IR 05000150/1980004
ML19338F853 | |
Person / Time | |
---|---|
Site: | Ohio State University |
Issue date: | 10/10/1980 |
From: | Hind J, Kniceley J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | |
Shared Package | |
ML19338F851 | List: |
References | |
50-150-80-04, 50-150-80-4, NUDOCS 8010270394 | |
Download: ML19338F853 (1) | |
Similar Documents at Ohio State University | |
---|---|
Category:INSPECTION REPORT
MONTHYEARIR 05000150/20242012024-05-0303 May 2024
[Table view]Ohio State University - U.S. Nuclear Regulatory Commission Safety Inspection Report 05000150/2024201 IR 05000150/20232012023-03-16016 March 2023 Ohio State University - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000150/2023201 IR 05000150/20232022023-03-13013 March 2023 Ohio State University - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000150/2023202 (Public) ML22070B0942022-04-12012 April 2022 Ohio State University U.S. Nuclear Regulatory Commission Safety Inspection Report IR 05000150/20202012021-03-30030 March 2021 Ohio State University Routine Inspection Report 05000150/2020201 IR 05000150/20194102019-12-11011 December 2019 Ohio State University - U.S. Nuclear Regulatory Commission Security Inspection Report 05000150/2019410 (Cover Letter Only) IR 05000150/20192012019-12-0202 December 2019 Ohio State University - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000150/2019-201 IR 05000150/20182012019-01-0909 January 2019 Ohio State University - U.S. Nuclear Regulatory Commission Safety Inspection Report 05000150/2018201 IR 05000150/20172012018-02-13013 February 2018 Ohio State University - Nuclear Regulatory Commission Safety Inspection Report No. 50-150/2017-201 IR 05000150/20162022016-10-20020 October 2016 Ohio State University - Nuclear Regulatory Commission Security Inspection Report No. 50-150/2016-202 (Letter Only) IR 05000150/20162012016-09-30030 September 2016 Ohio State University - NRC Safety Inspection Report 05000150/2016201 IR 05000150/20152012015-12-0404 December 2015 IR 05000150/2015201, November 2-5, 2015, Ohio State University IR 05000000/20001502014-11-0606 November 2014 IR 05000000-150-2014-201 on October 6-9, 2014, Ohio State University, NRC Routine Inspection Report IR 05000150/20132012013-12-0505 December 2013 IR 05000150-13-201, 11/18-21/2013, Ohio State University IR 05000150/20122022012-10-18018 October 2012 IR 05000150-12-202 on September 17-20, 2012 at Ohio State University - Transmittal Letter for NRC Security-Related Inspection IR 05000150/20122012012-10-18018 October 2012 IR 05000150-12-201 on September 17-20, 2012 at Ohio State University IR 05000150/20112012011-10-19019 October 2011 IR 05000150-11-201 on September 19-21, 2011, at the University of Ohio - NRC Routine Inspection Report No. 50-150/2011-201 IR 05000150/20102012010-10-14014 October 2010 IR 05000150-10-201 on 09/13/10 - 09/16/10 for Ohio State University IR 05000150/20102022010-10-14014 October 2010 IR 05000150-10-202, on 09/13/2010 - 09/16/2010, Ohio State University Transmittal Letter of Security-Related Inspection Report IR 05000150/20092012009-10-0101 October 2009 IR 05000150-09-201 on 09/08/09 - 09/10/09 for Ohio State University IR 05000150/20072012007-06-0101 June 2007 IR 05000150-07-201, on May 21-24, 2007, Ohio State University, Nuclear Reactor Laboratory IR 05000150/20062022006-12-0404 December 2006 NRC Inspection Report No. 05000150-06-202, Ohio State University, 11/15 & 16/06, Cover Letter IR 05000150/20062012006-12-0404 December 2006 NRC Inspection Report No. 05000150-06-201, Ohio State University, 11/13-16/06 IR 05000150/20052022005-12-0202 December 2005 NRC Inspection Report No. 50-150-2005-202 Conducted on October 3-6, 2005 IR 05000150/19992011999-03-0404 March 1999 Insp