: Neely Research Reactor, 05000276
Issue date: 12/17/1985
From: Masnyk D, Masnyk O, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19276D078 List:
References
50-160-85-05, 50-160-85-5, 50-276-85-05, 50-276-85-5, NUDOCS 8512260085
Download: ML20138P393 (1)


Text

FY9 "

-"T t

b te4TEntAL TRANH4ffffD M*nf.WffH -

,

coh1AeNS 2.799lhf0HMATa0It -

' "'

'

    • Rgc UNITE'3 STATES N,UCLEAR REGULATORY COMMlZION jP o

c[

REGION 18

,

.g

,j 101 MARIETTA STREET,N.W.

  • ATLANTA, GEORGI A 30323

.k*****,o[2 Report Nos.: 50-276/85-05 and'50-160/85-05'

Licensee:. Georgia Institute of Technology 225 North Avenue'

At1anta, GA 30332.

. Docket Nos.: 50-276 and 50-160 License.Nos.:

R-111 and R-97-Facility Name: Georgia Institute of Technology

= Inspection Conduc

December 4, 1985 f9(E.b M

ld'l7-I '

Inspector:

e/

O. M.-Masntk Physical Securfcy Specialist-Date Signed

~ Approved'by: b d

/2

/

d D.- R.-McGuire, Section Chief Date Sfgned Division of Radiation Safety and Safeguards.

SUMMARY

.The inspection _ involved five inspector-hours on. site by one NRC inspector. The inspector was > accompanied by a : Security Specialist from, the NRC's Office of Inspection and. Enforcement.

The inspection was J accomplished durin'g normal

'

__ orking hours.

w Areas? Inspected:

Security Plan and Physical ~ Protection of Special Nuclear

. Material.

Results:.The licensee was found to be in compliance with NRC requirements within

~

the areas-examined during the inspection.

.

l.

' '

8512260085 851219 EN PDR ADOCK 05000160

"

__

rDR" i

Afegg WITH

.