IE Insp Rept 50-156/79-03 on 790814.No Noncompliance Noted. Major Areas Inspected:Maint Surveillance & Retraining
ML19254D282
Person / Time
Site: University of Wisconsin
Issue date: 09/10/1979
From: Boyd D, Charles Brown, Daniels F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19254D279 List:
References
50-156-79-03, 50-156-79-3, NUDOCS 7910230281
Download: ML19254D282 (2)


Text

-

.

w e

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-156/79-03 Docket No. 50-156 License No. R-74 Licensee:

University of Wisconsin (TRIGA)

Nuclear Engineering Department Madison, WI 53705 Facility Name: University of Wisconsin Nuclear Reactor Inspection At: University of Wisconsin Nuclear Reactor Inspection Conducted: August

, 1979 h

-jo-7f

^

Inspectors:

C. H. Brown Y&

f r

<

9-/

~7

Approved by:

D.

Reactor Operations Section 3 Inspection Summary Inspection on August 14, 1979 (Report No.50-156/79-03)

Areas Inspected: A turnover inspection was conducted on an unannounced basis. Maintenance surveillance, retraining and future plans werr. dis-cussed. The facility was toured and reactor operatic.n was oLacrved. The inspection involved 8 inspector hours onsite by two NRC inspecters.

Results: No items of noncompliance or deviations were identifieu.

1196 261

.

L d*

7glosse

-

.

.

%

,

DETAILS 1.

Persons Contacted

  • R.

J. Cashwell, Reactor Supervisor

  • S. Matusewic, Senior Reactor Operator

,

  • Denotes personnel attending management interview.

2.

General The inspection was conducted as a turnover inspection and consisted of meeting the people associated with the operation of the reactor and a brief general view of how the facility operates.

The planned refuel of the core with the FLIP fuel load had been completed and core reactivity tests were being conducted. These operations included the security committments. A tour was conducted for familiarization of equipment and facility lay-out.

No items of noncompliance were identified on this tour.

3.

Management Interview At the conclusion of the tour a informal meeting was held with the licensee representatives denoted in Paragraph one. The discussion including a brief outline by the licensee of future plans. The licensee's retraining program and results were also discussed.

9b 2h2

.

-2-