Rept 50-150/99-201n on 990208-12.No Violations Noted. Major Areas Inspected:Aspects of Organization,Periodic & Special Repts,Operations,Maint,Operations & Maint Procedures,Requalification Training & EP IR 05000150/19960011996-11-0101 November 1996 Insp Rept 50-150/96-01 on 961007-11.No Violations Noted. Major Areas Inspected:Organization Aspects,Operations & Maint,Procedures,Emergency Preparedness,Surveillance, Experiments,Radiation Control & Environ Protection IR 05000150/19930031993-03-19019 March 1993 Insp Rept 50-150/93-03 on 930319.No Violations Noted. Major Areas Inspected:Licensee Event Rept Re 930305 Failure of Shim Safety Rod 1 to Drop Following Manual Scram Signal IR 05000150/19930021993-03-0101 March 1993 Partially Withheld Insp Repts 50-150/93-02,70-0801/93-01 & 70-3005/93-01 on 930209-10.Details Withheld,Per 10CFR2.790(d).Major Areas Inspected:Possession,Use & Accounting of SNM IR 05000150/19930011993-02-24024 February 1993 Partially Withheld Insp Rept 50-150/93-01 on 930209-10 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected: Plans,Procedures & Reviews,Rept of Safeguards Events & Physical Protection of SNM IR 05000150/19910011991-03-0404 March 1991 Insp Repts 50-150/91-01,70-0801/91-01 & 70-3005/91-01 on 910205-07.Violations Noted.Major Areas Inspected:Review of Facility Organization & Operations,Measurement & Statistical Controls & Repts.Encl Withheld Ref 10CFR2.790 IR 05000150/19910021991-03-0101 March 1991 Physical Security Insp Rept 50-150/91-02 on 910205-07.No Violations Noted.Major Areas Inspected:Plans,Procedures & Reviews,Repts of Safeguards Events & Physical Protection of SNM of Moderate Strategic Significance IR 05000150/19870041987-11-19019 November 1987 Insp Rept 50-150/87-04 on 871102-05.No Violations Noted. Major Areas Inspected:Records,Logs,Organization,Review & Audit Functions,Requalification Training,Procedures, Surveillance & Maint,Emergency Planning & Deviations IR 05000150/19870011987-02-19019 February 1987 Forwards Safeguards Insp Rept 50-150/87-01 on 870202-04 & Notice of Violations.Rept & Notice of Violation Withheld (Ref 10CFR2.790) IR 05000150/19870021987-02-18018 February 1987 Partially Withheld Insp Repts 50-150/87-02,70-0801/87-01 & 70-3005/87-01 on 870202-04 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Nuclear Matl Control & Accountability IR 05000150/19850011985-09-13013 September 1985 Insp Rept 50-150/85-01 on 850826-28.Violation & Deviation Noted:Failure to Calibr Radiation Instruments at Required Frequency & Failure to Follow Procedure IM-05, Use of RY-4 Jumper, Respectively IR 05000150/19840011984-12-12012 December 1984 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-150/84-01 IR 05000150/19810011981-09-21021 September 1981 IE Insp Rept 50-150/81-01 on 810817-21.No Noncompliance Noted.Major Areas Inspected:Records,Logs & Organization, Review & Audit Functions,Requalification Training, Surveillance & Maint IR 05000150/19800031980-10-12012 October 1980 IE Insp Rept 50-150/80-03 on 800930.No Noncompliance Noted. Major Areas Inspected:Emergency Planning,Including Examination of Coordination W/Support Agencies,Emergency Equipment & Training & Drills IR 05000150/19800041980-10-10010 October 1980 IE Insp Rept 50-150/80-04 on 800930.No Noncompliance Noted. Major Areas Inspected:Approved Security Plan & Implementation Re Protection of SNM & Security Organization. Details Withheld (Ref 10CFR2.790) IR 05000150/19800021980-05-0707 May 1980 IE Insp Rept 50-150/80-02 on 800416-17.No Noncompliance Noted.Major Areas Inspected:Logs & Records,Reactor Surveillance,Requalification Training & Reviews & Audits IR 05000150/19800011980-02-28028 February 1980 IE Insp Rept 50-150/80-01 on 800206-07.No Noncompliance Noted.Major Areas