Text
FY9 "
-"T t
b te4TEntAL TRANH4ffffD M*nf.WffH -
,
coh1AeNS 2.799lhf0HMATa0It -
' "'
'
- Rgc UNITE'3 STATES N,UCLEAR REGULATORY COMMlZION jP o
c[
REGION 18
,
.g
,j 101 MARIETTA STREET,N.W.
- ATLANTA, GEORGI A 30323
.k*****,o[2 Report Nos.: 50-276/85-05 and'50-160/85-05'
Licensee:. Georgia Institute of Technology 225 North Avenue'
At1anta, GA 30332.
. Docket Nos.: 50-276 and 50-160 License.Nos.:
R-111 and R-97-Facility Name: Georgia Institute of Technology
= Inspection Conduc
- December 4, 1985 f9(E.b M
ld'l7-I '
Inspector:
e/
O. M.-Masntk Physical Securfcy Specialist-Date Signed
~ Approved'by: b d
/2
/
d D.- R.-McGuire, Section Chief Date Sfgned Division of Radiation Safety and Safeguards.
SUMMARY
.The inspection _ involved five inspector-hours on. site by one NRC inspector. The inspector was > accompanied by a : Security Specialist from, the NRC's Office of Inspection and. Enforcement.
The inspection was J accomplished durin'g normal
'
__ orking hours.
w Areas? Inspected:
Security Plan and Physical ~ Protection of Special Nuclear
. Material.
Results:.The licensee was found to be in compliance with NRC requirements within
~
the areas-examined during the inspection.
.