Inspected:Radwaste Mgt & Radiation Protection Programs IR 05000150/19790021979-02-16016 February 1979 IE Insp Rept 50-150/79-02 on 790205-07.No Noncompliance Noted.Major Areas Inspected:Licensee Organization,Logs, Records,Reactor Surveillance,Requalification Training, Review,Audit & Experiments IR 05000150/19790011979-01-29029 January 1979 IE Insp Rept 50-150/79-01 on 790109-10.No Noncompliance Noted.Major Areas Inspected:Radwaste Mgt Program Including Organization,Audits,Training,Procedures, & Exposure Control 2024-05-03 Category:NRC-GENERATED MONTHYEARIR 05000150/19992011999-03-0404 March 1999
[Table view]Insp Rept 50-150/99-201n on 990208-12.No Violations Noted. Major Areas Inspected:Aspects of Organization,Periodic & Special Repts,Operations,Maint,Operations & Maint Procedures,Requalification Training & EP IR 05000150/19960011996-11-0101 November 1996 Insp Rept 50-150/96-01 on 961007-11.No Violations Noted. Major Areas Inspected:Organization Aspects,Operations & Maint,Procedures,Emergency Preparedness,Surveillance, Experiments,Radiation Control & Environ Protection IR 05000150/19930031993-03-19019 March 1993 Insp Rept 50-150/93-03 on 930319.No Violations Noted. Major Areas Inspected:Licensee Event Rept Re 930305 Failure of Shim Safety Rod 1 to Drop Following Manual Scram Signal IR 05000150/19930021993-03-0101 March 1993 Partially Withheld Insp Repts 50-150/93-02,70-0801/93-01 & 70-3005/93-01 on 930209-10.Details Withheld,Per 10CFR2.790(d).Major Areas Inspected:Possession,Use & Accounting of SNM IR 05000150/19930011993-02-24024 February 1993 Partially Withheld Insp Rept 50-150/93-01 on 930209-10 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected: Plans,Procedures & Reviews,Rept of Safeguards Events & Physical Protection of SNM IR 05000150/19910011991-03-0404 March 1991 Insp Repts 50-150/91-01,70-0801/91-01 & 70-3005/91-01 on 910205-07.Violations Noted.Major Areas Inspected:Review of Facility Organization & Operations,Measurement & Statistical Controls & Repts.Encl Withheld Ref 10CFR2.790 IR 05000150/19910021991-03-0101 March 1991 Physical Security Insp Rept 50-150/91-02 on 910205-07.No Violations Noted.Major Areas Inspected:Plans,Procedures & Reviews,Repts of Safeguards Events & Physical Protection of SNM of Moderate Strategic Significance IR 05000150/19870041987-11-19019 November 1987 Insp Rept 50-150/87-04 on 871102-05.No Violations Noted. Major Areas Inspected:Records,Logs,Organization,Review & Audit Functions,Requalification Training,Procedures, Surveillance & Maint,Emergency Planning & Deviations IR 05000150/19870021987-02-18018 February 1987 Partially Withheld Insp Repts 50-150/87-02,70-0801/87-01 & 70-3005/87-01 on 870202-04 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Nuclear Matl Control & Accountability IR 05000150/19850011985-09-13013 September 1985 Insp Rept 50-150/85-01 on 850826-28.Violation & Deviation Noted:Failure to Calibr Radiation Instruments at Required Frequency & Failure to Follow Procedure IM-05, Use of RY-4 Jumper, Respectively IR 05000150/19810011981-09-21021 September 1981 IE Insp Rept 50-150/81-01 on 810817-21.No Noncompliance Noted.Major Areas Inspected:Records,Logs & Organization, Review & Audit Functions,Requalification Training, Surveillance & Maint IR 05000150/19800031980-10-12012 October 1980 IE Insp Rept 50-150/80-03 on 800930.No Noncompliance Noted. Major Areas Inspected:Emergency Planning,Including Examination of Coordination W/Support Agencies,Emergency Equipment & Training & Drills IR 05000150/19800041980-10-10010 October 1980 IE Insp Rept 50-150/80-04 on 800930.No Noncompliance Noted. Major Areas Inspected:Approved Security Plan & Implementation Re Protection of SNM & Security Organization. Details Withheld (Ref 10CFR2.790) IR 05000150/19800021980-05-0707 May 1980 IE Insp Rept 50-150/80-02 on 800416-17.No Noncompliance Noted.Major Areas Inspected:Logs & Records,Reactor Surveillance,Requalification Training & Reviews & Audits IR 05000150/19800011980-02-28028 February 1980 IE Insp Rept 50-150/80-01 on 800206-07.No Noncompliance Noted.Major Areas Inspected:Radwaste Mgt & Radiation Protection Programs IR 05000150/19790021979-02-16016 February 1979 IE Insp Rept 50-150/79-02 on 790205-07.No Noncompliance Noted.Major Areas Inspected:Licensee Organization,Logs, Records,Reactor Surveillance,Requalification Training, Review,Audit & Experiments IR 05000150/19790011979-01-29029 January 1979 IE Insp Rept 50-150/79-01 on 790109-10.No Noncompliance Noted.Major Areas Inspected:Radwaste Mgt Program Including Organization,Audits,Training,Procedures, & Exposure Control 1999-03-04 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000150/19992011999-03-0404 March 1999
[Table view]Insp Rept 50-150/99-201n on 990208-12.No Violations Noted. Major Areas Inspected:Aspects of Organization,Periodic & Special Repts,Operations,Maint,Operations & Maint Procedures,Requalification Training & EP IR 05000150/19960011996-11-0101 November 1996 Insp Rept 50-150/96-01 on 961007-11.No Violations Noted. Major Areas Inspected:Organization Aspects,Operations & Maint,Procedures,Emergency Preparedness,Surveillance, Experiments,Radiation Control & Environ Protection ML20056D4851993-08-0404 August 1993 Exam Rept 50-150/OL-93-01 on 930628.Exam Results:Two Operator Requalification Retake Exams Administered.Both Operators Passed Exams IR 05000150/19930031993-03-19019 March 1993 Insp Rept 50-150/93-03 on 930319.No Violations Noted. Major Areas Inspected:Licensee Event Rept Re 930305 Failure of Shim Safety Rod 1 to Drop Following Manual Scram Signal PNO-III-93-013, on 930305,while Operators Were Performing Normal Manual Shutdown of 500-kilowatt pool-type Reactor,One Safety Rod Failed to Insert on Manual Scram Signal.Reactor Shutdown & Licensee Investigating to Determine Root Cause1993-03-0808 March 1993 PNO-III-93-013:on 930305,while Operators Were Performing Normal Manual Shutdown of 500-kilowatt pool-type Reactor,One Safety Rod Failed to Insert on Manual Scram Signal.Reactor Shutdown & Licensee Investigating to Determine Root Cause IR 05000150/19930021993-03-0101 March 1993 Partially Withheld Insp Repts 50-150/93-02,70-0801/93-01 & 70-3005/93-01 on 930209-10.Details Withheld,Per 10CFR2.790(d).Major Areas Inspected:Possession,Use & Accounting of SNM IR 05000150/19930011993-02-24024 February 1993 Partially Withheld Insp Rept 50-150/93-01 on 930209-10 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected: Plans,Procedures & Reviews,Rept of Safeguards Events & Physical Protection of SNM IR 05000150/19910011991-03-0404 March 1991 Insp Repts 50-150/91-01,70-0801/91-01 & 70-3005/91-01 on 910205-07.Violations Noted.Major Areas Inspected:Review of Facility Organization & Operations,Measurement & Statistical Controls & Repts.Encl Withheld Ref 10CFR2.790 IR 05000150/19910021991-03-0101 March 1991 Physical Security Insp Rept 50-150/91-02 on 910205-07.No Violations Noted.Major Areas Inspected:Plans,Procedures & Reviews,Repts of Safeguards Events & Physical Protection of SNM of Moderate Strategic Significance ML20155G2521988-06-0808 June 1988 Exam Rept 50-150/OL-88-01 on 880503-04.Exam Results: Both Candidates Passed Exams IR 05000150/19870041987-11-19019 November 1987 Insp Rept 50-150/87-04 on 871102-05.No Violations Noted. Major Areas Inspected:Records,Logs,Organization,Review & Audit Functions,Requalification Training,Procedures, Surveillance & Maint,Emergency Planning & Deviations ML20236G1071987-10-22022 October 1987 Exam Rept 50-150/OLS-87-01 on 871007-08.Exam Results: Two Reactor Operator Candidates Passed IR 05000150/19870021987-02-18018 February 1987 Partially Withheld Insp Repts 50-150/87-02,70-0801/87-01 & 70-3005/87-01 on 870202-04 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Nuclear Matl Control & Accountability ML20133M6831985-09-18018 September 1985 Notice of Deviation from Insp on 850826-28 ML20133M6761985-09-18018 September 1985 Notice of Violation from Insp on 850826-28 IR 05000150/19850011985-09-13013 September 1985 Insp Rept 50-150/85-01 on 850826-28.Violation & Deviation Noted:Failure to Calibr Radiation Instruments at Required Frequency & Failure to Follow Procedure IM-05, Use of RY-4 Jumper, Respectively ML20011A4361981-09-25025 September 1981 Notice of Deviation from Insp on 810817-21 IR 05000150/19810011981-09-21021 September 1981 IE Insp Rept 50-150/81-01 on 810817-21.No Noncompliance Noted.Major Areas Inspected:Records,Logs & Organization, Review & Audit Functions,Requalification Training, Surveillance & Maint IR 05000150/19800031980-10-12012 October 1980 IE Insp Rept 50-150/80-03 on 800930.No Noncompliance Noted. Major Areas Inspected:Emergency Planning,Including Examination of Coordination W/Support Agencies,Emergency Equipment & Training & Drills IR 05000150/19800041980-10-10010 October 1980 IE Insp Rept 50-150/80-04 on 800930.No Noncompliance Noted. Major Areas Inspected:Approved Security Plan & Implementation Re Protection of SNM & Security Organization. Details Withheld (Ref 10CFR2.790) IR 05000150/19800021980-05-0707 May 1980 IE Insp Rept 50-150/80-02 on 800416-17.No Noncompliance Noted.Major Areas Inspected:Logs & Records,Reactor Surveillance,Requalification Training & Reviews & Audits IR 05000150/19800011980-02-28028 February 1980 IE Insp Rept 50-150/80-01 on 800206-07.No Noncompliance Noted.Major Areas Inspected:Radwaste Mgt & Radiation Protection Programs IR 05000150/19790021979-02-16016 February 1979 IE Insp Rept 50-150/79-02 on 790205-07.No Noncompliance Noted.Major Areas Inspected:Licensee Organization,Logs, Records,Reactor Surveillance,Requalification Training, Review,Audit & Experiments IR 05000150/19790011979-01-29029 January 1979 IE Insp Rept 50-150/79-01 on 790109-10.No Noncompliance Noted.Major Areas Inspected:Radwaste Mgt Program Including Organization,Audits,Training,Procedures, & Exposure Control 1999-03-04 |
Inspection Report - Ohio State University - 1980004 | |
---|---|
Assessments
|
Text
,,
--_ --
i T
.
Q'
-
c l
U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-150/80-04 Docket No. 50-150 License No. R-75 Safeguards Group V Licensee: Ohio State University 161 Hitchcock Hall 2070 Neal Avenue Co?umbus, OH 43210 Facility Name: Nuclear Reactor Laboratory Inspection At: NRL Building, 1298 Kinnear Road, Columbus, OH Inspection Conducted: September 30, Ic80 Date of Last Physical Security Inspection: May 4 and 5, 1978 Type of Inspection:
Unannounced, Routine Inspectors:
k-22q tchu/PC J.'Kniceley
Date Physical Security Specialist-2 10 ib ID Approved By:
~
.
-
. A. Hind, Chief '[
Datd'
Safeguards Branch Inspection Summary Areas Inspccted:
Routine, unannounced inspection of the approved security plan and its implementation relative to the protection of SNM; security organization; access control; alarm systems; keys, locks and hardware; communications; surveillance; procedures; security program review; and protection against radiological sabotage.
The inspection involved eight inspection-hours onsite by one NRC inspector and was begun during regular hours.
Results: The licensee was found to be in compliance with NRC requirements in all eleven areas examined during the inspection. All previous items of security noncompliance are closed.
(Details Part 2.790(d) Information)